Loading...
HomeMy WebLinkAboutEngineer's Excavation Observation Report 11.30.2016HPI<UMAR Geott),.hn c I Etiq!rleerinu ; Frlg!neennCl Geo10T; rs1nt‘wlal4 fe�l;ny I Errd�ir�+nmrn;�l ee i j O- old 3'13 7 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 945-7988 Fax: (970) 945-8454 Email: hpkglenwood@kumarusa.com November 30, 2016 Eastbank, LLC Attn: Robert MacGregor 710 East Durant Avenue Aspen, Colorado 81611 rmac@n'dunrene.Caml Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado Project No. 16-7-583 Subject: Observation of Two Pit Excavations, Proposed Diesel Repair Shop, 3929 County Road 154, Garfield County, Colorado Dear Mr. MacGregor: As requested by Bruce Upton, the undersigned representative of H-P/Kumar observed the excavation at the subject site on November 10, 2016 to evaluate the soils exposed for foundation support. The findings of our observations and recommendations for the foundation design are presented in this report. The services were performed in accordance with our agreement for professional engineering services to Eastbank, LLC, dated November 10, 2016. The diesel repair shop is proposed to be built on the existing slab and footing pads remaining from a previous steel frame shop building at this site. The new shop will also be a one-story steel frame/metal skin building with a slab -on -grade floor. At the time of our visit to the site, two pits had been excavated, one about 30 feet north of the southwest corner of the existing slab -on -grade (Pit 1) and one at the northwest corner of the existing slab -on -grade (Pit 2). Pit 1 was 4 feet deep and consisted of about 2 feet of on-site clay fill overlying natural sandy silty clay soils. Pit 2 was 9 feet deep and consisted of about 3 feet of on-site clay fill overlying natural sandy silty clay. The existing northwest footing pad was partially exposed on the south side of Pit 2 and the bottom of the pad appeared to be Tess than 2 feet below the top of the concrete slab. The corner pad appeared to extend 2 feet north and 1 foot east of the northwest corner column, indicating that the pad is probably on the order of 2 by 4 feet in size. Results of swell -consolidation testing performed on samples of the natural clay soils taken from the site, shown on Figure 1, indicate the soils have low compressibility under light loading and have a low to moderate collapse potential when wetted under light load. The samples were moderately to highly compressible under increased loading after wetting. No free water was encountered in the pit excavations and the soils were moist. Considering the conditions exposed in the pit excavations and the nature of the proposed construction, spread footings placed on the undisturbed natural soil designed for an allowable soil bearing pressure of 1,500 psf can be used for support of the proposed shop. The exposed Eastbank, LLC November 30, 2016 Page 2 soils tend to compress when wetted and there could be some post -construction settlement of the foundation if the bearing soils become wet. New footings should be a minimum width of 18 inches for continuous walls and 2 feet for columns. Exterior footings should be provided with adequate soil cover above their bearing elevations for frost protection or should be insulated. Structural fill placed within floor slab areas can consist of the on-site soils compacted to at least 95% of standard Proctor density at a moisture content near optimum. Backfill placed around the structure should be compacted and the surface graded to prevent ponding within at least 10 feet of the building. Landscape that requires regular heavy irrigation, such as sod, and sprinkler heads should not be located within 10 feet of the foundation. The recommendations submitted in this letter are based on our observation of the soils exposed within the pit excavations and do not include subsurface exploration to evaluate the subsurface conditions within the loaded depth of foundation influence. This study is based on the assumption that soils beneath the footings have equal or better support than those exposed. The risk of foundation movement may be greater than indicated in this report because of possible variations in the subsurface conditions. In order to reveal the nature and extent of variations in the subsurface conditions below the excavation, drilling would be required. It is possible the data obtained by subsurface exploration could change the recommendations contained in this letter. Our services do not include determining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. If you have any questions or need further assistance, please call our office. Sincerely, H -P: KUMAR '"n -ti /JAL- 4 ,-r r- ' .0 4443 Daniel E. Hardin, P.E. '-.1,...?/5-4, ' . 3,'{`'� Rev. by: SLP d;AeS-- -------------------- DEH/ksw attachment Figure 1 — Swell -Consolidation Test Results cc: Kaup Engineering — Dale Kaup (katrperw0Prof.net) Bruce Upton (bruce.Ihcarcreck reomcast.net) H -P1 KUMAR Project No 16-7-583 Compression % Compression % 0 2 4 6 8 10 12 14 0 2 4 6 8 Moisture Content = 12.2 percent Dry Density = 91 pcf Sample of: Sandy Silty Clay From: Pit 1 at 2 iz Feet Compression upon wetting 0.1 1.0 10 APPLIED PRESSURE - ksf 100 Moisture Content = 18.4 percent Dry Density = 98 pcf Sample of: Sandy Silty Clay From: Pit 2 at 4 Feet -0 Compression upon wetting 0.1 16-7-583 1.0 10 APPLIED PRESSURE - ksf H -P- I<UMAR SWELL -CONSOLIDATION TEST RESULTS 100 Figure 1