HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLCO-02-17-4594
Eastbank LLC — New Auto Repair Shop + Offices
3927 County Road 154, Glenwood Springs
1) ALL WORK TO COMPLY WITH THE FOLLOWING BUILDING CODES: 2015 VERSIONS OF THE
IBC, IMC, IPC, AND 2009 VERSIONS OF IECC & IFC. ALL WORK SHALL ALSO COMPLY WITH
STATE/FEDERAL REGULATIONS AND WITH MANUFACTURER'S INSTALLATION
REQUIREMENTS.
2) COMPLY WITH "RURAL" ZONE DISTRICT REGULATIONS (AS DESCRIBED IN GARFIELD
COUNTY'S LAND USE & DEVELOPMENT CODE) AND ALL CONDITIONS OF THE CURRENT
LAND -USE PERMIT.
3) BUILDING IS APPROVED AS TYPE V -B, NON-SPRINKLERED CONSTRUCTION WITH THE
FOLLOWING OCCUPANCIES: AUTOMOTIVE REPAIR SHOP AS "MODERATE HAZARD
STORAGE" USE (OCCUPANCY GROUP 5-1) & OFFICES AS "BUSINESS" USE (OCCUPANCY
GROUP B). MULTIPLE OCCUPANCIES ARE CONSIDERED "NON -SEPARATED" USES AND
NO SEPARATION IS REQUIRED BETWEEN S-1 AND B OCCUPANCIES (I.B.C. TABLE 508.4)
4) CANNOT EXCEED MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE & COMBUSTIBLE
MATERIALS PER 2015 IBC, SECTION 414 AND 2009 IFC, CHAPTERS 27 AND 34.
5) USE OF THE AUTO REPAIR SHOP IS LIMITED TO NON-C.N.G., L.P. AND L.N.G. VEHICLES.
A SEPARATE BUILDING PERMIT WILL BE REQUIRED TO CONVERT THE REPAIR SHOP TO
THESE TYPES OF SYSTEMS.
6) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS, INCLUDING FIRE
EXTINGUISHERS, ALARMS & OTHER PERTINENT REQUIREMENTS. FIRE DISTRICT'S FINAL
APPROVAL LETTER IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE
OF OCCUPANCY.
7) ALL HIGH-STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR &
SIGN -OFF PER IBC, CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION.
8) LOCKS, LATCHES & LANDINGS PER 2015 IBC, SECTION 1008.
9) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12.
10) ACCESSIBILTY REQUIREMENTS PER 2015 IBC, CHAPTER 11, AND ICC A117.1-2009.
11) BUILDING MECHANICAL SYSTEMS INCLUDING COMBUSTION AIR, DUCTWORK & VENTING
REQUIREMENTS TO COMPLY WITH INTERNATIONAL MECHANICAL CODE (IMC) AND IECC,
SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME
INSPECTION.
12) PLUMBING REQUIREMENTS PER INTERNATIONAL PLUMBING CODE (IPC). PLUMBING
ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION.
13) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE
ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION.
ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE
OF OCCUPANCY.
14) ELECTRICAL POWER AND LIGHTING SYSTEMS TO COMPLY WITH IECC, SECTION 505.
15) VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO
ELECTRICAL ROUGH -IN INSPECTION.