Linde Inspection of Reinforcing Steel at Pump Bldg, Williams TXP1 Plant Parachute
[Untitled].pdf; -2938513.jpg; 104_367 4.jpg; 104_3685.jpg
Linde Process Plants has inspected and verified that the rebar installed by PCE Constructors at the Area 57 Pump
Building is per the current stamped LPP drawings and specifications. There were no exceptions made during the
inspection.
Attached are pictures, drawings, and sign offs for the reinforcing steel from LPP and our 3rd party inspector Terracon.
Please let me know if you have any further questions.
Thanks
Marlon R Ward
Project Engineer
Linde Process Plants
6100 S Yale Avenue
Suite 1200
Tulsa, OK 74136
970-285-0214
marl on . ward@lppusa .com
www.lppusa.com
CONFIDENTIALITY NOTICE : This e-mail message including attachments, if any, is intended only for the
person or entity to whom it is addressed and may contain confidential or privileged material of Linde Process
Plants, Inc and/or its Divisions. Any unauthorized review, use, disclosure, or distribution is prohibited. If you
are not the intended recipient, please contact the sender by e-mail and destroy all copies of the original message.
If you are the intended recipient but do not wish to receive communications through this medium, please so
advise sender immediately.
1
Im CONSTRUCTORS, INC. I
~~
QUALITY CONlROL FIELD INSTALLATION CHECKLIST: CONCRETE PLACEMENT FORM
PllOJECTNo. 7130 UNIT No . TXP1
EQUIPMENT Id . 53&1)A.'ll-5361Al8 DRAWING CN70·5710 SPECIFIC.ATIOI LPPICS-1
rTEM CONTRACTOR LPP Clienl COMMENTS INITIAL I DATE IN'illALIOATE INITIAllOATE
Pour Location: PumoShed !iflt'K '(-.'.> ~ (,[f·
Area: 57 /' / Y( vc...
N.97'-6" )) / I Coordinates: E. 331'-6"
I l
FORMS: .Bv;~J. J Adeaualetv Bt~ced/SuooOflod
Oimcnt~v11Uons r I (
ChonlferJCioonlMU { ~ I J
Fofl!! wo:I< h., boon p<OJl<•!;mlD..,,""' ') ) ~) ~ m11nublct1.1rt:slengl nttfing recommendaUons
(Suoerinlendenl initials this secllon}
B&!NEQR~IN!;Z S'!'£EI.;: ~f-3 I ( Clearances
Soacin1:1 orSta:el I /\ L-. \
Barstze \ ( I \
Proper Lap ' \ I J
Secure I ) I
Clean I , I
EM!lEDOED !]}';MS: 0 Anchor bolls. angles. channels, elc., (structural) /d7'-3
Pipe sleeves I frtHnas (piclnnl //,N-,,-/-,...,
Conduit I aroundina (eleclr!call ~9'-3 ~ l\.) -
~Q NQBill ~La&liM~NT: v Q
Prooer handllna ~s-7
Vibration / /
Finish I.... l
Admixtures .../
O.C.OATA:
El\. Quanlily (in cubic yafds) 144 Design Strenglh ( psi ) 4000
IToSI Clllntlers Required 4 Test Cylinder 28 dal avg (psi)
· No. Clinders Cesl I{ Time rrom Balch lo placemenl (min) OOmln.
CONCRETE TEST: Attach all Batch Tlckels %S'J1"1. 7S, / 8S'Jfl/7J
Required slump: 4•-6· Arnbh:nt temperalure (deg F) se.
Ac\ual slump 4'' Concrele Temperature (deg J) 71-S
wa:her condlr.co: cle«r Water Added at Job Sile (gal) CJ
Alr%Actual ,_s AJr %. Required 5-7
THE CONCRETE PlAZT ~ 0E£N INSPECTED./~ IN ACCORDANCE WITH THE PROJECT DESIGN DOCUMENTS:
CONTRACTOR f>:I _'l 0 '5 " 7-/ :J
PRINT SlGNATIJRE -OATE
LPP
PRl.NT SlGNA1'lJRE DATE
CLIENT
PRl~I SIGNATURE DAti!
Fonn No. QCM-F1002 r009 (January 2012) ConfidenliaHly Class 1-PubUc ln accordance with LS 104-03: Linde AG Page 1 of1
REINFORCING STEEL OBSERVATIONS REPORT
Report Number:
Service Date:
Report Date:
Client
AD13 !005 .0027
04105/l 3
04/08/l 3 Revision 1 -Obsen•alion Results
PCE Constructors. Inc
Attn: Brock Deloach
13544 Eads Road
Prairieville, LA 70769
Services Requested By: Merco Sandoval with PCE Constructors
Reinforcing Steel Type: Cast-in-place concrete
Observation Loeetion: Pump Shed (Area 57).
ObservnUoo Results :
Project
lrerracan
2308 Interstate Ave
Grand Junction, CO 81505
970-245-4078
TXPl Civil & Underground Construct ion
4289 County Road 215
Parachute, CO 81635
Proiecl Number: ADB 1005
Based on our observations, the reinforcing steel placement at the above-referenced locations is in accordance with the
identified project drewings.
Referenced Drawings: Harris Rebar Denver -R-006A, Williams Midstream PCR-CN?0-5110
Comments: No revisions on Williams Midstream drawings. Latest revision on Hanis Rebar drawings occurred 2/12/13.
Services:
Terracon Rep.: Elias Acevedo Started:
Reported To: Man:o Sandoval with PCE Finished:
Contractor:
Ucpon Distribution:
(l )l'CtC'eM11VC1C1Q.tu.Eded (l)PCECoostnlci.on, IDC, Emailed
(I ) PCE ConstnJcigrs, ISK:, Em ailed Reviewed By:
Ull~~;.er
Tllo !MIS .,,,., pcfounc<I In g ........ •-d!tl<8 Wilh op;>llc:i!bl!I ASTM, MSlfTO, °' DOT lUSl n'JO!riod&. This "'port ts O¥Ckl•tvefy lot the Ulll of tho dll!nl
lndicratjtd lbo'.'8 a,nd shil.U nol be C'Op ro6uted e>:cgpl In fW ~ Um wrililtn conR.1\1 of our c:-ornP BJtV. Tn1,rn 111"'1; lfllnsnjlto" herein RIO arw upplfcftb'o to
ll1e oclual &Ontples 189ted al LllO I0<11llolll•l 10l01 011C<4 •od "'" 001 ...,....,."Ty "1dlcetlvo of tho ptopo~les ol Olller opplR!lll'/ stnolaf"' ldenlkal ma<ctLils.
CTHU.tJa-11,.,., P~ 1 or I
fl :t3 4) Constructors, Inc.
13544 Eads Road, Prairieville, LA 70769 *PO Box 1582, Prairieville, LA 70769-1582
(P) 225-677-9100 (F) 225-677-9150
February 22, 2013
Garfield County Building & Planning Department
108 81h St., Suite 401
Glenwood Springs, CO 81601
Attention:
Reference:
Dear Sir:
Mr. David Bartholomew
BLC0-2-13-2751 & BLC0-2-13-2755
Parachute Creek 350 MMSCFD Turbo Expander Plant
Linde Civil & Underground Construction Contractor
Parachute, Colorado
As we discussed over the phone, PCE has applied for the two referenced building permits for tempora1y
facilities at the Williams Parachute Gas Plant. I will not be able to receive these two pe1mits in person. This letter
serves as authorization for PCE site manager Robert Montague to represent myself and PCE Constructors, Inc. in
any and all matters concerning the building pennits referenced above. Mr. Montague will also schedule any
necessary inspections to fulfill the requirements of the building permit.
Please contact our office with any questions or concerns ..
Ve1y truly yours,
PCE CONSTRUCTORS, INC.
~~
·Brock Deloach
cc:
Mark Allen -PCE
Robert Montague -PCE
Jim Wilson
From:
Sent:
To:
Cc:
Subject:
Attachments:
Andy Schwaller
Tuesday, April 09, 2013 8:49 AM
Matt Provost; Jim Wilson
211 OA01 W@LPPUSA.COM
FW: Inspection document sign-off and photos for 7130-PUMP SHED/DWG#057-C-ZB-1020
pump fdn .pdf; 104_3685.jpg; 015.jpg; 104_3650.jpg; 104_3651.jpg ; 104_3652.jpg ; 104_
3653.jpg; 104_3674.jpg ; ATT00001 .txt
This appears to be very thorough. Please add to the file. I told Lindi's representative that the engineer of record can do
the inspections once a building permit is in place. As long as they document the inspections like this, I am good to let
them do the inspections as long as they keep us in the loop.
Thanks,
Andy
From: 211 0A01W @LPPUSA .COM[mailto:]
Sent: Monday, April 08, 2013 3:58 PM
To: Andy Schwaller
Subject: Inspection document sign-off and photos for 7130-PUMP SHED/DWG#057-C-ZB-1020
LPP Project No. 2110A01W
Williams Field Services Co ., LLC
350 MMSCFD Cryogenic Gas Processing Plant
Parachute Creek TXP-1
Garfield County, CO
Correspondence No .:
Mr. Schwaller,
Per our phone discussions from earlier today, please find attached photos and the sign-offs attached from Terracon and
PCE/Linde/Williams for the subject foundation pour.
This data applies to the 3 -sided pump shed foundation .
Our understanding is that the Garfield County inspector will drop by the site this Wednesday to view these documents as
well.
I have conveyed to the field that Garfield County needs 24-hour advance notice of all future inspection points .
Please advise of any questions .
We appreciate your continued support with this effort.
Regards ,
Art Thompson
Project Manager
(918) 477-1273 -Direct
ANY AND ALL CORRESPONDENCE FOR THIS PROJECT TO BE SENT TO 2110A01W@LPPUSA.COM ONLY
1
~~
1-
1
I ~
~~ "'~ l l "-•
I §~
ih .
~.~ d j__Gi. .... ';...
al
S.:" li':l ~" § .. .•
,_.! t.
6~ 41]"
""' ,gi Sd
~~
.,t--,11
., ~
~a ~~n :.'!I ! ±;1aJ :-;;Ii i :rnst ~·:-§! ""§"~ !i!1tri :. e!
I e-
l ~
i
I ~
I
I '"~
' l1i
~1 ~ ~
I ; e-1<
I ii
I ~ l l .
I
... ,,, !!
"Ii
2-)J
I ~
I
I
' e-
~
0.
!!i .,.-.ti
!_ JI-JI .D-.i'I
!
-~ \ff ~f
<
REINFORCING STEEL OBSERVATIONS REPORT
Report Number: AD\31005.0027
Service Date: 04/05/13
Report Date: 04/08/13 Revision J -Obsen•ation Results
Client
PCE Constructors , Inc
Attn : Brock Deloach
13544 Eads Road
Prairieville, LA 70769
Services Requested By: Marco Sandoval with PCE Constructors
Reiuforciog Steel Type: Cast-in-place concrete
Observation Location: Pump Shed (Area 57).
Obscr"\'Dlion R esulls:
Project
lrerracan
2308 Interstate Ave
Grand Junction, CO 81505
970-245-4078
TXP I Civil & Underground Construction
4289 County Road 215
Parachute, CO B 1635
Proi cct Number: AD ll lOD S
Bas ed on our o b scrv~lions, the reinforcing steel placement at the above-referenced locations is in accordance with the
identified project drawings.
Referenced Dra~ngs: Harris Rebar Denver -R-006A, Williams Midstream PCR-CN70-S? 10
Commeob: No revisions on Williams Midstream drawings. Latest revision on Hartis Rebar drawings occurred 2/12/13.
Services:
Terracon Rep.: Elias Acevedo Started :
Reported To: Maroa Sandoval with PCE Finished:
Contractor:
Repo rt Dl•trlbutlon:
(l )IU~J.IM.flld°ed (l )PCEC'OllstrucJ o ~lct ,F.mni1ed
(I) PCE Construtton, Inc, Emailed Reviewed By:
r
Tha 1 .. 1s ,...,. petlonl1Cd In _..i acaud11nc:e wllh oppllco bro ASTM, MSKTO. or DOT ""' molbocb. This r19D11 ll c•W.lvtli for rho un of lho dtoni
1ru1ai1oo·a.tJ cwe 111ld-lhlU no' bo re p100uob" t!Xcqpl In ful wflMut lho ws l~en consoni orourccimpM')". Tes r fl'J !lulll lrMlirri rtod 'here!n oro °'*J applk.u~ lo
a10 •dual samp1 .. 1 .. lod et Iha loco1"'1(•)'1elemt1COd lll1d .,. oot ftCt••>S•rff\I lodl;aU ve ol lho prOflCJll•• of otl]of app;c"111~/ llmll;jt or ldOfldCl l moterl>l>.
croou.~.Jt-·ll.lrr t P.-s.c 1 of I
Jim Wilson
From:
Sent:
To:
Cc:
Subject:
Attachments:
Jim
marlon.ward@lppusa.com
Tuesday, May 07, 2013 12:28 PM
Jim Wilson
Steve .Lightwine@lppusa.com; Van.Gorman@lppusa.com; randall.brossman@lppusa.com;
Robert Montague; msandoval@pceci.com
Linde Inspection of Reinforcing Steel at Pump Bldg, Williams TXP1 Plant Parachute
[Untitled].pdf; -2938513.jpg; 104_3674.jpg; 104_3685.jpg
Linde Process Plants has inspected and verified that the rebar installed by PCE Constructors at the Area 57 Pump
Building is per the current stamped LPP drawings and specifications. There were no exceptions made during the
inspection.
Attached are pictures, drawings, and sign offs for the reinforcing steel from LPP and our 3rd party inspector Terracon .
Please let me know if you have any further questions.
Thanks
Marlon R Ward
Project Engineer
Linde Process Plants
6100 S Yale Avenue
Suite 1200
Tulsa, OK 74136
970-285-0214
marlon .ward@lppusa.com
www.lppusa .com
CONFIDENTIALITY NOTICE: This e-mail message including attachments, if any, is intended only for the
person or entity to whom it is addressed and may contain confidential or privileged material of Linde Process
Plants, Inc and/or its Divisions. Any unauthorized review, use, disclosure, or distribution is prohibited. If you
are not the intended recipient, please contact the sender by e-mail and destroy all copies of the original message.
If you are the intended recipient but do not wish to receive communications through this medium, please so
advise sender immediately.
1
rn Eu not GllOLIP --------~
Linde Process Plants, Inc.,
6100 South Yale Avenue, Suite 1200, Tulsa, Oklahoma 74136, USA
Phone : +l.918.4 77.1 200 , Fax: +1.918 .4 77 .11 00, www.LPP USA.com
CONFIDENTIALITY NOTICE: This e-mail message including attachments, if any, is intended
only for the person or entity to whom it is addressed and may contain confidential or
privileged material of Linde Process Plants, Inc and/or its Divisions. Any unauthorized
review, use, disclosure, or distribution is prohibited. If you are not the intended
recipient, please contact the sender by e-mail and destroy all copies of the original
message. If you are the intended recipient but do not wish to receive communications
through this medium, please so advise sender immediately.
(See attached file: pump f dn.pdj) (See attached file: 104 _ 3 685 jpg) (See attached file: 015 jpg) (See attached file :
104_3650jpg)(See attachedfile: 104_3651jpg)(See attachedfile: 104_3652jpg)(See attachedfile:
104_3653jpg)(See attachedfile: 104_3674jpg)
2
REINFORCING STEEL OBSERVATIONS REPORT
Report Number:
Service Date:
Report Date:
Client
AD131005.0027
04/05/13
04/05/13
PCE Constructors, Inc
Attn: Brock Deloach
13544 Eads Road
Praifieville, LA 70769
Project
lrerracan
2308 Interstate Ave
Grand Junction, CO 81505
970-245-4078
TXPl Civil & Underground Construction
4289 County Road 215
Parachute, CO 81635
ProjectNumber: AD131005
Services Requested By: Marco Sandoval with PCE Constructors
Reinforcing Steel Type: Cast-in-place concrete
Observation Location: Pump Shed (Area 57).
Observation Results:
Based on our observations, the reinforcing steel placement at the above-referenced locations appeared to be in general
accordance with the identified project drawings.
Referenced Drawings: Harris Rebar Denver-R-006A, Williams Midstream PCR-CN70-5710
Comments: No revisions on Williams Midstream drawings. Latest revision on Harris Rebar drawings occurred 2/12/13.
Services:
Terracon Rep.: Elias Acevedo Started:
Reported To: Marco Sandoval with PCE Finished:
Contractor:
Report Distribution:
(1) PCE Constructors, Inc, Emailed (1) PCE Constructors, Inc, Emailed
( 1) PCE Constructors, Inc, Emailed Reviewed By:
Engineer
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0013, 6-30-11, Rev B Page I of 1
Permit#:
Permit Holder:
Site:
Owner:
Status:
Inspector:
Corrections:
COLORADO STA TE ELECTRICAL BOARD
1560 Broadway, Suite 1350
Denver, CO 80202
736433
PCE CONSTRUCTORS, INC. MARK ROBARDS
PO BOX 1582 PRAIRIEVILLE 707690000
Inspection Report
Date Inspected: 03/29/2013
Phone: (225) 677-9100 Fax: Email: mikecook@pceci.com
4289 CR 215 Parachute, Garfield County,
TURBO EXPANDER PLANT
Rejected
Inspection Type: Partial Rough In
NEW COMMERCIAL
Norman Feck 877-320-9150
1) Cold drain tank (VR5710 in area 53) GE is not approved. Shall be 20' continuous. 250.52A3
2) (5) Scrubber GEs in area 52 are not approved. Shall be 20' continuous. 250.52A3
Comments:
1) Pumps Shed in area 57 pad ufer GE connection ok
2) Contractor re-read comment # 2 of 3/21 inspection report
--· . . . ... .... ·-·· ... . .... ....... -. ····-·-· -· ........ --. -·· ... : -