Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-03-17-4605 Habitat for Humanity ReStore 7025 Highway 82 — Glenwood Springs, Colorado 1) ALL WORK SHALL COMPLY WITH THE FOLLOWING BUILDING CODES: 2015 IBC, IMC, IPC, IFGC, IFC, AND 2009 IECC AND IFC. IN ADDITION, ALL WORK TO COMPLY WITH STATE & FEDERAL REGULATIONS AND WITH MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND INSPECTIONS POLICY. 3) WORK MUST COMPLY WITH "COMMERCIAL GENERAL" ZONE DISTRICT REGULATIONS PER GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE. 4) BUILDING IS APPROVED AS SPRINKLERED TYPE V -B CONSTRUCTION, OCCUPANCY GROUP "M" (MERCANTILE). 5) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS, INCLUDING FIRE SPRINKLER SYSTEM, FIRE EXTINGUISHERS, ALARMS & OTHER PERTINENT REQUIREMENTS. FIRE DISTRICT'S FINAL APPROVAL LETTER IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 6) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) TO COMPLY WITH ALL SETBACKS & OTHER REQUIREMENTS PER GARFIELD COUNTY OWTS REGULATIONS. ENGINEER TO PROVIDE FINAL INSPECTION REPORT FOR SEPTIC SYSTEM PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) ALL HIGH-STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR & SIGN -OFF PER IBC, CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION. 8) LOCKS, LATCHES & LANDINGS PER 2015 IBC, SECTION 1008. 9) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12. 10) ACCESSIBILTY REQUIREMENTS PER 2015 IBC, CHAPTER 11 & ICC A117.1-2009. 11) BUILDING MECHANICAL SYSTEMS INCLUDING COMBUSTION AIR, DUCTWORK & VENTING REQUIREMENTS TO COMPLY WITH INTERNATIONAL MECHANICAL CODE (IMC) AND IECC, SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 12) PLUMBING REQUIREMENTS PER INTERNATIONAL PLUMBING CODE (IPC). PLUMBING ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 13) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 14) ELECTRICAL POWER AND LIGHTING SYSTEMS TO COMPLY WITH IECC, SECTION 505. 15) VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION. 16) SIGN PERMIT APPLICATION REQUIRED FOR FREE-STANDING SIGN LOCATED ADJACENT TO BUILDING.