Loading...
HomeMy WebLinkAboutEngineer's Letter 01.17.2017S K PEIGHTAL ENGINEERS Ltd STRUCTURAL CONSULTANTS To: Eric Chacos Powder Trim Building 0054 Southard Station Rd Carbondale, CO 81623 From: Stephen Peightal, PE Date: January 17, 2017 Re: Davidson Remodel 5344 County Road 100 Carbondale, Colorado MEMORANDUM Rail Post Base It is my understanding that you will use the existing steel base assemblies to connect the rail log posts to the deck. This assembly is observed as a 1 1/ 4"o x 16" standard steel pipe, welded to a base plate 3/8" x 8" x 8". This base is attached to the deck with 8- 3" washer head screws through 1 /4"o holes around the plate perimeter. The assembly is waterproofed, and the stone topping is placed over the base, and around the pipe. A bearing plate 3/8' x 6" x 6" octagon is placed over the pipe onto the stone, and the log post is drilled to fit snug over the pipe. Based on the code 200 pound lateral force at the top of post, the connection to the wood deck is acceptable with the described screws, and must extend down into joists or blocking between joists. 16046M SKPE • 298 Park Avenue ■ #301 • Basalt, CO • 81621 • (970) 927-9510 • skpe@sopris.net Andy Schwaller From: Eric Chacos <chacos.powder@gmail.com> Sent: Monday, February 06, 2017 6:52 PM To: Andy Schwaller Subject: Fwd: 16046 Davidson memo stamped Attachments: 16046 Davidson M1-17-17st.pdf Hi Andy, Here is the post base detail. Let me know if you have questions. Thank you, Eric Have a Great Day, call Powder Trim Building! 970 948 0868 or email me Forwarded message From: "S Peightal" <speightal@sopris.net> Date: Feb 6, 2017 2:32 PM Subject: 16046 Davidson memo stamped To: "Eric Chacos" <chacos.powder[7agmail.com> Cc: r e, Eric, As requested find attached pdf copy of my 1-17-17 Memo, stamped for the Building Dept. Please contact me with any questions. Thanks, sp 1