Loading...
HomeMy WebLinkAboutApplication- PermitrA No . 67-83 i GARFIELD COUNTY BUILDING, .MNITATIONaiPLANNING DEPARTMENT 109 lith Street Suite 303 Glenwood Springs Colorado 81601 (303) 945-8212 Job Address J ` i Nature of Work Use of Building Owner Contractor Building Permit 214-0-26-4 .A1,643)212., Amount of Permit $ 0 '75'. 96 /4--Q-etAiL 5.e. &Ad. c b 4, = rez‘4' Clerk BUILDING PERMIT APPLICATION GARFIELD COUNTY, COLORADO A licant to com lete numbered spaces onl . PERMIT NO. PARCEUSCHED NO. JOB ADDRESS IGOLI& R al LEGAL DESCR. LOT NO. BLOCK t 'f SUBDIVISION u (J . ri f (/ V gr f v Ij� 2 ,ff c/,' ` L OWNERI17 h / .c.seg'T // &k ?ry` ADDRESS`Tf I Fk ' �/ PHb 3 WK. PH,6„26-6-77,166 3 CONTRACTOR cl/F�f'� C if ADDRESS PH, L{CENSE NO. 4 I ARCHITECT OR DESIGNER ADDRESS PH. LICENSE NO. 5 ENGINEER ADDRESS PH, LKENSE NO. i 6 S.F OF BUILDING a, Q.y S.FOFLOT Se CS At% HEIGHT NO. OF FLOORS %,iC:0Fr 7 USE OE BUILDING 1E6.0N4) PFS'/ C/S/('E 8 CLASS OF WORK: NEW ❑ADDITION a ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE 9 DESCRIBE WORK: 10 GARAGE SINGLE DOUBLE CARPORT SINGLE DOUBLE DRIVEWAY PERMIT ON SITE SEWAGE DISPOSAL PERMIT SITE PLAN 11 VALUATION OF WORK: $ ADJUSTED VAL.$ PLAN CHECK FEE 7�8.7 r — PERMIT FEE l 6, 7, . SS SPECIAL CONDITIONS: 1 7' `'6 IT ') " ° " IL ' SCHOOL IMPACT FEE/ Tsbs: /C. ini NO. OF BUILDINGS PARCEL c• USE OF BUI ❑INC NryOW. gN PARCEL l k,, TOTAL FEE plO 7(p /��S OCC. GR. CONST. TYPE w. . NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL„ VENTILATING QR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR ABANDONED FOR A PERIOD OF 180 DAYS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS GOVERNING THIS TYPE OF WORK WILL BE COMPLIED HEREIN OR NOT, THE GRANTING OF A PERMIT AUTHORITY TO V40 TE OR NCEL • -• LOCAL LAW •'RE G C l4. p� 1a.l,Li. i I 1 :kP- PLUMBING, CONSTRUCTION AUTHORIZED OR WORK IS SUSPENDED AT ANY TIME AFTER THIS APPLICATION AND OF LAWS AND ORDINANCES WITH WHETHER SPECIFIED DOES NOT PRESUME SIONS OF ANY OTHER STATE OR THE PERFO'MANCE ) J /S ---- j%• WATER SUPPLY rt1i I� DATE PERMIT ISSUED HEATING, SPECIAL APPROVALS REQUIRED RECEIVED NOT REQUIRED IS ZONING WORK IS HEALTH DEPT. KNOW FIRE DEPT. TO GIVE SOIL REPORT OR OF SETBACKS FLOOD HAZARD ign eofOwner, Contractor orauth.iy .awngrea.:^>U . .."../.+113 r/!/Q .e-oodnoti /AI f1 '.ii .a•. I�� MANUF HOME gii) ..,..,....-0-4.4- ur4ding pertmentApp ate Panning ... rtmentApproval l.=te r nil j 5 OTHER „Qpj�,[L O. u AGREEMENT l PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garform.1303 I HE,REB ACjCNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE jINITLAL AC -)47.9 p (Ct s 11(0600( LOKI° ,i4/: , t �`� The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector. 2. Permanent address assigned by the Garfield County Building Department posted where readily visible from access road, 3. A finished roof a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing. 4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running, water, floors and walls finished an a privacy door. 5. All steps outside or inside over three (3) steps must have handrails, guardrails on balconies or decks over 30" high constructed to all 1994 UBC requirements. 6. Outside grading done to where water will detour away from the building. 7 Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.0) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # (a7 prmtcond.lst Date 6/ 5 - --- -- a�._= 739� - tJ._.. /lab 410 v o #c0> A -g,0 a_ 3040.0 --- . .7,115,5 a..._ ;9a".0-.- /3-s; )! -- 7. g �y, .. _ ---.. 7fS. /' V 5DSI r° D d J GARFIELD COUNTY BUILDING AND PLANNING 970-945-5212 ; F(/).<.., MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION MANUFACTURED HOMES ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application pplic do and expe edittee the issuance of a permit it is important that complete information p d complete information will prevent delays m the plan review process. a Reviewing Y planllicant an the discovery that required information has not been provided by thepp delay of the permit issuance and in proceeding with building construction. ocowner eor contractor may be required to provide this information before the plan review may pr causes delays because other plans that are in line for review may bgiven attentionbeforethe new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Hyatt do not, it may Uniform Building be helpful to obtain a book titled "Dwelling Construction under the Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance withhe but dng, plumbing and mechanical codes, applicants are requested to review the following prior to and during design. Applicants are require to indicate appropriately and to submit the completed check list at time of application for a permit. For the placement of a manufactured home, questions numbers 1-4 and 19-28 are the only questions that need to be addressed; 1 1. Is a site plan included that indicates the distances of the proposed building or addition to property lines, other buildings, set back easements and utility easements? Yes 2. Does the site plan include the location of the I. S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties), streams or water courses? Yes 3. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes 4. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes _' _ 5. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes 6. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and so ts? Yes 7 Do the plans include design loads as required under the Uniform Building Code for roof snow loads, (a minimum of 40 pounds per square foot in Garfield County), floor loads and wind loads? Yes SC 8. Does the plan include a building section drawing indicating foundation, wall, floor and roof construction? Yes 9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof raftrg s or joists or trusses? Yes 10. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes 2 ad tion from the 11. Does the plan indicate the height of the building or midpenthe prid eland the eave down to existing st point of the building or addition measured at d span betweg grade c tours? Yes 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Co Chapter 37? Yes No 14. Does the plan include a window schedule or other verificationets of the Uniform Building Code? that egress/rescue windows m sleepin rooms and/or basements comply with the req Yes __�_ No 15. Does the plan include a window schedule or other verification that windows provide natural light and ve t' ation for all habitable rooms? Yes No 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No 17, Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No �— 18. Do you understand that if you are building on a parcel ()fluid created by the exemption process or the s bdivision process, are building plans in compliance with all plat notes and/or covenants? Yes No_ 19. Do you understand that if you belong to a homeowners association, it is your repo submitt ng to obtain written permission from the association, if required by that association, prior an application for a building permit? If you do nob �efiinded should the architectural co written permission from the cmmittee do you understand that the plan check fee will not deny o ject your building plans? Yes No 20. Will this be the only residential structure on the parcel? dam. Yes No If 3 21. Have two,(2) complete sets of construction drawings been submitted with the application? Yes A 22. Is this an application for the placement of a manufactured home? Yes No _4_ If yes, have you specified the size of the unit (min. 20ft. x 20 ft); live roof load (min, 40#); wind design (min, wind speed of 80 mph & 15 lb. wind load); foundation design; method of anchoring? Yes 23. Have you designed or had this plan designed while considering building and other construction code re uirements? Yes No 24. Does the plan accurately indicate what you intend to construct and what will receive a final inspects by the Garfield County Building Department? Yes No 25. Do you understand that approval for design and/or construction changes are required prior to the applicatii9n of these changes? Yes No 26. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "School Impact's o Septic System" fees required, at the time you pick up your building permit? Yes No 27. Are you aware that twenty four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before; afternoon inspections must be called in by 5:00 p.m. the day before. Failure to give twenty four (24) hour notice for inspections will delay your inspection one y1e day No 28. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancyof the building? Yes No 29. Are you aware that the person signing the Permit Application, whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for the project complying with the Uniform Building Code? Yes No 4 I hereby acknowledge that I have read, understand and answered these questions to the best of my ability, signare Phone: ��602 5 3 (days); Project Name: Project Address: date 5 a-47-7(---0____ (evenings) Cti2A-3 Z:a Ksiaic /oto Notes: Ifyou have answered "No" on any of the questions, you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the Building Official that additional information is necessary to review the plication and plans to determine minimum compliance with the adopted codes; the application may be placed behind_more re etit applications for building permits in the review process and not reviewed until required information has been provided and tie plication rotates again to first position for review, delay in issuance of the permit or delay m proceeding with construction. *erApp02.95 5 Effective August 15, 1995 BUILDING PERMIT CONDITIONS LIST 1994 UNIFORM BUILDING CODE Job Address: Lot 6, Heavenly View subdivision, Cr218, Silt Owner: Michelle Soet prebble Phone: 970-625-5366 Occupancy Classification: R-31 Floor Area: 2912 sq. ft. Date: june 24, 1998 Contractor: Owner Type of Construction: V -N Number of Stories: 2 + basement Valuation: $159,882.76 The following conditions are based on the i 994 edition of the Uniform Building Code. The approval of plans and specifications does not permit the violation of any section of the Uniform Building Code or any federal, state or local regulations. These conditions are part of the Building Permit and must be met prior to issuance of a Certificate of Occupancy. Any and all deviations from the original plans and specifications approved by the Budding Department shall be submitted to the Building Department for approval prior to installation. The purpose of this review is to provide for minimum protection of life, Limb, health, property, environment and for the safety and welfare of the consumer and general public as regulated by the Uniform Building Code, Uniform Plumbing and Mechanical Code. GENERAL CONDITIONS G-7 The approved plans and the Building Permit are to be kept on the site during construction. The approved plans must be available for reference during inspections. Section 106.4.2. G-8 Approved numbers or addresses should be provided for all new buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Section 502. ELECTRIC E-3 Contact State Electrical Inspector for requirements for an electrical permit. SITE S-4 Notify all utilities for line locations and approval prior to beginning any excavation on site. (Electric, Water/Wastewater, Rocky Mountain Natural Gas, Telephone, etc.) 1 X-27 Landings at doors shall comply with Section 1004,3 UBC. In single-family dwellings, duplexes, lodging houses and U occupancies, the landing or top step may be 8 inches maximum below the floor level, provided the door does not swing over the landing. X-35 Risers on stairways should not be less than 4 inches or exceed 8 inches, and runs should not be less than 9 inches. Section 1006.3. X-36 Stairways and handrails shall comply with Section 1006 of the UBC. X-39 Handrails projecting from a wall should have a space of not less than 1112 inches (38 mm) between the wall and the handrail, Section 1006.9. X-40 The handgrip portion of handrails should not be less than 1114 inches (32 min) or more than 2 inches (51 mm) in cross-sectional dimension or the shape should provide an equivalent gripping surface. The handgrip portion should have a smooth surface with no sharp corners. Section 1006.9. X-42 The top of handrails should be placed not less than 34 inches or more than 38 inches above the nosing of treads. Section 1006.9. X-45 Handrails should have their ends returned or should terminate in newel posts or safety terminals. Section 1006.9. X-47 Guardrails for stairs, balconies and landings should conform with Section 509. Note that maximum clearance between intermediate rails should be 4 inches and guardrail height should be at least 36 inches. Section 509. X-49 A minimum headroom clearance for stairways of not less than 6 feet 8 inches should be specified on the plans. Section 1006.9. X-60 Exits should be illuminated to comply with Section 1012. X-78 Exterior stairs shall be constructed per Section 1006.13 Foundation FN -8 The manufacturer of concrete shall furnish to the purchaser a delivery ticket with each batch of concrete before unloading at site providing the information specified in Section 1905 UBC Standards. These tickets shall be saved and available for review by the Building Official. FN -10 Basement walls below finished grade are required to be damp -proofed, Section 1402.4 LBC. FN -11 Provisions shall be made for the control and drainage of surface water around buildings, Section 1804,7 UBC. FN -14 Foundations supporting exterior decks shall extend below frost line, Section 1806.1 UBC. FN -22 Soils classification and analysis by a qualified and licensed soils engineer may be required by the building official, Section 1804.1. Wood Framing WF -4 Truss details from the manufacturer should be provided. NOTE: Ali pre-engineered roof and floor trusses should bear the stamp of a 3rd party inspector or agency. The plans should include the design load and bracing details. 3 Group R Occupancies R-4 Basements in dwelling units and every sleeping room below the fourth story should have at least one openable window or exterior door conforming to Section 310.4 for emergency escape or rescue which should open directly into a public street, public alley, yard or exit court. Section 310.4. R-5 Egress window specifications of Sec. 310.4 are as follows: Maximum sill height above finish floor: 44 inches Minimum net clear opening width: 20 inches Minimum net clear opening height: 24 inches Minimum net clear opening: 5.7 sq. ft. A minimum of 20" wide x 41" high or 34" wide x 24" high is needed to achieve the required 5.7 sq. ft. Window wells shall be provided per Section 310.4, Items 1 and 2. R-6 The following rooms should have exterior glazed openings to provide natural light and natural ventilation as specified in Section 1203: R-14 Every dwelling unit and guest room shall be provided with heating facilities capable of maintaining a room temperature of 70 degrees Fahrenheit at a point 3 feet above the floor in all habitable rooms; Section 310.11, R-18 Provide smoke detector(s) in accordance with Section 310.9 of the UBC. One smoke detector is required on each level, in halls outside bedrooms, in vaulted ceiling areas and in each sleeping room. .Alarm shall be interconnected, if necessary so that alarm is audible in the sleeping areas of the dwelling unit. See Section 310.9.1.4 and Section 310.9.1.5 for other required locations. R-22 Provide natural light and ventilation to all habitable rooms per Section 1203. .R-23 Provide minimum ceiling height in the basement and loft. Section 310.6 FIRE -RESISTIVE CONSTRUCTION FR -15 if enclosed usable space is provided under interior stairways the walls & soffits should be protected on the enclosed side as required for one-hour fife -resistive construction. Section 1006.12. FR -2I Fire blocks should be provided in accordance with Section 708.1 and 708.2 FR -23 Draft stops should be provided in accordance with Section 708.3 and 708.4. FR -26 The interior wall and ceiling finishes should comply with Section 804, Tables 8-A and B. Sanitation SA -4 Shower stall walls should be finished with a hard, nonabsorbent surface to a height of 70 inches above the drain inlet. Section 807. Exi1inz Requirements X-18 Exit doors shall be openable from the inside without the use ofa key or any special knowledge or effort. (See Section 1004.3 UBC.) X-21 Every required exit doorway should be ofa size to permit the installation ofa 3 -foot by 6 -foot 8 -inch door. A minimum clear width of 32 inches should be provided. Section 1004.6. WF -14 Roof rafters and ceiling joists shall be supported laterally to prevent rotation and lateral displacement when required by 2317. Roof trusses shall be supported laterally at points of bearing to prevent rotation and lateral displacement. (Sec. 2317 UBC). WF -21 Installation of TJT's and micro lams must comply with N.E.R. 119. Manufacturer's requirements for boring holes and cutting ofjoist must be followed. (i.e., flanges must never be cut or notched, etc.) WF -22 Lumber beams, rafters, trusses and joists shall be supported laterally over beams and points of bearing with solid blocking. Bridging or solid blocking shall be installed at intervals not exceeding 8 feet when the ratio of depth to thickness exceeds 5 to I (i.e., 2 x 10), Sections 2326.8.6 abd 2326.11.2 UBC. WF -27 Provide approved treated or decay resistant wood columns, sills, plates, and sleepers on concrete slabs, foundations, and exterior pads and piers in accordance with Sec. 2317. WP -39 Provide roof (and floor) sheathing per Section 2305, 2322, and 2326, and Tables 23-1-R-1, 23 -I -.R-2, 23 -I -S-1 and/or 23-1-T-1. WF -40 Plank flooring shall be installed as per Section 2326,9.3. WF -41 Plank roofing shall be installed per Section 2326.12.10. WF -42 Specify the size, grade and species for all exterior headers over 4 feet. Section 2326.11.6, WF -43 Specify the size, grade and species for all structural framing lumber. Section 2305, 2326. WF -44 Specify the grade and species of the log walls for approval prior to installation. Section 2305. WF -46 Conventional light frame construction shall be fastened in accordance with Table 23 -I -Q, minimum. Exterior Wall WL -15 Provide flashing for all exterior openings per Section 1402.2. Roof RF -6 An attic access opening (minimum 22 inches by 30 inches) should be provided with a minimum clear headroom of 30 inches. Section 1505.1. The opening should be located in a hallway, corridor or other accessible location. RF -8 Ventilation is required in attics and enclosed rafter spaces. Enclosed attics and enclosed rafter spaces formed where ceilings are applied direct to the underside of roof rafters shall have cross ventilation for each separate space by ventilating openings protected against the entrance of rain and snow. The net free ventilating area shall be not less than 1/150 of the area of the space ventilated, except that the area may be 1/300, provided at least 50 percent of the required ventilating area is provided by ventilators Located in the upper portion of the space to be ventilated at least three feet above eave or cornice vents, with the balance of the required ventilation provided by cave or cornice vents. The openings shall be covered with corrosion -resistant metal mesh openings of 1/4 in dimension (Section 1505.3 UBC) RF -31 Install metal roof per Chapter 1507.8 UBC, manufacturers' specifications, and approved listings Materials & Insulation MI -12 Water-resistant gypsum backing board should not be used in the following locations (Section 2512): 4 a. Over a vapor retarder. b. In areas subject to continuous high humidity. c. On ceilings. MI -16 Prefabricated construction shall comply with Section 1704. Glass & GlaZinR GG -3 Doors and panels of shower and bathtub enclosures and adjacent wall openings within 60 inches above a standing surface and drain inlet should be fully tempered, laminated safety glass or approved plastic and should comply with Section 2406. GG -4 Safety glazing should be provided at hazardous locations. Section 2406. UNIFORMPLUMBING CODE PL -2 Plumbing and mechanical must comply with the 1994 Uniform Plumbing Code (UPC) and the Uniform Mechanical Code (UMC). UNIFORM MECHANICAL CODE M-1 Gas furnace or boiler, hot water heater and gas fireplace shall comply with the 1994 UPC and the UMC. combustion air, installation, clearances, access, venting, gas line sizing, etc.) Plans were not submitted for review. M-16 Liquefied petroleum gas -burning appliances should not be installed in a basement, pit, or similar location where heavier-than-air gas might collect, unless such location is provided with an approved means of removal of unburned gas. Provide details for approval prior to appliance installations. Section 304.6 UMC. 5 CADCODE 637 127 Road GLENWOOD SPRINGS, COLORADO (970) 945-7315 Notes to Building Official Soet Prebble Residence Lot 6, Heavenly View Subdivision CR 218 ,Silt June 24, 1998 A review of the plans for the Soet Prebble Residence for conformance to UBC requirements was performed at a level customary to the trade. Except for the "red -lined" notes on the plans and conditions of permit which are expected to be field enforced, and, the Plan Review Correction List which should be resolved prior to issuing the permit, general UBC code compliance was found for the Soot Prebble Residence, The structural plans are not stamped by an architect and engineer licensed in the state of Colorado, Cadcode performed a spot check review only. The Building Official should be aware that the structural review by Cadcode was not performed by an engineer or architect licensed in the State of Colorado, See the Building Department copy of the redlined plans for joists, rafters, and beams checked, See the Plan review Correction List for items that should be addressed prior to issuance of the permit. Plans were not checked for UPC and UMC compliance although notes calling for general compliance with these codes are included, Attached are the conditions of permit and redlined plans so that the permit can be issued after the items on the Plan Review Correction List are resolved. Valuation calks; Project valuation - Main level dwelling - 1120 sq.ft x $66,02 = $ 73942,40 Basement (Unfin, ) - 1120 x 28.00 = 31360.00 Loft( Shell only*) - 672 x 52.82 = 35492.36 Deck - 596 x 10,00 = 5960.00 Covered porch - 400 x 22,82 = 9128.00 Project valuation - $155882.76 • Deduct 20% for shell only per UBC Standards Magazine Valuation Chart Building Permit Fee Plan Check Fee Fee Due Cadcode $ 11677.25 $ 758.71 379.35 GARFIELD COUNTY BUILDING INSPECTION DEPARTMENT 109 8th Street Glenwood Springs, Co. 81601 (970) 945-8212 Plan Review Correction List Prebble Residence Lot 6, Heavenly View Subdivision CR 218, Silt, Co. June 24, 1998 The following comments based on the 1994 edition of the Uniform Building Code shall be resolved prior to the issuance of the building permit. The purpose of this review is to provide for minimum protection of life, limb, health, property, environment and for the safety and welfare of the consumer and general public as regulated by the UBC. 1. There is no floor plan provided for the loft. It is unclear from the elevations if the natural ventilation requirements are met for the loft. Verify and provide revised plan as required. Sec. 1203. 2. Specify the size, length, width, and depth, and, a reinforcement schedule for all the interior and exterior t foundation pads. Sec. 106, 1806. .o: jr r ''z - P. , Sieer/- t)ildur�a 1 ' ale ✓" 3. The plans could not be verified for structural compliance as the grade and species of horizontal and vertical structural lumber was not provided. Specify the grade and species for the log walls, structural beams, floor joists, deck joists and rafters. Provide a beam schedule for the decks and any other structural beams headers and columns not shown on the plans. Provide engineering as required by the Building Official. Sec. 106, 2305, 2322, 2326 5. The walkout portion of the basement is post and beam construction. Specify the spacing of the 8x8 columns supporting the log walls and floor above. Specify a dead load for the log walls so that the 12x12 beam and column loading can be verified. Provide engineering as required. Sec. 106. 6. Refer to the conditions of permit and redlined plans for other code requirements. Al rZ" Pki)-/V Avg 7f /6 74011.SE- 1,40' c,‘ 0 3419 4 Vti_J::)1,Y75 / -_,........... *71 i ..,,!..L:,-, ' ' : ' • - ..1 4 -• 1.1: :, T*I- FIAi cC 14 cr- clot' /11-dilw4eVg//tiir i -7571-3y-2-a- C riPi 627-7/.../r/ g /4frii24-nIsic .,Pi/Wge-,Z6.-.? eV-74tnix --1(") ) courli(-( aks 1-Y4 /44 S SLA..32,33/Vi St cp./ 7-1;' 6;s-r-LC3i; 6 1.› 1.fl,et 11" 60- rVI ) - j1, ) I/ \ inutin turcomm • nun= 0 JFII 111 - ----------- , kiF) r p -kc 'ectv kdoc).1- -e) xl?!Ipoi.v7t4 891F" le,"( ed,p .144)12 7611,0/9 770 e •ficanciaAoccso kDat(6 p -! •"- tte'..5- Sol 11.5 d 6 afuliP ,6.*alfIrt4-1 t4i I)) 76 • h , • 1( 414 ) rift •-otv dt 1P- •jr .) .401 Fukct #1'co4c.5114) irectivever unclithr -••• •••=••• fge,PANI Ikm.c.F../Z. P4C1-40PITES- ocAr. q -Aff toed siopeci bhcK ( 1 CbQ 3);:"604r4.tei.,41,01.. a** , 11,0(7 —1-icw4A Th2- 0 — ettA. -onst • .. - _ .-5-7.0saix.,,. Lf 16 ° pAk (//.? • Ike ee 4,e -4 oLe •Id7 • -,1•••••=:. 7' • - 7iDfl I AP, 64. leedathli,t 01.1u, SO// t.. Ccuei WOR PL Ai o I - I • v k-'• ‘ „ 01 1111115 cf t- l'7) (IL'''. n .nc4 ii_ ,e_cy • --.1 +NI' ( • f ,If‘ , fer,AA I a t . 0 N A e7 11.o 0 AA. 4-4 H. • (' ,z -v4,7111/14 f / E. 0 10 R (I, 6( --- 1;)/ X --- =( f7• 117'Prt:/Y5 11 •c: .ri1.7114: _ ... t.,94'',„e1V C ' '' • ' -• ' '''''''' 1 •1' : \ '' ''''/ /77 I ,-..'.' ,,,,' .., ‘,,,,:v .:..• ,1„. ., s.; d' e..e,,- . ) t ,, .•1.01,'•' ,-i ir• / .-% ' .' ' ''''' V vf i i ,. drAz trriit' i i.r.) , 0,1 ioffiL,I. •-•' , 0)V—,., ..,iidiL' ...- ..t.1 ' .•-,..,,'••••••1 t `.., .11' 1...?+,`.--- ..- •i -o " _, e.,-..,-!..-' id,. ,A4 4 ./. j.../k ,,„....ref.-: .,.. • Lii •iitri ,..-2!.. 'as A Vik sc,H-sDu e teldf eip;)A-b link -1 / DESMA 4'T 1 oP4 i...'Etsci-rm ati. 1.2".x1R"acwimbr-silmar41 /g -c" cq 1 i,ax ra mot 59ia7cAeloes* 4 iCivi--.0fi1 :2 3 - • -,-'' . ' ' ' ":. , ) /V1. R.cc -4%i; ti.4 - ot to*.iciir :Pr:IRil 4 •."- 014 —0",..DA il,ilk 17`.Rcor ST:43c_ikk- -.::.1 -V-70 i: i+S ryd z.Escia--tPwr:44,-,:',-4-., . i_smcirs au) ,,-,1 iroLe4•*itc.,44644-st, 4'.. 04. rip;, -L: 10X44 TOtsT l'-041 s—C':i:7_,',7a. ._..1.:.,.:2",.xeri_.T.DEcic1016r. .: 3: to*.iciir :Pr:IRil 4 •."- 014 —0",..DA j. 4 L").( 8 ' Pas,'" -- :r01 — CD"- A - f4 -5,24t/3/ iffiet-n/M • emt,e, . _ -• - - - . \/ SCH1OU P 14' PW .- DEscizips-‘0#4 • 1..x.icrill in LIL i AI' X toll •F' ixolzMA vrf '—o" 160_ 10X44 TOtsT l'-041 ka: ._..1.:.,.:2",.xeri_.T.DEcic1016r. - si;tt.icf.r. D2-DLSr _13 . 4 •."- 014 —0",..DA j. • 5 ' [.44a . ...... i ii- - Te-..: - • • .... ... - • . - ..._, . ',•-='; t'1,:-.:2-'• .1 f '''''..1 • (...y._() ,A7.4)-:2.__: l•-,--„ 7.,:7..... - ,.... ... . .-'• ,..--::"%' • --.••-• '1. ',.,..= c,.. '.',.. . ', .1.. ' . ---- 1.'.' .1.,.. , . "--, •,..;,,, I ,, , q„.,) (:`,.r.,:7:7?- ' i ...-, , i _ 7 ...=-7.7- , .., --' (-1/.(.12-f-,4_, 114.../::,•:.: // -7 c„ ••_ . P -Z A L 1)D CO4Cre LtCrt 0)4 LL cmss si-cht) I%f COP nec÷ion feA 6014-6 x 4094 k /71; Aar,- for -4-544 cFi4 \ Ligkg el -r -OP VI 6 7c e I -E_ 1--/ 0 Dkilq RITEI lkftr&R - L • 5, cf 115') g9fk-r)'‘,t, Vit)3/ RIO( -723) 64" S 1117-C "e5,2 ens51(112 -004* cPc 40( ' • - . ...., ,••• ,_ .......-..i,i.. . ... . - - ' ' . • • ' '.. . if /I 1 A , j.)-1'` - ' •," - 1 ,.\/ , ....... ..... 1„.1.J 1.1 1--- 14\11 ,, ''''''. L, ----- 9. ¥,,2,,cuti Zioaki ‘41.42St711,1(-- 1 s Aivi a,toce- F77..-0; 4-6A toctift-0 :<�'•' 17.1M#4.04,0 r• f •t i - I� L '1 ONINV2I: I • I 00 v- -14731 131 *ti I 11 ittEl I 2f I I 1 P ( 0 0-71 z 9 - ). 0 a ; CP112 ......,: ...••••••••......-...• • • Na... .. ______ ii:i. ri .11 ri r ----1 q 1) 1 'tj I i i ilf 1 r r ii I i! pi 7 0 ! ..1 11 ir ! ; !i, 1 1 9 ; E 1 1 ..1. 1 . rl 17 l: q 1 11 • ..I. _ _ ... _ --Li. . ' } 1ri I • ' • I !I r • • II i . _ : L ..i ! , .....• - --. , 11 ...-... =...IIr L ilk , 1 ,...._ ! , ,..._. __. ______ ....... —71 ..... "L 1 1 ........ 1 : —_... Ti z INSPECTION WIL THIS CARD IS BE MADE UNLESS TED ON THE JOB 24 110t Its NOTICE ',QUIREP-FOR INSPECTIONS BUILDI .?G PERMIT GARFIELD TY, COLORADO Date Issu PI Zo ' I Are...4..i I Permit No 78.'Si AGREENT In consideration of the issu nce of this !Ser� �t, thhe}pplicant hereby agrees to comply with all laws and regulations related to the zoningg, IQEation; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspector and IMMEDIATELY BECOME NULL AND VOID. 0 u 1 b» tt Address or altirevi,Dom:.. Owne 1 Contractor Setbacks Frontide • ' Side Rear This Card Must Be Posted So It Is Plainly Visible From The Street!UntilFinal Inspection. • INSPE(CTION RECORD . Footing c - 1 +1- 9 °l f \-- P, .t.e ' Foundation (i; -�1_9.. A f` NI i, , r Underground Plumbing y_ rT_ � / Insulation ('p_$ Q q A r Rough Plumbing g'- 5/ !f �.C+ Drywall Chimney & Vent (O(/q Np Electric Final (by State Inspectory,9.4Q.ega, Gas Piping 9 --2-9g% Final X42. -4Q/ r-611,-0--.---- r I.;lertt'it' Rough illy Stale II sprctor)10 Septic Final �f �a�s-0,4„— Framing ,3 /�9e , (To include Roo in place an indows and Doors installed). mss. Notes: , ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. 0 11111 THIS PERM T IS NOT TRANSPIRABLE 'Phone 945 109 8th Street ` ' County Courthouse Glenwood Springs, Colorado. 1)0 NOT r ES' OV THIS CARD APPROVED. 5Vt sco3 Date IF PLACE l ;OM WITH CLEAR PLASTIC