Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-03-17-4604 Eastbank Lift Station Building Eastbank Minor Subdivision, Lot 2 3927County Road 154, Glenwood Springs 1) ALL WORK TO COMPLY WITH 2015 IBC, IMC, IPC, AND 2009 IECC & IFC. IN ADDITION, WORK MUST COMPLY WITH STATE/FEDERAL REGULATIONS AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) WORK MUST COMPLY WITH ALL CONDITIONS OF THE CURRENT LAND -USE PERMIT. 3) BUILDING IS APPROVED AS TYPE V -B, NON-SPRINKLERED CONSTRUCTION, OCCUPANCY GROUP F-2 "LOW -HAZARD FACTORY INDUSTRIAL" USE. 4) ALL STRUCTURES MUST BE LOCATED ON ESTABLISHED EASEMENTS. 5) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 2,000 PSF BEARING CAPACITY. 6) ENGINEER OF RECORD TO PERFORM INSPECTIONS RELATED TO MECHANICAL, PLUMBING & ELECTRICAL SYSTEMS AND SUBMIT REPORT PRIOR TO FINAL BUILDING INSPECTION. 7) CDPHE APPROVAL & SIGN -OFF REQUIRED PRIOR TO FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 8) EXIT ACCESS PER 2015 IBC, SECTIONS 1014.3 AND 1015. 9) LOCKS, LATCHES & DOOR LANDINGS PER 2015 IBC, SECTION 1008. 10) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12. 11) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 12) GARFIELD COUNTY'S FINAL INSPECTION & CERTIFICATE OF OCCUPANCY REQUIRED.