HomeMy WebLinkAboutApplication- PermitNo. 6718
GARPIELD COUNTY
BUILDING, &tNITATIONand PLANNING IJEI'ARTMENT
109 8th Street Suite 303
Glenwood Springs, Colorado 81601
(303) 945-8212
+ l�
Job Addx'resstl 91 L? -y L 4 ,Q} Q-1. .i,�F v '.. (
Nature of Work Building Permit
Use of Building k (" �1Qi:1 `f'1
Owner 1 r -CIS r'cki I n S u a
Contractor Lao \.) Gl,'i<"Oli-Nt-
Amount of Permit S ‘1.3 . a! Date
c37.
Clerk
LV
GARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
�
LP 1
TEL.EPHON'�': (970) 945-8212
Applicant to complete numbered spaces only. PERMIT NO.
INSPECTION LINE: (970) 945-9159
PARCEL/SCHEDULE NO.
JOB ADDRESS:
1
LOT NO.
BLOCK NO, SUBDTVISION/EkEMPTION
awNPx
2
R19.-, IL % i Jjaa6 s
ADDRESS
o 9 / Pte/
3
COMIIALTOR I f -N - .FBF
_P'9415--1/5,91‘
4
ARCHITECT/aDTI IEEE
ADDRESS
Pa 6-45-254r
re:
WK. ESL
LIG NO:
LIC NO:
5
9Q. F1 OF BUILDING
9Q. 1T. OF LOT
6
UBEOFPOBDING
b c -k Pk' 0't7 ,c -C i %,i. ze R4 7)-
OUGHT /0 /
NO. OFELOORS /
7
8
nFscamr:wowc: F!
; /1 }Z>17 200A/ 4,44cd 1Ve' - `1' f G/ .4-/e/2 i74
oMOVE
CIA -IS OF WORT
CADOTITON ❑ ALTP&ATION
DFEMOVE
9
GARAGE
oSING.E
o DOUBLE CARPORT: DSTNULE oD B E
10
o DRIVEWAY PERMIT 40(0,44..
DON SrtE SEWAGE DISPOSAL (SFFITC) p9ITE PLAN
VALUATION OF WORE; 5 +ti s 60 j ADJUSTED VALUATION:I
SPECIAL CONDITIONS:
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED EY THE STATE OF
COLORADO.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED
IS NOT COMMENCED W11H1N 110 DAYS, OR IF CONSTRUCTION OR. WORK IS
SUSPENDED OR ABANDONED FOR A PERIOD OF TV) DAYS AT ANY TIh1E AFTER WORK
IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN OR NOT THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF
CONSTRUCTIO�F�
Date
Signature of Owner, Contractor or authorized agent having Js jaud undpstuod notice above.
�.,� . /43/9
Building Dept, Apinny/Mate f
Ing Dept. A
PLAN CHECK FEE:
TOTAL FEF.: 3
PERMIT FEE:
DATE PERMIT ISSUED:
OCC: GROUP: CONST: TYPE: f_/}(
ZONING:
SETBACKS:
MiANU. DOME:
TSDS NO. & FEE:
AGREEMENT
PERMISSION [S HEREBY GRANTED TO THE APPPLICANT AS OWNE1, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTC,RE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF 11118 PERMIT, THE SIGNER HEREBY AGREES TO COMPLY Wriii ALL BUILDING CODES AND LAND USE REGULATIONS ADC1PTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.25.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
Y
COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OFTRE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE
COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING HIE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER W}IEN N VIOLATION
OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OFTITIE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RES PONS 113IL/TIES
OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES, THE RESPONSIBILITY' FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION
RESTS SPECIFICALLY WMI THE ARCHITECT, DESIGNER, BUILDER AND OS NEP. COMMENTS ARE INTENDED TO BE CONSERVATNE AND 1N 55 P j.tQF THE OWNERS INTEREST_
Garforrn.ao3 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE• AGREEMENT ABOVE. (INITIAL} (,//
The following items are required by Garfield County for a final inspection:
I. A final Electrical Inspection from the Colorado State Electrical Inspector.
2. Permanent address assigned by the Garfield County Building Department posted where
readily visible from access road.
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, kitchen
floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary
plumbing.
4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running, water,
floors and walls finished an a privacy door.
5. All steps outside or inside over three (3) steps must have handrails, guardrails on balconies
or decks over 30" high constructed to all 1994 UBC requirements.
6. Outside grading done to where water will detour away from the building.
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be issued
until all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICAI'L OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET,
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit 4
SA/ 9/1
Signature Date
prmtcond.Ist
0-
cr
/2 5( rid c
4- 7?
iZ ;2 5-
13/.9' le
3 5'64_1
A
-
Co -4
-401
„maul
A --
1(4
d r w
s
4-
o t
c re
H
4'r
-00
ape
ge.
i
3 Y'vd' '1_ ,StS
j I 2,1,1„6,
fyr AcG {R
•
v c14
_+
:r ° � Fri%,. ii rCt .+(„ i l I ``
I...�.. -i--J -ter ,,
$71,
Id of
1,10- .4'144' 0 4(
i d- ".-:
_ 1+-4?ct-r
- — Y
C
Irrei Y
7 :: '
x
-t
7
1
leo latmaton Coustraigin
4915 ST/\T E 1.-IWY. ea
pl-)0NE: 512S
GLENWOOD 5.! prd.TC CO, SI 0.:4511
d • r
.4
r
....
;
A F
•
/
/ i
I
/ ...- 1
1
; ... • ....II ., ,•
/
i
''.....
V-- I.
- ' . .....--. • ...,..
1 i
.,- "'"z.- , • --..-
.,,,,•,..,v
,- •
1'...i''
;,...ri, '....'k, 1..q.1`,20r.; H,-,:•;% ..::•Or -;.\/!.:710`,.;
(.1,1:1 Cp1-.1r:.1.F1 I1'..'.1..1,1 '.:',1''';''i., ;.'...,F ''.',-.;.!...1:11-',.•'-.C,;)
'''...' .,:;::1' .•-.. 1.,..i Li .., i.1;'..1 ...Hi,i',,..'' 1.:.•••';'1';','—'''',1%.11.:'•11 ' '., ',..'•::-:. \ 11-1L".'1. (1-1-.."1'..]: '.......,1 r "r', .4.,• 1,..1r •
-
:, 1 ',1 '; '.1. 'i,'..'• --: )..'.."!._.;. .'.+..,;'.`.,,;-; ;_ -\.r. , 1\'`•.;L; -.1.;''.',1 IT ,,.; NH., 4,;,:.. .;•,„ i,, i• I, ;1 11
rj'..;-..'17, 12.1..H.1.';`,,I'..;',,, L.;;, ;.;, ,),. , ! ;.1'.',:_, •'., i ...i.`-..1
...;.'...1,. . H I , '11.114-.1'.- i;L11;.(:.,`;`, i:;,...11'..;..:,.-, 1.,1. iJ; ,. I..
;'.• ; IL; '..;;,•',:',.., ;17.7520 2,;•:5-t,„) , F.'..(..F...1.'
' 1. L :._•:.i!..).;.; )' .Arl..,•;;H P.1.1...... '...- ."...1-,.5'..: 1.-.) ,,%, r_ o -ri:.:i: i,:-\7...cil , }._:-Nci, rni A
1..,...) 1,.1..,11....1;',..liir'1,1::',ITS !....1Eq,i;'i T..1-11:.. !,)1..'1)11.11j' 111)1-1') ''..'1 L-,.-°.1'._:1)1-..',
i.-- '.'!,...1-..Y.•',,1-1.'1-1_, IHI:'.'1 l'‘'.;),ALi„,,.;c.:„111,;•.T.,;G 1E'k.1.1'2,11-..S1....S, '....in,..'1,011[11' r`,,`...1'. l',. -,111. -...AJ ri',„
1.S ;'''%._• /1,'....,::,.,[ L,111...',A!,..11.....:CE
[:, ,, ",..:]r, -.:,c,, -,,.., ' •;,-,i' r..t. J.; i :-:.; ..,.. ',HI L''',1.'.1....1,. 1,, F.:,',,,'",„] -11,'T AS ".‘4011-1.11.)
'-'•'..,
4,n
/7
il Ll.'... -L L.,,.;;;',;";1'!'i '.•'..-,' Tr!' ' •;.. :..L.72(..T11,1.1.. le
41 '., .•,,, : • ..•-
•• 1' i ..). 11; ' • '.. • 4( 11, '
0
1 (1 • ''. - '.
'..r
J
00
411' SP 0
?NI "0%ITn
co 73 z
0
in m
'ri0c
Tri
..i.
rn
4
r
0'-' — C I -� % Z 'I]
' C ::n � < -3 '�
n [n tT Crl CII `�- •-j
' 4 z �zc�=
rn
1371Z01-3 Z
O • Z_O>C- a^C 2.
,-3 > .<7 OZ
Z
z
C M >
zCO a ..2.: Cr
ea 'Cr 4..7
rn69 ril,r z ry
X % ') I„' Dr) hr:
MC)c0 0 Z
Z" Q 0 v7
Z tz; p t 1Z
�
._
0
o
co
Z'.{
I
rj
C -r
o
1
520-0 -141 / 0_00 --
MEL RAY ROAD •
GARFIELD COU\ TY BUILDIN G AND PLANNII
970-945-8212
MINIMUM APPLICATIOIh REQUIREMENTS
for
SINGLE FAMILY DWVELLI G CONSTRUCTION
including
NEW CONSTRUCTION
MANUFACTURED HOMES
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
G
In order to understand the supe of the work .intended under a permit application and expedite
the issuance of a permit it is important that complete information be provided. Adequate and
complete information will prevent delays in the plan review process. Reviewing a plan and the
discovery that required information has not been provided by the applicant may result in the
delay of the permit issuance and in proceeding with building construction. The owner or
contractor may be required to provide this information before the plan review may proceed. This
causes delays because other plans that are in line for review may be Oven attention before the
new information may be reviewed after it has been provided to the Building Department.
Tease review this document to determine if you have enough information to design your
project and provide adequate information to facilitate a plan review, If you do not, it may
be helpful to obtain a book titled "Dwelling Construction under the Uniform Building
Code", This book is available to you through this department at our cost. Also, please
consider using a design professional for assistance in your design and a construction
professional for construction of your project.
To provide for a more understandable plan in order to determine compliance with the building,
plumbing and mechanical codes, applicants are requested to review the following check list prior
to and during design. Applicants are require to indicate appropriately and to submit the
completed check list at time of application for a permit.
For the placement of a manufactured home, questions numbers 1-4 and 19-28 are the only
questions that need to be addressed:
1
1. Is a site plan included that indicates the distances of the proposed building or addition to property
lines, other buildings, set back easements and utility easements?
Yes
2. Does the site plan include the location of the I.S,D.S. (Individual Sewage Disposal System) and
the distances to property lines, wells (on subject property and adjacent properties), streams or
water courses?
Yes 06 -
Does the site plan indicate the location and direction of the County or private road accessing the
property?
Yes t/
Do the pians include a foundation plan indicating the size, location and spacing of all reinforcing
steel in accordance with the uniform building code or per stamped engineered design.?
Yes V.
5. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and
the clearances required between wood and earth?
Yes N
6. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces
and soffits?
Yes
7 Do the plans include design loads as required under the Uniform Building Code for roof snow
loads, (a minimum of 40 pounds per square foot in Garfield County), floor loads and wind loads?
Yes
8. Does the plan include a building section drawing indicating foundation, wall, floor and roof
construction?
Yes V
9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists,
roof rafters or joists or trusses?
Yes rr`
10. Does the building section drawing or other detail include the method of positive connection of all
columns and beams?
Yes O.—
11. Does the plan indicate the height of the building or proposed addition from the highest point of
the building or addition measured at mid span between the ridge and the cave down to existing
grade contours?
Yes r
12. Does the plan include any stove or zero clearance fireplace planned for installation including make
and model and Colorado Phase 11 certifications or phase 3I EPA certification?
Yes No "`'"
13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply
with the Uniform Building Code,Chapter 37?
Yes No "'
14. Does the plan include a window schedule or other verification that egress/rescue windows from
sleeping rooms and/or basements comply with the requirements of the Uniform Building Code?
Yes i/ No
15. Does the plan include a window schedule or other verification that windows provide natural light
and ventilation for all habitable rooms?
Yes No
16. Do the plans indicate the location of glazing subject to human impact such as glass door;, glazing
immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking
surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety
glazing for;hese areas?
Yes Iv/ No
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated
on the plan?
Yes No
18. Do you understand that if you are building on a parcel of land created by the exemption process
or the subdivision process, are building plans in compliance with all plat notes and/or covenants?
Yes OffNo
19. Do you understand that if you belong to a homeowners association, it is your responsibility to
obtain written permission from the association, if required by that association, prior to submitting
an application for a building permit? if you do not have written permission from the association,
do you understand that the plan check fee will not be refunded should the architectural committee
deny or reject your building plans?
Yes iti4- No
20. Will this be the only residential structure on the parcel?
Yes No r' If no -Explain:
SSC 1 st..F 1 .713
/c ec"r
21. Have two 2) complete sets of construction drawings been submitted with the application?
Yes
22,
Is this an application for the placement of a manufactured home?
Yes No v'
If yes, have you specified the size of the unit (min, 20ft. x 20 ft); live roof load (min. 404); wind
design (min, wind speed of 80 mph & 15 lb. wind toad); foundation design; method of anchoring?
Yes
23. Have you designed or had this plan designed while considering building and other construction
code requirements?
Yes V No
24. Does the plan accurately indicate what you intend to construct and what will receive a final
inspection/by the Garfield County Building Department?
Yes 1/No
25. Do you understand that approval for design and/or construction changes are required prior.to the
application of these changes?
Yes � No
26. Do you understand that the Building Department will collect a "Plan Review" fee from you at the
time of application and that you will be required to pay the ' Permit Fee" as well as any "School
Impact" or Septic System" fees required, at the time you pick up your building permit?
Yes d/ No
27. Are you aware that twenty four (24) hour notice is required for all inspections? Inspections
will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood
Springs to Carbondale in the afternoon. Morning inspections must be called in by 12;00
p.m. the day before; afternoon inspections must be called in by 5:00 p.m. the day before.
Failure to give twenty four (24) hour notice for inspections will delay your inspection one
(1) day? /
Yes i' No
28. Are you aware that you are required to call for all inspections required under the Uniform Building
Code including approval on a final inspection prior to receiving a Certificate of Occupancy and
occupancy,,,ofthe building?
Yes ,•�' No
29. Are you aware that the person signing the Permit Application, whether the "Owner„ "Agent of
the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for the
project complying with the Uniform Building Code?
Yes r"/ No
hereby acknowledge that 1 have read, understand and answered these questions to the best of my
ability.
(97
signatui`e date
Phone: /''t?'"-- c'? c'E (days); q a"-- 5/2-g (evenings)
Project Name:
Project Address:
Notes:
mei
If you have answered "No" on any of the questions, you may be required to provide ibis information at the request of the Building
Official prior to beginning the plan review process. Delays in issuing the permit are to be expected, Work may not proceed
without the issuance of a permit. if it is determined by the Building Official that additional information is necessary to review
the application and plans to determine minimum compliance with the adopted codes; the application may be placed behind more
recent applications for building permits in the review process and not reviewed until required information has been provided and
'the apPlication rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction.
erApp02. 95 Effective August 15, 1995