Loading...
HomeMy WebLinkAboutApplication- PermitNo. 6120 GARFIELD CVUNTY BUILDING, SANITATION and PLANNING DEPARTMENT 109 803 Street Suite 303 Glenwood Springs, Colorado 81601 (303) 945-8212 8565 County Road 320, Rifle Job Address Nature or Work Building Permit Use of Building Double Garage Owner Lorile Loesch Contractor Owner Amount ofPe-unit S 204.25 late October 23, 1996 Permit: 162.25 Plan . 42.00 Paid $105.46 10-8-96 S. Archuleta Clerk BUILDING PERMIT APPLICATION GARFIELD COUNTY, COLORADO Applicant to complete numbered spaces only. PERMIT NO. ! 0 PARCEIJSCHED NO. g5-6 S e � 3 BLOCK JOB ADDRESS 1 2 3 4 5 6 7 8 9 LEGAL DESCR. LOT NO. OWNER LC C-'/ SUBDIV1SION ADDRESS 5.6- 3 a gip r --c. CONTRACTOR ARCHITECT OR DESIGNER ENGINEER S.F OFBUSLDSNG S f 2 ADDRESS AODRESS ADDRESS S.F OF LOT USE OF BUILDING AV 6/C]N,y(G A4g PH, Ic2 -r/J /f P1i. PH. PH. HEIGHT WK. PH. LICENSE NO. LICENSE NO. LICENSE NO. NO. OF FLOORS Cuss OF WORK: XNEW ❑ADDITION 7ALTERATION :REPAIR 7MOVE ❑REMOVE I -7iY ' 2 17 - GT To fq 4/� /�l, i (�J�1T-/Z / • DESCRIBE WORK jg7Ttl[/fes 10 GARAGE SINGLE DOUBLE DRIVEWAY PERMIT ON SITE SEWAGE DISPOSAL PERMIT SITE PLAN -VV ,Q CARPORT SINGLE DOUBLE 11 VALUATION OF WORK: S ADJUSTED, VAL.S SPECIAL CONDITICNS:67 r 17 ' x f p� 93 4� , o {o NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF'NCRK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS DR IF CONSTRUCTION OR WORK 15 SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. 1 HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND 'KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE CF WORK WILL BE COMPLIED WITH WHETHER SPEC:FIE:� HEREIN CR NOT THE GRANTING CF A PERMIT DOES NOT PRESUME 7C GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS +F ANY OTHER STATE CR LOCAL LAW REGULATING CONSTRUCTION O" E PERFORMANCE OF CONSTRUCTION ;Alt=lit , J ottc: aoov= dam- S+gnature of Owner. Contractor ar euthonzed agent h dila do Ai, r Builc ng DepartmentAoprorald. •- 9l P?ann.ng -partmproval TOTAL FE_ WATER SUPPLY DATE PERMIT ISSUED e0� — 9, OCC ER CONST. TYPE SPECIAL .APPROVALS REQUIRED RECEIVED NOT R EdUiRE0 ZONING HEALTH CEPT FIRE DEPT SOIL REPORT SETBACKS FLOOD HAZARD MANUF HOME OTHER AGREEMENT PERMISSION 15 HEREBY GRANTED TO THE APPLICANT AS OWNER. CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TC CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30-28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS. SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS. SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garform.003 I HEREBY ACKNOWLEDGE THAT ! HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE 'INITIAL fT�l 7/s U 1 14 ri -1"2N‘teci HISN2, 314Vci iiiiO is au -731444C01 H -LSN 31 N Nra 4-2rit ivt E id 4 O. w 0 0, r'N 19 2 uJ a. Z ;4_ Ere, x al j cr -J ,r 11 !ID -13Nv'd HJ. Nan Nvd oi 9-' I I n fig 2NNecl 1-1.1.91-G1 larvivd 2/163-111 _J liJ n a z 4OMA1 te =4 0 17) =4 z iv a 0 1 _ w til PANEL Pol NIT Designate North Ar v)� z L a R -Z. ey 0� • 0 o ,, 00 • Z • v. Vl� v X 0 0 )qTLE/i37- 1500 • �ea e t c rt CD - • tela 0 -11:1cis `u▪ GJ • 6 'Q U Z 0 n �. .. 0 cnc c lwpwin60\wpdocstplotloc | i 'l"- | GARFIELD COUNTY BUILDING AND PLANNING MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION MANUFACTURED HOMES ADDITIONS ALTERATIONS and MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided by the applicant may result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling construction under the Uniform Building Code. This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following check list prior to and during design. Applicants are required to indicate appropriately and to submit completed check list at time of application for a permit: For the placement of a manufactured home, questions numbers 1-4 and 19-28 are the only questions that need to be addressed: 1 1 Is a site plan included that indicates the distance of the proposed building or addition to property lines, other buildings, set back easements and utility easem ts? Yes No st> Not necessary for this project (2) 2. Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject property and adjacent properties) , streams or water courses? Yes No (1) Not necessary for this project (2) 3. Does the site plan indicate the location and direction of the County or private road accessi g the property? Yes No c„ Not necessary for this project (2, 4. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes No (1) Not necessary for this project (2) 5. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and ea ? Yes No na Not necessary for this project (2) 6. Do the plans indicate the size an location of ventilation openings for the attic, roof joist spaces and soffits? Yes No 0, Not necessary for this project c2, 7 Do the plans include design loads as required under the Uniform Building code for roof snow loads, (a minimum of 40 pounds per square foot in Garfield County) floor Toads and wind loads? Yes No (+) Not necessary for this project (2) 8. Does the .plan include a building section drawing indicating foundation, wall, floor and ro construction? Yes No (/) Not necessary for this project (2) 9. Does the building section drawing include size and spacing of floor joists, wall studs, c fling joists, roof rafters or joists or trusses? Yes No c» Not necessary for this project (2) 10. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes No (1) Not necessary for this project (2) 2 11. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the ave down to existing grade contours? Yes No (1) Not necessary for this project rn 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No c„ Not necessary for this project (2) 13. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37?/ Yes No (:) Not necessary for this project (2) 14. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes No (1) Not necessary for this project 15. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes No (1) Not necessary for this project X (2) 16. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these ar s? Yes No (1) Not necessary for this project (2) 17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes No t,, Not necessary for this project }( m 18 Do you understand that if you belong to a homeowners association, it is your responsibility to obtain written permission from that association, if required by that association, prior to submitting an application for a building per it? Yes No (1) Not necessary for this project (2) 19. Will this/be the only residential structure on the parcel? Yes J(. No If No -Explain 3 20. Have two (2) complete sets of constructions drawings been submitted with the applicati n? Yes V No c„ Not necessary for this project c2, 21. Is this an application for he placement of a manufactured home? Yes No If yes, have you specified the size of the unit (min. 20ft x 20ft); live roof load (min.40#); wind design (min. wind speed of 80 mph & 15 ib. wind load); foundation design; method of anchoring? Yes No („ Not necessary for this project (2) 22. Have you designed or had this plan designed while considering building and other constru tion code requirements? Yes No (3) 23. Does the plan accurately indicate what you intend to construct and what will receive a final ins ection by the Garfield Building Department? Yes \ No (31 24. Do you understand that approval for design and/or construction changes are required rior to the application of these changes? Yes � — No (3) 25. Do you understand that the Building Department will collect' P1an .Revi____,ew7 fee from you at the time of application and that you will be required to payla 'fermi Fee" s well as any "School impact" or " ptic system " fees required, at the time u pick up your building permit? 9 Yes No (3) -` �`�" 26. Are you aware that twenty four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before; afternoon inspections must be called in by 5:00 p.m. the day before . Failure to give 24 hour noti e for inspections will delay your inspection one (1) day. Yes No 27. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificat of Occupancy and occupancy of the building? Yes No (3, 4 a 28. Are you aware that the person signing the Permit Application whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the application is the party responsible for the project complying with the Uniform Codes". Yes No (3) I hereby acknowledge that I have read, understand and answered these questions accurately to the best of my ability. rte. J<<— signaire /C)— date Phone: (days); 2 5 g5 -7,Y (evenings) Project Name: Project Address; FS&s Zc'- 12,0 , r�L.e CSC E26_s--c Notes: (1) If you have answered "No" on any of these questions you may be required to protide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. (2) If you have answered "Not necessary for this project' on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the following: (3) A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy' not being issued. PerApp02.95 Effective August 15, 1995