Loading...
HomeMy WebLinkAboutApplication- PermitJob Address Nature of Work Use of Building Owner No. 6964 GARFIELD COUNTY BUILDING, SANITATION, and PLANNING DEPARTMENT 109 8th, Street, Suite 303 Glenwood Springs, CO 81601(970) 945-8212 7z 5 g ihdv. izfwd. . CD,ikpoi Building Permit °, Contractor 'rask oto ief mount of Permit$ S50.4 Date �l— 5 t 5 1 (;\0•A • 31.q t, .1 pamt dee. 24 2.2-5 � . � Cle 4 GARFIELD COUNTY BUILDING PERMIT APPLICATION GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO TELEPHONE: (970) 945-8212 INSPECTION LINE: (970) 945-9159 Applicant to complete numbered spaces only. PERMIT NO. PARCEL/SCHEDULE NO. JOB ADDRESS: 1 2 3 4 5 6 7 LOT NO. s) BLOCK NO. OWNER 61 O/1./ / &Yea 1.4 CONTRACTOR a.RC>ametet a a. () SQ. FT. OFBUILDINU USE OF BUILDING DERCRIDE WORK: R 9 10 CLASH OF WORK CL s- j 7 C. 1 SUBDTVISION7EXE51IION 1 %,z/ � ADDRFSR 7/$ g y al�s,a, S7G0 / ADDRESS ADDRESS SQ, Fr. OF LOT 30,195 s'9. '+ Ad I7c�: die .S'72) r7e _Cie" OADDmON D.4LTERA'ITO7 PH: PR: LIC. NO: LIC NO: NO. OF FLOORS °MOVE REMOVE G ARAUE RWERE aDOURLE CARPORT: SRINOLE ❑DOUBLE ❑ DRIVEWAY PERMIT oON RITE SELVAGE DIAPOSAL(SEP!C) "es, /vg Y VALUATION OF WORK::'- ` co SPECIAL CONDITIONS: NOTICE A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED BY THE STATE OF COLORADO, THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN ISO DAYS, OR IF CONSTRUCTION OR WORK I5 SUSPENDED OR ABANDONED FOR A PERIOD OF 110 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO DE TRUE AND CORRECT, ALL PROVISIONS OF LAWS GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERM DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LA REGULATTNc J CONSTRUCTION OR THE PERFORMANCE OF CONSTRUN. / Dale Ile LIZ SigoaNte of Ovener, .. tractor or authorized Igen[ and , ... , , notice above. ADSTIYALUATTON:I 13./ / � ` ` ~ (� O IRf PLAN CHECK FEE• J/ i 74 7 J I ?7-o(e , e e oST1 PLAN PERMIT FEE: /f r TOTAL FEE: DATE PERMIT ISSUED: OCC: GROUP: CONST: TYPE: Building Dept. AppmvalIDate Dept Ap , Da ZONING: VIAND. HOME: SETBACKS: ISDS NO. Sc FEE: A/ AGR .EME T PERMISSION IS HEREBY GRANTED TO TIIE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDINGDEPARTMENT. IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.21.201 CRS AS AMENDED_ TITE SI nGNER FURTHER AGREES THAT IF TIDE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOB). THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHAIL., NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQI,TIRING THE. CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN 1N VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. TLE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. GaAbtm•no3 I HEREBY ACIOTOWLEDOE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL) 1L3'2.q 10/e/g7 e-et4A ✓�'-e- cPA � 66.E The following items are required by Garfield County for a final inspection: 1. A final EIectrical Inspection from the Colorado State Electrical Inspector. 2. A permanent address assigned by the Garfield County Building Department posted where it is readily visible from an access road. 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing. 4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running water, all floors and walls finished and a privacy door. 5. All steps inside or outside over three (3) steps must have handrails. All balconies or decks over 30" high mush have guardrails constructed to meet all 1994 UBC requirements. 6. Outside grading done to where water will detour away from the building. 7 Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # Signature Date c: /cbw/final.wpd pOltaeri_77J 72 c ? „°ajoU •oa GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following check list prior to and during design. Applicants are required to indicate appropriately and to submit the completed check list at time of application for a permit. 1 11. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade c ntours? Yes 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase H EPA certification? Yes No 13 , Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No 14. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes No t/ 15. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No ti 17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No ✓ 18. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes ,% No 19. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? If you do not have written permission from the association, do you understand that the plan check fee will not be refunded should the architectural committee deny or reject your building plans? Yes / No 3 4- 29.. Are you aware that the person signing thePermitApplication, whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor", or otherwise, is the party responsible for the project complying with the Uniform Building Code? Yes n7 No 30. if you are accessing a county road and do not have an existing driveway you will need to acquire a driveway permit from Garfield County Road and Bridge. Their phone number is 945-6111. You will need to show proof prior to the issuance of the building permit. I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. ignature Phone: fid" -D71, (days); Project Name: Project Address: Notes: date 71" 91V--0/6IY (evenings) scY60/ If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minim= compliance with the adopted codes, the application may be placed behind more recent applications for budding permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. Per App 02.95 Effective August 15, 1995 V0 Y' t4 L/ � � - () IV▪ L co • 6 upo c°" .k Co` f) � . LD 1C)t-i • LOT, 1 • 802 4r fV)C�S /J"i4 3'E pole..Ae-d LO �- .3p995�.,FT,+ f' y,,« ' . , sok i' :#. f '. %; f i1.. -r >� Y-