Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-02-17-4594 Eastbank LLC — New Auto Repair Shop + Offices 3927 County Road 154, Glenwood Springs 1) ALL WORK TO COMPLY WITH THE FOLLOWING BUILDING CODES: 2015 VERSIONS OF THE IBC, IMC, IPC, AND 2009 VERSIONS OF IECC & IFC. ALL WORK SHALL ALSO COMPLY WITH STATE/FEDERAL REGULATIONS AND WITH MANUFACTURER'S INSTALLATION REQUIREMENTS. 2) COMPLY WITH "RURAL" ZONE DISTRICT REGULATIONS (AS DESCRIBED IN GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE) AND ALL CONDITIONS OF THE CURRENT LAND -USE PERMIT. 3) BUILDING IS APPROVED AS TYPE V -B, NON-SPRINKLERED CONSTRUCTION WITH THE FOLLOWING OCCUPANCIES: AUTOMOTIVE REPAIR SHOP AS "MODERATE HAZARD STORAGE" USE (OCCUPANCY GROUP 5-1) & OFFICES AS "BUSINESS" USE (OCCUPANCY GROUP B). MULTIPLE OCCUPANCIES ARE CONSIDERED "NON -SEPARATED" USES AND NO SEPARATION IS REQUIRED BETWEEN S-1 AND B OCCUPANCIES (I.B.C. TABLE 508.4) 4) CANNOT EXCEED MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE & COMBUSTIBLE MATERIALS PER 2015 IBC, SECTION 414 AND 2009 IFC, CHAPTERS 27 AND 34. 5) USE OF THE AUTO REPAIR SHOP IS LIMITED TO NON-C.N.G., L.P. AND L.N.G. VEHICLES. A SEPARATE BUILDING PERMIT WILL BE REQUIRED TO CONVERT THE REPAIR SHOP TO THESE TYPES OF SYSTEMS. 6) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS, INCLUDING FIRE EXTINGUISHERS, ALARMS & OTHER PERTINENT REQUIREMENTS. FIRE DISTRICT'S FINAL APPROVAL LETTER IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) ALL HIGH-STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR & SIGN -OFF PER IBC, CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION. 8) LOCKS, LATCHES & LANDINGS PER 2015 IBC, SECTION 1008. 9) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12. 10) ACCESSIBILTY REQUIREMENTS PER 2015 IBC, CHAPTER 11, AND ICC A117.1-2009. 11) BUILDING MECHANICAL SYSTEMS INCLUDING COMBUSTION AIR, DUCTWORK & VENTING REQUIREMENTS TO COMPLY WITH INTERNATIONAL MECHANICAL CODE (IMC) AND IECC, SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 12) PLUMBING REQUIREMENTS PER INTERNATIONAL PLUMBING CODE (IPC). PLUMBING ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 13) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 14) ELECTRICAL POWER AND LIGHTING SYSTEMS TO COMPLY WITH IECC, SECTION 505. 15) VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION.