Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLC0-02-17-4592 Evergreen Commercial Center -Lot 4, Tenant Improvements 5394 County Road 154 Glenwood Springs, Colorado 1) NEW WORK RELATED TO PROPOSED TENANT IMPROVEMENTS SHALL COMPLY WITH THE FOLLOWING BUILDING CODES: 2015 IBC, IMC, IPC, IFGC, IFC, AND 2009 IECC. 2) REFER TO PLAN ATIACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND INSPECTIONS POLICY. 3) ALL WORK TO COMPLY WITH "COMMERCIAL LIMITED" ZONE DISTRICT REGULATIONS PER GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE. 4) TENANT SPACES AND ENTIRE BUILDING ARE APPROVED AS TYPE 11-B CONSTRUCTION, OCCUPANCY GROUP S-1 (MODERATE HAZARD STORAGE). MAXIMUM ALLOWABLE QUANTITIES OF HAZARDOUS MATERIALS ARE LISTED IN TABLE 307.1(1) -SEE SECTION 406.8. 5) NEW ONE-HOUR FIRE-RATED PARTY WALL BE TW EEN ADJACENT TENANT SPACES TO BE CONTINUOUS, EXTENDING FROM FOUNDATION/FLOOR TO UNDERSIDE OF ROOF SHEATHING. 6) VERIFY EGRESS DOOR (MIN. SIZE: 36" x 80'' SWINGING DOOR) AT BOTH TENANT SPACES RESULTING FROM PROPOSED TENANT IMPROVEMENTS. EGRESS DOORS SHALL MEET ICC/ANSI All7.1-2009 FOR ACCESSIBILITY. 7) NEW BATHROOM FACILITIES TO MEET ICC/ANSI Al17.l-2009 STANDARDS FOR ACCESSIBILITY INCLUDING MINIMUM SIZE, LAYOUT, CLEARANCES, FEATURES, ETC. -REFER TO ATIACHMENT FOR ILLUSTRATIONS OF SPECIFIC REQUIREMENTS TO BE MET. 8) BATHROOM INTERIOR FINISHES INCLUDING FLOORS, WALLS AND WALL BASES SHALL HAVE A SMOOTH, HARD, NONABSORBENT SURFACE AND TO OTHERWISE COMPLY WITH SECTION 1203, TOILET AND BATHROOM REQUIREMENTS. 9) PROVIDE MECHANICAL VENTILATION/EXHAUST FAN AT NEW BATHROOM WITH INSTALLATION AND VENTING PER MANUFACTURER'S REQUIREMENTS. 10) NEW MECHANICAL/HEATING SYSTEMS TO COMPLY WITH l.M.C. AND l.E.C.C. -SECTION 503. MECHANICAL ROUGH-IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION . 11) PLUMBING TO COMPLY WITH l.P.C. AND l.F.G.C. REQUIREMENTS. PLUMBING ROUGH-IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 12) ELECTRICAL PERMITIING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.