Loading...
HomeMy WebLinkAboutApplication- PermitSob Address GARPTELD COUNTY BUILDING, SANITATION and PLANNING DEPARTMEIVT 109 8th Street Suite 303 Glenwood Springs, Colorado 81601 (303) 945-8212 1577 County Road 335, New Castle Nature of Work Use of Building Owner Contractor Amount of Permit $ 98.18 Date August 12, 1997 Permit: 59.50 Plan : 38.68 Paid $98.18 8-6-97 S. Archuleta Building Permit Root Cellar & Utility Room (Original permit I5715) David & Renee Miller Owner Cleric BUILDING PERMIT APPLICATION GARFIELD COUNTY, COLORADO Applicant to complete numbered spaces only. PERMIT NO. V',3/1 PARCELJSCHED NO. JOB ACORESS 15 -7 -7 1.0 !G-{ 155- Ne.(I+' & eJ. 44 `b L et, c17 1 LEGAL DESOR. LOT NO, BLOCK SUBDIVISION 2 ,,�11,, OWNER .�j'l fLee,.Yi+�t ' � ADDRESSI. 7( lir,i 3.36-- PH.4» '- 1. WK. PH. „Seii+L(1 3 CONTRACTOR 0 r_ I � .�.e ADDRESS it C [�� �Ki`� f]fZ; f- PH. LICENSE NO. ` 4 ARCHITECT OR DESIGNER �- - ADDRESS PH, LICENSE NO, 5 ENGINEER ADDRESS PH. LICENSE NO. 6 S.F OF BUILDING ' ]_2 5 fa NN S.F OF LOT 3 t- at -re 5 HEIGHT c f NO. OF FLOORS % 7 USE OF BUILDING — 8 CLASS OE WORK: D NEW D ADDITION d ALTERATION D REPAIR D MOVE C REMOVE 104 ta tJ4 ' Q /o O' 9 f DESCRIBE WORK: j1 ex, ir fi 1 plez A ' („,,d7 it : rot) iv? 9,i* i ' j��, I' /A19i Zitoo 1 e/7 a / 1y 1 0 GARAGE SINGLE DOUBLE CARPORT SINGLE DOUBLE DRIVEWAY PERMIT ON SITE SEWAGE DISPOSAL PERMIT SITE PLAN 11 VALUATION CF WORK 1 ADJUSTED �/ PLAN CHECK FEE PERMIT FEE �; /VAL.S -Y O SPECIAL CONDITIONS: //o. X /(. 4 1 I (' / � — /] - L?4,pL/r-c 1V %.J – aio�C SCHOOL IMPACT FEE J,�jv NO. OF BUILDINGS ON PARCEL USE OF BUILDINGS NOW ON PARCEL ' TOTAL FEE fi OCC, GR. CONST, TYPE /('^'•� NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK CR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHN 180 DAYS, OR IF CONSTRUCTION OR WORK 15 SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. !HEREBY CERTIFY TI -LAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT, THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO V1• TE CEL THE PROVISIONS OF ANY OTHER STATE OR AL LAW 2 U CONSTRUCTION OR T j1ERFORMANCE OF n•.TRUCTIO If Daces 'f`',/ (Dates WATER SUPPLY DATE PERMIT ISSUED F j2 – 7 SPECIAL ArFRwars REQUIRED RECENED No. REQUIRED ZONING HEALTH DEPT. FIRE DEPT SCIL REPORT SETBACKS FLOOD HAZARD 5 nature of Contractor or authorized agent,:' ing read an understood notice above. 11 i ft /. , ' ,7 MANUF HOME — OTHER 1 Buliding epartmentAoprovaat ,�plagrung Cepa mentApproval/Oa te ld 7 AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED W1TH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. r--, THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS`'AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS CR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY W1TH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garform.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE JINITIAL 1 The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot and cold running. water, . floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****Cannot occupy or use dwelling until a Certificate of Occupancy (C.O.) is issued. Occupancy or use of dwelling without a C.O will be considered an illegal occupancy and may be grounds for vacating premises until above conditions are met. I understand and agree to abide by the above conditions for occupancy, use and the issuartce of a Certificate of Occupancy for the dwelling under building permit # Signature Date GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION MANUFACTURED HOMES ADDITIONS ALTERATIONS and MOVED BUI.LDIN GS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following check list prior to and during design. Applicants are require to indicate appropriately and to submit the completed check list at time of application for a permit. For the placement of a manufactured home. questions numbers 1-4 and 19-28 are the only questions that :need to be addressed: 1 1. Is a site plan included that indicates the distances of the proposed building or addition to property lines, other b 'Wings, set back easements and utility easements? Yes Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties), streams or water courses? Yes 3. Does the site plan indicate the location and direction of the County or private road accessing the property? Yes 4. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes ✓ 5 . Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes 6. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and soffits? Yes 7 Do the plans include design loads as required under the Uniform Building Code for roof snow loads, (a minimum of 40 pounds per square foot in Garfield County), floor loads and wind loads? Yes S, Does the plan include a building section drawing indicating foundation, wall, floor and roof construction? Yes 9. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters�r joists or trusses? Yes 1/ 10. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes 2 11. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contoyrs? Yes d/ 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and mod and Colorado Phase II certifications or phase 1I EPA certification? Yes 1/' No 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter7? Yes No IV 14. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements com with the requirements of the Uniform Building Code? Yes No 15. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? , ?( Yes No 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No 17. Is the location of all natural and liquid petroleum gas .furnaces, bailers and water heaters indicated on thepl ? Yes No 18. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivision process, are building plans in compliance with all plat notes and/or covenants? Yes No 19. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? If you do not have written permission from the association, do you understand that the plan check fee will not be refunded should the architectural committee deny or reject your building plans? �f {/ Yes No Iv 20. Will this be the only residential structure o the parcel? Yes No S If no -Explain: 3 21. Have two (2 complete sets of construction drawings been submitted with the application? Yes +L 22. Is this an application for the place of a manufactured home? Yes No If yes, have you specified the size of the unit (min. 20ft. x 20 ft); live roof load (min. 40#); wind design (min. wind speed of 80 mph & 15 lb. wind load); foundation design; method of anchoring? Yes 23. Have you designed or had this plan designed while considering building and other construction code requirements? Yes t -V' No 24. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes No 25. Do you understand that approval for design and/or construction changes are required prior to the application ofse changes? Yes �No 26. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "School Impact" or Septic System" fees required, at the time you pick up your building permit? Yes No 27. Are you aware that twenty four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before; afternoon inspections must be called in by 5:00 p.m. the day before. Failure to give twenty four (24) hour notice for inspections will delay your inspection one (1) da ? Yes No 28. Are you aware that you are required to call for all inspections required under the Uniform Building Code including..approval on a final inspection prior to receiving a Certificate of Occupancy and occupaz c-ofthe building? Yes No 29. Are you aware that the person signing the Permit Application, whether the 'Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, is the party responsible for the project cfiompiying with the Uniform Building Code? Yes L/ No 4 1 hereby acknowledge that 1 have read, understand and answered these questions to the best of my ability. signature date Phone: ?17 '7 2 -205 ---(days); (evenings) Project Name: Project Address: Notes: If you have answered "No" on any of the questions, you may be required to provide this information at the request of the Building O ciai prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of a pennit. If it is determined by the Building Official that additional information is necessary to review the application and plans to determine minimum compliance with the adopted codes; the application may be placed behind more receii applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. erApp02.95 Effective August 15, 1995 5