HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-03-17-4605
Habitat for Humanity ReStore
7025 Highway 82 — Glenwood Springs, Colorado
1) ALL WORK SHALL COMPLY WITH THE FOLLOWING BUILDING CODES: 2015 IBC, IMC, IPC, IFGC,
IFC, AND 2009 IECC AND IFC. IN ADDITION, ALL WORK TO COMPLY WITH STATE & FEDERAL
REGULATIONS AND WITH MANUFACTURER'S INSTALLATION REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND
INSPECTIONS POLICY.
3) WORK MUST COMPLY WITH "COMMERCIAL GENERAL" ZONE DISTRICT REGULATIONS PER
GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE.
4) BUILDING IS APPROVED AS SPRINKLERED TYPE V -B CONSTRUCTION, OCCUPANCY GROUP "M"
(MERCANTILE).
5) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS, INCLUDING FIRE SPRINKLER
SYSTEM, FIRE EXTINGUISHERS, ALARMS & OTHER PERTINENT REQUIREMENTS. FIRE DISTRICT'S
FINAL APPROVAL LETTER IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.
6) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) TO COMPLY WITH ALL SETBACKS &
OTHER REQUIREMENTS PER GARFIELD COUNTY OWTS REGULATIONS. ENGINEER TO
PROVIDE FINAL INSPECTION REPORT FOR SEPTIC SYSTEM PRIOR TO FINAL BUILDING
INSPECTION & CERTIFICATE OF OCCUPANCY.
7) ALL HIGH-STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR & SIGN -OFF
PER IBC, CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION.
8) LOCKS, LATCHES & LANDINGS PER 2015 IBC, SECTION 1008.
9) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12.
10) ACCESSIBILTY REQUIREMENTS PER 2015 IBC, CHAPTER 11 & ICC A117.1-2009.
11) BUILDING MECHANICAL SYSTEMS INCLUDING COMBUSTION AIR, DUCTWORK & VENTING
REQUIREMENTS TO COMPLY WITH INTERNATIONAL MECHANICAL CODE (IMC) AND IECC,
SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION.
12) PLUMBING REQUIREMENTS PER INTERNATIONAL PLUMBING CODE (IPC). PLUMBING ROUGH -IN
INSPECTION REQUIRED PRIOR TO FRAME INSPECTION.
13) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL
BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
14) ELECTRICAL POWER AND LIGHTING SYSTEMS TO COMPLY WITH IECC, SECTION 505.
15) VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL
ROUGH -IN INSPECTION.
16) SIGN PERMIT APPLICATION REQUIRED FOR FREE-STANDING SIGN LOCATED ADJACENT TO
BUILDING.