HomeMy WebLinkAbout9.04 Annual Review 01.02.2013January 2, 2013
Garfield County Building and Planning
Attn: Fred Jarman
108 8th Street, Suite 401
Glenwood Springs, CO 81601
WPX ° E GY
imminewa
RE: Land Use Change under Major Impact Review — Resolution 2010-08
2012 Annual Report — PA 41-9 pad location
Township 7 South, Range 95 West, 6th P.M.
Section 9: NE'/4NE'
Garfield County, Colorado
Dear Mr. Jarman:
Per the conditions of approval listed in the Resolution 2010-08 associated with the PA 41-9 pad
location:
9. The Applicant shall be required to submit a report annually, until such time as the well
pad is released from the COGCC reclamation bond, of the extraction and processing
operation, for staff review. Upon review of any deficiencies pursuant to conditions of
approval or other local, state, or federal permits, Staff may, forward the report to the
County Commissioners for full review of the Special Use Permit.
On the PA 41-9 location, normal operations occurred this year which includes the following:
• 05/16/12: Bareground Weed Spray Application (around the wellhead, production
equipment, and tank facilities).
• 06/28/12: WPX sprayed for Kochia and Plumeless Thistle.
• 09/20/12: WPX sprayed for Russian Knapweed and Houdstongue.
• WPX personnel and contractors continually monitor and maintain production equipment,
water removal, and production as needed.
WPX has reviewed the conditions set forth in the Major Impact Review and remains compliant
under the conditions of the resolution listed above.
After review of this annual report, please call me at (970) 263-2754 (0) or (970) 361-2006 (C) if
any additional information is needed.
Sincerely,
WPX Energy Rocky Mountai
Bryan S. Hotard
Field Land Team Lead — Piceance District
1058 County Road 215 1 PO Box 370 1 Parachute CO 81635 1 970.285.9377 Tel 1 866 525.1481 Fax 1 www wpxenergy.com