Loading...
HomeMy WebLinkAboutPlansANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO ]HELICAL DILE INSTALLATION RECORD 1 Pile #/ : 5756 "f umover Svstem: Pile Type : 313 Inspection Classification sub -system - Contractor AwhorPipc SubLontractor ❑ Building /E:cictipment: Pump Shed Work Package: IPNIT [] Other ❑ Area/Unit: AREA 57 e Insiallalion 1)ete & Time 1 IM12 Weather °F 34 Slam lime : 8:41v c� CenOcriira: Cootdtr+atcs: (N) 95.80 (E) 333.47 Finish Time : 8:58 0 we c Mvelkad: Torque 11 5K Indicator T Dietl €ate Torque Factor 25 I'ile Orientation Sketch I � F I ~~ — ........ — — 1 I I � E' A" u Lead Section Ikseription : 18' long with (3) 20 helices LMeacion Description & Quartil : OD 8.625 Schedule A95 (Wall thickness) Engxdn=d lAmgih : 16 T op of Ptak Ovation, 94.33 Inclination ofllelical Pile NSe2"/o 1:1'296 Garietiitede►binn (N) -0.043 (E 4031 Acts Installation Data Depth PSI Torque Comments Depth PSI Torque Sec attwhrd spreadsheet at end of area S7 srclitar_ Narne Leonidas Siephenson N%une Name Signature Signature Signature: Daae 3/21!!2013 1 D7ic Bate ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO RELICAL PILE INSTALLATION RECORD Pile # : 5757 Turnover System: Pile'I'ype : 3B Inspection Clussihcalion Contrador: AachorPipe Subcontractor ❑ Work Package: IPW p Other ❑ Sub -System: Building /Equipment: Pump Shed AeeaMnil AREA 57 Name Leonidas Stephewwn I Name Name Signature Sigmahae Sip09— Dat. 3121I2013 hale Date lns"ation Dade & Thme 12f3f12 Wadher "F 48 Start Time : - 2; 15 M aCcnted nc Coordinates (N) 95.91 (E) 34838 Finish Time : 2:20 e g O/ c Ta9ue Drive Head: 115K ]ndialor � Torque Factor 25 Pile OdWa,tion Sketch Tyre 1 -- ` 1 Lcad Section Description: Pl� 18' I with (3) 20 helices j Extension Description & j Ir Quenlit y • j _ OD 8.625 Schedule rn Fr —------------------- d .495 (1n.) _ (Wall thiclmess) j _ EmbWmad Leahglh : p" 26 Top of Plate Elevation : 9433 y lndinalionofHciea) T <Z% Pile EWc2% Cadaline&vialion OX -0.116 ActuA lmstalktion Data Comments � 1x31 Tangene DMO PSI Torque See attar bw spreadshm a end dares 57 section. Name Leonidas Stephewwn I Name Name Signature Sigmahae Sip09— Dat. 3121I2013 hale Date ANCHORPIPE INTERNATIONAL INC WILLMIS TXP-1 LINDE PARACHUTE, COLORADO 1 HELICAL P LIK INSTAILIL ATION RECORD I Pile 4 : 5758 Turnover Systew hic Type: 3B inspection Classification Sub -System. Contractor: AnchorPipe Subcontractor ❑ Building/EquipmenC Pump Shed Work Package: IPMT ❑ Other ❑ Arca/Unit: AREA 57 a Installation Date 1213/12 & Tmre Weather_ ®F 47 Start Time : 3:00 O a Cenlerluie C"oardioat (N) 95.86 (E) 363.44 Finish Time : 3:43 • o Drive Head: 115K Torque Indicator Type Dud gauge Torque Factor 25 Pile Orientation Sketch I 1 j j — — — — — ----. _ 1 I 1 j m� a chi Lead Section Description: : p 18' lcurg wish (3]20 helices Rctcraion Description & Qutmtify : OD &625 (In j : Schedule ( Wall thidmess) _495 Embedment Length : 39 Top orPlate Elevation : 9433 Inclination ofFldical Pile NSG2% BWc2'f. Caderib edevinlion (I) 0.016 (E) 41058 Acral Lublin Data Depth PSI TorqueComments tnrp>. I PSI Torque See attached spreadsheet at and of area 57 section. Mame Lconwas Shvknsan Name Othur Other Name Signatere Signature Signature Date 3/21/2013 Dace Dale ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO HELICAL PILE INSTALLATION RECORD Pile ii : 5759 Turnover System: file Type : 313 Inspection Classification Sub—System: Contractor. Anchorl'ipe Subcontruetor ❑ Building /Equipment: Pump Shed Fork Package: IPMT ❑ Other p Arca/Unit: AREA 57 Installation Date &Time: 12l3112 1 Weather 45 Start Time : 3:57 s2 Centerline Coardirrates: (1V) 95.68 (L') 37839 >inish Time : 4:25 Drive Head: 115K Torque 1,dicator T m Duala Fuge Torque Tactor 25 Pik Orientation Sketch 1 l N I ----.—.—._..i..._.�.—.� I p` ca Lead Section Description : 18' to %vilh (3) 20 helices Extension Description & Quontit OD 8.625 Schcdnle (Wall thickness) 495 Embedment Length: 39 Top o1 Plate Elevation : 94.33 Inclination orHclical Pile NS<2% EW<2% CentalinedLviation (N) -0.157 (E1 -0.111 ActwA Imtaliation Data Comments neper rs1 Torque Depth rsl Torque SCI: attached spreadsheet at mW or area 57 suction. Name liooidas Steplrcnsrnt Name Nmw Signature Signature Signature Date 3121(2013 Date Date ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO HELICAL PILE INSTALLATION RECORD Pile# : 5760 Turnover System Pile Type. -3B Inspection Classification Contractor: AnchorPipe Subcontractor 11 Work Package: WHIT ❑ (Xher ❑ suh-System: Building ./E.quipment: Pump Shed ArcaiUniC AREA 57 Installation IDale dt Time : 12/4/12 Weather ®F 26 Start Titne : 7:34+ eeeo E Centealine (N) Courdinads: 95.88 (E) 393.47 FinL4e "lime: 7:39 C? o Torque Drive Head: 115K Indicator T}•pe Dua gaug1c Torque Factor 25 Pile Orientation Sketch I j j ------- ------------- —� I � I o. H d n w LA 'd Lead Section Description: 18' to with (3) 20 helices Extension Description & Quantityj 013 (In.): (in.): 8.625 Schedule (Wall thickness) _495 Embedment I cagdi : 27 Top orPbde Mention: 94.33 Inclination of Flelicar Pik 1V5<z"ra rV1�Q°l'o Centerline deviation (1) 0.038 (E) -0.029 Actual InStAntion Data Depth PSI Torque Comments Depth PSI Torque See attached spreadshcel at end of area 57 seetion. Name Leonidas Sictdiensnn Name Name Sig1w= �L-- Signature Signaim Date 3121 t2t)13 Date Ikue ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO HELICAL PILL INSTALLATION RECORD Pile S: 5761 Turnover System: Pile Type: 3B Inspection Classification sub -System: Contractor AnrhorPipc Subcontractor ❑ Building /Equipment Pump Shed Work 1'SdMg= 1PM1' ❑ Other p Arca/Unit: AREA 57 Installation Date l 112/12 & Time : Weather °F 63 Start Time : 2:47 a Cenleriine 10 E Comdinal �) 8337 {E) 393.40 Finish Time : 3-03 w Torque ud Drive Head: 115K Indicator I Torque Factor 25 Pile Orientation Sketch gouge l i N Lead Section Description: 18'1 ng with {3)20 helices j Extension Description & j � uanlil t OD Schedule--�---------- (in.) : 8.625 ( Wall thiclLness) 495 — — — — j p" E,nbe lment Length: 16 j �I Top of Plate Elevation : %33 j ludh align of Helical NS<2% EWA:!% I Pile CenteYlirtc deviation 0.032 1 M -0.1 Actwd Ustalla wo Data Depth Psi Torque Depth rsl Torque Comments See attached spreaddxxt at end orarea 57 sedan. Name Leonidas Stplim n Name Now Signature Sigrrarure Signature Det. TrAf21nl3 f Date Date ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO HELICAL PILE INSTALLATION RECORD Pile # :5762 Turnover System: Pile Type: 3B 26 inspection Classification Subcontractor 17 IPMT El Other Q Sub—Systcm: Contractor: AnchorPipe $ Building /Equipment: Pump Shed Work Package: Area/Unit: ARTA 57 Installation Dale & Time 11/4/12 Weather. OF 26 Start Time: 7:53 $ Centedine Coandmales: (N) 83.32 (E) 378.53 Finish rime: 7:57 W 16 040. Drive Head: Torque 115K Indicator Type Dual BMW Torque Factor 25 Pile Orientation Sketch t j j j _•4-•—•—•—•—•_ j � t t IL ow a � Lead Section Description: 18'longwith M20 helices Extension D cription & Quant OD (in.) : 8.625 Sdtodule (Wall thicluress) .495 Ernbedmad Length : 27 Top of Place Elevation : 9433 Inclination oTHclical Pile NS<2% EW<2% Centealinc deviation -0.024 1 (E) 0.031 Astral Lls#allatian Data Depth PSI Torque Depth rSl TorqueComments See attached spreaddW at end of area 57 section. Name Leonidas Stephenson NOW Name SiDratwe Signffiwe Signature Date 3/212013 Date Dale ANCHORPIPE INTERNATIONAL INC W WAMS TXP-1 LINDE PARACHUTE, COLORADO HELICAL PILE INSI'A1 •i -A MN RECORD Pile t : 5763 Turnover System: Pile Type : 3B Inspection Classification Sub-Systan: Contractor. Anc hmPipe Subcontractor ❑ Building /Equipment: Pump Shed Work Package: IPMT ❑ Other ❑ Anmg)nit: AREA 57 la"lotion Dale 12/3112 & Time: Weatlter of 47 Start Titres : 2:55 z Ceatatirc at Coorde (N) 83.23 (E} 363.42 Finish rime: 2:59 a � c3' vo Torque Drive Head: 115K T dicator ge Torque Fader 25 Pile Orientation Sketch Type i lead Section Description : 18' long with (3) 20 helices � N F.xlension Description & H — -------- �OD: 8.625 uic Schedule d95^�' ! p Enhahoeat Length : 26 j � I aTap ofPlale Mevation : 94.33 IndmalionofHelical NS<2% EWCL% t Pik - Ccutcdwe deviation -0.113 El -0.083 Actad Ittshillbtios.I7xft D.pM INA Torque �b m Ter"r Comments See almdied spreadsheet at end ofarea 57 section. Mame Lemidas Steplressm Mame Name Srgnalrue Signature Signature ` Date 3212013 Date Dae ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO MIEUCAL PILE INSTALLATION RECORD Pile # : 5764 Turnover System: Pile Type: 3B Inspection Classification Contractor: AnchorPipe Subcontractor ❑ Work Package: Irml' G Other ❑ Sub -Sy -stem: Building /Equipment: Pump Shed Arealth it: AREA 57 hs Installation Date 12M2 & Time : Weather. °F 48 StmaTimc: 217 oCoordinates Centerline (N) 8335 ( 34&43 Firhish Time : 231 Y c Drive Head: 115K Torque Indicator Type aW 810 TiNgwFactor 25 Pile Orientation Sketrh E I N j j ! — — — —---------- ! I I j ! I. d rL; � Lead Section Description: 18' � 3)20 hdiccs Ehdension Description & Quanlil : OD 8 6?S Schedule (Wall thickness) 495 Embedment Length: 26 Top of Plate Elevation: 9433 Inclination of Hdical Pile NS<2% EW<2% Cenlcrline deviation (N) 0.014 [l -0.07 Acted LISti{ation Data Dept PSI Torque Comments Depth I PSI Torque See attached sp mwhfreel at end ofam 57 section Name Leonidas Stephenson Name Name Sighrrrae Sigmtue Sig idure naw 3!212013 Date Date ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO HELICAL PILE INSTALLATION RECORD Pile # : 5765 Turnover System: Pile Type: 3B Inspection Classification Sub—%)rA=: Contractor_ AnehorPipc Subcontmetor ❑ Building /Equipment: Pump Shed Work Padwgc- IPMP ❑ Other ❑ Area/Unit: AREA 57 Installation Date dt Time 111V12 Weather: "F 44 Start Time : 11:39 i= aCenledioe ah Coordinates (E7 33339 Finish Timm: 11.49 11.49 16 G9 1-0 T° Dual . Drive Head: 115K lndicator PC Torque Factor 25 Prue Orientation Sketei I I Lead Section Description : IS- long with 3) 20 belioes Extension Description dt a Quanli >' i — — — — — — — — — — OD 8.625 Schedule (Wall thickness) 495 p' t j Embedment Length : 16 Top of Plate Elevation : 9433 j I Inclination of Helical Pile . NS<2%EWQ% Centafine deviation (N) -0.082 i) 4147 Deptlh PSI Torque Actual Installatiton Dais 1Dyh1b pal Comments Torque See allnd d sp>eadslhaet at and of a= 57 section. Now Leonidas Stephenson Name Name Sig=turc Sigxatne �T Signature Daic 321/2013 Date Date ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP 1 LINDE PARACHUTE, COLORADO HELICAL PILE INSTALLATION RECORD Pile # : 5766 Turnover System: Pile Type : 3B Inspection Classification Contractor. AnchorPipe Subcontractor ❑ Work Package: 1PMT ❑ Other ❑ Sub -System. Buifding/Equiprnenl: Pmnp Shed Anca/Unit: AREA 57 InsiallationDale 1213/12 Weather_ °F 63 Start Tune: 1:32 e & Tnuc w Unleir�es 70-86 (E) 333.42 Finish Time: 1:38 Ica 3-10 Torque Dual Drive Head: 115K Indicator gauge Torque Factor25 Pile Orientation Sketch Type 1 Lead Section Descriptio : 18' long with (3) 20 helices I N Frio Description Jk j Quant : I OD Schedule —..j_._..—•—•—.— (In-) : 8.625 (Wall thidrness) 495 — — — — y Embedment Length : 17 1 a j u Top orPlate Elevation : 9433 j Inclination of NS<2% EWQ t Pile Cettedine deviation 0.016 E) -0.078 Actual Instsllafion Data Depth PSI Torque Depth PSI Torque Comments See anadod spreadsheet at end of area 57 soctioa Name LeoniftSt Omoon Name Name Signakwe Signature Signature Date 3212013 Nate Dore ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO HELICAL PR& INSTALLATION RECORD Pile # : 5767 Tumover System: Sub -System: Pile Type: 3B Inspection Classification Contractor. Anchorilipa Subcontractor ❑ Work Package: 1PMT ❑ Other p Building /Equipment: Pump Shed Area/[)nit: AREA 57 tnslattattonUede 12/3/12 Weather I "F 48 Star nw: 1:50 a 8t Tune Caderlme (1�7086 a • Coord�es (� 348.46 I:mislrTune: 1:54 G7 w Torque Dod Drive Head-. 115K lndicmor 10109C Torque Factor 25 Pile 0rie ntation Sketch Type 1 t Lead Section Description : 18' long with (3)20 helices I „ Extension Description &� wc+Quantit�r : 1 OD 8625 Sdtodulc .495 _ ......... a ------ — — — w (hL) _ (Wall thidmess) ! p' Embedment Length : 26 1 a i Top of Plate Eleva ion : 9433 Inclination ofHdical A1S<17G EW4'/o t Pile Centerline deviation &023 -0.044 Actual Iostallaiien Data ColnmeMs Depth P31 Torque Depth MI Torgee S w auadW at end of area 57 sec6oa Name l.wnidas Stepherrsan Name Name SignauueSig�u� Signeturc Date 3/21/2013 Date Date ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO HF;LICAL PILE INSTALLATION RECORD Pile # : 5768 Turnover System: Pile Type : 3B Inspection Classification Sub -System: Contractor: AnchorPipe Subcontractor ❑ Building /Equipment: Pump Shed Work Package: ipm-r ❑ Other ❑ Area/Unit: AREA 57 e Installation Date I V2/12 & Time Weather_ �F 65 Start T n 3S6 0 Centerline Coand'otaies (Id) 70.71 (E) 36339 Finish Time : 407 a► c Torque Drive Head: 115K Indicator Type Dual Torque Factor F 25 Pile Orientadoe Sketch 1 p t — — — — ---- t i l t at ;�. p" u Lead Section Desai Pty : 18' loryE; with (3) 20 helices Extension Description 8t Quantity: OD (In.) : 8.625 Schedule (Wall thickness) 495 Embedment Length : 16 Top of Plate Elevation : 94.33 Inclination of Helical Pile NS<2% EW�o Centaiine deviation (N) -0.127 10 -0.113 Actual Installation Data Comments Depth PSI TOM- Depth PSI Torque See dMdwd spreadsheet at end of area 57 sectioa Name Leonidas Stephenson Name Name Siawtum Signature Signature Date 3212013 Date flare ANCHORPIPE INTERNATIONAL INC WILLIAN IS TXR-1 LINDE PARACHUTE, COLORADO HELICAL PILE INSTALLATION RECORD Pile * : 5769 Turnover System: Pile Type: 3B Inspection Classification Sub -System: - CDntrac lor: AndtorPipe Subcontractor ❑ Building /Equipment: Pump Shed Work PwkaSe= IPMT ❑ Other ❑ AmWUniC AREA 57 e Insfeilatian a & T� : 112/12 - Weallfer. "F 63 StartTime : 334 a Cealaiite Caord es (N) 70.77 (E) 37834 Finish Time: 3.43 °1 c Drive Head: 115K Torque Indicator T ��e Torque Factor 25 Pile Orientation Sketch N � E I I I I C6 Lead Section Description : 18' Ion vvilh (3) ZO helices Extension Description & atr►!it y OD (In.) : 8.625 Sdiedule (Wall addmtss) 495 Embedment Length : 16 Top orPbdc Elevation : 94.33 Inclination ofmicd NS<2% Pile: EW<2% ccaterlbedeviation -0071 {1; -0.156 Actual botallatian DM2 Depth PSI Torque Depth rgl Torque Comments See aaached spreadsheet at end of area 57 sectiaa 606m" Name UM Leonides Stephenson Name Name Sig►mtwe Signatm SiPn Uffe Date 3/212013 Date Date ANCHORPIPE INTERNATIONAL INC WILLIAMS TXP-1 LINDE PARACHUTE, COLORADO IIEL ICAL PILE INSTALLATION RECORD Pile # : 5770 Turnover Systcra: Pile Type: 3B Inspection Classification Contractor. Arr Jm?i re Subcontractor ❑ Work Package: 1PMT p Other ❑ Sub—System: Building iE9 P� - an m t• PhShed P ArealllniC AREA 57 Installation Date 11RJ12 a di: Tame a Cerdcrlunc (1) 70.69 a Coad'otalex Torque Dual Drive Head: 115K Indicator gauge nepb I Psi 1 Torque Weather. OF 1 59 (E) 1 393.40 Torque Factor 25 18' long with (3) 20 helices OD Sch le I (I(In.).,8.625 (Well thickness) .495 16 94.33 NS2% EW<2% -0.15 (E I -0.104 Actual Installation Mtn D"Ib I PSI I T.M. Start Tone : 3:13 Fmish Mune: 3:23 Pile Orientation Sketch Comments See attached spreadshcat at end of area 57 sce iorr_ Name Leonidas Siephensoo Name IName Si�rnut�c Signature - Signature Date 3/2120/3 Date [)Me Lead Section Description : Extension Description & o. Quantity: a Fanhednrenl Length Top of Plele Elevation : Iodination ofHdical Pile: Comdtine devialim MI nepb I Psi 1 Torque Weather. OF 1 59 (E) 1 393.40 Torque Factor 25 18' long with (3) 20 helices OD Sch le I (I(In.).,8.625 (Well thickness) .495 16 94.33 NS2% EW<2% -0.15 (E I -0.104 Actual Installation Mtn D"Ib I PSI I T.M. Start Tone : 3:13 Fmish Mune: 3:23 Pile Orientation Sketch Comments See attached spreadshcat at end of area 57 sce iorr_ Name Leonidas Siephensoo Name IName Si�rnut�c Signature - Signature Date 3/2120/3 Date [)Me PILE Module Pile location Building/Unit Pile Type DATE Depth Survey 5746 AREA 57 VST -5360 4 12/6/12 39 YES 5747 AREA 57 VST -5360 4 12/6/12 38 YES 5748 AREA 57 VST -5360 2 12/7/12 12 YES 5749 AREA 57 VST -5360 4 12/6/12 39 YES 5750 AREA 57 VKO-5630 1 12/4/12 10 YES 5751 AREA 57 VKO-5630 1 12/4/12 10 YES 5752 AREA 57 MISC 1 12/4/12 11 YES 5753 AREA 57 MISC 1 12/4/12 11 YES 5754 AREA 57 MISC 1 12/4/12 11 YES 5755 AREA 57 M15C 1 12/4/12 11 YES 5756 AREA 57 Pump Shed 3B 11/2/12 16 YES 5757 AREA 57 Pump Shed 3B 12/3/12 26 YES 5758 AREA 57 Pump Shed 3B 12/3/12 39 YES 5759 AREA 57 Pump Shed 3B 12/3/12 39 YES 5760 AREA 57 Pump Shed 3B 12/4/12 27 YES 5761 AREA 57 Pump Shed 3B 11/2/12 16 YES 5762 AREA S7 Pump Shed 3B 11/4/12 27 YES 5763 AREA 57 Pump Shed 3B 12/3/12 26 YES 5764 AREA 57 Pump Shed 3B 12/3/12 26 YES 5765 AREA 57 Pump Shed 3B 11/2/12 16 YES 5766 AREA 57 Pump Shed 3B 12/3/12 17 YES 5767 AREA 57 Pump Shed 3B 12/3/12 26 YES 5768 AREA 57 Pump Shed 3B 11/2/12 16 YES 5769 AREA 57 Pump Shed 3B 11/2/12 16 YES 5770 AREA 57 Pump Shed 3B 11/2/12 16 YES 5771 AREA 57 MISC 1 12/4/12 11 YES 5772 AREA 57 MISC 1 12/4/12 12 YES 5799 AREA 57 MISC 1 12/4/12 11 YES Indnation Reped signed TEMP START RNISH Dr head Torq fact INCL N INCL S BP YES 3/21/2013 42 8:09 8:52 115k 25 NS<2% EW<2% YES 3/21/2013 42 2:15 3:00 115k 25 NS<2% EW<2% YES 3/21/2013 33 9:36 9:44 115k 25 NS<2% EW<2% YES 3/21/2013 46 12:51 1:34 115k 25 NS<2% EW<2% YES 3/21/2013 46 1:52 1:55 115k 25 NS<2% EW<2% YES 3/21/2013 46 2:05 2:09 115k 25 NS<2% EW<2% YES 3/21/2013 42 12:20 12:25 115k 25 NS<2% EW<2% YES 3/21/2013 47 12:40 12:49 115k 25 NS<2% EW<2% YES 3/21/2013 48 12:57 1:03 115k 25 NS<2% EW<2% YES 3/21/2013 48 1:19 1:27 115k 25 NS<2% EW<2% YES 3/21/2013 34 8:41 8:58 115k 25 NS<2% EW<2% YES 3/21/2013 48 2:15 2:20 115k 25 NS<2% EW<2% YES 3/21/2013 47 3:00 3:43 115k 25 NS<2% EW<2% YES 3/21/2013 45 3:57 4:25 115k 25 NS<2% EW<2% YES 3/21/2013 26 7:34 7:39 115k 25 NS<2% EW<2% YES 3/21/2013 63 2:47 3:03 115k 25 NS<2% EW<2% YES 3/21/2013 26 7:53 7:57 115k 25 NS<2% EW<2% YES 3/21/2013 47 2:55 2:59 115k 25 NS<2% EW<2% YES 3/21/2013 48 2:27 2:31 115k 25 NS<2% EW<2% YES 3/21/2013 44 11:39 11:49 115k 25 NS<2% EW<2% YES 3/21/2013 63 1:32 1:38 115k 25 NS<2% EW<2% YES 3/21/2013 48 1:50 1:54 115k 25 NS<2% EW<2% YES 3/21/2013 65 3:56 4:07 115k 25 NS<2% EW<2% YES 3/21/2013 63 3:34 3:43 115k 25 NS<2% EW<2% YES 3/21/2013 59 3:13 3:23 115k 25 NS<2% EW<2% YES 3/21/2013 38 11:04 11:19 115k 25 NS<2% EW<2% YES 3/21/2013 1 32 10:46 10:53 115k 2S NS<2% EW<2% YES 3/21/2013 43 3:51 4:02 115k 25 NS<2% EW<2% 10 11 12 13 14 15 16 17 18 19 1900 1900 1900 2000 2000 2100 2100 2200 2200 2000 2100 2200 2200 2200 1200 1200 1200 1100 1200 1200 2200 2300 2300 2500 2600 2600 2600 900 1000 1100 1100 1100 1100 1100 1200 1100 1100 1100 1100 1200 1200 1200 1200 1100 1100 1100 1100 1100 1100 900 1000 1000 9+50 1000 1000 900 900 1000 1050 1000 1050 2000 2000 2100 2100 2300 2300 2300 2300 2200 2300 2200 2200 2200 2200 2200 2000 2200 2300 2200 2200 2200 2200 1700 2100 2300 2000 2200 2100 2200 2500 2700 3000 2800 2700 2500 2500 2600 1800 2000 2200 2200 2600 2800 2800 3100 3200 2400 2600 2600 2600 2600 2400 2200 2000 2200 2300 2300 2300 2200 2000 2000 2200 2300 2300 2200 2200 2200 2300 2200 2300 2200 2200 2300 2200 2200 2200 2200 2200 2400 2300 2200 2300 2200 2300 2500 2500 2500 2700 2700 2900 2900 1700 2000 2200 2400 2600 2800 2900 3000 2700 2700 3300 3400 3400 3400 3200 1000 1100 1100 1100 1100 1100 1100 1100 1100 1100 1100 1200 1200 900 900 1000 1000 1.100 1100 ZD 21 CC (N) CC (E) CDE ACC(N) I ACC(E) CCD(N) CCD(E) 114.5 390.5 97.000 114.534 390.539 0.034 0.039 102.5 390.5 97.000 102.507 390.549 0.007 0.049 102.5 375.5 97.000 102.5 375.476 0 -0.024 102.5 360.5 97.000 102.5691 360.475 0.069 -0.025 108.5 364.667 97.666 108.5221 364.606 0.022 -0.061 108.5 372.667 97.666 108.452 372.585 -0.048 -0.082 99.667 353.594 96.500 99-681 353.625 0.014 0.031 99.667 358.573 96.500 99,64 358.588 -0.027 0.015 99.667 364.25 96.500 99.659 364.273 -0.008 0.023 99.667 368.5 96.500 99.597 368.424 -0.07 -0.076 95.84 333.5 94.333 95.797 333.469 -0.043 -0.031 95.84 348.5 94.333 95.91 348.384 0.07 -0.116 95.84 363.5 94.333 95.856 363-442 0.016 -0.058 95.84 378.5 94.333 95.683 378.389 -0.157 -0.111 95.84 393.5 94.333 95.878 393.471 0.038 -0.029 83.34 393.5 94.333 83.372 393.4 0.032 1 -0.1 83.34 378.5 94.333 83-316 378.531 -0.024 0.031 83.34 363.5 94.333 83.2271 363.417 -0.113 -0.083 83.34 348.5 94.333 83.354 348.43 0.014 -0.07 83.34 333.5 94.333 83.258 333.393 -0.082 -0.107 70.84 333.5 94333 70.856 333.422 0.016 -0.078 70.84 348.5 94.333 70.863 348.456 0.023 -0.044 70.84 363.5 94.333 70.713 363.387 -0.127 -0.113 70.84 378.5 94.333 70.769 378.344 -0.071 -0.156 70.84 393.5 94.333 70.69 393.396 -0.15 -0.104 99.667 347.636 96.000 99.6 347.613 -0.067 -0.023 105.479 349.959 96.000 105.516 349.967 0.037 0.008 170.729 372.917 100.344 170.777 372.956 0.048 0.039