Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
6.0 Water Supply System
INTERSTATE HIGHWAY 70 FRONTAGE ROAD NORTH SCALE' 1 "_ 40' 1" PVC SERVICE LINE WITH CURB VALVE AND VALVE BOX. INSTALL A POST TO MARK THE END OF THE PIPELINE TRACT A PROPOSED 1' PVC PIPE 1" PVC SERVICE LINE WITH CURB VALVE AND VALVE BOX. INSTALL A POST TO MARK THE END OF THE PIPELINE TRACT B END 2" PVC PIPE, BEGIN 1" PVC PIPE PROPOSED 2" CLASS 200 PVC PIPE (5 FOOT BURY, LOCATED WITHIN THE UTILITY EASEMENT) e 1" PVC SERVICE LINE ___/1 WITH CURB VALVE AND VALVE BOX. INSTALL A POST TO MARK THE END OF THE PIPELINE WQ4- D03710 3 0 TRACT C 11J71101H SYS7Eid 0 SCALE: 1"= 40' CONNECT NEW PIPE INTO THE EXISTING WATERLINE EXISTING WATERLINE FROM WELL ----1 TRACT D PROPOS D PUMPHOUSE, SEE D AILS BELOW CONSULTING ENGINEERS AND HYDROLOGISTS O (0 r-- 00 0 vi Z_ 0 V) 0 0 3 W -J 0 V) 0 N 0 (0 070 0 N Z a_ 0 0 z w J (0 O (0 N 0a) 00 11 N 0) N 0 0) M 0 M x u_ ANCHOR BOLTS AS NECESSARY TO SECURE STRUCTURE #4 REBAR AT 12" C/C EACH WAY, 2" CLR 12 1 6 } 4 REBAR, 3"CLEAR, CONTINUOUS AROUND PERIMETER FOUHBATOCH CHOSS=SEC7101K1 SCALE: 1"= 1'-0" 17 20 n 20 10 21 14 Y7AT EQUPHEIM7 = PELAEJ SCALE: 1'= 1'-0" PROPOSED ©ELflOEW 1. EXISTING 7" STEEL WELL CASING, SEE WELL IMPROVEMENTS BELOW 2. PELLET CHLORINATOR, LAND—O—MATIC LM3 WITH MOUNTING BRACKET AND SUPPORT; PROVIDE 30 POUNDS OF CHLORINE PELLETS 3. 1-1/4" UNION (3) 4. 1-1/4" BALL VALVE (4) 5. 1-1/4" RISER PIPE, SCH 40 GALVANIZED STEEL OR SCH 80 PVC 6. 1-1/4" CHECK VALVE (2) 7. 1"WATER METER WITH TOTALIZER AND UNIONS 8. 10 GPM DOLE FLOW CONTROL VALVE 9. PRESSURE SWITCH, WELL PUMP ON AT 50 PSI, OFF AT 70 PSI 10. 1-1/4" PIPE, SCHEDULE 40 GALVANIZED STEEL OR SCHEDULE 80 PVC 11. 0-160 PSI LIQUID—FILLED PRESSURE GUAGE WITH 1/4" SHUTOFF VALVE 12. WELL—MATE WN -253 HYDROPNUEMATIC PRESSURE TANKS (2) 13. 1-1/4" 50 PSI PRESSURE REDUCING VALVE 14. PUMPHOUSE STRUCTURE, MINIMUM 6'x8' INSIDE DIMENSIONS, INSULATED, WITH A 18"x18" REMOVABLE SKYLIGHT CENTERED OVER THE WELL 15. 2"x 1-1/4" REDUCER 16. 2" RISER PIPE (GALVANIZED STEEL OR SCH 80 PVC) THROUGH FLOOR 17. FLEXIBLE COUPLING 18. 2" CLASS 200 PVC PIPE TO TRACTS A—D, 5 FOOT BURY 19. PORTABLE HEATER 20. DUPLEX ELECTEICAL OUTLETS (2) 21. ELECTRICAL CONTROLS, INCLUDING A MOTOR SAVER FOR THE WELL PUMP WELL IMPROVEMENTS: 1. INSTALL A GOULDS 25GS20 SUBMERSIBLE PUMP ON APPROXIMATELY 55 FEET OF DROP PIPE 2. INSTALL A NEW SANITARY SEAL, WITH PROVISIONS FOR THE PELLET CHLORINATOR. OPERATION: ALL VALVES ARE TO REMAIN OPEN DURING NORMAL OPERATION. THE WELL PUMP HAS A CAPACITY OF ABOUT 25-30 GPM AT ITS OPERATING HEAD. THE PRESSURE TANKS WILL OPERATE IN A PRESSURE RANGE OF 50-70 PSI, MAINTAINED BY THE PRESSURE SWITCH OPERATING THE PUMP. THE DOLE VALVE LIMITS THE RATE OF FLOW INTO THE TWO HYDROPNUEMATIC PRESSURE TANKS TO A RATE OF 10 GPM TO AVOID SHORT—CYCLING THE PUMP; DEMAND IN EXCESS OF 10 GPM IS PROVIDED DIRECTLY BY THE PUMP WHILE IT IS RUN— NING. THE PRV MA NTAINS A CONSTANT PRESSURE OF 50 PSI IN THE WATER SERVICE LINE AT DEMANDS FROM 0-30 GPM. NUJ R=1 REVISIONS DATE BY DATE 5/4/95 SCALE 1"= 1'-0" ENGINEER P. BELAU DWG FILE 413RIPPY JOB 413-01 SHEET OF 1 SHEETS