HomeMy WebLinkAboutApplication- PermitGARFIELD COUNTY
BUILDING, SANITATION
and PLANNING DEPARTMENT
109 8th. Street, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
Job Address
Nature of Work
ILL
No. 6939
h Cep
of Building Pemit
Use Building �/01 r 00 1) S (Qof5-
b S i iLF
o dory)mr\ J� 1
( s
ta1 QtY),\Zt -
Amount of Permit$ q LAP Date 1 U
Contractor
Kt rn4 ke n zs
BUILDING PERMIT APPLICATION
GARFIELD COUNTY, COLORADO
Applicant to complete numbered spaces only. PERMIT NO. PARCELJSCHED NO.
Jog ADCR /2�A� J / !Ci /(� L—V
BLOCK
1
ESS
LEGAL LOT NO.
DESCR,
SUBDIVISION
2
3
OWNER ?4&4y 1;1
451
CONTRACTOR .ez.ice .� jun&
ADDRESS4ff7fJ� /e%ya(09'
PH.V�USQ/
WK. PH. 73-73-
3
57S
4
5
ARCHITECT OR DESIGNER avec `p�T
6
7
ADCRESS 1/LS-,(//a14/642.-/V
PH. 5-_--/VS—
ADDRESS f 2 /� ,_?� J
PH62$:JVS"
LICENSE NO. �f�
- LICENSE NO.,,e„/�
4<7
2 E Irv:, 5ry'or-+c-
S.F OF BUILDING3 [moi 3060 2-3 t)8C, (
ENGINEER
8
ADDRESS
PH.
LICENSE NO. /e,l�
S.F OF LOT . S3 x!G
HEIGHT 13J2*i
NO. OF FLOORS
/
USE OF BUILDING t� , w/41� /fir ,AV 6-„r22,-249-
CLASS 1F WORK: NEW a ADDITION ❑ ALTERATION 0 REPAIR o MOVE ❑ REMOVE
9
DESCRSEE WORK: L 72 Y!/ - p, , J &G./Le/404S/ ^ 17 7-2444-
10
07 1 D6q. p
GARAGE SINGLE DOUBLE
CARPORT SINGLE
DOUBLE
DRIVEWAY PERMIT ON SITE SEWAGE DISPOSAL PERMIT
SITE PLAN
11
re • r0
VALUATION OF WORN: S /,JQ, QC;e2
ADJUSTEDVAL.S *7 //13,; 0
SPECIAL COC1TI9NS; f i{ a ±- AU /{- 6- "('
G 12 L 1.)1 cy M u ',-t H g L'' <' C; c >) [ Jr'1 a/
Y�
NOTICE
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING. HEATING.
VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK CR CONSTRUCTION AUTHORIZED IS
NOT COMMENCED WITHIN 164 DAYS. CR IF CONSTRUCTION CR WORK 1S SUSPENDED
OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS
COMMENCED
1 HERESY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATCN .AND KNOW
THE SAME TC BE TRUE ANC CCRRECT ALL PROVISIONS CF LAWS AND ORDINANCES
GOVERNING THIS TYPE QF WORK WILL SE COMPLIED WITH WHETHER SPECIFIED
HEREIN CR NOT THE GRANTING CF A PERMIT DOES NCT PRESUME TO GIVE
AUTHCRITI TQ VIOLATE OR .NCE_ THE PROVISkCNS CF ANY OTHER STATE OR
LOCAL LAW EGL'LATING CONSTRUCTION CR THE PERFORMANCE CF
CCNSTRU' N-
EL-
re of Owner
ontractor or authonz
BUIICIng veoarrrnent Ap
•r• .
date
PERMISSION IS HEREB
CONSTRUCT THE STRU
/, Date) f /We-
t bawl.
9e-
thawl. r_ a Ind urra(C• abov
/yi
1
E .L I � � I/ i r�1 Y� C .•
Planning •arrment App
•
+rail • -t
PLAN CHECK FEE .7r'Jg7o, I
SCHOOL IMPACT FEE
PERMIT FEE e. X8"7'7, 02
NC. OF BUILDINGS ON
PARCEL
USE OF BUILDINGS NOW ON
PARCEL
TOTAL FE 7 Z,,
WATER SUPPLY
OCC.OR.
DATE PERMIT ISSUED
CONST. TYPE
SPECIAL APPRCJALS
4Eol1IRE❑
RECENED
NOT REQUIRED
ZONING
HEALTH DEPT
FIRE DEPT
sat_ REPORT
SETBACKS
FLOOD HAZARD
MANUF HOME
OTHER
aste.` 4 !sA E ILII. 10
A, ED TO THE APPL ANT AS • ER, CO } RACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO
URE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER
AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF
THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT
SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM
THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING
OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE CR ANY OTHER ORDINANCE OR REGULATION OF THIS
JURISDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN
ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE
RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER,
BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
Garform.003
1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL
�81ighgc4t*.Q(.3y
h
A-- 3aa4
A.--AL1-3006,_47
efreei
ocow
C 43,
o4( 0 O
age/ 70 J
..2_416 ls
3
Liq
Nhin
0 6 rr
z cJ,,
C 2"
.1) 77.-1 J
1, S" 7e. Al
1. Is a site plan included that indicates the distances of the proposed building or addition to property
lines, other buildings, set back easements and utility easements?
Yes X
2. Does the site plan include the location of the I. S.D.S. (Individual Sewage Disposal System) and
the distances to property lines, wells (on subject property and adjacent properties), streams or
water courses?
Yes T
3 Does the site plan indicate the location and direction of the County or private road accessing the
property?
Yes X
4. Do the plans include a foundation plan indicating the size; location and spacing of all reinforcing
steel in accordance with the uniform building code or per stamped engineered design?
Yes X
5 Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and
the clearances required between wood and earth?
Yes N �_
6. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces
and soffits?
Yes K
7. Do the plans include design loads as required under the Uniform Building Code for roof snow
loads, (a minimum of 40 pounds per square foot in Garfield County), floor loads and wind loads?
Yes X
8. Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction'?
Yes X
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists,
roof ravers or joists or trusses?
Yes {(
10. Does the building section drawing or other detail include the method of positive connection of all
columns and beams?
Yes X
7
11. Does the plan indicate the height of the building or proposed addition from the highest point of
the building or addition measured at mid span between the ridge and the eave down to existing
grade contours?
Yes D(
12. Does the plan include any stove or zero clearance fireplace planned for installation including make
and model and Colorado Phase certifications or phase II EPA certification?
Yes No
13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply
with the Uniform Building Code
Chapter 37?
Yes No
14. Does the plan include a window schedule or other verification that egress/rescue windows from
sleeping rooms and/or basements comply with the requirements of the Uniform Building Code?
Yes _ No Po
15. Does the plan include a window schedule or other verification that windows provide natural light
and ventilation for all habitable rooms?
Yes No N P4 --
16.
i4 -16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing
immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking
surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety
glazing for these areas?
Yes No rl! Pt"
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated
on the pian?
Yes No +U
18. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission fro the association, if required by that association, prior to submitting
an application for a building permit?
Yes _It_ No A/
19. Will this be the only residential structure on the parcel?
Yes No x If no -Explain:
20, Have two (2) complete sets of construction drawings been submitted with the application?
Yes—
21. Is this an application for the placement of a manufactured home?
Yes No k'
If yes, have you specified the size of the unit (min. 20ft. x 20ft); live roof load (min. 40#); wind
design (min. wind speed of 80 mph & 15 lb. wind load); foundation design; method of anchoring?
Yes
22. Have you designed or had this plan designed while considering building and other construction
code requirements?
Yes
23. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection by the Garfield County Building Department?
Yes No
24. Do you understand that approval for design and/or construction changes are required prior to the
application of these changes?
Yes No
25. Do you understand that the Building Department will collect a "Plan Review" fee from you at the
time of application and that you will be required to pay the "Permit Fee" as well as any "School
Impact" or Septic System" fees required, at the time you pick up your building permit?
Yes No
26. Are you aware that twenty four (24) hour notice is required for all inspections? Inspections
will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood
Springs to Carbondale in the afternoon. Morning inspections must be called in by 12:00
p.m. the day before; afternoon inspections must be called in by 5:00 p.m. the day before.
Failure to give twenty four (24) hour notice for inspections will delay your inspection one
(1) day?
Yes No
27. Are you aware that you are required to call for all inspections required under the Uniform Building
Code including approval on a final inspection prior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes JX No
28. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent of
the Owner", 'General Contractor", "Contractor" or otherwise, is the party responsible for the
project complying with the Uniform Building Code?
Yes X No
4
I hereby acknowledge that I have read, understand and answered these questions to the best of my
ability.
/fr-
si ture / date
Phone: 521/S— 757 S (days); 9 .?V7/ (evenings)
Project Name:
Project Address: c 7 / /20: c.)W
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building
Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed
without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review
the application and plans to determine minimum compliance with the adopted codes; the application may be placed behind more
recent applications for building permits in the review process and not reviewed until required information has been. provided and
the application _rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction.
PerApp02.95 Effective August 15, 1995
5
1
307.1.5-307,2.5 1994 UNIFORM BUILDING CODE
3. Rooms used for the storage of Class 1 flammable liquids shall not be located in a basement.
307.I.6 Requirement for report. The building official may require a technical opinion and re-
port to identify and develop methods of protection from the hazards presented by the hazardous
material. The opinion and report shall be prepared by a qualified person, firm or corporation ap-
proved by the building official and shall be provided without charge to the enforcing agency.
The opinion and report may include, but is not limited to. the preparation of a hazardous material
management plan (HMMP); chemical analysis; recommendations for methods of isolation. separa-
tion, containment or protection of hazardous materials or processes, including appropriate engi-
neering controls to be applied; the extent of changes in the hazardous behavior to he anticipated
under conditions of exposure to fire or from hazard control procedures; and the limitations or condi-
tions of use necessary to•achieve and mainrain control of the hazardous materials or operations. The
report shall be entered into the riles of the code enforcement agencies. Proprietary and trade secret
information shall be protected under the laws of the state or jurisdiction having authority.
307.2 Construction, Height and Allowable Area.
307.2.1 General. Buildings or parts of buildings classed in Group H because of the use orcharac-
ter of the occupancy shall be limited to the types of construction set forth in Table 5-B and shall not
exceed. in area or height. the limits specified in Sections 504. 505 and 5{16.
31)7?? Floors. Except for surfacing. Moors in areas containing hazardous materials and in area'
where motor vehicles, boats, helicopters or airplanes are .stored. repaired or operated shall he of
noncombustible, liquid -tight construction.
EXCEPTION; In Group H. Divisions 4 and 5 Occupancies, floors may he surfaced or waterproofed with
asphaltic paving materials in that portion of the facility where no repair work Is done.
307.2.3 Spill control. When required by the Fire Code, floors shall be recessed a minimum of 4
inches (102 mm) or shall be provided with a liquid -tight raised sill with a minimum height of
4 inches (162_ mm) so as to prevent the flow of liquids to adjoining areas. Except for surfacing, the siI I
shall be canstnrcted of noncombustible material, and the liquid -tight seal .shall he compatible with
the material being stored. When liquid -richt sills are provided. they may he omitted at door openings
by the installation of an open -grate trench which connects to an approved drainage .system.
307.2.4 Drainage. When required by the Fire Code, the room, building or area shall he provided
with adrainate system to direct the flow of liquids to an approved location or. the room, building or
area shall be designed to provide secondary containment for the hazardous materials and fire -pro-
tection water.
Drains from the area shall be sized to carry the sprinkler system design flow rate over the sprin-
kler system design area. The slope of drains shall not he less than I percent. Materials of construc-
tion for the drainage system shall be compatible with the stored materials.
Incompatible materials shall he separated from each other in the drain systems. They may he
combined when they have been rendered acceptable for discharge by an approved means into the
public sewer. Drainage of spillage and fire -protection water directed to a neutralizer or treatment
system shall comply with the following:
1. The system shall be designed to handle the maximum worst-case spill from the single largest
container plus the volume of fire -protection water from the system over the minimum design area
for a period of 20 minutes.
2. Overflow from the neutralizer or treatment system shall be provided to direct liquid leakage
and fire -protection water to a safe locarion away from the building. any material or fire -protection
control valve, means of egress. adjoining property, or fire department access roadway.
307.2.5 Containment. When required by the Fire Code, drains shall be directed to a containment
system or other location designed as secondary containment for rhe hazardous material liquids and
1-38