HomeMy WebLinkAbout18 Revised Preliminary Cost EstimateRiver Edge Colorado Infrastructure Cost Estimates1'2'3'4'5'6
Filing 1
Item #
Description I Units Qty. Unit Cost
Total
Notes
LS
Lump[3umEEstimatefincluding[ ontingency
$ -
Use Lump Sum Estimate ❑
Itemized[Estimate
1
Type 1 -Road (Entry) 6
ft
1225
$ 650.00
$ 796,250
2
Type 2 -Road (Local)
ft
3320
$ 285.00
$ 946,200
3
Type 3 -Road (GH Access)
ft
43
$ 230.00
$ 9,890
4
Type 4 -Road (Alley)
ft
1940
$ 175.00
$ 339,500
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
500
$ 45.00
$ 22,500
7
Trails (Hard)
ft
1550
$ 60.00
$ 93,000
8
Trails (Soft)
ft
2585
$ 17.50
$ 45,238
9
Potable Water
ft
5000
$ 115.00
$ 575,000
10
Raw Water
ft
7815
$ 45.00
$ 351,675
11
Sanitary Sewer
ft
5600
$ 135.00
$ 756,000
12
Dry Utilities
ft
3380
$ 145.00
$ 490,100
Total Construction Costs $ 4,425,000
Filing 1A
Item #
Description 1 Units 1 Qty. 1 Unit Cost
Total
Notes
LS
Lump[SumC#stimateilincludingWontingency
$ -
Use Lump Sum Estimate ❑
Itemizedt stimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
0
$ 285.00
$ -
3
Type 3 -Road (GH Access)
ft
1000
$ 230.00
$ 230,000
4
Type 4 -Road (Alley)
ft
0
$ 175.00
$ -
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
0
$ 45.00
$ -
7
Trails (Hard)
ft
0
$ 60.00
$ -
8
Trails (Soft)
ft
0
$ 17.50
$ -
9
Potable Water
ft
0
$ 115.00
$ -
10
Raw Water
ft
0
$ 45.00
$ -
11
Sanitary Sewer
ft
0
$ 135.00
$ -
12
Dry Utilities
ft
0
$ 145.00
$ -
Total Construction Costs $ 230,000
Prelimianry Infrastructure Cost Estimate -River Edge Colorado
Page 1 of 7
Filing 2
Item #
Description I Units 1 Qty. 1 Unit Cost
Total
Notes
LS
Lump2SumlEstimate[1including[ ontingency
$ -
Use Lump Sum Estimate ■
Itemized Estimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
2800
$ 285.00
$ 798,000
3
Type 3 -Road (GH Access)
ft
0
$ 230.00
$ -
4
Type 4 -Road (Alley)
ft
0
$ 175.00
$ -
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
0
$ 45.00
$ -
7
Trails (Hard)
ft
1000
$ 60.00
$ 60,000
8
Trails (Soft)
ft
1600
$ 17.50
$ 28,000
9
Potable Water
ft
3160
$ 115.00
$ 363,400
10
Raw Water
ft
4326
$ 45.00
$ 194,670
11
Sanitary Sewer
ft
3700
$ 135.00
$ 499,500
12
Dry Utilities
ft
2750
$ 145.00
$ 398,750
Total Construction Costs $ 2,342,000
Filing 2A
Item #
Description 1 Units Qty. I Unit Cost
Total
Notes
LS
Lump6um[aFstimate[ifincludinglrontingency
$ -
Use Lump Sum Estimate
Itemized1 stimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
0
$ 285.00
$ -
3
Type 3 -Road (GH Access)
ft
840
$ 230.00
$ 193,200
4
Type 4 -Road (Alley)
ft
0
$ 175.00
$ -
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
0
$ 45.00
$ -
7
Trails (Hard)
ft
0
$ 60.00
$ -
8
Trails (Soft)
ft
0
$ 17.50
$ -
9
Potable Water
ft
0
$ 115.00
$ -
10
Raw Water
ft
0
$ 45.00
$ -
11
Sanitary Sewer
ft
0
$ 135.00
$ -
12
Dry Utilities
ft
0
$ 145.00
$ -
Total Construction Costs $ 193,000
Prelimianry Infrastructure Cost Estimate -River Edge Colorado
Page 2 of 7
Filing 3
Item #
Description Units Qty. Unit Cost3
Total
Notes
LS
Lump[;Sum[#stimategincludinglrontingency
$ -
Use Lump Sum Estimate)
Itemized1 stimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
4560
$ 285.00
$ 1,299,600
3
Type 3 -Road (GH Access)
ft
0
$ 230.00
$ -
4
Type 4 -Road (Alley)
ft
900
$ 175.00
$ 157,500
5
Bridge
Ea
1
$ 500,000.00
$ 500,000
6
Walls
sq ft
3900
$ 45.00
$ 175,500
7
Trails (Hard)
ft
920
$ 60.00
$ 55,200
8
Trails (Soft)
ft
1735
$ 17.50
$ 30,363
9
Potable Water
ft
5415
$ 115.00
$ 622,725
10
Raw Water
ft
9200
$ 45.00
$ 414,000
11
Sanitary Sewer
ft
4200
$ 135.00
$ 567,000
12
Dry Utilities
ft
5230
$ 145.00
$ 758,350
Total Construction Costs $ 4,580,000
Filing 3A
Item #
Description I Units 1 Qty. Unit Cost
Total
Notes
LS
Lump[fum[iEstimatelifincludinglrontingency
$ -
Use Lump Sum Estimate
ItemizedfiFstimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
0
$ 285.00
$ -
3
Type 3 -Road (GH Access)
ft
510
$ 230.00
$ 117,300
4
Type 4 -Road (Alley)
ft
0
$ 175.00
$ -
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
0
$ 45.00
$ -
7
Trails (Hard)
ft
0
$ 60.00
$ -
8
Trails (Soft)
ft
0
$ 17.50
$ -
9
Potable Water
ft
0
$ 115.00
$ -
10
Raw Water
ft
0
$ 45.00
$ -
11
Sanitary Sewer
ft
0
$ 135.00
$ -
12
Dry Utilities
ft
0
$ 145.00
$ -
Total Construction Costs $ 117,000
Prelimianry Infrastructure Cost Estimate -River Edge Colorado
Page 3 of 7
Filing 3B
Item #
Description I Units 1 Qty. 1 Unit Cost
Total
Notes
LS
Lump3umlEstimate[1including[ ontingency
$ -
Use Lump Sum Estimate ■
Itemized Estimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
0
$ 285.00
$ -
3
Type 3 -Road (GH Access)
ft
960
$ 230.00
$ 220,800
4
Type 4 -Road (Alley)
ft
0
$ 175.00
$ -
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
0
$ 45.00
$ -
7
Trails (Hard)
ft
0
$ 60.00
$ -
8
Trails (Soft)
ft
0
$ 17.50
$ -
9
Potable Water
ft
0
$ 115.00
$ -
10
Raw Water
ft
0
$ 45.00
$ -
11
Sanitary Sewer
ft
0
$ 135.00
$ -
12
Dry Utilities
ft
0
$ 145.00
$ -
Total Construction Costs $ 221,000
Filing 4
Item #
Description 1 Units Qty. I Unit Cost
Total
Notes
LS
Lump6umlEstimatef includinglirontingency
$ -
Use Lump Sum Estimate ❑
ltemlzedLstimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
1445
$ 285.00
$ 411,825
3
Type 3 -Road (GH Access)
ft
0
$ 230.00
$ -
4
Type 4 -Road (Alley)
ft
0
$ 175.00
$ -
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
0
$ 45.00
$ -
7
Trails (Hard)
ft
1000
$ 60.00
$ 60,000
8
Trails (Soft)
ft
1720
$ 17.50
$ 30,100
9
Potable Water
ft
3280
$ 115.00
$ 377,200
10
Raw Water
ft
3070
$ 45.00
$ 138,150
11
Sanitary Sewer
ft
900
$ 135.00
$ 121,500
12
Dry Utilities
ft
1510
$ 145.00
$ 218,950
Total Construction Costs $ 1,358,000
Prelimianry Infrastructure Cost Estimate -River Edge Colorado
Page 4 of 7
Filing 4A
Item #
Description I Units 1 Qty. 1 Unit Cost
Total
Notes
LS
LumpCSumlEstimateC includingXontingency
$ -
Use Lump Sum Estimate ■
ItemizedIstimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
0
$ 285.00
$ -
3
Type 3 -Road (GH Access)
ft
510
$ 230.00
$ 117,300
4
Type 4 -Road (Alley)
ft
0
$ 175.00
$ -
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
0
$ 45.00
$ -
7
Trails (Hard)
ft
0
$ 60.00
$ -
8
Trails (Soft)
ft
0
$ 17.50
$ -
9
Potable Water
ft
0
$ 115.00
$ -
10
Raw Water
ft
0
$ 45.00
$ -
11
Sanitary Sewer
ft
0
$ 135.00
$ -
12
Dry Utilities
ft
0
$ 145.00
$ -
Total Construction Costs $ 117,000
Filing 5
Item #
Description 1 Units Qty. I Unit Cost
Total
Notes
LS
Lump6um[#stimatef includinglirontingency
$ -
Use Lump Sum Estimate ❑
itemized estimate
1
Type 1 -Road (Entry) 6
ft
0
$ 650.00
$ -
2
Type 2 -Road (Local)
ft
2600
$ 285.00
$ 741,000
3
Type 3 -Road (GH Access)
ft
0
$ 230.00
$ -
4
Type 4 -Road (Alley)
ft
535
$ 175.00
$ 93,625
5
Bridge
Ea
0
$ 500,000.00
$ -
6
Walls
sq ft
0
$ 45.00
$ -
7
Trails (Hard)
ft
500
$ 60.00
$ 30,000
8
Trails (Soft)
ft
1390
$ 17.50
$ 24,325
9
Potable Water
ft
3010
$ 115.00
$ 346,150
10
Raw Water
ft
6130
$ 45.00
$ 275,850
11
Sanitary Sewer
ft
2570
$ 135.00
$ 346,950
12
Dry Utilities
ft
2920
$ 145.00
$ 423,400
Total Construction Costs $ 2,281,000
Prelimianry Infrastructure Cost Estimate -River Edge Colorado
Page 5 of 7
Additional Offsite Activities
Item #
Description I Units 1 Qty. 1 Unit Cost
Total
Notes
LS
Lump6umL stimate[lfincludingrontingency
$ -
Use Lump Sum Estimate ■
ItemizedL stimate
1
Intersection Hwy 82 6
Ea
1
$ 3,250,000.00
$ 3,250,000
2
Water/Wastewater Improvements
per RFWS Pre -Inclusion Agreement 6
LS
1
$ 8,100,000.00
$ 8,100,000
3
Glenwood Ditch
ft
2890
$ 60.00
$ -
4
RWTP
Ea
1
$ 100,000.00
$ -
5
Community Facility
LS
1
$ 1,725,000.00
$ -
6
Park Improvements
LS
1
$ 700,000.00
$ -
7
RFTA Crossing Agreement 6
LS
1
$ 850,000.00
$ -
8
$ -
9
$ -
10
$ -
11
$ -
12
$ -
Total Construction Costs $ 11,350,000
Additional Onsite Activities
Item #
Description I Units I Qty. Unit Cost
Total
Notes
LS
Lump6umNstimateffincludingfaTontingency
$ -
Use Lump Sum Estimate ❑
ItemizedE stimate
1
Earthwork/Soil Placement
_ cu.yd.
720000
$ 5.00
$ 3,600,000
2
Landscaping
sq. ft
2042880
$ 1.50
$ 3,064,320
3
Glenwood Ditch
ft
2890
$ 60.00
$ 173,400
4
RWTP
Ea
1
$ 100,000.00
$ 100,000
5
Community Facility
LS
1
$ 1,725,000.00
$ 1,725,000
6
Park Improvements
LS
1
$ 700,000.00
$ 700,000
7
RFTA Crossing Agreement 6
LS
1
$ 850,000.00
$ 850,000
8
$ -
9
$ -
10
$ -
11
$ -
12
$ -
Total Construction Costs $ 10,213,000
Prelimianry Infrastructure Cost Estimate -River Edge Colorado
Page 6 of 7
Total Construction Costs
Item #
Description I Units 1 Qty. I Unit Cost
Total
Notes
LS
Lumpl3um[fstimatel1including[ ontingency
$ -
Use Lump Sum Estimate ■
Itemized[Lstimate
1
Type 1 -Road (Entry) 6
ft
1225
$ 650.00
$ 796,250
2
Type 2 -Road (Local)
ft
14725
$ 285.00
$ 4,196,625
3
Type 3 -Road (GH Access)
ft
3863
$ 230.00
$ 888,490
4
Type 4 -Road (Alley)
ft
3375
$ 175.00
$ 590,625
5
Bridge
Ea
1
$ 500,000.00
$ 500,000
6
Walls
sq ft
4400
$ 45.00
$ 198,000
7
Trails (Hard)
ft
4970
$ 60.00
$ 298,200
8
Trails (Soft)
ft
9030
$ 17.50
$ 158,025
9
Potable Water
ft
19865
$ 115.00
$ 2,284,475
10
Raw Water
ft
30541
$ 45.00
$ 1,374,345
11
Sanitary Sewer
ft
16970
$ 135.00
$ 2,290,950
12
Dry Utilities
ft
15790
$ 145.00
$ 2,289,550
13
Additional Offsite Activities 6
LS
1
$ 11,350,000.00
$ 11,350,000
14
Additional Onsite Activities 6
LS
1
$ 10,213,000.00
$ 10,213,000
Total Construction Costs $ 37,429,000
Notes:
1 Roadways include sidewalks, curb/gutter, lighting, and landscaping, roundabout, stormwater and site grading allowances. Water, sewer and dry utilities unti costs include all fittings, liftstations, manholes and other appurtances.
'Garden Home Lots are assumed to be served by utilities from the streets and not internal accessways. Additonal grading, fencing, berming and landscaping are considered part of lot development costs at time of building construction and are excluded from this
estimate.
3All unit costs are built or lump sum numbers prepared for preliminary costing.
° Required grading, fencing, berming, and plantings on indiviudal lots are considered a part of building costs and are excluded from this estimate.
Original estimate prepared by 8140 Partners, LLC.
6 Estimate modified by HDR Engineering, Inc to reflect changes in project SH 82 Access location, updated Offsite Water/Wastewater costs per Pre -Inclusion Agreement, and overall escalation since original estimate was submitted in 2011.
Prelimianry Infrastructure Cost Estimate -River Edge Colorado
Page 7of7