Travis Stewart
Detached Barn -Manufactured Steel Building
Roaring Fork Preserve -Lot 4
Carbondale, Colorado
1) ALL WORK SHALL COMPLY WITH THE 2015 VERSIONS OF l.R.C., l.B.C., l.F.G.C., l.M.C.,
1.M.C. AND 2009 VERSIONS OF l.E.C.C. & l.F.C. IN ADDITION, ALL WORK SHALL COMPLY
WITH MANUFACTURER'S INSTALLATION SPECIFICATIONS.
2) REFER TO PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS AND INSULATION
DETAILS AT EDGE OF CONCRETE SLAB FOUNDATION.
3) PROPOSED BUILDING IS APPROVED AS A DETACHED ACCESSORY STRUCTURE TO
RESIDENTIAL USE. ANY CHANGE IN USE AND/OR OCCUPANCY MAY REQUIRE A LAND
USE CHANGE PERMIT AND/OR SUBSEQUENT BUILDING PERMIT(S).
4) PRIOR TO CONSTRUCTION, CONTACT LOCAL FIRE DISTRICT FOR PERTINENT FIRE CODE
REQUIREMENTS (2009 INTERNATIONAL FIRE CODE). FIRE DISTRICT'S FINAL APPROVAL
REPORT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF
OCCUPANCY.
5) PER PLAT NOTE #14, A SITE SPECIFIC GEOTECHNICAL SOILS INVESTIGATION MUST BE
CONDUCTED TO DETERMINE FOUNDATION DESIGN REQUIREMENTS. IN ADDITION, AN
OPEN-HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION TO VERIFY MINIMUM
SOILS BEARING CAPACITY (AS DETERMINED BY SOILS ENGINEER) WITH STRUCTURAL
ENGINEER OF RECORD.
6) A LOT IMPROVEMENT CERTIFICATE SEALED BY A COLORADO LICENSED SURVEYOR
IS REQUIRED AT FOUNDATION INSPECTION TO VERIFY STRUCTURE WILL BE IN
CONFORMANCE WITH BUILDING SETBACK REQUIREMENTS.
7) ALL HIGH-STRENGTH BOLTING AND FIELD WELDING REQUIRES A SPECIAL INSPECTOR
PER SPECIAL INSPECTIONS PROVISIONS OF l.B.C., CHAPTER 17. PROVIDE APPROVAL
REPORT AT FRAME INSPECTION.
8) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.