Loading...
HomeMy WebLinkAboutOWTS Construction PlanKENNBTH J. BROTSKY, PE 558 RIO OSO LANE GRAND JUNCTTON, CO 81507 March 20, 2017 Jim Vüil-son Garfj-el-d County Communj-ty Development 1oB Bth st., ste 401 Glenwood Sprj-ngs, Co 81601 Re Construction Plan of Record OVüTS 1960 Chair Bar Road Garfield Count.y Dear Jim; This is to advise that inspections were made during construction of the above referenced OVüTS and that the system has been constructed j-n accordance wj-th the approved Pl-ans and specifications. Ties from the house corners to the septic tank, and north end of the absorption bed are shown on the attached "Construction Plan of Record". Additionally, the "Vent/Inspection Tubes" mark the south end of the absorption bed. A pressure test was performed and the system is operating sat j-sfactorily. $J Sincerel-y your "Ë sì. Lt b 4 ¡y ${ Kenneth J. Bro ê4aqae ---EıSE eo CLEAI{OUT 7-tcs r5OO GALLON SEPTIC TA¡IIçCONCRETE PI,]MPISAh{rcRENCO' PE¿OO5I1 WITH BIOTTJBEFILTER CARTRIDGE PRNSSUR,E ?u"t L/8Ê r/¿ /", 7a' Tø Jo'--L" 4z!âù tt /o¿;!g 4g'f '¡or:4" 9e'¿" tl ,I 5F/ eoa'*': 5w " óeBçe Pt rnP Z¡o ¡/t¿l 4af4, B¿eo, t{/€ 'l o$ 4 ROWS OF *QIIICK-4 STD' I¡ÍI.ILTRATORS. rr EACTI- ROW={4TOTAL j INSTALLED BY: PETTR GROVER CONSTRUCTION PLAI\I OF RECORD ON.SITE WASTEWATER TREATIVTENI SYSTEM(OWTS) 1960 CIIAIR BAR ROAI) C 1 rd4f¿g .ð4 VENT/INSPECTIONPORTS i. \--R GARFIELD COIINTT, CO.