HomeMy WebLinkAbout3.3.8 Water UsageSeptember 1, 2009
Water Usage and Storage
Williams.
EXPLORATION & PRODUCTION
1058 CR #2I5
P.O. Box 370
Parachute, CO 81635-0370
970/285-9377
970/285-2047 fax
RE: Special Use Permit under Major Impact Review Process PA 41-9 Location
The PA 41-9 facility does not require water for the production process. While
producing the gas from the well; water is a part of the overall product that is
separated out and stored into a tank on location. The tank is emptied as needed
by Summit Energy Services. This water is then hauled to the Parachute Water
Management Facility located in Section 36.
‹-3_„]
Brad Moss
Production and Facilities Superintendent E&P
Williams Production RMT CO
PO Box 370
Parachute, CO 81635