Loading...
HomeMy WebLinkAboutApplication- Permitof c! , 157• w 1/3/a GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 108 Eighth Street, Suite 201 Glenwood Springs, Coloradof 81601 Phone (970) 945-8212 INDIVIDUAL SEWAGE DISPOSAL PERMIT Permit 4140 Assessor's Pereel No. This does not constitute a building or use permit. PROPERTY T d Owner's Name ��'1Q bN%% - ! MvJR� �-rin % Present Address ` OZ� j I� Z- Phone 7325‘1060 System Location 7075 Legal Description of Assessor's Parcel No Ez 7025- iL ; oZ SYSTEM DESIGN ry� I( 000 ? 1115# Septic Tank Capacity (gallon) Other Percolation Rate (minutes/inch) Number of Bedrooms (or other) Required Absorption Area - See Attached Special Setback Requirements: Date Inspector FINAL SYSTEM INSPECTION AND APPROVAL (as installed) Call for Inspection (24 hours notice) Before Covering Installation System Installer (Keg Septic �{,(4' i Septic Tank Capacity (KCSJ Septic Tank Manufacturer or Trade Name Septic Tank Access within 8" of surface Absorption Area Absorption Area Type and/or Manufacturer or Trade Name Adequate compliance with County and State regulations/requirements Other �- l� CQ 041( E - Date v Inspector RETAIN WITH RECEIPT RECORDS AT CONSTRUCTION SITE CONDITIONS: 1. All installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter 25, Article 10 C.R.S. 1973, Revised 1984. 2. This permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con- nection to or use with any dwelling or structures not approved by the Building and Zoning off ice shall automatically be a violation or a requirement of the permit and cause for both legal action and revocation of the permit. 3. Any person who constructs,alters, or installs an individual sewage disposal system in a manner which involves a knowing and material variation from the terms or specifications contained in the application of permit commits a Class I, Petty Offense ($500.00 tine —6 months in jail or both). INDIVIDUAL SEWAGE DISPOSAL SYSTEM APPLICATION OWNER J.q Mtn — I Wa(A -1 ice! : r pS ADDRESS J 0.L5 i -L 1 ��. GWS PHONE 41-5 -G06a CONTRACTOR en 4, IZ,.DIA," f (K r in . ADDRESS 52q (milt ll IZ.' c(sc (Z,� £W5 PHONE GMS— X55/ 1 PERMIT REQUEST FOR ( ) NEW INSTALLATION ( ) ALTERATION ( j REPAIR Attach separate sheets or report showing entire area with respect to surrounding areas, topography of area, habitable building, location of potable water wells, soil percolation test holes, soil profiles in test holes (See page 4). LOCATION OF PROPOSED FACILITY: / Near what City of Town [ (2 watal SPr ; N y Size of Lot a • 11 C ere s Legal Description or Address ZQuL,S Ek./ WASTES TYPE: ( ) DWELLING ( ) TRANSIENT USE (A COMMERCIAL R INDUSTRIAL ( ) NON-DOMESTIC WASTES ( ) OTHER—DESCRIBE BUILDING OR SERVICE TYPE: k f7A- i L Number of Bedrooms lU Number of Persons Garbage Grinder 0Automatic Washer 0Dishwasher SOURCE AND TYPE OF WATER SUPPLY: WELL ( ) SPRING ( ) STREAM OR CREEK If supplied by Community Water, give name of supplier: DISTANCE TO NEAREST COMMUNITY SEWER SYSTEM: Was an effort made to connect to the Community System? _Nn A site • Ian is re ' uired to be submitted that indicates the followin MINIMUM distances: Leach Field to Well: 100 feet Septic Tank to Well: 50 feet Leach Field to Irrigation Ditches, Stream or Water Course: 50 feet Septic System (septic tank & disposal field) to Property Lines: 10 feet YOUR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT WILL NOT BE ISSUED WITHOUT A SITE PLAN. GROUND CONDITIONS: Depth to first Ground Water Table Percent Ground Slope 2 7 pot - TYPE OF INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROPOSED: ( SEPTIC TANK (000 ( ) AERATION PLANT ( ) VAULT ( ) VAULT PRIVY ( ) COMPOSTING TOILET ( ) RECYCLING, POTABLE USE ( ) PIT PRIVY ( ) INCINERATION TOILET ( ) RECYCLING, OTHER USE ( ) CHEMICAL TOILET( ) OTHER -DESCRIBE FINAL DISPOSAL BY: V) ABSORPTION TRENCH, BED OR PIT ( ) EVAPOTRANSPIRATION ( ) UNDERGROUND DISPERSAL ( ) SAND FILTER ( ) ABOVE GROUND DISPERSAL ( ) WASTEWATER POND ( ) OTHER -DESCRIBE WILL EFFLUENT BE DISCHARGED DIRECTLY INTO WATERS OF THE STATE? /' 7 PERCOLATION TEST RESULTS: (To be completed by Registered Professional Engineer, if the Engineer does the Percolation Test) Minutes p7 3 per inch in hole No. 1 Minutes per inch in hole No. 3 Minutes 2C per inch in hole No. 2 Minutes ;--y per inch in hole Name, address and telephone of RPE who made soil absorption tests: Name, address and telephone of' RPE responsible for design of the system: Applicant acknowledges that the completeness of the application is conditional upon such further mandatory and additional tests and reports as may be required by the local health department to be made and furnished by the applicant or by the local health department for purposed of the evaluation of the application; and the issuance of the permit is subject to such terms and conditions as deemed necessary to insure compliance with rules and regulations made, information and reports submitted herewith and required to be submitted by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to be relied on by the local department of health in evaluating the same for purposes of issuing the permit applied for herein. I further understand that any falsification or misrepresentation may result in the denial of the application or revocation of any permit granted based upon said application and in legal action for perjury as provided by law. Signed PLEASE D Date / — 3 -- v 6. N ACCURATE MAP TO YOUR PROPERTY!! 3 O yL 0 0 v a A COni:11) tat c 3 -t 0 0 178 05 o w y 4 1 z o ob zc �z Z��C �optr, County Road (Note the Road Number and Name) i PERCOLATION TESTS The successful operation of your septic system depends on the rate the soil in which your leach field will be installed will accept water. THIS IS CRITICAL. The rate of absorption is called the percolation rate and it determines the size of the leach field needed for a particular flow of sewage and in some cases even determines the feasibility of the installation of a septic tank and leach field system. PERCOLATION TEST MUST BE DONE AT THE GROUND DEPTH WHERE ABSORPTION WILL TAKE PLACE. STANDARD SEEPAGE BEDS (LEACH FIELDS) ARE INSTALLED THREE FEET DEEP SO THE PERCOLATION HOLES ARE DUG FOUR FEET DEEP, AT LEAST 20 FEET APART, IN A TRIANGLE SHAPE. THE PERCOLATION TEST IS DONE IN THE BOTTOM ONE (1) FOOT OF THE HOLE: 8"—JA" I I I I I 1 I I t 1 wader L I y , W4 r Z' i 4 4. - - -' A posthole digger, auger or backhoe can be used to dig the percolation test holes. If a back hoe is used, dig the back hoe hole three (3) feet deep, with a bite for steps, and put a test hole one (1) foot deep and 8 to 12 inches in diameter in the bottom. Installation of absorption areas (i.e. drywells) deeper than three (3) feet require the permission of the Environmental Health Department. B'ck I%oe j{oLe 11 Saturation with water will affect the percolation rate, and since the system will be expected to operate when the soil is saturated with water, THE HOLES MUST BE FILLED WITH WATER AT LEAST EIGHT (8) HOURS BEFORE THE TEST AND ALLOWED TO STAND. More water will be needed to perform the percolation test, so AT LEAST FIVE (5) GALLONS OF WATER PER HOLE SHOULD BE ON HAND WHEN THE TEST IS PERFORMED. AN EIGHT (8) FOOT PROFILE HOLE IN THE LEACH FIELD AREA IS REQUIRED IN THE STATE OF COLORADO TO DETERMINE THE PROXIMITY OF GROUND WATER AND BEDROCK. (One soil profile hole shall be drilled or dug to provide observation of the soil profile of the area of the soil absorption system. The hole shall be prepared at least eight (8) feet deep. The hole may be terminated when groundwater or bedrock is encountered. The hole shall be prepared in such a way as to provide identification of the soil profile four (4) feet below the bottom of the soil absorption system). 4 s (FOR APPLICANT'S INFORMATION) PERCOLATION TESTS FOR DRY WELLS (SEEPAGE PITS) ARE PERFORMED AT THE LEVEL OF THE BOTTOM OF THE PIT (USUALLY 10 FEET). Ctauad CeveL /0 /� l,� fie rco14{;03 %csf Far S.e�age If you call for a percolation test or inspection and for some reason are not ready when the time comes, please call us before 4:00 p.m. at 945-8212 to cancel the appointment. THANK YOU FOR YOUR COOPERATION. 5 } RECOMMENDED MINIMUM REQUIREMENTS FOR INDIVIDUAL SEWAGE DISPOSAL SYSTEMS Before construction is started, the Inspector must be contacted for approval and detailed information concerning the proposed disposal system. Higher standards than those which follow may be required in individual cases to assure attainment of the obiective. Those objectives are to locate, construct and maintain individual sewage disposal systems in such a manner that existing or contemplated water supplies will not become contaminated and so that sewage will not overflow the ground surface and result in a nuisance or health hazard. 1. LIQUID CAPACITY OF TANK (GALLONS) (Provides for use of garbage grinder, automatic clothes washers and other water using household appliances). Recommended Minimum Number of Bedrooms Tank Capacity 2 or less 750 gallons 3 or less 1,000 gallons 4 1,250 gallons For each additional bedroom, add 250 gallons 2. MINIMUM LEACHING AREA OF DISPOSAL FIELD ABSORPTION AREA REQUIREMENTS FOR INDIVIDUAL RESIDENCES Percolation Rate Required Absorption Percolation Rate Required Absorption (time required for Area, in sq. ft. (time required for Area, in sq. ft. water to fall one per bedroom water to fall one per bedroom inch, in minutes) (b) standard trench inch, in minutes) (b) standard trench (c) seepage beds & (c) seepage beds & (d) seepage pits (d) seepage pits *1 or less 10..... 228 *2 15 279 *3 30(e).. 395 *4 45(e).. 483 *5 60 (e), (f) 558 *(See Below) *Percolation rates faster than five (5) minutes per inch or slower than sixty (60) minutes per inch require engineered system and/or Board of Health approval. (a) (b) It is desirable to provide sufficient land area for entire new absorption system if needed in future. In every case, sufficient land area should be provided for the number of bedrooms (minimum of 2) that can reasonably be anticipated, including the unfinished space available for conversion as additional bedrooms. 6 „rear Abserption area is figured as trench -bottom area and includes a statistical allowance for vertical sidewall area. (c) Absorption area for seepage pits is figured as effective sidewall area beneath the inlet. (d) Unsuitable for seepage pits if over thirty. (e, f) Unsuitable for absorption system if over sixty. Dwelling on less than two acres, areas of high water tables, or areas with a percolation test rate faster than 1” in 5 minutes must have altemative sewage facilities, i.e., central collection, holding tanks, individual treatment, etc. EXCEPTION: Absorption areas may be allowed with percolation rates faster than one (1) inch in five (5) minutes provided the soil is a sandy texture and no water table problems are encountered. 1. Maximum length of drainage line: 100 linear feet 2. Minimum width of drainage trench: 18 inches 3. Minimum spacing between trenches or pipes: 6 feet 4. Maximum grade of drainage lines: As level as possible 5. Minimum depth rock under drain PVC: 6" under PVC, 2" over PVC 6. Minimum depth of cover over distribution lines: 12 inches 7. Maximum depth of cover over distribution lines: Variable 8. Minimum grade of house sewer: 1/8 to 1/4" per linear ft. 9. Minimum distance of sewage disposal system from dwelling: 20 feet 10. Minimum distance of septic tank from dwelling: 5 feet 11. Minimum distance of leaching area to a well: 100 feet 12. Minimum distance of septic tank to a well: 50 feet 13. Minimum distance of leaching area to a stream or water course: 50 feet 14. Minimum distance from septic tank and disposal field to property lines: 10 feet for drywell 10 feet for leach field 15. Minimum sewer pipe and distribution pipe: 4 inch diameter Septic construction should be of concrete, concrete block or of a material that will resist deterioration and which can be made reasonable watertight. Acceptable drain field pipe materials include plastic, terra cotta or concrete. If the house sewer line is longer than 10 feet between house and septic tank, a clean-out Y should be installed as near as practical to the house. Septic tanks should be inspected once a year and cleaned when necessary. Cleaning is recommended when space between the scum accumulation and sludge residue on the tank bottom is less than eighteen (18) inches. The Department recommends pumping a septic tank once every four (4) years when a yearly inspection by the owner is not practical. 7 JAN -03-2006 TUE 12:52 PM ROTOROOTER tr-14-5011 0I:$0ie ProO-LORIS 1 F1'IYALD ' Garfield County Permits 108 Sr' Sheet, Ste. #201 Olmtwaod Springs, CO 81601 970-9454212 FAX NO. 9709455547 • P. 01/01 1700101111 1-110 P.001/001 1-117 December 14, 2005 To Whom It May Concern: M owners of the property at 7025 Highway 82, (location of Furniture Farmhouse, Specialty Sparta) Glenwood Swinge CO, Hansen-Fyrweld Holdinp authorizes Roto Roamer Phunbing w act u contractor to excavate and install an loath field et the above desonbed address. Please provide Roto Rooter Plumbing with the }roper permits rewired iter the above described repair. BametaFYrwald Holdiaga CRONK CONSTRUCTION • INCORPORATED 1129.24- Road Grand JuneJJon, CO 81505 970-245-0577, 970-257-7453 (fax) June 15, 2006 RECEIVED JUL 0 7 2006 GARFIELD COUNTY BUILDING & PLANNING CERTIFICATE OF INSPECTION AND ACCEPTANCE Individual Sewage Disposal System Fyrwald Commercial Project 7025 Highway 82 Glenwood Springs, CO 81601 The individual sewage disposal system of reference was inspected on June 15, 2006. The system was found to conform with the plans and specifications set forth in the engineered sewage disposal system design for the aforementioned property prepared on April 24, 2006. Copies of the engineered plan may be obtained from the Garfield County Environmental Health Department or the undersigned design engineer. Thomas A. Cronk, P. 1129 -24- Road Grand Junction, CO 81505 970-245-0577 [] W ❑ W D J Q ‹zoao J J W❑ Z ° > t N Ou I y a ai Qww ❑ ❑ W F F aa'Nw )xWN a a t w u N h W L R w u J£ W1JZm❑W Z G O J Q J£ w ❑ F Q d a Q £zaDDa0 tto❑ w J ^ ❑ u Q F zu ZN OWoz1r> alt ¢w£) Ns O i l Q0I&Fow wQ0 — O a > N 3o zo wzz oF¢Fowo CI O 0 Uy CDU o o a O b 3.5' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CRONK CONSTRUCTION INCORPORATED 1129.24- Road • Grand Junction, CO 81505 970-245-0577, 970.257.7453 (fax) INDIVIDUAL SEWAGE DISPOSAL SYSTEM DESIGN Date: April 24, 2006 Prepared by: Thomas A. Cronk, P.E. Cronk Construction Inc. 1129 -24- Road Grand Junction, CO 81505 245-0577 Type of Design: Commercial Repair System Owner: Ernie Frywald Bamett-Frywald Holdings, Inc. 415 E. Hyman Avenue Aspen, CO 81611 970-618-9175 Property address: 7025 Highway 82, Glenwood Springs, CO 81601 Tax schedule No.: Legal Descript: Page 1 of 9 P LIELho RECEIVED MAY 0 4 2006 GARFIELD COUNTY BUILDING & PLANNING 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1.0 Site History The site consists of approximately 4.274 acres of uncultivated native soil. Drainage is approximately 1% to the southwest. The site is a commercial property with approximately 15,000 sq. ft. of retail area and two warehouses of approximately 10,000 sq. ft. each. The three structures are served by an existing individual sewage disposal system (ISDS) which shows signs of failure. The owners wish to install a repair ISDS. A percolation test/soils evaluation was conducted on the property of reference on 03/28/06 by Tom A. Cronk, registered professional engineer (R.P.E.). The 03/28/06 investigation was intended to develop subsurface design parameters for a repair ISDS to serve the existing commercial buildings. Because of the commercial nature of the project, an engineered ISDS design has been prepared. The 03/28/06 perc test/soils evaluation is attached for reference as Appendix A. The locations of the site investigation excavations are shown on the attached plot plan. A discussion of developed subsurface design parameters and the engineered ISDS design follows. 2.0 Development of Design Parameters A perc excavation trench (excavation A) was extended to a depth of 126" below ground surface (BGS). There was no evidence of ground water or high seasonal water table in the open excavation to a depth of 126" BGS. The soils evaluation indicates three distinct soil horizons underlie the site. A Iithological description follows: depth (in.) description 0" - 24" 24" - 36" 36" - 126" clayey sand loam, reddish brown; soft; friable sandy clay, light red; hard and blocky friable pit run (25mm-300mm) in brown sand matrix A pressurized INFILTRATOR absorption field is proposed for the site. An average design perc rate of 52 min/in. is chosen for overall system sizing for subsurface absorption below a depth of 36" BGS. Page 2 of 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3.0 System Design An INFILTRATOR absorption field is proposed for discharge of septic effluent at the site. The bottom of the INFILTRATOR absorption field will be located at a maximum depth of 36" below the existing ground surface. A lift station discharging into pressurized effluent distribution laterals will be employed to discharge septic effluent into the absorption field. Construction of the system will consist of removing the existing site soils from the area underlying the absorption field. The initial excavation will be continued to a depth of 36". After removal of surface soils, the open excavation will be disked or scarified and INFILTRATORS (model QUICK4) will be used to construct a septic effluent distribution system in the open excavation. The INFILTRATOR effluent distribution system will be installed in accordance with the "Infiltrator Technical Manual", available from Infiltrator Systems Inc., 123 Elm Street, Suite 12, Old Saybrook, Connecticut 06475. Adjacent INFILTRATORS shall be fastened with a minimum of four (4) 3/4" x #8 self -tapping sheet metal or bright brass deck screws to prevent movement and separation during backfilling. The INFILTRATOR absorption field will provide a minimum of 4.0 ft of filtration soil between the septic effluent discharge piping and the surrounding subsoils. After the INFILTRATORS are installed, synthetic filter fabric (140-200 mesh) will be placed over the INFILTRATORS and the system will be covered with a soil cap. The soil cap will consist of a minimum of 24" of sandy loam soil mounded 5% to promote surface run off away from the absorption field. Septic effluent will be introduced into the INFILTRATOR absorption field through pressurized distribution laterals installed in each row of INFILTRATORS as shown in the attached graphics. The injection laterals will consist of 1" Schd 40 PVC pipe with 5/32" (0.1563") holes equally spaced 48" o.c. along each row of INFILTRATORS. Holes in the injection laterals will be centered in each INFILTRATOR unit and drilled at 12:00 o'clock to direct effluent up for dispersal against the top of the chamber. Injection laterals shall be suspended from the top of the chamber with all weather plastic pipe strapping (min. 120 lbs tensile strength) at every chamber joint connection. Septic effluent will be delivered to the distribution laterals through two 2" (Schd 40 PVC) pressure manifold. Each pressure manifold will be centrally located in the absorption field and serve six of the twelve rows of INFILTRATORS (see attached absorption field plan view). A lift station will be utilized to deliver septic effluent to the absorption field and promote equal distribution of septic effluent. The lift station will employ a duplex 051 high head effluent pump (OSI model no. P500512) and screened pumping vault (OSI model no. PVU57-2419-L) and shall be constructed in accordance with the attached graphics. Two 2" Schd 40 PVC pressure transport line will be used to transfer septic effluent from the duplex pumping system to the absorption field (one line to each pump). The pressure mains will be self draining or be buried a minimum of 36" below ground surface to prevent freezing. All pressure piping and mound construction shall be completed in accordance with the attached graphics. The installer must also confirm the setbacks from property lines, building envelopes, and existing easements shown in the attached graphics are maintained. Additionally, any unknown utility lines, easements, or other adverse conditions disclosed during construction must maintain the required setbacks listed on page 6 of this document. A minimum of 12" (18" recommended) of soil cover is required for all gravity flow effluent piping, the septic tank/lift station, and the absorption field (excepting maximum 8" Page 3 of 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 soil cover over septic access ports). All non -draining pressure effluent piping must be covered with a minimum of 36" of cover to prevent freezing. The existing ISDS on the property shall be abandoned. Abandonment of the absorption field shall consist of capping the influent piping followed by abandoning the gravel absorption field in-place. The existing septic tank shall be drained of residual fluids by pumping and either: 1) physically removed, or 2) filling with structural fill (e.g., gravel, flowable fill, compacted soil, or concrete) and abandoned in- place. The ISDS will be designed to accept sewage discharge from a 15,00 square foot commercial retail building and two commercial warehouses encompassing approximately 20,000 square feet. The existing warehouse buildings employ 14 people for one eight hour shift per day. Sewage loading estimates follow: source loading factor average daily sewage flow (gaUday) 15,000 sq. ft. of retail space 0.1 gal/sq. ft. -day 1,500 gallday 14 employees (1/2 bath only) 20 gal/employee-day-8hr. shift 280 gaUday Total Average Daily Flow 1,780 gal/day To facilitate additional warehouse personnel, the average daily design flow will be increased to 2,000 gaUday. Using the increased design flow, the ISDS may accept waste from the 15,000 sq. ft. retail building and a total of 25 employees at the two warehouse buildings. As shown in the attached septic layout plan, a 3,000 gallon, two compartment septic tank will be installed to provide a minimum of 30 hours retention time for sewage effluent generated from the retail building. Each warehouse building will require a 1,000 gallon, two compartment septic tank. A minimum 1,000 gallon single compartment, one-piece tank will be used as a pumping vault for the OSI pump and screened pumping vault. The effluent pumping system will consist of a P500512 OSI duplex pumping system with an associated Biotube pumping vault (OSI Model PVU57-2419-L) as shown in the attached effluent pump system detail. All construction, dosing chamber capacity, location of ISDS elements, and setbacks from property lines, building envelopes, and existing easements shall be in accordance with the attached graphics. As discussed above, an INFILTRATOR system is proposed to discharge septic effluent to the underlying sub -soils. To allow for future expansion, the absorption field will be sized to accept a maximum of 2,000 gallons/day (average flow) of septage. As shown in the attached graphics, the absorption field will consist of 288 QUICK4 INFILTRATOR units and shall be 36 ft by 96 ft in lateral dimensions. The absorption field will encompass a gross area of 3,456 square feet with an effective area (9.2 sq. ft.IINFILTRATOR plus 40% reduction factor) of 4,416 sq. ft. Calculations and design parameters used to size the absorption field follow. Page 4 of 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4.0 Site Specific Installation/Ooeration Requirements The owner and system contractor shall be aware and comply with the following installation and system operation requirements. 4.1 Installation - Setbacks. Notifications. and Inspections • All installation activities shall be conducted in accordance with current Colorado Department of Health fSDSRegulations as well as any relevant Garfield County regulations and requirements. If at any time during construction, subsurface site conditions are encountered which differ from the design parameters developed in Section 2.0. construction activities will stop and the design engineer will be contacted to address any necessary design modifications. • Installation procedures including grade, location, setbacks, septic tank size, and absorption field size shall conform with the attached graphic details. Construction activities and system components will not encroach upon existing easements or utility corridors. A minimum of 6 ft of undisturbed soil shall be maintained between individual absorption elements and the septic tank and/or adjacent absorption elements. Minimum site specific setbacks for system components are: Source Septic Tank Absorption Field Building Sewer water line 10' 25' 10' domestic well 50' 260' 50' dwelling 5' 20' property lines 10' 10' dry gulch 10' 185' pond/lake/stream 50' 210' irrigation ditch open 50' 210' lined/gated 25' 25' solid pipe 10' 10' • To avoid surface flow infiltration and saturation of the new absorption system, abandonment of irrigation in the vicinity of the disposal system is required. Diversion ditches necessary to divert surface flows around the new absorption bed must maintain the minimum setbacks listed above. • All gravity flow sewer lines and effluent distribution piping shall be 4 inches in diameter and have glued joints. INFILTRATORS shall be placed level in the absorption field. All lines discharging sewage from the residence to the septic tank shall maintain fall of between 1/8 in. and 1/4 in. per foot and shall employ sweep 90's or 2-45's at all turns. Sewer lines from the dwelling to the septic tank and at least 6 ft from the septic tank outlet must meet minimum standard ASTM -3034. Sewer lines under driveways shall always meet minimum Schedule 40 PVC standards and shall be encased with corrugated metal pipe or flow fill and minimum 1-1/2" high density blue board when covered with less than 12" of soil. Page 6 of 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 • A minimum of 12" of soil cover (18" recommended) shall be maintained over all gravity draining ISDS components to prevent freezing of septic effluent (excepting maximum 8" cover over septic access ports). Four in. sanitary clean -outs shall be installed at maximum 100' intervals in all gravity flow effluent lines exceeding 100' in length. • The installer shall not place INFILTRATORS in the open excavation until inspected and approved by the design engineer. Additionally, the final cover shall not be placed on sewer lines, septic tank, or the absorption area until the system has been inspected and approved by the design engineer. The installer shall provide 48 hour notice 10 the engineer for all required inspections. • The effluent distribution system shall be constructed in accordance with the "Infiltrator Technical Manual" available from Infiltrator Systems Inc., 123 Elm Street, Suite 12, Old Saybrook, Connecticut 06475. • Pressure piping shall consist of two each 2 in. pressure transport lines, two each 2 in. pressure manifolds, and 1 in. pressure laterals. All pressure piping shall be min. Schd 40 PVC and have glued joints. • The septic effluent pumping system shall consist of OSI components (OSI effluent duplex pump model no. P500512 and associated OSI model PVU57-2419-L pump vault) as detailed in the attached effluent pumping system detail. The effluent pump control panel shall be Orenco model no. SIETM. Electrical wiring shall be continuous cable with all connections made in a weather proof box exterior to the dosing chamber. Limit switching shall consist of: 1) low level/pump off, 2) high level/pump on, and 3) high level alarrn/system failure. The high level alarm shall be easily detectable by occupants. Emergency notification information (e.g., telephone numbers of owner, Mesa County Environmental Health Department, service personnel) shall be posted near the high level alarm. • The effluent pump shall be configured with a minimum dose volume of 200 gal. Storage capacity in excess of the high-level alarm shall be 6" above the pump -on float level. • All access manholes on septic tanks and dosing chambers will be child proof and contain appropriate warning labels if accessible to the public. Confined space entry precautions should be observed by maintenance personnel. • The surface cap shall consist of sandy loam soil mounded 5% over the absorption field to promote surface runoff. • The owner shall modify the recorded property plat or survey to abandon interior property lines and/or record all easements required to afford compliance with Colorado Department of Public Health and Environment minimum setback requirements for onsite wastewater systems. • The system contractor shall be aware of the potential for construction activities to reduce soil permeabilities at the site through compaction, smearing, and shearing. The following precautions and construction procedures should be employed during Page 7 of 9 1 y 0 b 104 / 1S S/ h / 7 / 7 1 1 1 1 1 1 1 1 1 0 a mWNNNN01pN Q w U U m " Y ,To azOOnn666 N 2 N a U F LJZZ 2 0..‹ 2 Z ❑ X - p JW om pwi y _ Lay, u K n J Z❑�❑ ZO £ N - u .2-0 W N 2 flm W a W W \ O )w -mm, O 6- u 4 u 0L )0........ Z OOIJpy -www ww aa -CO -.£0 N J J V 0 4 0 c • L Coy a = i Ni 1 1 1 INFILTRATOR, INSTALL IN ACCORDANCE VITH 'INFILTRATOR TECHNICAL MANUAL. INFILTRATOR SYSTEMS INC, 123 ELM STREET. SUITE 12, OLD SAYBROOK, CONNECTICUT 06475 /i SYNTHETIC FILTER FABRIC (140-200 MESH) OVER INFILTRATORS, TYP 1' SCHD 40 pressure laterals with 5/32' holes spaced 48' o.c. at 1200 o'clock to direct discharge up for dispersion against top of chamber (typ. 1 of 24) provide sandy loan 5011 cap (Hound 5%) EXISTING GROUND SURFACE 1 1 1 1 1 1 1 1 1 F- 1 1 1 1 2' SCHD 40 PVC PRESSURE MANIFOLD, TYPICAL, ONE OF TWO ABSORPTION L DISK OR SCARIFY UNDER ABSORPTION BED, TYPICAL 36' PROVIDE MIN I/8' FALL PER J 12' RUN FOR DRAIN BACK TO LIFT STATION FOR ALL LINES VITH LESS THAN 36' OF COVER, TYPICAL TWO 2' SCHD 40 PVC PRESSURE TRANSPORT LINES FROM LIFT STATION UTILIZING DUPLEX PUMPS (ONE LINE FROM EACH PUMP) FIELD - CROSS SECTION SCALE' 1'=5' NOTES 4I -REDDISH BROVN CLAYEY SAND LOAM, SOFT AND FRIABLE N2 -LIGHT RED SANDY CLAY, HARD AND BLOCKY, FRIABLE P3 -PIT RUN GRAVEL (25nn-JOOnn) IN BROWN SAND MATRIX NO STANDING GROUNDWATER OR HIGH SEASONAL WATER TABLE TO 126' BGS FRYVALD COMMERCIAL PROJECT 7025 HWY 82 GLENWOOD SPRINGS ABSORPTION FIELD - CROSS SECTION ARPRIL 23. 2006 SCALE. AS SHOWN 4''SCHD 40 PVC VENT/INSPECTION ,..�., PORT 1 ' ' SOIL CAP SUSPEND PRESSURE LATERAL WITH ALL WEATHER PLASTIC PIPE STRAP VITH 120 LBS TENSILE STRENGTH AT EVERY CHAMBER CONNECTION, TYP. PROVIDE MIN. 1/8' FALL PER 12' RUN FOR DRAIN BACK TO PRESSURE MAIN, TYP. `11 P=I I GA 11=1 h=1 1= 111-I I I-11 1' SCHD 40 PVC PRESSURE LATERAL VITH 5/32' HOLES SPACED 48. 0.C. AND DRILLED AT 12100 O'CLOCK TO DIRECT DISCHARGE UP FOR DISPERSAL AGAINST TOP OF INFILTRATOR 3/4' THREAD CAP 126' - 3 SOILS LOG (SEE NOTES) 1111�11�I111III1111ii1�1-� 3/4' THREAD NIPPLE TO SURFACE FOR CLEAN OUT AND PRESSURE BALANCING (END OF LATERAL ONLY) DRILL END PLATE, CAULK, AND CAP 3/4' THREAD TEE PRESSURE LATERAL CONSTRUCTION DETAIL SCALE: 1'=1' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Pump Selection for a Pressurized System FRYWALD COMMERCIAL PROJECT 7025 HWY 82, GLENWOOD SPRINGS, CO 3 0 e. ta m5 I; 11 it NI gi 0 0 O 2 3 ieel'(H0 .) PeeH opwewtp lelol 0 0 n 8 53 0 O 0 O Net Discharge, gpm g g afl l 8 & fl & a V A; O M N O N♦ O! O O co~ •� ^ o 0 a ei 0 o o M N O N N o. C _. � _ ._ _- I __.I__ __�_—_ 1 1 ___t_. Effluent Pur P50 Serie 1/2 hp to 1-1 1, _ 7 I -_4_. — -T 1 b a N a p, V a!1 a 0 0 O 2 3 ieel'(H0 .) PeeH opwewtp lelol 0 0 n 8 53 0 O 0 O Net Discharge, gpm g g afl l 8 & fl & a V A; O M N O N♦ O! O O co~ •� ^ o 0 a ei 0 o o M N O N N o. C 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 DESIGN CALCULATIONS AVERAGE DESIGN FLOW OF 2000 GAL.IDAY PEAK FLOW = 150% OF AVERAGE = 3000 GAL.IDAY DESIGN PERCOLATION RATE = 52.0 MIN.IINCH A = 21i, WHERE, A = ABSORPTION FIELD AREA Q = PEAK FLOW t = PERC TIMEIINCH A = 3 5� 52.0 = 4326.66 SQUARE FEET SIZE ADJUSTMENT FACTOR OF 0.6 FOR INFILTRATOR SYSTEM ADJUSTED AREA = 4326.66 X 0.6 = 2596.0 SQUARE FEET ABSORPTION FIELD SIZED AT 36 FT. x 96 FT. = 3456 SQUARE FEET USE 288 QUICK4 INFILTRATORS @ 9.2 SQ. FT EACH FOR TOTAL ABSORPTIVE AREA OF 288 X 9.2 = 2,649.6 SQUARE FEET Page 5 of 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 installation to minimize disturbance to native soils: i. Excavation should proceed only when the moisture content of the soil is below the plastic limit. If a sample of soil forms a rope instead of crumbling when rolled between the hands it is too wet and should be allowed to dry before excavation continues. ii. Excavation and backfill equipment should work from the surface where at all practical to avoid compaction of the soils at depth. iii. The bottom and sidewalls of the excavation should be left with a rough, open surface. The appearance should be that of broken or ripped soil as opposed to a sheared, smeared, or troweled surface. Any smoothed or smeared surfaces should be removed with a toothed rake or shallow ripper taking care to remove loose residues from the bottom of the excavation by hand if necessary. iv. Care should be taken in placing fill materials in the excavation to avoid damaging the exposed soil surfaces. 4.2 Operation - Maintenance and Inspections • The owner shall install a structural barrier if necessary and take precautions to prevent vehicular traffic, excessive surface watering, accidental flooding, or other activities in the vicinity of the absorption field which may compact, saturate, or otherwise alter the subsurface soil parameters used in designing the septic system. • The owner will plant and maintain grass or other shallow rooted cover crop to prevent erosion and promote evapotranspiration over the absorption field. • The owner will inspect and maintain the required mounding and drainage away from the absorption field to prevent saturation from precipitation and surface flows. • To mitigate the generation of preferential flow channels which may compromise the operation of the system, the owner will inspect and prevent intrusion of burrowing animals and deep rooted plants into the absorption field. • The effluent pump filter shall be inspected and cleaned as necessary every six (6) months. • The owner will conduct periodic maintenance of the septic system by removing accumulated sludge from the septic tank every 3-4 years to prevent clogging of the absorption field. Page 8 of 9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5.0 Limitations This report is a site specific design for installation of an individual sewage disposal system and is applicable only for the client for whom our work was performed. Use of this report under other circumstances is not an appropriate application of this document. This report is a product of Cronk Construction Incorporated and is to be taken in its entirety. Excerpts from this report may be taken out of context and may not convey the true intent of the report. It is the ownefs and owner's agents responsibility to read this report and become familiar with the recommendations and design guidelines contained herein. The recommendations and design guidelines outlined in this report are based on: 1) the proposed site development and plot plan as furnished to Cronk Construction Incorporated by the client, and 2) the site conditions disclosed at the specific time of the site investigation of reference. Cronk Construction Incorporated assumes no liability for the accuracy or completeness of information fumished by the client. Site conditions are subject to external environmental effects and may change over time. Use of this plan under different site conditions is inappropriate. If it becomes apparent that current site conditions vary from those anticipated, the design engineer should be contacted to develop any required design modifications. Cronk Construction Incorporated is not responsible and accepts no liability for any variation in assumed design parameters. Cronk Construction Incorporated represents this report has been prepared within the limits prescribed by the owner and in accordance with the current accepted practice of the civil engineering profession in the area. No warranty or representation either expressed or implied is included or intended in this report or in any of our contracts. Thomas A. Cronk, P.E. Date 1 94,6.. NOTE: This individual sewage disposal plan is meant to include the following six pages of graphics including: 1) plot plan, 2) septic layout plan, 3) absorption field plan view, 4) absorption field cross section, 5) cross section - effluent pumping system, and 6) effluent pumping system design. The plan is not to be implemented in the absence of these related graphics. In addition, results from the percolation test and soils evaluation are included for reference as Appendix A. Page 9 of 9 b.1 yOpO� -gNb, 0 \ Lot 1 2107 acres \r �D' y O 5° \A \fir, \ perc test locations (CCI 3/28/06) property lsne described vt reception no 232928 Garfield Co Clerk 1 Recorder's Office 0 /4 /'Kperc test locations (Garfield Cnty) 15,000 SO. FT OF RETAIL existing building sewers 6 septic tank Lease agreement (lease no 17638) Denver S Rio Grande Western Railroad to Colton's Hone Furnishings Lot 2 \ \ \ /" \ j/ /ee\n' // 20' util.ty r, / easement J\ / ,p h / ( \ t5 / 2.167 ocres Z Jam` ‚3-- t\\ C 80' 60' access 1 utility easement FYRVALD COMMERCIAL PROJECT 7025 HVY 82, GLENVOOD PLOT PLAN MARCH 13, 2006 SCALE. I'=100' NORTH 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 L O sy Ljpu?g « • o S y p a COpm - Ny yin N✓� 4rd0 daNN O4 y N c.:013‘44 • a 4 o N° a o OIC u- Cr. • C Nc 6o- 0, W l p a N Ny Jv yol pin No Y✓aN V 0,0J Y°yl Y nm ❑ O S a amTu 4 a=o LL 3• 044 1 N aNE 4 are a o Hina V V u 4n a,r. >75t0 n S - a n • N Z rnL Z Up V L4~ u 0 0 C 4.1S a a Q 0▪ .3C j -OP 0 ' lO J N b N L ➢l >.N2 O CE 0 cc Z-0 G oy C L O w n C l E 4n n0 9E • • I • • • • • 1 • • • • • I I I I I I 1 I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I ' r 1 1 r I 1 I I r I 1 I r I I I r I I I I I I I I I I I I I I I I j I I I I I I I I I I I I I I I I 1 I I I I r I I 1 1 1 I 1 1 1 I 1 I I 1 1 I I I I I I I I I I 1 I I I I I 1 1 1 I 1 1 1 1 C61 .9E 1 I 1 1 1 1 I I 1 1 I I 1 I 1 I I I 1 1 � I II 1 1 1 1 I 1 1 1 1 I 1 { I 1 1 1 1 1 I 1 1 1 1 I 1 I 1 I il— 1 -r- T 1 I 1 II 1 T 1 f 1 1 1 1 1 1 I II 1 1 r. 1 • • • • • 1 • I • 1 • • • • • mTT . U U Z) WIYw_ 0▪ 01> n0Q JC]J Q=n o W G II JJ iuw� £NI'O. Om£ No u -N Q- IK W >-NY1O:Q CY0 03 L) L NCCN W_ Z ao_ II 0 — W Z 0 H a 0 O N m Q 1 1 1 1 1 1 1 1 1 1 1 1 1 41 0 c� 0. N U . d 0 v Cr, -'o Y m s N C7 v v � 0 w 7 W n c s 'o N N 1 o .c .0 ▪ v L J a P a z x A a m in .n. 5 U E0 3 E 0 > Eo4'> O O Cl CD 0 < ^ O • v ¢ N ; 0 9 •• c rnE a o o in E r Eueoco >� E Dv a o u en N * 0 O 0 0 > 0 u U v C 0. E d c04� t�����.�� E O rn> 0'w O 0 O H 0 0 E n O E o n 4> >o ° �O L 0 O 0 0 U v c 0 uo ¢ a o 0 C v a o c 0 o w d d o `t n ` O N u Cl E 0 E E E 0 L N Y O c T rte+ Q PO o En vo `o 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 APPENDIX A SOILS AND PERCOLATION REPORT CRONK CONSTRUCTION INCORPORATED 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CRONK CONSTRUCTION • INCORPORATED 1129.24- Road Grand Junction, CO 81505 970.245.0577, 970.257.7453 (tax) SOILS AND PERCOLATION REPORT Date: March 28, 2006 Prepared by: Client: Thomas A. Cronlc, P.E. 1129 -24- Road Grand Junction, CO 81505 245-0577 Ernie Fyrwald Barnett-Fyrwald Holdings, Inc. 415 E. Hyman Avenue Aspen, CO 81611 (970) 618-9175 Property address: 7025 Highway 82, Glenwood Springs, CO Tax schedule No.: Legal Descript.: 1.0 Soils Evaluation The site consists of approximately 4.274 acres of uncultivated native soil. Drainage is approximately 1% to the southwest. A percolation test/soils evaluation was conducted on the property of reference on 03/28/06 by Tom A. Cronk, registered professional engineer (R.P.E.). A pert excavation trench (excavation A) was extended to a depth of 126" below ground surface (BGS). There was no evidence of ground water or high seasonal water table in the open excavation to a depth of 126" BGS. The soils evaluation indicates three distinct soil horizons underlie the site. A lithological description follows: depth (in.) description 0" - 24" 24" - 36" 36" - 126" clayey sand loam, reddish brown; soft; friable sandy clay, light red; hard and blocky; friable pit run (25mm-300mm) in brown sand matrix Perc holes were constructed in excavation A at the surface and at depths of approximately 38 in. and 72 in. Additional perc holes were constructed in excavations B and C at a depth of 36 in. The holes appeared to be well saturated at the time of the test. Results of the percolation test are shown in Table 1. Page A-1 of A-3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TABLE 1 Percolation Test Results 7025 Highway 82 Depth Time on 03/28/06 Time Drop Pere Rate min/in 14:20 14:35 15:00 15:20 l (A) 0" - 16" 5.25 6.0 7.0 7.625 60/2.375 25 (A) 38' - 52" 5.0 5.0 5.25 5.5 60/0.5 120 (A) 72" - 84" 5.0 6.375 7.625 9.25 60/4.25 14 (B) 36" - 48" 5.5 5.875 6.375 6.875 60/1.375 44 (C) 36" - 48" 5.125 5.75 6.375 7.0 r I 60/1.875 32 2.0 Conclusions and Recommendations Soils at the site appear acceptable for implementation of an individual sewage disposal system (1SDS). The following site-specific considerations should be observed during implementation of the ISDS: • The bottom of the ISDS absorption field should be located no deeper than 78" BGS to maintain 4' of usable infiltration soil above the extent of the subsoils observation excavation located at 126" BGS. An average design perc rate of 52 min/in. is recommended for overall system sizing for discharge below a depth of 36" BGS. • Care should be taken during construction to avoid compaction and smearing of the exposed infiltrative surfaces and preserve the natural permeability of the native soils. Page A-2 of A-3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3.0 Limitations This report provides a professional assessment of the feasibility of implementing an individual sewage disposal system on the property of reference. The design parameters developed in this document are representative of the site conditions disclosed at the specific time of the site investigation. Site conditions are subject to change from external events both manmade (irrigation or pond construction) and naturally occurring (flooding or excessive precipitation). Cronk Construction Incorporated is not responsible and accepts no liability for any variation in assumed design parameters caused by extemal events. Cronk Construction incorporated represents this report has been prepared within the limits prescribed by the owner and in accordance with the current accepted practice of the civil engineering profession in the area. No warranty or representation either expressed or implied is included or intended in this report or in any of our contracts. SEAL Page A-3 of A-3 Thomas A. Cronk, P.E. fj Date