Loading...
HomeMy WebLinkAboutApplication- PermitJob Address GARFIELD COUNTY BUILDING, SANITATION, and PLANNING DEPARTMENT 109 8th, Street, Suite 303 Glenwood Springs, CO 81601(970) 945-8212 fl Ler Nature of Work Building Permit Use of Building Owner ,D,).14-1 Contractor '.C. n No. 6954 1 itoed2ke,(b. rQ<�,c j v L. Amount of Permit$ � . (03 Date 2-7 -,S/ Clerk GARFIELD COUNTY BUILDING PERMIT APPLICATION TE1..,EPIIONE: (970) 945-8212 Applicant to complete numbered spaces only. GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO INSPECTION LINE: (970) 945-9159 PERMIT NO. PARCEL/SCHEDULE NO. ros ADDRESS: 3 % 2-6 A 1112 2 Ff1? 'r✓0) ' .=45 1- (i% , ,07 W., v-7 -AL 1 LOTNO.� BLOCK NO. -Cf SUBDIVISION/EXEMPTION iy ...C if?' / !..) cni7F- f17/r `ice .s-aP f ADD:O 1 3 35-0 /deb? — 27 WPM 3 . J CONTRACTOR J �J � ffV %L'� ADDRESS ,,¢-yy7 ,}..�� '.Sp/ f & 4 fe�� YH: LIC. NO: 4 anoaLa9 PH L[CNO: A.CHIIECDENGNEER 0 g/dc2 5 SQ. FI: OF BUII.I�Qdd/ff% SQ. Ff. OF LOT J v/ _ _' C F�SCEQ'2; f NO. FLOORS 6 USE OF BUILDING lnieR. V. fa;Sr 7W,c-,''.A..•.4!: •�.'..T, ., 1 `�.. 0 sf f' d,d r13 -Yr) OF9CB®6 WORK=/1167h) th 57 c O 8 CLASS OF wring: ,\ksEW oADDTnON oALTERATION MIME oREMOVE (/ 4 9 �_ GARAGE oSpVGLE oDOUBLE. oeINOLE oOOURI2 10 o DRIVEWAYPFEAUT oON SITE SEWAGE DISPOSAL (SEPTIC) osrFF PLAN ?/ / VAWATTON OF WORE. a S j'-0 ,, 0 0 AMSTED D VALUATION:S / 5 , . f V ] 0 11 �� •� r [l L✓ SPEc7AL CONDmoNB: NOTICE A SEPARATE, ELECTRICAL PERMIT IS REQUIRED AND MUST SE ISSUED COLORADO. THIS PERMIT BECOMES NULL AND VOID IF WORK OR AUTHORIZED IS NOT COMMENCED WITHIN ISO DAYS, OR. IF WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF ISO AFTER WORK 1S COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY LOCAL LAW REGULATING CONSTRUCTION OR THE CONSTRUCTION. 'y1% U (.�f//�� i?1 " �-024-1(-- Data BY THE STATE OF CONSTRUCTION CONSTRUCTION OR DAYS AT ANY TIME APPLICATION AND OF LAWS SPECIFIED PRESUME TO GIVE OTHER STATE OR PERFORMANCE OF 9 — — 9.5' .,.. notice above. PLAN C1 ECKFEE: PERMIT FEE: TOTAL FEE: 4 DATE PERMIT ISSUED: JIJ J {-% / f/ ~ YJ V /'J OCC: GROUP: CONST: TYPE: %/ / f % "f J + �I v ZONING SETBACKS. Signature of Owner, Coninctol or authorized agent . .ad and , , . / : , : MANU. HOME: Z ISDS NO. & FEE: / 5-6 / ()! Building Dept Approval/Date Nos/I PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDINGDEPARTMENT. AGREEMENT IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BOLDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING TIM CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS IURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD DD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FDR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Gar onn.Go3 9/040/c( Ch02 i I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL) �d /f 54.5 The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector. 2. A permanent address assigned by the Garfield County Building Department posted where it is readily visible from an access road. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold miming water, kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing. 4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running water, all floors and walls finished and a privacy door. 5. All steps inside or outside over three (3) steps must have handrails. All balconies or decks over 30" high mush have guardrails constructed to meet all 1994 UBC requirements. 6. Outside grading done to where water will detour away from the building. 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ***"CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # Signature 04-;114/9 4-12ienf 7y c:/cbw/finaI.wpd Date 3 2-a 017d4y, °a .29'910148',.°o S bS P4 45.4. 40 6 14. s' 4 .)'6 1d►oo ifi6 I /21 6 4'/i, 9i( s'}---° -f goo. b-�.. ma, 3.4 B'.ae GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT PROCEDURE REQUIRED FOR COMPLIANCE WITH THE GARFIELD COUNTY SEWAGE DISPOSAL REGULATIONS: Step I: Application A. Obtain a standard "Individual Sewage Disposal System" application from the Building and Sanitation Department, 109 8th Street, Suite 303, Glenwood Springs, Colorado 81601, 970-945-8212 or 625- 5571 B. Return completed application, map to property, and diagram of site to the Building and Sanitation Department (Pages land 3) and building plans. INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMITS WILL NOT BE ISSUED WITHOUT A BUILDING PERMIT. C. Obtain a receipt for the applicable fee. Make check or money order payable to "Garfield County Treasurer". FEES ARE NOT REFUNDABLE. D. Your Individual Sewage Disposal Permit will be issued provided no prohibitive problems are encountered. Step II. Percolation Tests - SEE DETAILED INSTRUCTIONS ON PAGE 6 *A. Prepare three (3) percolation holes 4 feet deep, 8 to 12 inches in diameter, and 20 feet apart in the area of the proposed leach field area (Instructions for post hole or back hoe holes are on page 4). B. Fill percolation holes with water once for the required eight (8) hour soaking period. C. Request percolation test by Sanitarian. (To avoid construction delay, we suggest arrangements for percolation test be made at least 24 hours prior to the end of the soaking period). Please have at least five (5) gallons of water for each hole available at the site for the percolation test. *If a dry well (seepage pit) is proposed, consult with the Environmental Health Department for percolation test procedures. ! ! !IMPORTANT!!! Please be advised that dine Sanitarian's initial field visit to your property .reveals any unusual difficulties such as high water table, excessive percolation rates, bedrock, etc., the services of a Colorado Registered Professional Engineer and/or Board of Health approval will be required prior to the issuance of your Individual Sewage Disposal System permit. Step III. Final Inspection A. When all components are in place, connected and ready to cover, request a final inspection by the Sanitarian. 13. DO NOT backfill any part of the system prior to the inspection.. C. The initial fee covers the perc test and one inspection before cover up. Any additional percolation tests will be charged at 8100.00 each and additional inspections will be charged at 830.00 each. D. Upon final approval, carefully cover the entire system. Please feel free to contact the Building and Sanitation Department if questions regarding your sewage treatment system arise. (FOR APPLICANT'S INFORMATION) 1 PERCOLATION TESTS The successful operation of your septic system depends on the rate the soil in which your leach filed will be installed will Accept water. THIS IS CRITICAL. The rate of absorption is called the percolation rate and it determines the size of the leach field needed for a particular flow of sewage and in some cases even determines the feasibility of the installation of a septic tank and leach field system. AN EIGHT (8) FOOT PROFILE HOLE IN THE LEACH FILED AREA IS REQUIRED IN THE STATE OF COLORADO TO DETERMINE THE PROXIMITY OF GROUND WATER AND BEDROCK In some cases, the profile hole may be waived but only by specific approval of the Environmental Health Department. PERCOLATION TEST MUST BE DONE AT THE GROUND DEPTH WHERE ABSORPTION WILL TAKE PLACE. STANDARD SEEPAGE BEDS (LEACH FIELDS) ARE INSTALLED THREE FEET DEEP, SO THE PERCOLATION HOLES ARE DUG FOUR FEET DEEP, AT LEAST 20 FEET APART, IN A TRIANGLE SHAPE. THE PERCOLATION TEST IS DONE IN THE BOTTOM ONE (1) FOOT OF THE HOLE: 1IL[ Th t.t)fi-r HACKJIOE Li_OLE /' txJr9�E 21 `//�, L A post hole digger, auger or back hoe can be used to dig the percolation test holes. If a back hoe is used, dig the back hoe hole three (3) feet deep and put a test hole one (1) foot deep and 8 to 12 inches in diameter in the bottom. Installation of absorption areas (i.e. drywells) deeper than three (3) feet require the permission of the Environmental Health Department. Saturation with water will affect the percolation rate, and since the system will be expected to operate when the soil is saturated with water, THE HOLES MUST BE FILLED WITH WATER AT LEAST EIGHT (8) HOURS BEFORE TH TEST AND ALLOWED TO STAND. More water will be needed to perform the percolation test, so AT LEAST FIVE (5) GALLONS OF WATER PER HOLE SHOULD BE ON HAND WHEN THE TEST IS PERFORMED. (FOR APPLICANTS INFORMATION) 4 PERCOLATION TESTS FOR DRY WELLS (SEEPAGE PITS) ARE PERFORMED AT TFIE LEVEL OF THE BOTTOM OF TI -IE PIT (USUALLY 10 FEET). (Cko untc( L [_ Pere°Lt. ,a lcsf JO( S4 Qin / 1 If you call for a percolation test or inspection and for some reason are not ready when the time comes, please call us before 5:00 p.m. at 945-8212 or 625-5571 to cancel the appointment. THANK YOU FOR YOUR COOPERATION. (FOR APPLICANT'S INFORMATION) 5 RECOMMENDED MINIMUM REQUIREMENTS FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEMS Before construction is started, the Inspector must be contacted for approval and detailed information concerning the proposed disposal system. Higher standards than those which follow may be required in individual cases to assure attainment of the objective- Those objectives are to located, construct and maintain individual, sewage disposal systems m such a manner that existing or contemplated water supplies will not become contaminated and so that sewage will not overflow the ground surface and result in a nuisance or health hazard. LIQUID CAPACITY OF TANK (GALLONS) (Provides for use of garbage grinder, automatic clothes washers and other water using household appliances). Recommended Minimum Number of Bedrooms Tank Capacity 2 or less 3 or less 4 For each additional bedroom. add 750 gallons 1,000 gallons 1,250 gallons 250 gallons MINIMUM LEACHING AREA OF DISPOSAL FIELD ABSORPTION AREA REQUIREMENTS FOR INDIVIDUAL RESIDENCES Percolation Rate (time required for water to fall one inch, in minutes) *I or less *7 *3 *4 *5 Required Absorption Area, in sq. ft. per bedroom (b) standard trench (c) seepage beds & (d) seepage pits Percolation Rate (time required for water to fall one inch, in minutes) 10 15 30(e).. 45(e).. 60 (e), (f) *(See Below) *Percolation rates faster than five (5) minutes per inch or slower than sixty (60) minutes per inch require engineered system and/or Board of Health approval. Required Absorption Area, in sq. II. per bedroom (b) standard trench (c) seepage beds & (d) seepage pits 228 279 395 483 558 (a) (b) It is desirable to provide sufficient land area for entire new absorption system if needed in future. In every case, sufficient land area should be provided for the number of bedrooms (minimum of 2) that can. reasonably be anticipated, including the unfinished space available .for conversion as additional bedrooms. (FOR APPLICANTS INFORMATION) 6 (c4) Absorption area is figured as trench -bottom area and includes a statistical allowance for vertical side wall area. Absorption area for seepage pits is figured as effective side wall area beneath the inlet Unsuitable for seepage pits if over thirty. Unsuitable for absorption system if over sixty. Dwelling on less than two acres, areas of high water tables, or areas with a percolation test rate faster than 1" in 5 minutes must have alternative sewage facilities, i.e., central collection, holding tanks, individual treatment, etc. EXCEPTION: Absorption areas may be allowed with percolation rates faster than one (1) inch in five (5) minutes provided the soil is a sanely texture and no water table problems are encountered. 1. Maximum length of drainage line: Minimum width of drainage trench: Minimum spacing between trenches or pipes: 4. Maximurn grade of drainage lines: 5. Minimum depth rock under drain PVC: 6. Minimum depth of cover- over distribution lines: 7. Maximum depth of cover over distribution lines: 8. Minimum grade of house sewer: 9. Minimum distance of sewage disposal system from dwelling: 10. Minimum distance of leaching area to a well: 1 1. Minimum distance of septic tank to a well: 12. Minimum distance ofleaching area to a stream or water course: 13. Minimum distance from septic tank and disposal field to property lines: 14. Minimum sewer pipe and distribution pipe: 1 00 linear feet 18 inches 6 feet As leve] as possible 6" under PVC, 2" over PVC 12 inches Variable 1/8 to 1/4" per linear ft. 10 feet 100 feet 50 feet 50 feet 25 feet for drywell 10 feet for leach field 4 inch diameter Septic construction should be of concrete, concrete block or of a material that will resist deterioration and which can be made reasonable watertight. Acceptable drain field pipe materials include plastic, terra cotta or concrete. if the house sewerline is longer than 10 feet between house and septic tank, a clean-out Y should be installed as near as practical to the house. Septic tanks should be inspected once a year and cleaned when necessary. Cleaning is recommended when space between the scum accumulation and sludge residue on the tank bottom is less than eighteen (.18) inches. The Department recommends pumping a septic tank once every four (4) years when a yearly inspection by the owner is not practical. 7 '. C I (_ tail deter- ') rr'0111 e1'c r:esr; .(shits TYPE OF SYSTEM TO BE CONSTRUCTED (1 1/2" to 2 1/2" Clean Gravel Required Unless Otherwise Approved) 11)P 1" per fora Led /1]Ipe 1" solid pipe rl-011 Lank b 0 (133 c7 G] ca -C) CO,cr4c� cU C - ' C1 c cz .. 0 c c C c7 C) r.] C1 to ca c- o c, r� io Ln. c Q a u C] c C1 L) n S7 n f-, c, ,,'1 ) �` . O 0 c- 0 c:_1). c_3 t1-1, I. 1,Cn �-. l'a l . � .�-] 0 ca 0 a Q CILU 3, 1 6' 1 .l, lckf111 2`I l' SIDE V 11_Id 2mx)<)(\/xxxxx)( 00_21-;2-ost_51,s,„s, [J c,) ca 0 { [� tip Ccry� �c,0r�en c� 7'D " c) cU o r] cIJ ) c) ,, Seepage fled Ilackf ill 1u - -- or s Lr•aw ?1'_ 1 �iv�l aver ,l p I pe ---1n qraYei 6" Gravel under Alpo TOP n 0 0h;�a � /__A CI D iU�°o2ton})0oaon oto,eaQ opO 60 660Oo0o0°00.."aar) 0 (t 0 U 000V 1-)0 `1(] QQ0 f)o0 old u• Od a� fr] bbdd 600011 .ar�r'o Boa o q o c70 ° ]14:.: � *tip 4 '' hay 0 r 0, °C) C rt,° nq''44+#:". straw over rack f1-.s._n 3 0 d 1 I n as (1 t1 Gravel '1" solid pipe ex- tending into drywell 1' k ''Site deLerm1ned From SIDE VIEl! r perc test results Backfill -----II" solid pipe to tan' 4" hay or straw (FOR APPLICANT'S INFORMATION) 8 Gravel Concrete ringt or cinder hl ock,s 1' of gravel in �-�UntLont Drywell GARFIELD COUNTY BUILDING AND PLANNING MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION MANUFACTURED HOMES ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information he provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling construction under the Uniform Building Code. This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following check list prior to and during design. Applicants are required to indicate appropriately and to submit completed check list at time of application for a permit: I. Is a site plan included that indicates the distance of the proposed building or addition to property lines, other buildings, set back easements and utility easements? Yes _.1,.i__ No cys Not necessary for this project (2) 2. Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties) , streams or water courses? Yes ✓ No ,,, Not necessary for this project (2) 3. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes V No cis Not necessary for this project c2s 4. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes _V__ No w Not necessary for this project (2) 5. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes / No ro Not necessary for this project (2) 6. Do the plans indicate the size an location of ventilation openings for the attic, roof joist spaces and soffits? Yes No rn Not necessary for this project (2) 7. Do the plans include design loads as required under the Uniform Building code for roof snow loads, ( a minimum of 40 pounds per square foot in Garfield County) floor loads and wind loads? Yes _.1,,l_ No cls Not necessary for this project cls S. Does the plan include a building section drawing indicating foundation, wall, floor and roof construction? Yes i. No of Not necessary for this project (2) 9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes No _ii) Not necessary for this project (2) 2 10. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes _1/_ No (l, Not necessary for this project (2) 11. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the cave down to existing grade contours? Yes No 0, Not necessary for this project (2) 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes �' No 0, Not necessary for this project (2) 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes ✓ No (l, Not necessary for this project (2) 14. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes No 0, Not necessary for this project (2) IS. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No u, Not necessary for this project (2) 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No 0, Not necessary for this project (2) 17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No 0, Not necessary for this project (2) 18 Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from that association, if required by that association, prior to submitting an application for a building permit? Yes No („ Not necessary for this project 3 19. Have two (2) complete sets of constructions drawings been submitted with the application? Yes __i__ No n> Not necessary for this project (2) 20. Is this an application for the placement of a manufactured home? Yes No __L%_ If yes, have you specified the size of the unit (min. 20ft x 20ft); live roof load (min.40#); wind design (min. wind speed of 80 mph & 15 lb. wind load); foundation design; method of anchoring? Yes No c„ Not necessary for this project (2) 21. l -lave you designed or had this plan designed while considering building and other construction code requirements? Yes ,� No (31 22. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield Building Department? Yes 1/ No 0) 23. Do you understand that approval for design and/or construction changes are required prior to the application of these changes? Yes �/ _ No 0) 24. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "School impact" or "Septic system " fees required, at the time you pick up your building permit? Yes No (3) 25. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection_ prior to receiving a Certificate of Occupancy and occupancy of the building? Yes _V__ No 0) 26. Are you aware that the person signing the Permit Application whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the 'application is the party responsible for the project complying with the Uniform Codes". Yes ), No c}r (CONTINUED ON NEXT PAGE) 4 I hereby acknowledge that I have read, understand and answered these questions accurately to the best of my ability. { signature — date r 7� Phone: bi3 -0 P.-7 (days); 6/3— 0$7)-7 (evenings) Project Narne: S.�%v ,�01) C� Project Address: 3 200 /UeZ Fi2e-YUTittC if i /WV G S Notes: (1) If you have answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior Lo beginning the plan review process. Delays in issuing the permit are to be expected_ Work may not proceed withour the issuance of the permit. (2) 1f you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary Lo review the application and plans to determine minimum compliance with the adopted codes, please expect the following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided arid the application rotates again to first position for review. B. Delay in issuance of the permit. Delay in proceeding with construction. (3) If you answered "No" lo this question the circumstances described in the question could result in a "Stop Work Order" being issued or a `Certificate of Occupancy" not being issued. PerApp02.95 Effective August 15, 1995 5 •L SL7 LL 2 6c C�Checklist pull permit 1 copy assessor's pull plans, list CO# and date (assessor's box) 1 copy w/permit final in computer List on CO sheet copy building card office card filled out type CO 1 ,j highlight commercial /1 plans Don's signature Al 2. copies INSPNOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GARFIELD COUNTY, COLORADO �yy Date Issued�Ilrt... "° ned Area Permit No..1�1!'9 AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IEDIATELY:BEOME NULL AND VOID. 51r Use Addrelsaiiig113erlpt Owne Setbacks Front A fa If Co Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. INSPECTION RECORD Footing I 1 - -_ c.ir A, Irl Ca l (6- I�'', c, '/ ir--, 7—y-r4i Foundation 1 l ` c----_ c4 9 A ,„,t, +e:*; • ' Underground Plumbing Insulation 6. p. 94 HILA a Rough Plumbing (y -, _ro�' }`"`n'� Drywall 1,- _ T`/ a Chimney & Vent fi r , I Electric Final (by State Inspector) a- - c.__ Gas Piping GI. ` ) _" of1- Fin , rn /3�I91E � Electric Rough (By State Inspector)5; ,�..—!eptic Final]/ --o2 3 , .e1—. ,..57� 0,,m__ Framing `fi .�-7, q 6 4 A_Af (To include Roof in place lin4 Widows and Doors installed). Notes: ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 945-9159 109 8th Street County Courthouse Glenwood Springs, Colorado. APPROVED DO NOT DESTROY THIS CARD Dat y IF PLACED WITH CLEAR PLASTIC