Loading...
HomeMy WebLinkAbout9.04 Annual Review 01.02.2013January 2, 2013 Garfield County Building and Planning Attn: Fred Jarman 108 8th Street, Suite 401 Glenwood Springs, CO 81601 WPX ° E GY imminewa RE: Land Use Change under Major Impact Review — Resolution 2010-08 2012 Annual Report — PA 41-9 pad location Township 7 South, Range 95 West, 6th P.M. Section 9: NE'/4NE' Garfield County, Colorado Dear Mr. Jarman: Per the conditions of approval listed in the Resolution 2010-08 associated with the PA 41-9 pad location: 9. The Applicant shall be required to submit a report annually, until such time as the well pad is released from the COGCC reclamation bond, of the extraction and processing operation, for staff review. Upon review of any deficiencies pursuant to conditions of approval or other local, state, or federal permits, Staff may, forward the report to the County Commissioners for full review of the Special Use Permit. On the PA 41-9 location, normal operations occurred this year which includes the following: • 05/16/12: Bareground Weed Spray Application (around the wellhead, production equipment, and tank facilities). • 06/28/12: WPX sprayed for Kochia and Plumeless Thistle. • 09/20/12: WPX sprayed for Russian Knapweed and Houdstongue. • WPX personnel and contractors continually monitor and maintain production equipment, water removal, and production as needed. WPX has reviewed the conditions set forth in the Major Impact Review and remains compliant under the conditions of the resolution listed above. After review of this annual report, please call me at (970) 263-2754 (0) or (970) 361-2006 (C) if any additional information is needed. Sincerely, WPX Energy Rocky Mountai Bryan S. Hotard Field Land Team Lead — Piceance District 1058 County Road 215 1 PO Box 370 1 Parachute CO 81635 1 970.285.9377 Tel 1 866 525.1481 Fax 1 www wpxenergy.com