HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-03-17-4604
Eastbank Lift Station Building
Eastbank Minor Subdivision, Lot 2
3927County Road 154, Glenwood Springs
1) ALL WORK TO COMPLY WITH 2015 IBC, IMC, IPC, AND 2009 IECC & IFC. IN ADDITION,
WORK MUST COMPLY WITH STATE/FEDERAL REGULATIONS AND MANUFACTURER'S
INSTALLATION REQUIREMENTS.
2) WORK MUST COMPLY WITH ALL CONDITIONS OF THE CURRENT LAND -USE PERMIT.
3) BUILDING IS APPROVED AS TYPE V -B, NON-SPRINKLERED CONSTRUCTION, OCCUPANCY
GROUP F-2 "LOW -HAZARD FACTORY INDUSTRIAL" USE.
4) ALL STRUCTURES MUST BE LOCATED ON ESTABLISHED EASEMENTS.
5) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION TO VERIFY 2,000 PSF
BEARING CAPACITY.
6) ENGINEER OF RECORD TO PERFORM INSPECTIONS RELATED TO MECHANICAL,
PLUMBING & ELECTRICAL SYSTEMS AND SUBMIT REPORT PRIOR TO FINAL BUILDING
INSPECTION.
7) CDPHE APPROVAL & SIGN -OFF REQUIRED PRIOR TO FINAL INSPECTION & CERTIFICATE
OF OCCUPANCY.
8) EXIT ACCESS PER 2015 IBC, SECTIONS 1014.3 AND 1015.
9) LOCKS, LATCHES & DOOR LANDINGS PER 2015 IBC, SECTION 1008.
10) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12.
11) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE
ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME
INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION
& CERTIFICATE OF OCCUPANCY.
12) GARFIELD COUNTY'S FINAL INSPECTION & CERTIFICATE OF OCCUPANCY REQUIRED.