HomeMy WebLinkAboutApplication- PermitJob Address
GARFIELD COUNTY
BUILDING, SANITATION,
and PLANNING DEPARTMENT
109 8th, Street, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
fl Ler
Nature of Work Building Permit
Use of Building
Owner ,D,).14-1
Contractor
'.C. n
No. 6954
1 itoed2ke,(b.
rQ<�,c j v L.
Amount of Permit$ � . (03 Date
2-7 -,S/
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
TE1..,EPIIONE: (970) 945-8212
Applicant to complete numbered spaces only.
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
INSPECTION LINE: (970) 945-9159
PERMIT NO. PARCEL/SCHEDULE NO.
ros ADDRESS: 3 % 2-6 A 1112 2 Ff1? 'r✓0) ' .=45 1- (i% , ,07 W., v-7
-AL
1
LOTNO.� BLOCK NO.
-Cf
SUBDIVISION/EXEMPTION
iy
...C if?' / !..)
cni7F- f17/r `ice .s-aP f
ADD:O 1 3 35-0 /deb?
— 27
WPM
3
. J
CONTRACTOR J �J
� ffV %L'�
ADDRESS ,,¢-yy7 ,}..��
'.Sp/ f & 4 fe��
YH:
LIC. NO:
4
anoaLa9
PH
L[CNO:
A.CHIIECDENGNEER
0 g/dc2
5
SQ. FI: OF BUII.I�Qdd/ff%
SQ. Ff. OF LOT J v/ _ _'
C
F�SCEQ'2;
f
NO. FLOORS
6
USE OF BUILDING
lnieR. V. fa;Sr 7W,c-,''.A..•.4!:
•�.'..T, ., 1
`�.. 0 sf f' d,d
r13 -Yr)
OF9CB®6 WORK=/1167h) th 57 c
O
8
CLASS OF wring: ,\ksEW oADDTnON oALTERATION MIME oREMOVE
(/ 4
9
�_
GARAGE oSpVGLE oDOUBLE. oeINOLE oOOURI2
10
o DRIVEWAYPFEAUT oON SITE SEWAGE DISPOSAL (SEPTIC) osrFF PLAN
?/ /
VAWATTON OF WORE. a S j'-0 ,, 0 0 AMSTED D VALUATION:S / 5 , . f V ] 0
11 �� •� r [l L✓
SPEc7AL CONDmoNB:
NOTICE
A SEPARATE, ELECTRICAL PERMIT IS REQUIRED AND MUST SE ISSUED
COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR
AUTHORIZED IS NOT COMMENCED WITHIN ISO DAYS, OR. IF
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF ISO
AFTER WORK 1S COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY
LOCAL LAW REGULATING CONSTRUCTION OR THE
CONSTRUCTION.
'y1% U
(.�f//�� i?1 " �-024-1(--
Data
BY THE STATE OF
CONSTRUCTION
CONSTRUCTION OR
DAYS AT ANY TIME
APPLICATION AND
OF LAWS
SPECIFIED
PRESUME TO GIVE
OTHER STATE OR
PERFORMANCE OF
9 — — 9.5'
.,.. notice above.
PLAN C1 ECKFEE:
PERMIT FEE:
TOTAL FEE: 4 DATE PERMIT ISSUED:
JIJ J {-% /
f/ ~ YJ V
/'J
OCC: GROUP: CONST: TYPE:
%/ / f %
"f J + �I v
ZONING
SETBACKS.
Signature of Owner, Coninctol or authorized agent . .ad and , , . / : , :
MANU. HOME:
Z
ISDS NO. & FEE:
/ 5-6 / ()!
Building Dept Approval/Date
Nos/I
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDINGDEPARTMENT.
AGREEMENT
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BOLDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING TIM
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS IURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILITIES BY GARFIELD DD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FDR THESE ITEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT
OF THE OWNERS INTEREST.
Gar onn.Go3
9/040/c(
Ch02
i
I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL) �d
/f
54.5
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector.
2. A permanent address assigned by the Garfield County Building Department posted where
it is readily visible from an access road.
A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold miming water, kitchen
floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing.
4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running
water, all floors and walls finished and a privacy door.
5. All steps inside or outside over three (3) steps must have handrails. All balconies or decks
over 30" high mush have guardrails constructed to meet all 1994 UBC requirements.
6. Outside grading done to where water will detour away from the building.
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration
of extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be
issued until all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
***"CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit #
Signature
04-;114/9 4-12ienf 7y
c:/cbw/finaI.wpd
Date
3 2-a
017d4y, °a
.29'910148',.°o
S bS
P4 45.4. 40 6
14. s' 4 .)'6
1d►oo
ifi6 I /21 6
4'/i, 9i( s'}---°
-f
goo. b-�..
ma, 3.4 B'.ae
GARFIELD COUNTY
BUILDING AND SANITATION DEPARTMENT
PROCEDURE REQUIRED FOR COMPLIANCE WITH THE GARFIELD COUNTY SEWAGE DISPOSAL
REGULATIONS:
Step I: Application
A. Obtain a standard "Individual Sewage Disposal System" application from the Building and Sanitation
Department, 109 8th Street, Suite 303, Glenwood Springs, Colorado 81601, 970-945-8212 or 625-
5571
B. Return completed application, map to property, and diagram of site to the Building and Sanitation
Department (Pages land 3) and building plans. INDIVIDUAL SEWAGE DISPOSAL SYSTEM
PERMITS WILL NOT BE ISSUED WITHOUT A BUILDING PERMIT.
C. Obtain a receipt for the applicable fee. Make check or money order payable to "Garfield County
Treasurer". FEES ARE NOT REFUNDABLE.
D. Your Individual Sewage Disposal Permit will be issued provided no prohibitive problems are
encountered.
Step II. Percolation Tests - SEE DETAILED INSTRUCTIONS ON PAGE 6
*A. Prepare three (3) percolation holes 4 feet deep, 8 to 12 inches in diameter, and 20 feet apart in the
area of the proposed leach field area (Instructions for post hole or back hoe holes are on page 4).
B. Fill percolation holes with water once for the required eight (8) hour soaking period.
C. Request percolation test by Sanitarian. (To avoid construction delay, we suggest arrangements for
percolation test be made at least 24 hours prior to the end of the soaking period). Please have at
least five (5) gallons of water for each hole available at the site for the percolation test.
*If a dry well (seepage pit) is proposed, consult with the Environmental Health Department for percolation
test procedures.
! ! !IMPORTANT!!! Please be advised that dine Sanitarian's initial field visit to your property .reveals any unusual
difficulties such as high water table, excessive percolation rates, bedrock, etc., the services of
a Colorado Registered Professional Engineer and/or Board of Health approval will be
required prior to the issuance of your Individual Sewage Disposal System permit.
Step III. Final Inspection
A. When all components are in place, connected and ready to cover, request a final inspection by the
Sanitarian.
13. DO NOT backfill any part of the system prior to the inspection..
C. The initial fee covers the perc test and one inspection before cover up. Any additional percolation
tests will be charged at 8100.00 each and additional inspections will be charged at 830.00 each.
D. Upon final approval, carefully cover the entire system.
Please feel free to contact the Building and Sanitation Department if questions regarding your sewage treatment
system arise.
(FOR APPLICANT'S INFORMATION)
1
PERCOLATION TESTS
The successful operation of your septic system depends on the rate the soil in which your leach filed will be installed
will Accept water. THIS IS CRITICAL. The rate of absorption is called the percolation rate and it determines the
size of the leach field needed for a particular flow of sewage and in some cases even determines the feasibility of the
installation of a septic tank and leach field system. AN EIGHT (8) FOOT PROFILE HOLE IN THE LEACH
FILED AREA IS REQUIRED IN THE STATE OF COLORADO TO DETERMINE THE PROXIMITY OF
GROUND WATER AND BEDROCK In some cases, the profile hole may be waived but only by specific approval
of the Environmental Health Department. PERCOLATION TEST MUST BE DONE AT THE GROUND DEPTH
WHERE ABSORPTION WILL TAKE PLACE. STANDARD SEEPAGE BEDS (LEACH FIELDS) ARE
INSTALLED THREE FEET DEEP, SO THE PERCOLATION HOLES ARE DUG FOUR FEET DEEP, AT
LEAST 20 FEET APART, IN A TRIANGLE SHAPE. THE PERCOLATION TEST IS DONE IN THE
BOTTOM ONE (1) FOOT OF THE HOLE:
1IL[
Th
t.t)fi-r
HACKJIOE Li_OLE
/'
txJr9�E 21
`//�, L
A post hole digger, auger or back hoe can be used to dig the percolation test holes. If a back hoe is used, dig the
back hoe hole three (3) feet deep and put a test hole one (1) foot deep and 8 to 12 inches in diameter in the bottom.
Installation of absorption areas (i.e. drywells) deeper than three (3) feet require the permission of the Environmental
Health Department.
Saturation with water will affect the percolation rate, and since the system will be expected to operate when the soil
is saturated with water, THE HOLES MUST BE FILLED WITH WATER AT LEAST EIGHT (8) HOURS
BEFORE TH TEST AND ALLOWED TO STAND. More water will be needed to perform the percolation test,
so AT LEAST FIVE (5) GALLONS OF WATER PER HOLE SHOULD BE ON HAND WHEN THE TEST IS
PERFORMED.
(FOR APPLICANTS INFORMATION)
4
PERCOLATION TESTS FOR DRY WELLS (SEEPAGE PITS) ARE PERFORMED AT TFIE LEVEL OF THE
BOTTOM OF TI -IE PIT (USUALLY 10 FEET).
(Cko untc( L [_
Pere°Lt. ,a lcsf JO( S4 Qin / 1
If you call for a percolation test or inspection and for some reason are not ready when the time comes, please call us
before 5:00 p.m. at 945-8212 or 625-5571 to cancel the appointment.
THANK YOU FOR YOUR COOPERATION.
(FOR APPLICANT'S INFORMATION)
5
RECOMMENDED MINIMUM REQUIREMENTS FOR
INDIVIDUAL SEWAGE DISPOSAL SYSTEMS
Before construction is started, the Inspector must be contacted for approval and detailed information concerning the
proposed disposal system. Higher standards than those which follow may be required in individual cases to assure
attainment of the objective- Those objectives are to located, construct and maintain individual, sewage disposal
systems m such a manner that existing or contemplated water supplies will not become contaminated and so that
sewage will not overflow the ground surface and result in a nuisance or health hazard.
LIQUID CAPACITY OF TANK (GALLONS)
(Provides for use of garbage grinder, automatic clothes washers and other water using household
appliances).
Recommended Minimum
Number of Bedrooms Tank Capacity
2 or less
3 or less
4
For each additional bedroom. add
750 gallons
1,000 gallons
1,250 gallons
250 gallons
MINIMUM LEACHING AREA OF DISPOSAL FIELD ABSORPTION AREA REQUIREMENTS FOR
INDIVIDUAL RESIDENCES
Percolation Rate
(time required for
water to fall one
inch, in minutes)
*I or less
*7
*3
*4
*5
Required Absorption
Area, in sq. ft.
per bedroom
(b) standard trench
(c) seepage beds &
(d) seepage pits
Percolation Rate
(time required for
water to fall one
inch, in minutes)
10
15
30(e)..
45(e)..
60 (e), (f)
*(See Below)
*Percolation rates faster than five (5) minutes per inch or slower than sixty (60) minutes per inch require engineered
system and/or Board of Health approval.
Required Absorption
Area, in sq. II.
per bedroom
(b) standard trench
(c) seepage beds &
(d) seepage pits
228
279
395
483
558
(a)
(b)
It is desirable to provide sufficient land area for entire new absorption system if needed in future.
In every case, sufficient land area should be provided for the number of bedrooms (minimum of 2) that can.
reasonably be anticipated, including the unfinished space available .for conversion as additional bedrooms.
(FOR APPLICANTS INFORMATION)
6
(c4) Absorption area is figured as trench -bottom area and includes a statistical allowance for vertical side wall
area.
Absorption area for seepage pits is figured as effective side wall area beneath the inlet
Unsuitable for seepage pits if over thirty.
Unsuitable for absorption system if over sixty.
Dwelling on less than two acres, areas of high water tables, or areas with a percolation test rate faster than 1" in 5
minutes must have alternative sewage facilities, i.e., central collection, holding tanks, individual treatment, etc.
EXCEPTION: Absorption areas may be allowed with percolation rates faster than one (1) inch in five (5) minutes
provided the soil is a sanely texture and no water table problems are encountered.
1. Maximum length of drainage line:
Minimum width of drainage trench:
Minimum spacing between trenches or pipes:
4. Maximurn grade of drainage lines:
5. Minimum depth rock under drain PVC:
6. Minimum depth of cover- over distribution lines:
7. Maximum depth of cover over distribution lines:
8. Minimum grade of house sewer:
9. Minimum distance of sewage disposal system
from dwelling:
10. Minimum distance of leaching area to a well:
1 1. Minimum distance of septic tank to a well:
12. Minimum distance ofleaching area to a stream
or water course:
13. Minimum distance from septic tank and disposal
field to property lines:
14. Minimum sewer pipe and distribution pipe:
1 00 linear feet
18 inches
6 feet
As leve] as possible
6" under PVC, 2" over PVC
12 inches
Variable
1/8 to 1/4" per linear ft.
10 feet
100 feet
50 feet
50 feet
25 feet for drywell
10 feet for leach field
4 inch diameter
Septic construction should be of concrete, concrete block or of a material that will resist deterioration and which
can be made reasonable watertight.
Acceptable drain field pipe materials include plastic, terra cotta or concrete. if the house sewerline is longer than 10
feet between house and septic tank, a clean-out Y should be installed as near as practical to the house.
Septic tanks should be inspected once a year and cleaned when necessary. Cleaning is recommended when space
between the scum accumulation and sludge residue on the tank bottom is less than eighteen (.18) inches.
The Department recommends pumping a septic tank once every four (4) years when a yearly inspection by the
owner is not practical.
7
'. C I (_ tail deter-
') rr'0111
e1'c r:esr;
.(shits
TYPE OF SYSTEM TO BE CONSTRUCTED
(1 1/2" to 2 1/2" Clean Gravel Required Unless Otherwise Approved)
11)P
1" per fora Led
/1]Ipe
1" solid pipe
rl-011 Lank
b 0 (133 c7 G] ca -C) CO,cr4c� cU C - ' C1
c cz .. 0 c c C c7 C) r.] C1 to ca c- o c,
r� io Ln. c Q a u C] c C1 L) n S7 n f-, c, ,,'1
) �` . O 0 c- 0 c:_1). c_3 t1-1, I. 1,Cn
�-. l'a l .
� .�-] 0 ca 0 a Q CILU
3, 1 6' 1 .l,
lckf111
2`I
l'
SIDE V 11_Id
2mx)<)(\/xxxxx)(
00_21-;2-ost_51,s,„s,
[J c,) ca 0
{ [� tip Ccry�
�c,0r�en
c�
7'D " c) cU o r] cIJ
) c) ,,
Seepage fled
Ilackf ill
1u - --
or s Lr•aw
?1'_ 1 �iv�l aver
,l p I pe ---1n
qraYei
6" Gravel
under Alpo
TOP
n 0
0h;�a �
/__A
CI
D
iU�°o2ton})0oaon oto,eaQ
opO 60
660Oo0o0°00.."aar)
0
(t 0 U
000V 1-)0 `1(] QQ0
f)o0 old u• Od
a� fr] bbdd
600011
.ar�r'o
Boa o q o c70 ° ]14:.:
� *tip 4 '' hay 0 r
0, °C) C rt,° nq''44+#:". straw over rack
f1-.s._n 3 0 d 1 I
n
as (1 t1
Gravel
'1" solid pipe ex-
tending into
drywell 1'
k
''Site deLerm1ned From
SIDE VIEl!
r
perc
test results
Backfill
-----II" solid pipe to tan'
4" hay or straw
(FOR APPLICANT'S INFORMATION)
8
Gravel
Concrete ringt or
cinder hl ock,s
1' of gravel in
�-�UntLont
Drywell
GARFIELD COUNTY BUILDING AND PLANNING
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
MANUFACTURED HOMES
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit
application and expedite the issuance of a permit it is important that
complete information he provided. Adequate and complete information will
prevent delays in the plan review process. Reviewing a plan and the
discovery that required information has not been provided by the applicant
may result in the delay of the permit issuance and in proceeding with
building construction. The owner or contractor may be required to provide
this information before the plan review may proceed. This causes delays
because other plans that are in line for review may be given attention before
the new information may be reviewed after it has been provided to the
Building Department.
Please review this document to determine if you have enough
information to design your project and provide adequate information to
facilitate a plan review. If you do not, it may be helpful to obtain a book
titled "Dwelling construction under the Uniform Building Code. This
book is available to you through this department at our cost. Also,
please consider using a design professional for assistance in your
design and a construction professional for construction of your project.
To provide for a more understandable plan in order to determine
compliance with the building, plumbing and mechanical codes, applicants
are requested to review the following check list prior to and during design.
Applicants are required to indicate appropriately and to submit
completed check list at time of application for a permit:
I. Is a site plan included that indicates the distance of the proposed
building or addition to property lines, other buildings, set back
easements and utility easements?
Yes _.1,.i__ No cys Not necessary for this project (2)
2. Does the site plan include the location of the I.S.D.S. (Individual
Sewage Disposal System) and the distances to property lines, wells (on
subject property and adjacent properties) , streams or water courses?
Yes ✓ No ,,, Not necessary for this project (2)
3. Does the site plan indicate the location and direction of the County or
private road accessing the property?
Yes V No cis Not necessary for this project c2s
4. Do the plans include a foundation plan indicating the size, location
and spacing of all reinforcing steel in accordance with the uniform
building code or per stamped engineered design?
Yes _V__ No w Not necessary for this project (2)
5. Do the plans indicate the location and size of ventilation openings for
under floor crawl spaces and the clearances required between wood
and earth?
Yes / No ro Not necessary for this project (2)
6. Do the plans indicate the size an location of ventilation openings for
the attic, roof joist spaces and soffits?
Yes No rn Not necessary for this project (2)
7. Do the plans include design loads as required under the Uniform
Building code for roof snow loads, ( a minimum of 40 pounds per
square foot in Garfield County) floor loads and wind loads?
Yes _.1,,l_ No cls Not necessary for this project cls
S. Does the plan include a building section drawing indicating
foundation, wall, floor and roof construction?
Yes i. No of Not necessary for this project (2)
9. Does the building section drawing include size and spacing of floor
joists, wall studs, ceiling joists, roof rafters or joists or trusses?
Yes No _ii) Not necessary for this project (2)
2
10. Does the building section drawing or other detail include the method
of positive connection of all columns and beams?
Yes _1/_ No (l, Not necessary for this project (2)
11. Does the plan indicate the height of the building or proposed addition
from the highest point of the building or addition measured at mid
span between the ridge and the cave down to existing grade contours?
Yes No 0, Not necessary for this project (2)
12. Does the plan include any stove or zero clearance fireplace planned
for installation including make and model and Colorado Phase II
certifications or phase II EPA certification?
Yes �' No 0, Not necessary for this project (2)
13. Does the plan include a masonry fireplace including a fireplace
section indicating design to comply with the Uniform Building Code
Chapter 37?
Yes ✓ No (l, Not necessary for this project (2)
14. Does the plan include a window schedule or other verification that
egress/rescue windows from sleeping rooms and/or basements
comply with the requirements of the Uniform Building Code?
Yes No 0, Not necessary for this project (2)
IS. Does the plan include a window schedule or other verification that
windows provide natural light and ventilation for all habitable rooms?
Yes No u, Not necessary for this project (2)
16. Do the plans indicate the location of glazing subject to human impact
such as glass doors, glazing immediately adjacent to such doors;
glazing adjacent to any surface normally used as a walking surface;
sliding glass doors; fixed glass panels; shower doors and tub
enclosures and specify safety glazing for these areas?
Yes No 0, Not necessary for this project (2)
17. Is the location of all natural and liquid petroleum gas furnaces, boilers
and water heaters indicated on the plan?
Yes No 0, Not necessary for this project (2)
18 Do you understand that if you belong to a homeowners association, it
is your responsibility to obtain written permission from that
association, if required by that association, prior to submitting an
application for a building permit?
Yes No („ Not necessary for this project
3
19. Have two (2) complete sets of constructions drawings been submitted
with the application?
Yes __i__ No n> Not necessary for this project (2)
20. Is this an application for the placement of a manufactured home?
Yes No __L%_
If yes, have you specified the size of the unit (min. 20ft x 20ft); live
roof load (min.40#); wind design (min. wind speed of 80 mph & 15 lb.
wind load); foundation design; method of anchoring?
Yes No c„ Not necessary for this project (2)
21. l -lave you designed or had this plan designed while considering
building and other construction code requirements?
Yes ,� No (31
22. Does the plan accurately indicate what you intend to construct and
what will receive a final inspection by the Garfield Building
Department?
Yes 1/ No 0)
23. Do you understand that approval for design and/or construction
changes are required prior to the application of these changes?
Yes �/ _ No 0)
24. Do you understand that the Building Department will collect a "Plan
Review" fee from you at the time of application and that you will be
required to pay the "Permit Fee" as well as any "School impact" or
"Septic system " fees required, at the time you pick up your building
permit?
Yes No (3)
25. Are you aware that you are required to call for all inspections required
under the Uniform Building Code including approval on a final
inspection_ prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes _V__ No 0)
26. Are you aware that the person signing the Permit Application whether
the "Owner", "Agent of the Owner", "General Contractor", "Contractor"
or otherwise, signing the 'application is the party responsible for the
project complying with the Uniform Codes".
Yes ), No c}r
(CONTINUED ON NEXT PAGE)
4
I hereby acknowledge that I have read, understand and answered these
questions accurately to the best of my ability.
{
signature
—
date
r 7�
Phone: bi3 -0 P.-7 (days); 6/3— 0$7)-7 (evenings)
Project Narne: S.�%v ,�01) C�
Project Address: 3 200 /UeZ Fi2e-YUTittC if i /WV G S
Notes:
(1) If you have answered "No" on any of these questions you may be required to provide this information at
the request of the Building Official prior Lo beginning the plan review process. Delays in issuing the
permit are to be expected_ Work may not proceed withour the issuance of the permit.
(2) 1f you have answered "Not necessary for this project" on any of the questions and it is determined by the
Building Official that the information is necessary Lo review the application and plans to determine
minimum compliance with the adopted codes, please expect the following:
A. The application may be placed behind more recent applications for building permits in the review
process and not reviewed until required information has been provided arid the application
rotates again to first position for review.
B. Delay in issuance of the permit.
Delay in proceeding with construction.
(3)
If you answered "No" lo this question the circumstances described in the question could result in a "Stop
Work Order" being issued or a `Certificate of Occupancy" not being issued.
PerApp02.95 Effective August 15, 1995
5
•L SL7
LL
2 6c
C�Checklist
pull permit 1 copy assessor's
pull plans, list CO# and date (assessor's box) 1 copy w/permit
final in computer
List on CO sheet
copy building card office card filled out
type CO 1 ,j highlight commercial
/1 plans
Don's signature Al
2. copies
INSPNOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
�yy
Date Issued�Ilrt... "° ned Area Permit No..1�1!'9
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IEDIATELY:BEOME NULL AND VOID.
51r
Use
Addrelsaiiig113erlpt
Owne
Setbacks
Front
A fa If
Co
Side
Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing I 1 - -_ c.ir A, Irl Ca l (6- I�'', c, '/ ir--, 7—y-r4i
Foundation 1 l ` c----_ c4 9 A ,„,t, +e:*; • '
Underground Plumbing
Insulation 6. p. 94 HILA a
Rough Plumbing (y -, _ro�' }`"`n'�
Drywall 1,- _ T`/ a
Chimney & Vent fi r , I
Electric Final (by State Inspector) a- - c.__
Gas Piping GI. ` ) _" of1-
Fin , rn /3�I91E �
Electric Rough (By State Inspector)5; ,�..—!eptic
Final]/ --o2 3 , .e1—. ,..57� 0,,m__
Framing `fi .�-7, q 6 4 A_Af
(To include Roof in place lin4 Widows
and Doors installed).
Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 945-9159 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPROVED DO NOT DESTROY THIS CARD
Dat
y
IF PLACED
WITH CLEAR PLASTIC