Loading...
HomeMy WebLinkAboutPlant LayoutRoaring Fork Water & Sanitation District May 2016 A footprint of the planned phases of the WWTF is shown in Figure 7-3 Figure 7-3 PRELIMINARY NOT FOR CONSTRUCRON 6 Iru scNNvcxa oenooR ncerR 12 gr.— Roaring Fork Water and Sanitation District cr= P",,,,"lauts OI 7.2 Wastewater Conveyance for expanded Service Area This section presents the infrastructure necessary to convey wastewater from the Expanded Service Area to the WWTF. The Expanded Service Area is located down gradient from the WWTF. A lift station will be located strategically adjacent and down gradient from the Eastbank School Site. Flow from the Eastbank School and adjoining properties will gravity flow to the lift station. This lift station will pump flows through multiple force mains located along Country Road 109. The force mains continue to the nearest existing gravity flow sewer line located at the Longshadow cul-de-sac Ironbridge. Flow will then flow to existing Lift stations 1 and 2 in Ironbridge where flow will be pumped through existing force mains to the District's WWTF influent interceptor sewer. See Figure 7-4 for a conceptual site plan for the conveyance facilities. A conceptual level cost estimate is included as Table 7-1. 7-3