May 2016
A footprint of the planned phases of the WWTF is shown in Figure 7-3
Figure 7-3
PRELIMINARY
NOT
FOR
CONSTRUCRON
6 Iru
scNNvcxa oenooR ncerR
12 gr.—
Roaring Fork Water
and Sanitation District
cr=
P",,,,"lauts
OI
7.2 Wastewater Conveyance for expanded Service Area
This section presents the infrastructure necessary to convey wastewater from the Expanded
Service Area to the WWTF. The Expanded Service Area is located down gradient from the
WWTF. A lift station will be located strategically adjacent and down gradient from the
Eastbank School Site. Flow from the Eastbank School and adjoining properties will gravity
flow to the lift station. This lift station will pump flows through multiple force mains located
along Country Road 109. The force mains continue to the nearest existing gravity flow
sewer line located at the Longshadow cul-de-sac Ironbridge. Flow will then flow to existing
Lift stations 1 and 2 in Ironbridge where flow will be pumped through existing force mains to
the District's WWTF influent interceptor sewer. See Figure 7-4 for a conceptual site plan for
the conveyance facilities.
A conceptual level cost estimate is included as Table 7-1.
7-3