Loading...
HomeMy WebLinkAbout1.35 EngDesign-SewageCollectionivo.t,r4E COLORADO SEWAGE COLLECTION DESIGN REPORT RIVER EDGE COLORADO GARFIELD COUNTY, COLORADO OWNER/APPLICANT: CARBONDALE INVESTMENTS, LLC 7999 HWY 82 CARBONDALE CO 8 1 6 2 3 970-456-5325 CONSULTANT: 8140 PARTNERS, LLC PO BOX 0426 EAGLE, CO 81631 JANUARY 14, 2011 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado SEWAGE COLLECTION DESIGN REPORT RIVER EDGE COLORADO GARFIELD COUNTY, COLORADO TABLE OF CONTENTS INTRODUCTION 3 A. BASIS 3 B. PURPOSE AND SCOPE OF REPORT 3 C. FINDINGS 3 II. PROJECT LOCATION AND DESCRIPTION 4 A. PROJECT LOCATION 4 B. PROJECT DESCRIPTION 4 III. STANDARDS 5 IV. WASTEWATER FLOWS 6 V. SYSTEM DESIGN 7 A. GENERAL OVERVIEW 7 B. DESIGN CRITERIA 8 C. SYSTEM DESIGN AND CALCULATIONS 8 1. SEWAGE COLLECTION SYSTEM SIZING 8 2. PUMP STATION FOR RFWSD TREATMENT ALTERNATIVE 11 D. VARIATIONS FROM DESIGN STANDARDS 12 VI. COST ESTIMATE AND METHOD OF FINANCING 12 APPENDICES APPENDIX A: VICINITY MAP AND PROJECT SITE APPENDIX B: PRELIMINARY MODELING OUTPUT APPENDIX C PUMP STATION COMPUTATIONS 2 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado I. INTRODUCTION A. BASIS This Sewage Collection Design Report ("Report") has been prepared in support of an application for PUD Plan Review ("Rezoning") and Subdivision Review ("Preliminary Plan") for the proposed River Edge Colorado ("Project", "REC", or "REC PUD") in accordance with the requirements of the Garfield County Unified Land Use Resolution of 2008 ("ULUR"), as amended. This Report, along with the Sanitary Sewage Disposal Plan, specifically addresses the requirements of Sections 5-501G.11.d, 501G.11.g, 5-502C.14, and 7-106.B of the ULUR. The Report includes a number of technical appendices. In addition, this Report is supported by other referenced documents submitted as part of the REC rezoning and preliminary plan applications including the River Edge Colorado PUD and Subdivision Drawing Package ("Drawing Package"). Specifically, this Report provides Garfield County with a preliminary understanding of the design and layout of the sewage collection system as well as summarizing the calculations and assumptions for the Project as specifically required by Section 5- 501G.11.d of the ULUR. The Report concludes that a sewage collection system can be designed and constructed to support the development of the Project in accordance with generally accepted practices. B. PURPOSE AND SCOPE OF REPORT The primary purpose of this Report is to provide preliminary design information for the proposed sewage collection system for REC that supports the design and layout of the sewage collection system depicted on the engineering plans (i.e., Sewage Collection and Water Supply and Distribution Plan, SW01-03 Series drawings in the Drawing Package). This Report, in combination with the Sewage Collection and Water Supply and Distribution Plan, SW01-03 Series drawings in the Drawing Package, document the feasibility of serving the Project with a sanitary sewage collection system in accordance with Section 7-106.B of the ULUR. The Report includes the basis of the design including soil conditions, and calculations supporting the design. The Report further serves as the design framework for final design efforts to be completed in association with each Final Plat. C. FINDINGS The preliminary design of the sewage collection system has been completed under the direction and review of William S. Otero P.E. (Colorado Registration #32163). William S. Otero P.E. has determined that the Project can be adequately served by a sewage collection system, as shown herein and as depicted in the sewage collection system engineering plans shown on the Sewage Collection and Water Supply and Distribution Plan, SW01-03 Series drawings in the Drawing Package provided herewith that the proposed system meets generally accepted engineering standards for the collection of sewage, and requirements of the ULUR. 3 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado II. PROJECT LOCATION AND DESCRIPTION A. PROJECT LOCATION The Project is located along State Highway 82 ("SH 82") between the City of Glenwood Springs and Town of Carbondale near the junction of County Road 110/113 ("CR 113") and SH 82. The property is located almost entirely west of the Roaring Fork Transit Authority ("RFTA") right-of-way and east of the Roaring Fork River and the Roaring Fork Conservancy ("RFC') Conservation Easement (i.e., Grant of Conservation Easement dated February 3, 2000, recorded at Reception Number 559036 and survey map, recorded December 24th, 2008, recorded at Reception Number 760571 in the real property records of Garfield County, Colorado). The Project straddles Cattle Creek which is also located within the RFC Conservation Easement. A vicinity map is provided as Exhibit 1 in Appendix A. The Project covers approximately 160 acres ("Project Site") as shown and described on the Project Site drawing [Exhibit 2(a -d), Appendix A]. The Project is proposed by Carbondale Investments, LLC ("CI"). B. PROJECT DESCRIPTION The Project is a proposal to create a walkable clustered -form of residential development with neighborhood amenities including naturalized open space and enhanced wildlife habitat, community recreation, parks, and neighborhood agriculture that is designed to serve the residents and preserve and provide reference to the rural character and agricultural roots of the Roaring Fork Valley. The Project aims to have a strong historic identity back to the days of 'old Colorado' when compact neighborhoods formed with a strong sense of community based on the land and surrounding landscape. The REC landscape aesthetic will be simple, informal, and place emphasis in the use of plant and landscape materials local, adaptable and appropriate to the climate and environment of the area. The Project will include approximately 366 residential units of various sizes and types including 55 affordable homes and one exclusive executive lot for a custom home. Housing types will range from attached homes to small single family attached and detached garden homes, village homes, and larger estate homes. Smaller garden homes are anticipated to be designed for younger residents that are looking for their first home in the County, while village homes and estate homes will provide move up opportunities for growing families. Densities in the Project are proposed at less than 21/2 units per acre. Lot sizes will vary from over 1 acre to approximately 5,000 square feet for single family homes, and 1,700-5000 square feet of lot area for each garden home. Most of the units back to either proposed active parks or reclaimed open space to help enhance the connection to the land. The REC layout and design is depicted in the PUD Plan, PUD01-03 Series and the Preliminary Plan PRPN01-03 Series of the Drawing Package. The architectural theme will be complementary to the traditional architecture of the valley. Generally, exterior materials will include wood, stone, brick, stucco and cement board siding. Varied roof heights and articulation of the front elevations will be used to break up the massing and provide street -level appeal. Front porches and covered stoops are included on homes to emphasize the entry and connection to the sidewalk and street. Roofing will include dimensional shingles, metal, or other materials appropriate to the building style and that roofs will generally be pitched. Gables, wall plane and 4 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado roofline articulation, bays, balconies, porches, canopies and arcades will be used in the design of various buildings. The selection of materials will minimize the exterior maintenance of the homes to help maintain a quality appearance for the long term. The street pattern and pedestrian network are designed to facilitate community interaction. Streets have detached sidewalks with designated cross walks at major intersections and landscaped areas that create a comfortable environment for walking. On -street parking in most areas will further buffer vehicular and pedestrian uses. Internal circulation is maximized and dead streets are limited. Alleys are used where appropriate to enhance the streetscape and achieve a mix of housing styles. A soft trail system is used to connect open spaces and other common elements with the sidewalk network. The homes are placed close to the streets to help define the streetscape space and provide visual interest to pedestrians. Street trees and plantings are proposed to enhance the aesthetics of the street. The community is served with a variety of recreational facilities and a neighborhood center that could include meeting room(s), fitness room, offices, kitchen, restrooms, recreational facilities, and limited community service use such as a day care facility, deli/coffee shop, or health club. Parks will provide informal recreational opportunities within the community and will likely include tot lots, playfields, and trail system. The west portion of the property is generally set aside as the naturalized area that buffers the RFC Conservation Easement along the Roaring Fork River. The soft trails around the property allow residents to enjoy the river and wetland areas without disrupting the environment in conformance with the terms of the RFC Conservation Easement. More than the minimum open space requirements will be met by the project. Nearly 50% of the Project Site is in some form of open space, common area or park. Finally, opportunities for productive and edible landscapes, including community gardens and neighborhood orchards are integrated and dispersed in between the residential land uses as gathering and focal places for residents connecting REC to its agricultural heritage. The combination of trails, recreation areas, and open space system with the ability to engage in 'interactive community agriculture' on a small scale will make REC a very desirable place to live, filling a unique niche not yet met in Garfield County. This unique combination will help establish a sense of place, foster community, and engage residents with their immediate environment. It is intended this overall outdoor focus will set the tone and become a major driver of the identity of REC. III. STANDARDS The following standards have been utilized in analyzing and designing the proposed sewage collection system. The exact standards which will be applicable and utilized will depend on the needs of the selected owner and operator. At a minimum, all system design shall conform to CDPHE Design Standards. • Site Location and Design Approval Regulations for Domestic Wastewater Treatment Works 5 -CCR 1002-22, CDPHE Water Quality Control 5 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado Commission ("WQCC") dated September 30, 2009 ("CDPHE Site Location and Design Approval Regulation") • Roaring Fork Water and Sanitation District Rules and Regulations, dated 2007 ("RFWSD Rules") IV. WASTEWATER FLOWS Wastewater flow estimates are the basis for determining wastewater infrastructure requirements, including collection system and wastewater treatment capacity. The Project provides service to 366 residential units, neighborhood center and development -specific maintenance facilities. Table III.0-1 presents a summary of wastewater flows, as measured in gallons per day (gpd), for the project using both CDPHE and RFWSD criteria. As shown, RFWSD criteria are more conservative and therefore served as the basis for collection system design further described below. Table 111.0-1 Project Flows (gpd) Average Daily Flows (ADQ) in the sanitary sewer system was calculated for the Project using both REC and RFWSD criteria as shown above: Eq. 1) ADQ (REC) = (375 EQRs x 189 gpd/EQR) x 10% for 1/I = 77,963 gpd Eq. la) ADQ (RFWSD) = 375 EQRs x 350 gpd/EQR = 131,250 gpd Similarly, Peak Monthly Flows (PMQ) and the Instantaneous Peak Flows (PKQ) in the sanitary sewer system can be calculated for the Project using both REC and RFWSD criteria as shown above: 6 REC "Self -Sufficient" Wastewater Treatment Alternative RFWSD Wastewater Treatment Alternative Residential Units (EQRs) 366 366 Persons per EQR 2.70 3.50 Population 988 1,281 Residential Flow (gpd/EQR) 189 350 Residential Use (gpcd) 70 100 Total Residential ADQ (gpd) 69,174 128,100 Non -Residential Area (sq. ft.) 30,000 30,000 Non -Residential Use (EQRs/1,000 sq. ft.) 9 9 Non -Residential Flow (gpd/EQR) 189 350 Total Non -Residential ADQ (gpd) 1,701 3,150 ADQ including I/I (gpd) 77,963 131,250 Peak Month Factor 1.5 1.5 PMQ (gpd) 116,944 196,875 Instantaneous Peak Factor 4.0 4.0 PKQ (gpd) 311,850 525,000 Average Daily Flows (ADQ) in the sanitary sewer system was calculated for the Project using both REC and RFWSD criteria as shown above: Eq. 1) ADQ (REC) = (375 EQRs x 189 gpd/EQR) x 10% for 1/I = 77,963 gpd Eq. la) ADQ (RFWSD) = 375 EQRs x 350 gpd/EQR = 131,250 gpd Similarly, Peak Monthly Flows (PMQ) and the Instantaneous Peak Flows (PKQ) in the sanitary sewer system can be calculated for the Project using both REC and RFWSD criteria as shown above: 6 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado Eq. 2) PMQ (REC) = ADQ x 1.5 = 116,944 gpd Eq. 2a) PMQ (RFWSD) = ADQ x 1.5 = 196,875 gpd Eq. 3) PKQ (REC) = ADQ x 4.0 = 311,850 gpd Eq. 3a) PKQ = ADQ x 4.0 = 525,000 gpd These estimates represent the likely average and maximum wastewater flows from the Project under the two treatment alternatives. Typically, primary delivery systems (i.e. lift stations) are sized for the PKQ and treatment systems are sized for the PMQ. V. SYSTEM DESIGN A. GENERAL OVERVIEW A gravity sewage collection scheme has been proposed for the Project and surrounding area. The scheme will consist of approximately 4,058 feet of gravity sewer main, 12,437 feet of gravity sewer lines, 663 feet of pressurized sewer line, and 109 precast concrete manholes. The scheme has been developed as a predominantly gravity system with the intent of having very few pumping units. This is a very traditional form of sewerage system. In limited circumstances, when gravity collection and conveyance is not practical, a low pressure collection system will be used to feed wastewater to the gravity sewer. Sewer mains were located outside of the street when possible, but a majority of the overall system is located beneath paved streets. The scheme consists of several catchments as shown in Appendix B on Figure 1 that feed the sewer trunk line. The catchments consist of approximately 370 connections to service 375 EQRs within the Project Site inclusive of the neighborhood center, possible treatment plants and necessary maintenance facilities. An allowance has been made for the development of land to the north and east of this Project to provide for future development through the sizing of the collection pipe network and phasing/staging of the pump station or treatment plant, depending on the treatment alternative selected. Under either treatment alternative, stub -outs from the collection system will be provided at the north and east ends of the Project Site to allow for future service extensions to adjacent properties within the area. Under the RFWSD treatment alternative, a pump station will be located on Tract AO at the corner of the proposed Riverside Loop Drive and Rookery Street. The pump station is expected to have a peak inflow of approximately 365 gallons/minute. The trunk line connecting the pump station to the WWTP is a pressure line and will need to be catered for in the design. In addition, an assessment of the operational conditions will be made during the detailed design process to determine the exact configuration of the pump station and level of flow equalization that may be necessary to coordinate with the operational capacities of the RFWSD WWTP. Based on current preliminary calculations, an equalization tank of approximately 40,000 gallons may be required (See Appendix D). Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado The collection system has been preliminarily planned and designed to allow sewage to be treated either onsite by a non-RFWSD operated WWTP (i.e., owned and operated by the REC POA) or transferred to a WWTP owned and operated by the RFWSD. As presented in the Sanitary Sewage Disposal Plan, either alternative is capable of technically processing the collected sewage and treating it to discharge standards established by CDPHE for release to the Roaring Fork River. B. DESIGN CRITERIA The following collection system design criteria have been adopted for the Project: • Gravity Pipe Sizing: 8 inch minimum diameter • Gravity Flow Velocities: 2.5-15 fps (2 fps minimum) • Pump Station Storage: Emergency storage at 20% ADF minimum above the high level alarm • Alarms: All pump stations will be equipped with remote monitoring and alarm capability • Pump Out: All pump stations will have an emergency pump out hydrant to enable connection of a diesel trailer pump in the event of power outage or pump failure. • Pump Station and Pressure Line Design Standards: Chapter3, Design Criteria Considered in the Review of Wastewater Treatment Facilities, CDPHE, WQCC, April 2007 • Gravity Pipe, Manhole and Low Pressure System Standards: RFWSD Rules and Regulations C. SYSTEM DESIGN AND CALCULATIONS The sewage collection system design is depicted on Sewage Collection and Water Supply and Distribution Plan, Series SW01-03 of the Drawing Package. The design is supported by the following design information and calculations. 1. SEWAGE COLLECTION SYSTEM SIZING All design, material and construction aspects of the sewage collection piping including manholes shall be in accordance with the RFWSD Rules and Regulations, except as specifically provided herein. Preliminary model output for the gravity sewer design are supplied in Appendix B. The following summarizes the design approach. a) Trunk Mains In order to determine the proper trunk sewer size, the estimated peak flow from each subbasin was first determined. The equation is as follows: 8 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado Eq. 4) PKQ = ADQ x 4.0 Unlike many design formulas, the RFWSD peak flow equation does not have a built-in dampening factor that decreases the total flow in the trunk sewer with an increase in cumulative subbasin area. This dampening of peak flow with increasing tributary area correlates with several studies and should be considered in the final design to limit the overdesign. b) Manning's Equation The Manning's Equation is the most commonly used resistance formula for the analysis of open channel and gravity flow pipe systems. The equation modified to English Units is shown below. Eq 5) V = (1.49/n)112/3S1/2 Where: V = Average velocity (ft/sec), R = Hydraulic radius (ft), S = Slope of the Energy Grade Line (ft/ft), 'n' = Roughness coefficient The roughness coefficient varies depending on the type of material. For example, glass would have an 'n' value of 0.010 while earth channels would have an 'n' value of 0.020. There has been much debate about the appropriate 'n' value used for different piping materials in sanitary sewer systems. To complicate the debate, the slime layer that thrives on the wetted portions of the sanitary piping also contributes to and affects the actual value of 'n'. Due to the unknowns at this time, such as the actual type of the pipe installed, the number of joints in the piping system, and the affect that the slime layer will have on the 'n' value, a value of 0.009 has been adopted for the preliminary design. An 'n' value of 0.009 represents the used 'n' value used for the evaluation and design of PVC pipe. c) Pipe Size For the preliminary modeling effort, the trunk mains were sized for pipe diameters of 10 inches and all remaining pipes were sized for pipe diameters of 8 inches. At final design, the pipe diameters of these collection pipes may be further reduced to a minimum of 6 inches for small subbasins. d) Pipeline Velocity For this modeling, the minimum design velocity in the trunk sewer is set at 2 ft/sec during peak flow conditions. The maximum design velocity in the trunk sewer system was limited to 10 ft/sec during full flow conditions. 9 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado e) Depth of Flow (d/D) The depth of flow in (d/D) in the pipe was another consideration included in the hydraulic evaluation. It was desired to maximize the depth of flow in each pipe segment without surcharging the pipe. The preliminary modeling limited the d/D under peak flows to 0.75 (75% full). f) Structures Including the effect that manholes and other structures have on the dynamic modeling of the system is also an important consideration. It is recommended that the actual location of the junction structures and manholes be finalized during final design. Additionally, it is recommended that the size and location of stub outs for phased and future adjoining property connections on the trunk sewer be located at a manhole to allow connection from future developments, eliminating the need to make field connections, which may compromise the trunk sewer. g) Hydraulic Modeling (1) Methodology In order to accurately model the sewer system it was necessary that the computer model be able to account for the time wastewater takes to flow from one manhole or structure to the next. For this to be accomplished, the model calculated the flow velocity based on the contributed flows at each input point to determine the time for this flow to reach the next input flow point. Inflows are added at each input point and the total flow is then used to calculate the travel time to the next downstream manhole or structure. The model then determines the water surface elevation at each manhole or junction structure so that the depth of flow and velocity can be determined. (2) InRoads Storm and Sanitary In Roads Storm and Sanitary, marketed by Bentley, is one of the most advanced design, analysis, and planning tools, capable of analyzing both gravity flow and pressurized force main hydraulics. InRoads Storm and Sanitary was used to determine the physical constraints and characteristics, such as pipe size and structure locations. This was accomplished using minimum and maximum criteria such as depth of cover, velocity, and pipe slope. The basic information used to preliminarily size the sewers using InRoads Storm and Sanitary included: • Minimum and maximum allowed pipeline velocities; • Manning's 'n'; • Flow input data for each subbasin; and 10 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado • Physical sewer manholes (nodes) location (located using coordinates). (3) Subbasin Flows The flow from each subbasin was determined using the subbasin areas established and PKQ calculated using the RFWSD criteria. The inflow to the trunk sewer was determined using the total tributary area to the trunk sewer at each junction structure location. The formula is utilized in such manners that as additional subbasin flows enter the trunk sewer, the area of the subbasins contributing to the flows are combined. Therefore, once the subbasin areas are combined the flows are recalculated and the appropriate pipe size selected. As previously discussed, the flows from each subbasin will be introduced into the trunk sewer through various junction structures strategically located along the sewer alignment. There is at least one junction structure associated with each subbasin to collect flow from the subbasin tributaries and release them into the trunk at a single entry point. (4) Trunk Sewer Modeling A preliminary hydraulic model was prepared to evaluate general sewer line performance. As previously stated the primary purpose of this preliminary modeling was to define the size of the sewer line that will eventually be installed. See Appendix B for additional information and details relating to the preliminary modeling. 2. PUMP STATION FOR RFWSD TREATMENT ALTERNATIVE A preliminary analysis and design of the wastewater pump station that would transfer collected sewage to the RFWSD's WWTP has been completed as part of the preliminary design of the sewage collection system. Appendix C provides the pump station preliminary computations. The basis following represents the basis of design for the pump station. a) Average and Peak Flow Calculations for Design Conditions The average and peak flow computations are provided in Appendix C. The anticipated average flow is approximately 90 gpm while the peak flow is approximately 365 gpm. b) Wet Well Configuration and Size The wet well has been designed as being 6 to 10 feet in diameter. Multiple wet wells will be required should areas to the north and east be developed. 11 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado c) Number, Type, Capacity, Motor Horsepower and Net Positive Suction Head (NPSH) Preliminary design calculations indicate that the pump should be designed to 365 gpm. Motors shall be protected from over -current, over -temperature and voltage imbalance. See Appendix C for additional detail. d) System Head Curve and Head Computations The system head computations are provided in Appendix C. System head calculations include the size and length of force main static head and anticipated dynamic losses. e) Primary and Back-up Power Sources Primary three phase power will be provided by Holy Cross. Backup power will be provided by an emergency diesel generator. D. VARIATIONS FROM DESIGN STANDARDS The preliminary sewage collection design indicates that no substantive variations from either RFWSD or CDPHE design standards are anticipated. Should variations be necessary during the final design process, each variation is explained in detail and justification provided. VI. COST ESTIMATE AND METHOD OF FINANCING A cost analysis and estimate will be provided for the infrastructure improvements under separate cover in conformance with Section 6-301C.8.r.(3) of the ULUR at the time of and in association with each Subdivision Application for Final Plat. The cost estimate shall include estimates for those facilities identified in the Development Agreement as necessary to support the development of the lots being proposed for creation within the boundaries of the Final Plat being submitted for review. Based on the preliminary design submitted for review in association with the current Rezoning and Preliminary Plan and supported by this Report, preliminary costs have been developed and reviewed by 8140 Partners, LLC. These costs have been determined to be reasonable and support the feasibility of constructing a cost effective sewage collection system for the Project. Preliminary cost estimates are viewed by CI as proprietary information. CI is responsible for financing and constructing all collection facilities identified as part of the sewage collection system. CI will finance the collection facilities using traditional financing mechanisms. 12 Sewage Collection Design Report River Edge Colorado, Garfield County, Colorado APPENDIX A: VICINITY MAP AND PROJECT SITE App. A-1 BITS\MISC REPOPT FIGURES \PUD-VICMAP.DWG ELHN m > o a o � `w= 3 Q 0G- 0 0 0 0 N 5 000 0 5.000 10 000 SCALE IN FEET Owner/Developer: RiVentige COLORADO Carbondale Investments, LLC 7999 HWY 82 Carbondale, CO 81623 Phone No: 970.456.5325 Title: VICINITY MAP Prepared by: 8140 Partners, LLC Date: 12/01/10 Exhibit: App. A-2 BITS\MISC REPORT FIGURES \PUD -L 02 PRELIM PLAT\ENGINEERING & DESIGN\CAC LEGAL DESCRIPTION - PARCEL A (NORTH PARCEL) - RIVERS EDGE PUD A TRACT OF LAND SITUATED IN THE EAST HALF OF SECTION 12, TOWNSHIP 7 SOUTH, RANGE 89 WEST, AND IN THE WEST HALF OF SECTION 7, TOWNSHIP 7 SOUTH, RANGE 88 WEST OF THE 6TH PRINCIPAL MERIDIAN, COUNTY OF GARFIELD, STATE OF COLORADO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING GARFIELD COUNTY SURVEYOR'S 2 1/2" BRASS, FOUND IN PLACE, AND CORRECTLY MARKED AS THE SOUTHEAST CORNER OF SAID SECTION 7, THENCE S 452515" E A DISTANCE OF 5479.54 FEET TO THE TRUE POINT OF BEGINNING; THENCE, 5 89'4370" E A DISTANCE OF 1005.44 FEET TO A POINT ON THE WESTERLY LINE OF THE ROARING FORK TRANSIT AUTHORITY TRANSPORTATION CORRIDOR EASEMENT; THENCE, ALONG THE WESTERLY LINE OF SAD EASEMENT S 103052" E A DISTANCE OF 2644.53 FEET, THENCE, 494.34 FEET ALONG THE ARC OF A CURVE TO THE RIGHT, HAVING A RADIUS OF 2815.00 FEET, A CENTRAL ANGLE OF 100042 AND SUBTENDING A CHORD BEARING OF S 14'3701" E A DISTANCE OF 493.70 FEET; THENCE, S 090509" E A DISTANCE OF 120.78 FEET; THENCE, DEPARTING THE WESTERLY LINE OF SAID EASEMENT N 6576'14" W A DISTANCE OF 6045 FEET; THENCE, N 49'54'1D" W A DISTANCE OF 64.72 FEET; THENCE, N 49'54'10" W A DISTANCE OF 86.97 FEET; THENCE, N 48'11'10" W A DISTANCE OF 54.30 FEET; THENCE, N 56'4127" W A DISTANCE OF 123.97 FEET, THENCE, N 804724" W A DISTANCE OF 93.00 FEET; THENCE, N 2035'31" W A DISTANCE OF 119.58 FEET; THENCE, N 7870'43" W A DISTANCE OF 3384 FEET; THENCE, S 7541'48" W A DISTANCE OF 37.80 FEET, THENCE, S 2297'52" W A DISTANCE OF 56.05 FEET; THENCE, S 590757" W A DISTANCE OF 45.48 FEET; THENCE, N 8732'35" W A DISTANCE OF 28.23 FEET; THENCE, N 580793" W A DISTANCE OF 95.71 FEET, THENCE, N 71'2044" W A DISTANCE OF 85.73 FEET, THENCE, N 364510" W A DISTANCE OF 93.22 FEET; THENCE, N 2539'22" W A DISTANCE OF 181.92 FEET; THENCE, N 65'10'24" W A DISTANCE OF 98.43 FEET; THENCE, 5 8502'33" W A DISTANCE OF 52.20 FEET; THENCE, S 56'3552" W A DISTANCE OF 39.34 FEET; THENCE, S 2749'33" W A DISTANCE OF 42.96 FEET; THENCE, S 3727'43" E A DISTANCE OF 21.60 FEET; THENCE, N 77'02'57" W A DISTANCE OF 89.66 FEET; THENCE S 7724'18" W A DISTANCE OF 70.95 FEET; THENCE, N 855539" W A DISTANCE OF 55.55 FEET; THENCE, 5 84'28'58" W A DISTANCE OF 49.93 FEET; THENCE, N 14'22'48" E A DISTANCE OF 68.20 FEET; THENCE, N 0511'46" W A DISTANCE OF 77.59 FEET, THENCE, N 152005" E A DISTANCE OF 10,82 FEET; THENCE, N 2273'40" E A DISTANCE OF 44.14 FEET; THENCE N 1034'58" E A DISTANCE OF 35.11 FEET; THENCE, N 055991" E A DISTANCE OF 47.16 FEET; THENCE, N 03'48'08" E A DISTANCE OF 36.48 FEET; THENCE, N 04'4552" E A DISTANCE OF 71 03 FEET; THENCE, N 0707'51" E A DISTANCE OF 5466 FEET; THENCE, N 2528'14" W A DISTANCE OF 63.68 FEET; THENCE, N 370544" W A DISTANCE OF 61.05 FEET; THENCE, N 26'1129" W A DISTANCE OF 5552 FEET; THENCE, N 38'14'36" W A DISTANCE OF 44.36 FEET; THENCE, N 5011'32" W A DISTANCE OF 37.73 FEET; THENCE, N 59'54'48" W A DISTANCE OF 54.16 FEET; THENCE, N 0751'30" W A DISTANCE OF 36.97 FEET; THENCE, N 57'33'47" W A DISTANCE OF 65.70 FEET; THENCE, N 81'56'22" W A DISTANCE OF 8502 FEET; THENCE, N 04'11'29" W A DISTANCE OF 158,65 FEET; THENCE, N 355741" W A DISTANCE OF 41.30 FEET; THENCE, N 5146'03" W A DISTANCE OF 24.70 FEET; THENCE, N 255745" W A DISTANCE OF 20999 FEET; THENCE, N 11'58'37" W A DISTANCE OF 3382 FEET; THENCE, N 41'0546" E A DISTANCE OF 78.19 FEET; THENCE, N 0629'01" W A DISTANCE OF 117.20 FEET; THENCE, N 20'05'27" W A DISTANCE OF 94.24 FEET; THENCE, N 113293" W A DISTANCE OF 63.83 FEET; THENCE, N 0757'46" W A DISTANCE OF 141.45 FEET; THENCE, N 0056'14" E A DISTANCE OF 5976 FEET; THENCE, N 1017'44" W A DISTANCE OF 91.04 FEET; THENCE, N 4741'59" W A DISTANCE OF 134.55 FEET; THENCE, N 102749" W A DISTANCE OF 74.18 FEET; THENCE, N 1903'06" W A DISTANCE OF 43.27 FEET; THENCE, N 210701" W A DISTANCE OF 72.23 FEET; THENCE, N 001530" E A DISTANCE OF 217.77 FEET; THENCE, N 0016'30" E A 015TANC19 OF 312.94 FEET TO THE POINT OF BEGINNING, CONTAINING AN AREA OF 73.003 ACRES, MORE OR LESS. THE NAME AND ADDRESS OF THE PERSON WHO CREATED THIS LEGAL DESCRIPTION IS: JEFFREY ALLEN TUTTLE, P.LS. 33638 727 BLAKE AVENUE GLENWOOD SPRINGS, COLORADO 81601 LEGAL DESCRIPTION - PARCEL C (SOUTHEAST PARCEL) - RIVERS EDGE PUD A TRACT OF LAND SITUATED IN THE SOUTHWEST QUARTER OF SECTION 7, TOWNSHIP 7 SOUTH, RANCE 88 WEST OF THE SIXTH PRINCIPAL MERIDIAN, COUNTY OF GARFIELD, STATE OF COLORADO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WESTERLY RIGHT OF WAY UNE OF COLORADO STATE HIGHWAY 82, WHENCE A 2 1/2" BRASS CAP, FOUND IN PLACE AND PROPERLY MARKED AS THE SOUTHEAST CORNER OF SAID HERON 7, BEARS S 7901'43" E A DISTANCE OF 2054.18 FEET; THENCE, ALONG SAID WESTERLY RIGHT OF WAY LINE N 053510" W A DISTANCE OF 188.14 THENCE, 282.60 FEET ALONG THE ARC OF A CURVE TO THE LEFT HAVING A RADIUS OF 2915.00 FEET, A CENTRAL ANGLE OF 5'33'17" AND SUBTENDING A CHORD BEARING OF N 12'2749" W A DISTANCE OF 28249 FEET; THENCE, DEPARTING SAID RIGHT OF WAY UNE S 90'0000" E A DISTANCE OF 49.74 FEET; THENCE, S 0501'00" E A DISTANCE OF 202.70 FEET; THENCE, S 073498" E A DISTANCE OF 260.70 FEET TO THE POINT OF BEGINNING, CONTAINING AN AREA OF 0.234 ACRES, MORE OR LESS. THE NAME AND ADDRESS OF THE PERSON WHO CREATED THIS LEGAL DESCRIPTION 15: JEFFREY ALLEN TUTTLE, P.L.S, 33638 727 BLAKE AVENUE GLENWOOD SPRINGS, COLORADO 81601 Owner/Developer: RiVerEdge COLORADO Carbondale Investments, LLC 7999 HWY 82 Carbondale, CO 81623 Phone No: 970.456.5325 LEGAL DESCRIPTION - PARCEL 8 (SOUTH PARCEL) - RIVERS EDGE PUD A TRACT OF LAND SITUATED IN THE EAST HALF OF SECTION 12, TOWNSHIP 7 SOUTH, RANGE 89 WEST, AND IN THE WEST HALF OF SECTION 7 AND IN THE NORTH HALF OF SECTION 18, TOWNSHIP 7 SOUTH, RANGE 88 WEST OF THE 6TH PRINCIPAL MERIDIAN, COUNTY OF GARFIELD, STATE OF COLORADO, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WESTERLY RIGHT OF WAY LINE OF COLORADO STATE HIGHWAY 82, WHENCE A 2 1/2" BRASS CAP, FOUND IN PEACE AND CORRECTLY MARKED A5 THE SOUTHEAST CORNER OF SAID SECTION 7, BEARS S 78'49'20" E A DISTANCE OF 2150.14 FEU; THENCE, ALONG SAID RIGHT OF WAY LINE S 09'35'09 E A DISTANCE OF 401.79 FEET; THENCE, S 003509 E A DISTANCE OF 1545.87 FEET; THENCE, 626.05 FEET ALONG THE ARC OF A CURVE TO THE LEFT HAVING A RADIUS OF 1482.50 FEET, A CENTRAL ANGLE OF 24'11'44" AND SUBTENDING A CHORD BEARING OF 5 21'41'02" E A DISTANCE OF 621,41 FEET; THENCE, 5 374674 E A DISTANCE OF 387.28 FEET; THENCE, 294.32 FEET ALONG THE ARC OF A CURVE TO THE RIGHT, HAVING A RADIUS OF 281500 FEET, A CENTRAL ANGLE OF 559'26" AND SUBTENDING A CHORD BEARING OF 5 384711 E A DISTANCE OF 294.19 FEET; THENCE, DEPARTING SAID RIGHT OF WAY LINE N 805516 W A DISTANCE OF 218.07 FEET; THENCE, N 40'2030 W A DISTANCE OF 6938 FEET; THENCE, S 87'28'29 W A DISTANCE OF 36.35 FEET; THENCE, S 83'52'12 W A DISTANCE OF 10.80 FEET; THENCE, N 58'27'19 W A DISTANCE OF 41.45 FEET; THENCE, N 29'51'31 W A DISTANCE OF 8.20 FEET; THENCE, N 211524 W A DISTANCE OF 25.22 FEET; THENCE, N 69'00'53 W A DISTANCE OF 987 FEET; THENCE, S 87'3744 W A DISTANCE OF 22.60 FEET; THENCE, N 57'25'01 W A DISTANCE OF 17,28 FEET; THENCE, N 5009'49 W A DISTANCE OF 26.07 FEET; THENCE, N 46'21'12 W A DISTANCE OF 9.99 FEET; THENCE, N 44'28'05 W A DISTANCE OF 21.45 FEET; THENCE, N 55'50'08 W A DISTANCE OF 4905 FEET; THENCE, N 56'25'40 W A DISTANCE OF 4994 FEET, THENCE, N 68'12'23 W A DISTANCE OF 36.45 FEET; THENCE, N 46'5104 W A DISTANCE OF 55.18 FEET; THENCE, N 68'49'21 W A DISTANCE OF 25.14 FEET; THENCE, N 4741'50 W A DISTANCE OF 78.78 FEET; THENCE, N 30'26'40 W A DISTANCE OF 24.58 FEET; THENCE, N 254701 W A DISTANCE OF 30.08 FEET; THENCE, N 18'11'39 W A DISTANCE OF 34.61 FEET; THENCE, N 355021 W A DISTANCE OF 2932 FEET; THENCE, N 21'59'14 W A DISTANCE OF 27.50 FEET; THENCE, N 30'16'07 W A DISTANCE OF 22.97 FEET; THENCE, N 2541'38 W A DISTANCE OF 169.44 FEET; THENCE, N 41'1739 E A DISTANCE OF 82.61 FEET; THENCE, N 380152 E A DISTANCE OF 1989 FEET; THENCE, N 312614 W A DISTANCE OF 262.40 FEET; THENCE, N 57'58'09 W A DISTANCE OF 102.47 FEET; THENCE, N 574731 W A DISTANCE OF 105.38 FEET; THENCE, N 55'58'11 W A DISTANCE OF 126.13 FEET; THENCE, N 56'14'57 W A DISTANCE OF 118.42 FEET; THENCE, N 49'16'04 W A DISTANCE OF 136.33 FEET; THENCE, N 413051 W A DISTANCE OF 150.05 FEET; THENCE, N 32'49'55 W A DISTANCE OF 102.14 FEET; THENCE, N 37'44'19 W A DISTANCE OF 552.12 FEET; THENCE, N 18'10'02 W A DISTANCE OF 47.26 FEET; THENCE, N 2758'19 W A DISTANCE OF 109.20 FEET; THENCE, N 3701'36 W A DISTANCE OF 71.09 FEET; THENCE, N 4172'47 W A DISTANCE OF 152.23 FEET; THENCE, N 4022'24 W A DISTANCE OF 33E82 FEET; THENCE, N 64'2053 W A DISTANCE OF 34.06 FEET; THENCE, N 470076 W A DISTANCE OF 52.42 FEET; THENCE, N 44'53'41 W A DISTANCE OF 154,66 FEET; THENCE, N 303748 W A DISTANCE OF 86.59 FEET; THENCE, N 5701'32 W A DISTANCE OF 44.89 FEET; THENCE, N 3033'12 W A DISTANCE OF 85.72 FEET; THENCE, N 373002 W A DISTANCE OF 7909 FEET; THENCE, N .373730 W A DISTANCE OF 63.32 FEET; THENCE, N 2502'15 W A DISTANCE OF 33.98 FEET; THENCE, N 39'52'25 W A DISTANCE OF 42.02 FEET; THENCE, N 2536'04 W A DISTANCE OF 107,17 FEET; THENCE, N 303108 W A DISTANCE OF 164.72 FEET; THENCE, N 110001 W A DISTANCE OF 107,90 FEET; THENCE, N 2156'06 E A DISTANCE OF 163.60 FEET; THENCE, N 630033 E A DISTANCE OF 177.81 FEET; THENCE, N 851143 E A DISTANCE OF 393.54 FEET; THENCE, N 071526 W A DISTANCE OF 21.79 FEET; THENCE, N 8551'11 E A DISTANCE OF 50.00 FEET; THENCE, N 801506 E A DISTANCE OF 65.56 FEET; THENCE, N 575094 E A DISTANCE OF 50.12 FEET; THENCE, S 8151'15 E A DISTANCE OF 33,08 FEET, THENCE, S 81'39'50 E A DISTANCE OF 8961 FEET; THENCE, N 56'07'00 E A DISTANCE OF 26.86 FEET; THENCE, N 073031 E A DISTANCE OF 2793 FEET; THENCE, N 3741'57 W A DISTANCE OF 28.06 FEET; THENCE, N 50'00'15 E A DISTANCE OF 22.23 FEET; THENCE N 82'02'30 E A DISTANCE OF 36.49 FEET; THENCE, S 63'34'38 E A DISTANCE OF 54.05 FEET; THENCE, 5 455058 E A DISTANCE OF 20.95 FEET, THENCE, S 114120 E A DISTANCE OF 29.18 FEET; THENCE, 5 111717 W A DISTANCE OF 26.42 FEET; THENCE, 5 115041 E A DISTANCE OF 30.14 FEET; THENCE, 5 43'42'10 E A DISTANCE OF 69.77 FEET, THENCE, S 31'3699 E A DISTANCE OF 56.76 FEET; THENCE, 5 49'38'46 E A DISTANCE OF 4012 FEET, THENCE, 5 45'3095 E A DISTANCE OF 40.88 FEET; THENCE, 5 681608 E A DISTANCE OF 43.39 FEET, THENCE, S 73'1024 E A DISTANCE OF 67.60 FEET; THENCE, 5 570715 E A DISTANCE OF 1986 FEET, THENCE, S 673730 E A DISTANCE OF 52.31 FEET; THENCE, 5 83'28'21 E A DISTANCE OF 46.95 FEET, THENCE, N 86'2027 E A DISTANCE OF 61.04 FEET; THENCE, N 317979 E A DISTANCE OF 47.07 FEET; THENCE, N 055808 E A DISTANCE OF 32.16 FEET; THENCE, N 770897 E A DISTANCE OF 798 FEET; THENCE, S 24'51'03 E A DISTANCE OF 72.35 FEET; THENCE, 5 4152'47 E A DISTANCE OF 5071 FEET, THENCE, 5 514121 E A DISTANCE OF 38.31 FEET; THENCE, S 813039 E A DISTANCE OF 87,15 FEET, THENCE S 5711'12 E A DISTANCE OF 77.06 FEET; THENCE, S 4751'16 E A DISTANCE OF 88.65 FEET, THENCE, 5 57'39'13 E A DISTANCE OF 65.60 FEET; THENCE 5 49'55'38 E A DISTANCE OF 7496 FEET, THENCE, 5 61'0152 E A DISTANCE OF 43.44 FEET; THENCE, 5 71'4693 E A DISTANCE OF 55.45 FEET TO THE POINT OF BEGINNING, CONTAINING. AN AREA OF 85.924 AGRES, MORE OR LESS. THE NAME AND ADORESSS OF THE PERSON WHO CREATED THIS LEGAL DESCRIPTION IS: JEFFREY ALLEN TUTTLE, P.L.S. 33638 727 BLAKE AVENUE GLENWOOD SPRINGS, COLORADO 81601 Title: PROJECT SITE LOCATION AND DESCRIPTION (1 OF 4) Prepared by: 8140 Partners, LLC Date: 12/01/10 Exhibit: App. A-3 BITS\MISC REPORT FIGURES \PUD -L 02 PRELIM PLAT\ENGINEERING & DESIGN\CAC Owner/Developer: 44 ,`\ N \ +\ ,i \ �-IA \\ �7 \\ 200 0 200 400 \ \ ` \\ \ ' \\ \ ` \ PARCEL A (NORTH PARCEL) 1` ig % X16 /25 �'/ 1130 J7 a7Jl v\ `r ffi�- �\\ .i P 44s SCALE IN it II II FEET IdVer-Edge COLORADO Carbondale Investments, LLC 7999 HWY 82 Carbondale, CO 81623 Phone No: 970.456.5325 Gr >s` uz ur [I4J�LIS^_�f �w I 1 PARCEL B (SOUTH PARCEL) ' PARCEL C ; (SOUTHEAST 7. `�--.PARCEL) " I • LCAIT�E- CREEK 1 ' • I I i Title: PROJECT SITE LOCATION AND DESCRIPTION (2 OF 4) Prepared by: 8140 Partners, LLC Date: 12/01/10 Exhibit: App. A-4 BITS\MISC REPORT FIGURES \PUD -L 02 PRELIM PLAT\ENGINEERING & DESIGN\CAC D..5 I25 um -7" L18�,-, J gl Vi 2 � PARCEL A (NORTH PARCEL) `I '\L55 r: ''''‘‘ 7.-..z ,::**;;':77-\1:1`.'\'' /1-'",-7--..----t I.�B\ ♦ II '' 1• 1 I I I '- I .I 1 II .V I I . I II 11 I I . I 1 I1 I I I ' I I I 111 1 D I ;�I I I ' I 11 I I , I I . I `o I I 1 I I I I . I I . • i I 1 1 , 1 I I . I I I I I I . I I I I I I . I I 1 11 . I PARCEL B (SOUTH PARCEL) NNW -- PARCEL 0 (SOUTHEAST PARCEL) ATr, . CREEK -ak�, 1 `9a `\ 1 MATCHLINE V \� tis -- -- \v �` \ \ ,.,-c' N- ----- _�� 4$ \ 2 „,,,71'..".6,7 1v HLIfV `\7 200 0 200 400 \a.�s n SCALE IN FEET 5, \ \ � Yea \ Owner/Developer: RftrEtige COLORADO Carbondale Investments, LLC 7999 HWY 82 Carbondale, CO 81623 Phone No: 970.456.5325 Title: PROJECT SITE LOCATION AND DESCRIPTION (3 OF 4) Prepared by: 8140 Partners, LLC Date: 12/01/10 Exhibit: App. A-5 CURVE TABLE (PROPERTY BOUNDARY) CURVE RADIUS LENGTH CHORD BEARING DELTA C1 281500 494.34 49370 N 14'37'1" W 1203'42" C2 1482.50 626.05 621.41 5 21'41'2" E 24'11'44" C3 2815.00 29432 294.19 N 30'47'11" W 5'59'26" C4 2915.00 282.60 282.49 N 12'21'49" W 533'17" Owner/Developer: RiVerEdge COLORADO Carbondale Investments, LLC 7999 HWY 82 Carbondale, CO 81623 Phone No: 970.456.5325 LINE TABLE (PROPERTY BOUNDARY) LINE LENGTH 8 ARM LINE LENGTH BEARING Ll 1005.44 89'4330 E L85 25.14 N 6849'21° W L2 2644.53 1838'52" E 686 78.78 N 474150" W L3 120.78 9 9'35'9" E L87 24.58 N 30'26'40" W L4 60.45 65'36'13" W 688 30.08 N 25'47'1" W L5 6472 49'5410" W L89 3461 N 1911'39" W L6 86.97 49'54'10" W L90 29.32 N 30'58'21" W L7 5430 48'17'10" W 191 27.50 N 21'59'14" W 68 123.97 56'47'27" W 692 22.97 N 37107" W L9 93.00 83'47'24" W L93 169.44 N 2841'38" W 610 119.58 2035'31" W L94 82.61 N 41'17'39" E 111 33.84 N 78'043 W L95 15.89 N 38'34'52" E 612 3780 79'41'48" W 696 262.40 N 34'26'44" W 613 56.05 22'57'52" W L97 102.47 N 5758'9" W 614 4548 5031'57" W 698 10538 N 53'43'31" W L15 28.23 82'32'35" W 199 126.13 9 5858'11' W 616 9571 N 5073" W 6100 11842 N 501457" W 617 85.73 71'20'44" W 1101 136.33 N 4016'4" W 618 93.22 36'43'10" W L102 150.05 N 44'30'51" W L19 181.92 25'39'22" W L103 102.14 N 32'4955" W L20 98.43 65'10'24" W L104 552.12 N 37'44'19" W L21 52.20 S 85'233 W L105 47.26 N 18'10'2" W L22 39.34 56'3352" W 6106 109.20 N 27'58'19" W L23 42.96 2749'33" W L107 71.09 N 35'1'36" W L24 21.60 3727'43" E L108 152.23 N 41'32'47" W L25 89.66 N 77'2'57" W L109 339.82 N 4022'24" W L26 70.95 70'2418 W 6110 34.06 N 64'20'53" W L27 55.55 88'5939 W Lilt 52.42 N 45'0'36" W L28 4993 84'28'58" W 6112 154.66 N 44'53'41" W L29 68.20 14'22'48" E L113 86.59 N 32'35'48" W 630 7759 N 5'11'48" W L174 4489 N 57152" W 131 10.82 N 18'205" E L115 85.72 N 3033'12" Ni L32 44.14 N 22'53'40 E L116 79.09 N 3739'2" W L33 35.11 N 10'34'58" E 6117 63.32 9 37'32'30" W L34 47.16 N 8'59'51" E 6718 33.98 N 222'15° W L35 36.48 N 314.08" E L119 42.02 N 3952'25" W L36 71.03 9 4'40'52" E L120 107.17 N 25'36'4" W L37 54.66 N 737'51" E L121 16472 N 3234'8" W L38 63.68 2828'14" W L122 107.90 N 11'39'1" W L39 61.05 N 32'244" W 1123 16380 N 24'56'6' E L40 55.52 26'17'29" W L124 177.81 N 63'39'33" E 641 44.36 38'14'36" W L125 393.54 N 83'14'43" E L42 37.73 5301'32 W L126 21.79 N 7'15'26" W L43 54.16 59'54'48" W L127 50.00 N 80'51'11" E L44 36.97 8751'35" W 6128 65.56 N 8015'6" E L45 65.70 5733'47" W L129 50.12 N 57'50'4" E L46 85.02 81'56'22" W L130 33.08 5 84'51'15" E L47 158.65 N 4'11'29" W L131 89.61 S 81'39'50" E L48 41.30 35'5041 W 1132 26.86 N 5977" E L49 2470 N 54'46'3" W L133 27.93 N 7'38'31" E 650 209.99 28'51'45" W 6134 28.06 N 37'41'57" W L51 33.82 11'58'37" W 0135 22.23 N 50'0'15" E L52 78.19 N 41'3'46" E L136 36.49 N 82'2'30" E L53 117.20 N 629'1" W 6137 54.05 S 653438" E L54 94.24 N 205'27" W L738 20.95 5 45'59'58° E L55 63.83 N 1132'3" W 6139 29.18 S 1444'20" E L56 141.45 9 757'45" W L140 26.42 9 71'11'17" W L57 50.76 N 556714" E 1141 30.14 S 14'58'41" E L58 91.04 N 19'17'44 W L142 69.77 5 43'42'10° E L59 134.55 N 44'41'59" W 6143 5676 5 31'36'59" E 660 74.18 N 19'23'49" W L144 40.12 5 49'38'46° E L61 43.27 N 1033'6" W L145 40.88 5 45'30'55" E 662 72.23 N 21'30'1" W L146 43.39 5 621038" E L63 21777 N 016'30" E 6747 67.60 S 73'16'24' E L64 312.94 N 0'16'30 E LI48 15.86 5 53'5'15" E L65 401.79 S 9'35'9" E L149 5231 S 63'37'30" E L66 1545.87 9 9'35'9" E LI 50 46.95 5 83'28'21" E 667 387.28 33'46'54" E L151 61.04 N 8620'27" E L68 218.07 89'53'16" W L752 47.07 N 31'59'9" E L69 6938 40'23'30" W 6153 32.16 N 658'38" E 170 36.35 8728'29" W L154 798 N 72'8'7" E L77 10.80 83"52'12" W 6155 72.35 S 24'51'3" E L72 41.45 58'27'19" W 6156 50.71 5 41'52'47" E L73 8.28 2051'31" W 6157 38.31 S 54'44'21" E L74 25.22 24'1624 W 0158 87.15 5 03'39'39" E L75 9.87 N 69'053" W L159 7796 5 5711'12" E L76 22.60 8731'44" W 6760 88.65 5 41'51'16" E L77 17.28 N 57'25'1" W 1161 6560 5 5739'13" E L78 26.07 N 50'9'49" W 6162 7496 5 49'55'38" E L79 999 N 4821'12" W L163 4344 S 61'4'52" E L80 21.45 N 44'285 W 6764 5545 5 71'46'2" E 681 49.05 N 5550'8" W L165 188.14 N 035'10" 8 L82 4994 N 56'25'40" W L766 49.74 E LB3 36.45 N 68'12'23" W 0167 202.70 5 6'1'0" E L84 55.18 N 46'54'4" W 6168 260.70 5 4'34'58" E Title: PROJECT SITE LOCATION AND DESCRIPTION (4 OF 4) Prepared by: 8140 Partners, LLC Date: 12/01/10 Exhibit: App. A-6 APPENDIX B: PRELIMINARY MODELING OUTPUT App. B-1 tria 0 N oLLJ SS—Z—N3 0 EORs SANITARY SEWER PIPE SYSTEM (TYR.) /_- SS -2-319 SS -Z -N17 5 E053 SANITARY SEWER FLOW ZONE (TYP.) • 1 1L 200 0 200 400 SCALE IN FEET / / / /. / / Owner/Developer: i i W� e COLORADO Carbondale Investments, LLC 7999 HWY 82 Phone No: Carbondale, CO 81623 970.456.5325 Title: Sanitary Sewer Catchments Schematic Prepared by: 8140 Partners, LLC Date: 01/14/2011 Figure: 1 App. B-2 SS - Output-ALL-Phl.txt Design Log InRoads Storm & Sanitary Design Log Drainage File: P:\Carbondale Investments\06.00 Design Tasks\06.02 - Task 02 Prelim Plat\Engineering & Design\Calculations\InRoads\SDB\REC-SAN.sdb Design File: P:\CARBONDALE INVESTMENTS\06.00 DESIGN TASKS\06.02 - TASK 02 PRELIM PLAT\ENGINEERING & DESIGN\CALCULATIONS\WORKING\JLA\SS WORKING.DWG Display Log: P:\CARBONDALE INVESTMENTS\06.00 DESIGN TASKS\06.02 - TASK 02 PRELIM PLAT\ENGINEERING & DESIGN\CALCULATIONS\WORKING\JLA\design.log Date: Friday, November 05, 2010 4:19:02 PM Designing manhole SS -MH -N47 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N46 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0222 cfs Flow From: Fixed 4.0000 ft 0.0222 cfs Fixed 8.0000 0.0440 0.0600 2.1812 2.2297 Designing manhole SS -MH -N46 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N45 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: in ft ft ft/s 0.0355 cfs Fixed 4.0000 ft 0.0355 cfs Fixed 8.0000 in 0.0590 ft 0.0800 ft 2.2829 ft/s 2.0102 Designing manhole SS -MH -N45 Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Flow Regime: SuperCritical Page 1 App. B-3 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N44 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0533 cfs Fixed 4.0000 ft 0.0533 cfs Fixed 8.0000 in 0.0790 ft 0.1000 ft 2.2458 ft/s 1.7029 Designing manhole SS -MH -N50 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N49 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0178 cfs Fixed 4.0000 ft 0.0178 cfs Fixed 8.0000 in 0.0400 ft 0.0500 ft 2.0027 ft/s 2.1485 Designing manhole SS -MH -N49 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N48 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0178 cfs Fixed 4.0000 ft 0.0178 cfs Fixed 8.0000 in 0.0410 ft 0.0500 ft 1.9325 ft/s 2.0474 SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 2 Zone 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical Upstream 4.0000 ft Upstream 0.0180 ft/ft 8.0000 in Partial 2.3418 cfs Supercritical App. B-4 Designing manhole SS -MH -N48 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N47 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0178 cfs Fixed 4.0000 ft 0.0178 cfs Fixed 8.0000 0.0410 0.0500 1.9325 2.0474 Designing manhole SS -MH -N44 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N43 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: in ft ft ft/s 0.0710 cfs Fixed 4.0000 ft 0.0710 cfs Fixed 8.0000 in 0.1020 ft 0.1200 ft 2.0732 ft/s 1.3776 Designing manhole SS -MH -N43 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N42 Results: Total Flow: Status: Pipe Width: Depth of Flow: 0.0155 cfs Fixed 4.0000 ft 0.0155 cfs Fixed 8.0000 in 0.0370 ft SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0180 ft/ft 8.0000 in Partial 2.3418 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0063 ft/ft 8.0000 in Partial 1.3872 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Page 3 Zone 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial App. B-5 Critical Depth: Velocity: Froude Number: SS - Output-ALL-Phl.txt 0.0500 ft Capacity: 1.9611 ft/s 2.1887 Flow Regime: SuperCritical 2.4685 cfs Designing manhole SS -MH -N42 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N41 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0266 cfs Fixed 4.0000 ft 0.0266 cfs Fixed 8.0000 in 0.0510 ft 0.0700 ft 2.1141 ft/s 2.0049 Designing manhole SS -MH -N41 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N40 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0377 cfs Fixed 4.0000 ft 0.0377 cfs Fixed 8.0000 in 0.0670 ft 0.0800 ft 2.0182 ft/s 1.6653 Designing manhole SS -MH -N40 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N39 Results: Total Flow: 0.0377 cfs Fixed 4.0000 ft 0.0377 cfs Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Page 4 zone 4.0000 ft Upstream 0.0160 ft/ft 8.0000 in Partial 2.2079 cfs Supercritical zone 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Supercritical Upstream 4.0000 ft Upstream App. B-6 Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 8.0000 0.0670 0.0800 2.0182 1.6653 Designing manhole SS -MH -N39 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N38 in ft ft ft/s 0.0377 cfs Fixed 4.0000 ft Results: Total Flow: 0.0377 cfs Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 8.0000 in 0.0670 ft 0.0800 ft 2.0182 ft/s 1.6653 Designing manhole SS -MH -N16 No flow found upstream Designing pipe SS -P -N15 No flow in structure Designing manhole SS -MH -N15 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N14 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0666 cfs Fixed 4.0000 ft 0.0666 cfs Fixed 10.0000 0.0750 0.1100 2.6867 2.0979 Designing manhole SS -MH -N14 Results: Total Flow: Status: Chamber Width: in ft ft ft/s 0.0666 cfs Fixed 4.0000 ft SS - output-ALL-Phl.txt Slope: Pipe Height: Flow Status: Capacity: 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0150 ft/ft 10.0000 in Partial 3.8760 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Page 5 Upstream 4.0000 ft App. B-7 Designing pipe SS -P -N13 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0666 cfs Fixed 10.0000 in 0.0700 ft 0.1100 ft 2.9697 ft/s 2.4019 Designing manhole SS -MH -N13 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N12 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.1754 cfs Fixed 4.0000 ft 0.1754 cfs Fixed 10.0000 in 0.1660 ft 0.1800 ft 2.2523 ft/s 1.1659 Designing manhole SS -MH -N12 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N11 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.1754 cfs Fixed 4.0000 ft 0.1754 cfs Fixed 10.0000 in 0.1660 ft 0.1800 ft 2.2523 ft/s 1.1659 Designing manhole SS -MH -N11 Results: Total Flow: 0.1754 cfs SS - Output-ALL-Phl.txt Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 0.0200 ft/ft 10.0000 in Partial 4.4757 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Page 6 Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Supercritical Upstream App. B-8 Status: Chamber Width: Designing pipe SS -P -N10 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 4.0000 ft 0.1754 cfs Fixed 10.0000 in 0.1660 ft 0.1800 ft 2.2523 ft/s 1.1659 Designing manhole SS -MH -N10 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N9 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.1754 cfs Fixed 4.0000 ft 0.1754 cfs Fixed 10.0000 0.1660 0.1800 2.2523 1.1659 Designing manhole SS -MH -N9 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N8 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: in ft ft ft/s 0.1754 cfs Fixed 4.0000 ft 0.1754 cfs Fixed 10.0000 in 0.1660 ft 0.1800 ft 2.2523 ft/s 1.1659 Designing manhole SS -MH -N8 SS - Output-ALL-Phl.txt Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Supercritical Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Page 7 App. B-9 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N7 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.1754 cfs Fixed 4.0000 ft 0.1754 cfs Fixed 10.0000 in 0.1660 ft 0.1800 ft 2.2523 ft/s 1.1659 Designing manhole SS -MH -N38 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N37 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0111 cfs Fixed 4.0000 ft 0.0111 cfs Fixed 8.0000 in 0.0320 ft 0.0400 ft 1.7269 ft/s 2.0741 Designing manhole SS -MH -N37 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N36 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0244 cfs Fixed 4.0000 ft 0.0244 cfs Fixed 8.0000 in 0.0500 ft 0.0700 ft 1.9942 ft/s 1.9104 SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 8 zone 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical zone 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Supercritical App. B-10 Designing manhole SS -MH -N36 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N35 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0466 cfs Fixed 4.0000 ft 0.0466 cfs Fixed 8.0000 0.0740 0.0900 2.1596 1.6935 Designing manhole SS -MH -N35 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N34 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: in ft ft ft/s 0.0599 cfs Fixed 4.0000 ft 0.0599 cfs Fixed 8.0000 in 0.0840 ft 0.1100 ft 2.3126 ft/s 1.6990 Designing manhole SS -MH -N34 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N33 Results: Total Flow: Status: Pipe Width: Depth of Flow: 0.0599 cfs Fixed 4.0000 ft 0.0599 cfs Fixed 8.0000 in 0.0840 ft SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Page 9 Upstream 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial App. B-11 Critical Depth: Velocity: Froude Number: SS - Output-ALL-Phl.txt 0.1100 ft Capacity: 2.3126 ft/s 1.6990 Flow Regime: SuperCritical 1.7455 cfs Designing manhole SS -MH -N33 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N32 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0599 cfs Fixed 4.0000 ft 0.0599 cfs Fixed 8.0000 in 0.0840 ft 0.1100 ft 2.3126 ft/s 1.6990 Designing manhole SS -MH -N7 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N6 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.2353 cfs Fixed 4.0000 ft 0.2353 cfs Fixed 10.0000 in 0.1920 ft 0.2000 ft 2.4591 ft/s 1.1784 Designing manhole SS -MH -N6 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N5 Results: Total Flow: 0.2353 cfs Fixed 4.0000 ft 0.2353 cfs Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Page 10 Upstream 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Supercritical Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Supercritical Upstream 4.0000 ft Upstream App. B-12 Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 10.0000 0.1920 0.2000 2.4591 1.1784 Designing manhole SS -MH -N5 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N4 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: in ft ft ft/s 0.2353 cfs Fixed 4.0000 ft 0.2353 cfs Fixed 10.0000 in 0.1920 ft 0.2000 ft 2.4591 ft/s 1.1784 Designing manhole SS -MH -N32 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N31 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0289 cfs Fixed 4.0000 ft 0.0289 cfs Fixed 8.0000 in 0.0500 ft 0.0700 ft 2.3568 ft/s 2.2578 Designing manhole SS -MH -N31 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N30 0.0289 cfs Fixed 4.0000 ft SS - output-ALL-Phl.txt Slope: Pipe Height: Flow Status: Capacity: 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Page 11 Zone 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical Upstream 4.0000 ft App. B-13 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0289 cfs Fixed 8.0000 in 0.0500 ft 0.0700 ft 2.3568 ft/s 2.2578 Designing manhole SS -MH -N30 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N29 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0289 cfs Fixed 4.0000 ft 0.0289 cfs Fixed 8.0000 in 0.0500 ft 0.0700 ft 2.3568 ft/s 2.2578 Designing manhole SS -MH -N4 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N3 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.2642 cfs Fixed 4.0000 ft 0.2642 cfs Fixed 10.0000 in 0.2040 ft 0.2200 ft 2.5349 ft/s 1.1758 Designing manhole SS -MH -N3 Results: Total Flow: Status: Chamber Width: 0.2642 cfs Fixed 4.0000 ft SS - Output-ALL-Phl.txt Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Page 12 Upstream 4.0000 ft App. B-14 Designing pipe SS -P -N2 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.2642 cfs Fixed 10.0000 in 0.2040 ft 0.2200 ft 2.5349 ft/s 1.1758 Designing manhole SS -MH -N2 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N1 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.2642 cfs Fixed 4.0000 ft 0.2642 cfs Fixed 10.0000 in 0.2040 ft 0.2200 ft 2.5349 ft/s 1.1758 Designing manhole SS -MH -N26 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N25 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0222 cfs Fixed 4.0000 ft 0.0222 cfs Fixed 8.0000 in 0.0470 ft 0.0600 ft 1.9827 ft/s 1.9601 Designing manhole SS -MH -N25 Results: Total Flow: 0.0222 cfs SS - Output-ALL-Phl.txt Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Supercritical Zone 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Flow Regime: SuperCritical Flow From: Page 13 Upstream App. B-15 Status: Chamber width: Designing pipe SS -P -N24 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 4.0000 ft 0.0222 cfs Fixed 8.0000 in 0.0470 ft 0.0600 ft 1.9827 ft/s 1.9601 Designing manhole SS -MH -N24 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N23 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0222 cfs Fixed 4.0000 ft 0.0222 cfs Fixed 8.0000 in 0.0470 ft 0.0600 ft 1.9827 ft/s 1.9601 Designing manhole SS -MH -N23 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N22 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0888 cfs Fixed 4.0000 ft 0.0888 cfs Fixed 8.0000 0.1020 0.1300 2.5915 1.7219 Designing manhole SS -MH -N22 in ft ft ft/s SS - Output-ALL-Phl.txt Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Supercritical Upstream 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 14 zone 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Supercritical App. B-16 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N21 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0888 cfs Fixed 4.0000 ft 0.0888 cfs Fixed 8.0000 in 0.1020 ft 0.1300 ft 2.5915 ft/s 1.7219 Designing manhole SS -MH -N21 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N20 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0888 cfs Fixed 4.0000 ft 0.0888 cfs Fixed 8.0000 in 0.1020 ft 0.1300 ft 2.5915 ft/s 1.7219 Designing manhole SS -MH -N20 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N19 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0888 cfs Fixed 4.0000 ft 0.0888 cfs Fixed 8.0000 in 0.0890 ft 0.1300 ft 3.1523 ft/s 2.2479 SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Supercritical Upstream 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 15 Upstream 4.0000 ft Upstream 0.0175 ft/ft 8.0000 in Partial 2.3091 cfs Supercritical App. B-17 Designing manhole SS -MH -N19 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N18 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.1110 cfs Fixed 4.0000 ft 0.1110 cfs Fixed 8.0000 in 0.0990 ft 0.1500 ft 3.3811 ft/s 2.2817 Designing manhole SS -MH -N18 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N17 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.1110 cfs Fixed 4.0000 ft 0.1110 cfs Fixed 8.0000 0.0980 0.1500 3.4308 2.3275 Designing manhole SS -MH -N29 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -N28 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: in ft ft ft/s 0.0244 cfs Fixed 4.0000 ft 0.0244 cfs Fixed 8.0000 in 0.0510 ft 0.0700 ft SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0175 ft/ft 8.0000 in Partial 2.3091 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Page 16 Upstream 4.0000 ft Upstream 0.0182 ft/ft 8.0000 in Partial 2.3521 cfs Supercritical Zone 4.0000 ft Upstream 0.0130 ft/ft 8.0000 in Partial 1.9902 cfs App. B-18 Velocity: Froude Number: SS - Output-ALL-Phl.txt 1.9379 ft/s 1.8379 Flow Regime: SuperCritical Designing manhole SS -MH -N28 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N27 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0488 cfs Fixed 4.0000 ft 0.0488 cfs Fixed 8.0000 in 0.0760 ft 0.0900 ft 2.1770 ft/s 1.6839 Designing manhole SS -MH -N27 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N26 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0488 cfs Fixed 4.0000 ft 0.0488 cfs Fixed 8.0000 in 0.0760 ft 0.0900 ft 2.1770 ft/s 1.6839 Designing manhole SS -MH -N17 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -N16 Results: Total Flow: Status: 0.1599 cfs Fixed 4.0000 ft 0.1599 cfs Fixed Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Page 17 Slope: Upstream 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs Supercritical Upstream 4.0000 ft Upstream 0.0308 ft/ft App. B-19 Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 8.0000 in 0.1030 ft 0.1800 ft 4.5998 ft/s 3.0410 Designing manhole SS -MH -N1 Results: Total Flow: Status: Chamber Width: Designing pipe SS-P-N1B Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.1599 cfs Fixed 4.0000 ft 0.1599 cfs Fixed 10.0000 0.1280 0.1700 2.9770 1.7657 Designing manhole SS -MH -N16 Results: Total Flow: Status: Chamber width: in ft ft ft/s 0.4241 cfs Fixed 4.0000 ft SS - output-ALL-Phl.txt Pipe Height: Flow Status: Capacity: Designing pipe SS -P -S10 WARNING: Full flow velocity is greater Results: Total Flow: 0.4241 cfs Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: Fixed 10.0000 in 0.1400 ft 0.2800 ft 6.9445 ft/s 3.9310 Designing manhole SS -MH -S913 Results: Total Flow: 0.4241 cfs Status: Chamber width: Designing pipe SS -P -S9 Fixed 4.0000 ft 8.0000 in Partial 3.0616 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: than Upstream 4.0000 ft Upstream 0.0200 ft/ft 10.0000 in Partial 3.0985 cfs Supercritical maximum (10.00) Flow From: Upstream 4.0000 ft Upstream Slope: 0.0471 ft/ft Pipe Height: 10.0000 in Flow Status: Partial Capacity: 6.8659 cfs Flow Regime: Flow From: Chamber Length: Page 18 Supercritical Upstream 4.0000 ft App. B-20 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.4241 cfs Fixed 10.0000 in 0.2600 ft 0.2800 ft 2.9032 ft/s 1.1799 Designing manhole SS -MH -S9 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S8 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.4441 cfs Fixed 4.0000 ft 0.4441 cfs Fixed 10.0000 in 0.2660 ft 0.2900 ft 2.9462 ft/s 1.1823 Designing manhole SS -MH -S8 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S7 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.4441 cfs Fixed 4.0000 ft 0.4441 cfs Fixed 10.0000 in 0.2660 ft 0.2900 ft 2.9462 ft/s 1.1823 Designing manhole SS -MH -S41 Results: Total Flow: Status: Chamber Width: 0.0266 cfs Fixed 4.0000 ft SS - Output-ALL-Phl.txt Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Supercritical zone 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Supercritical Upstream 4.0000 ft Upstream 0.0040 ft/ft 10.0000 in Partial 2.0016 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Page 19 zone 4.0000 ft App. B-21 Designing pipe SS -P -S42 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0266 cfs Fixed 8.0000 in 0.0480 ft 0.0700 ft 2.3079 ft/s 2.2572 Designing manhole SS -MH -S40 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S41 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0488 cfs Fixed 4.0000 ft 0.0488 cfs Fixed 8.0000 in 0.0640 ft 0.0900 ft 2.7906 ft/s 2.3572 Designing manhole SS -MH -S39 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S40 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0666 cfs Fixed 4.0000 ft 0.0666 cfs Fixed 8.0000 in 0.0770 ft 0.1100 ft 2.9131 ft/s 2.2382 Designing manhole SS -MH -S38 Results: Total Flow: 0.0777 cfs SS - Output-ALL-Phl.txt Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical Zone 4.0000 ft Upstream 0.0175 ft/ft 8.0000 in Partial 2.3091 cfs Flow Regime: SuperCritical Flow From: Page 20 Zone App. B-22 Status: Chamber width: Designing pipe SS -P -S39 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 4.0000 ft 0.0777 cfs Fixed 8.0000 in 0.0860 ft 0.1200 ft 2.8979 ft/s 2.1033 Designing manhole SS -MH -S37 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S38 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0777 cfs Fixed 4.0000 ft 0.0777 cfs Fixed 8.0000 in 0.0860 ft 0.1200 ft 2.8979 ft/s 2.1033 Designing manhole SS -MH -S36 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S37 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0777 cfs Fixed 4.0000 ft 0.0777 cfs Fixed 8.0000 0.0860 0.1200 2.8979 2.1033 Designing manhole SS -MH -S35 in ft ft ft/s SS - Output-ALL-Phl.txt Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Supercritical Upstream 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 21 Upstream 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Supercritical App. B-23 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S36 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.0777 cfs Fixed 4.0000 ft 0.0777 cfs Fixed 8.0000 in 0.0860 ft 0.1200 ft 2.8979 ft/s 2.1033 Designing manhole SS -MH -S34 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S35 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.0777 cfs Fixed 4.0000 ft 0.0777 cfs Fixed 8.0000 in 0.0830 ft 0.1200 ft 3.0500 ft/s 2.2547 Designing manhole SS -MH -S49 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S50 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.0089 cfs Fixed 4.0000 ft 0.0089 cfs Fixed 8.0000 in 0.0290 ft 0.0400 ft 1.5916 ft/s 2.0090 SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Supercritical Upstream 4.0000 ft Upstream 0.0180 ft/ft 8.0000 in Partial 2.3418 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 22 Zone 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical App. B-24 Designing manhole SS -MH -S48 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S49 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0089 cfs Fixed 4.0000 ft 0.0089 cfs Fixed 8.0000 in 0.0290 ft 0.0400 ft 1.5916 ft/s 2.0090 Designing manhole SS -MH -S47 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S48 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0089 cfs Fixed 4.0000 ft 0.0089 cfs Fixed 8.0000 0.0290 0.0400 1.5916 2.0090 Designing manhole SS -MH -S33 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S34 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: in ft ft ft/s 0.0977 cfs Fixed 4.0000 ft 0.0977 cfs Fixed 8.0000 in 0.1070 ft 0.1400 ft SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Page 23 Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical zone 4.0000 ft Upstream 0.0100 ft/ft 8.0000 in Partial 1.7455 cfs App. B-25 velocity: Froude Number: SS - Output-ALL-Phl.txt 2.6617 ft/s 1.7251 Flow Regime: SuperCritical Designing manhole SS -MH -S32 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S33 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.0977 cfs Fixed 4.0000 ft 0.0977 cfs Fixed 8.0000 in 0.1000 ft 0.1400 ft 2.9328 ft/s 1.9689 Designing manhole SS -MH -S31 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S32 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.1155 cfs Fixed 4.0000 ft 0.1155 cfs Fixed 8.0000 in 0.1010 ft 0.1500 ft 3.4169 ft/s 2.2820 Designing manhole SS -MH -S46 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S47 Results: Total Flow: Status: 0.0355 cfs Fixed 4.0000 ft 0.0355 cfs Fixed Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0130 ft/ft 8.0000 in Partial 1.9902 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Page 24 Slope: zone 4.0000 ft Upstream 0.0175 ft/ft 8.0000 in Partial 2.3091 cfs Supercritical zone 4.0000 ft Upstream 0.0200 ft/ft App. B-26 Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 8.0000 in 0.0550 ft 0.0800 ft 2.5270 ft/s 2.3062 Designing manhole SS -MH -S45 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S46 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0355 cfs Fixed 4.0000 ft 0.0355 cfs Fixed 8.0000 0.0550 0.0800 2.5270 2.3062 Designing manhole SS -MH -S44 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S45 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: in ft ft ft/s 0.0355 cfs Fixed 4.0000 ft 0.0355 cfs Fixed 8.0000 0.0550 0.0800 2.5270 2.3062 Designing manhole SS -MH -S43 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S44 Results: in ft ft ft/s 0.0555 cfs Fixed 4.0000 ft SS - output-ALL-Phl.txt Pipe Height: Flow Status: Capacity: 8.0000 in Partial 2.4685 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Page 25 Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical zone 4.0000 ft App. B-27 Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.0555 cfs Fixed 8.0000 0.0690 0.1000 2.8443 2.3119 Designing manhole SS -MH -S42 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S43 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: in ft ft ft/s 0.0555 cfs Fixed 4.0000 ft 0.0555 cfs Fixed 8.0000 in 0.0600 ft 0.1000 ft 3.4814 ft/s 3.0393 Designing manhole SS -MH -S30 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S31 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.1710 cfs Fixed 4.0000 ft 0.1710 cfs Fixed 8.0000 in 0.1220 ft 0.1800 ft 3.8617 ft/s 2.3370 Designing manhole SS -MH -S29 Results: Total Flow: Status: Chamber width: 0.2043 cfs Fixed 4.0000 ft SS - Output-ALL-Phl.txt Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Page 26 Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical Upstream 4.0000 ft Upstream 0.0350 ft/ft 8.0000 in Partial 3.2655 cfs Supercritical Upstream 4.0000 ft Upstream 0.0175 ft/ft 8.0000 in Partial 2.3091 cfs Supercritical zone 4.0000 ft App. B-28 Designing pipe SS -P -S30 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.2043 cfs Fixed 8.0000 0.1340 0.2000 4.0376 2.3257 Designing manhole SS -MH -S28 in ft ft ft/s Results: Total Flow: 0.2043 cfs Status: Chamber width: Fixed 4.0000 ft SS - Output-ALL-Phl.txt Designing pipe SS -P -S29 WARNING: Full flow velocity is greater Results: Total Flow: 0.2043 cfs Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: Fixed 8.0000 in 0.1030 ft 0.2000 ft 5.8776 ft/s 3.8857 Designing manhole SS -MH -S7 Results: Total Flow: 0.6483 cfs Status: Chamber width: Designing pipe SS -P -S6 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: Fixed 4.0000 ft 0.6483 cfs Fixed 12.0000 in 0.3020 ft 0.3300 ft 3.2267 ft/s 1.2189 Designing manhole SS -MH -S6 Results: Total Flow: 0.6705 cfs Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Upstream 0.0175 ft/ft 8.0000 in Partial 2.3091 cfs Supercritical than maximum (10.00) Flow From: Upstream 4.0000 ft Upstream Slope: 0.0500 ft/ft Pipe Height: 8.0000 in Flow Status: Partial Capacity: 3.9030 cfs Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Supercritical Upstream 4.0000 ft Upstream 0.0040 ft/ft 12.0000 in Partial 3.2548 cfs Flow Regime: SuperCritical Flow From: Page 27 Zone App. B-29 Status: Chamber width: Designing pipe SS -P -S5 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 4.0000 ft 0.6705 cfs Fixed 12.0000 in 0.3070 ft 0.3400 ft 3.2624 ft/s 1.2213 Designing manhole SS -MH -S5 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S4 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.6705 cfs Fixed 4.0000 ft 0.6705 cfs Fixed 12.0000 in 0.3070 ft 0.3400 ft 3.2624 ft/s 1.2213 Designing manhole SS -MH -S4 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S3 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.7282 cfs Fixed 4.0000 ft 0.7282 cfs Fixed 12.0000 0.3210 0.3500 3.3323 1.2169 Designing manhole SS -MH -S3 in ft ft ft/s SS - Output-ALL-Phl.txt Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: 4.0000 ft Upstream 0.0040 ft/ft 12.0000 in Partial 3.2548 cfs Supercritical Upstream 4.0000 ft Upstream 0.0040 ft/ft 12.0000 in Partial 3.2548 cfs Flow Regime: SuperCritical Flow From: Injected Sanitary Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 28 4.0000 ft Upstream 0.0040 ft/ft 12.0000 in Partial 3.2548 cfs Supercritical App. B-30 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S2 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.7282 cfs Fixed 4.0000 ft 0.7282 cfs Fixed 12.0000 in 0.3210 ft 0.3500 ft 3.3323 ft/s 1.2169 Designing manhole SS -MH -S27 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S28 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0155 cfs Fixed 4.0000 ft 0.0155 cfs Fixed 8.0000 in 0.0370 ft 0.0500 ft 1.9611 ft/s 2.1887 Designing manhole SS -MH -S26 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S27 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0155 cfs Fixed 4.0000 ft 0.0155 cfs Fixed 8.0000 in 0.0370 ft 0.0500 ft 1.9611 ft/s 2.1887 SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0040 ft/ft 12.0000 in Partial 3.2548 cfs Supercritical Zone 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 29 Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical App. B-31 Designing manhole SS -MH -S25 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S26 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0155 cfs Fixed 4.0000 ft 0.0155 cfs Fixed 8.0000 in 0.0370 ft 0.0500 ft 1.9611 ft/s 2.1887 Designing manhole SS -MH -S24 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S25 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0155 cfs Fixed 4.0000 ft 0.0155 cfs Fixed 8.0000 0.0370 0.0500 1.9611 2.1887 Designing manhole SS -MH -S23 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S24 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: in ft ft ft/s 0.0155 cfs Fixed 4.0000 ft 0.0155 cfs Fixed 8.0000 in 0.0370 ft 0.0500 ft SS - Output-ALL-Phl.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Page 30 Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs App. B-32 Velocity: Froude Number: SS - Output-ALL-Phl.txt 1.9611 ft/s 2.1887 Flow Regime: SuperCritical Designing manhole SS -MH -S22 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S23 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0155 cfs Fixed 4.0000 ft 0.0155 cfs Fixed 8.0000 in 0.0370 ft 0.0500 ft 1.9611 ft/s 2.1887 Designing manhole SS -MH -S21 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S22 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0155 cfs Fixed 4.0000 ft 0.0155 cfs Fixed 8.0000 in 0.0370 ft 0.0500 ft 1.9611 ft/s 2.1887 Designing manhole SS -MH -S20 Results: Total Flow: Status: Chamber Width: 0.0200 cfs Fixed 4.0000 ft Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Designing pipe SS -P -S21 WARNING: Full flow velocity is greater than Results: Total Flow: 0.0200 cfs Upstream 4.0000 ft Upstream 0.0200 ft/ft 8.0000 in Partial 2.4685 cfs Supercritical maximum (10.00) Flow From: Page 31 Zone 4.0000 ft Upstream App. B-33 Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: Fixed 8.0000 0.0350 0.0600 2.7319 3.1358 Designing manhole SS -MH -S19 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S20 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: in ft ft ft/s 0.0355 cfs Fixed 4.0000 ft 0.0355 cfs Fixed 8.0000 in 0.0570 ft 0.0800 ft 2.3997 ft/s 2.1505 Designing manhole SS -MH -S18 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S19 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.0355 cfs Fixed 4.0000 ft 0.0355 cfs Fixed 8.0000 in 0.0570 ft 0.0800 ft 2.3997 ft/s 2.1505 Designing manhole SS -MH -S17 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S18 0.0488 cfs Fixed 4.0000 ft SS - output-ALL-Phl.txt Slope: Pipe Height: Flow Status: Capacity: 0.0437 ft/ft 8.0000 in Partial 3.6500 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0180 ft/ft 8.0000 in Partial 2.3418 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Page 32 Upstream 4.0000 ft Upstream 0.0180 ft/ft 8.0000 in Partial 2.3418 cfs Supercritical Zone 4.0000 ft App. B-34 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0488 cfs Fixed 8.0000 in 0.0690 ft 0.0900 ft 2.5030 ft/s 2.0345 Designing manhole SS -MH -S16 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S17 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0488 cfs Fixed 4.0000 ft 0.0488 cfs Fixed 8.0000 in 0.0690 ft 0.0900 ft 2.5030 ft/s 2.0345 Designing manhole SS -MH -S15 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S16 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0488 cfs Fixed 4.0000 ft 0.0488 cfs Fixed 8.0000 in 0.0690 ft 0.0900 ft 2.5030 ft/s 2.0345 Designing manhole SS -MH -S14 Results: Total Flow: Status: Chamber Width: 0.0666 cfs Fixed 4.0000 ft SS - Output-ALL-Phl.txt Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Supercritical Upstream 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Supercritical Upstream 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Page 33 zone 4.0000 ft App. B-35 Designing pipe SS -P -S15 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0666 cfs Fixed 8.0000 in 0.0800 ft 0.1100 ft 2.7568 ft/s 2.0769 Designing manhole SS -MH -S13 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S14 Results: Total Flow: Status: Pipe Width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0866 cfs Fixed 4.0000 ft 0.0866 cfs Fixed 8.0000 in 0.0910 ft 0.1300 ft 2.9768 ft/s 2.0985 Designing manhole SS -MH -S12 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S13 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.1044 cfs Fixed 4.0000 ft 0.1044 cfs Fixed 8.0000 in 0.0850 ft 0.1400 ft 3.9576 ft/s 2.8899 Designing manhole SS -MH -S11 Results: Total Flow: 0.1044 cfs SS - Output-ALL-Phl.txt Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0150 ft/ft 8.0000 in Partial 2.1378 cfs Supercritical Zone 4.0000 ft Upstream 0.0290 ft/ft 8.0000 in Partial 2.9738 cfs Flow Regime: SuperCritical Flow From: Page 34 Upstream App. B-36 Status: Chamber width: Fixed 4.0000 ft SS - Output-ALL-Phl.txt Chamber Length: Designing pipe SS -P -S12 WARNING: Full flow velocity is greater Results: Total Flow: 0.1044 cfs Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 8.0000 in 0.0750 ft 0.1400 ft 4.7406 ft/s 3.6919 Designing manhole SS -MH -S10 Results: Total Flow: 0.1044 cfs Status: Chamber width: Fixed 4.0000 ft Designing pipe SS -P -S11 WARNING: Full flow velocity is greater Results: Total Flow: 0.1044 cfs Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 8.0000 in 0.0750 ft 0.1400 ft 4.7406 ft/s 3.6919 Designing manhole SS -MH -S2 Results: Total Flow: 0.8326 cfs Status: Chamber width: Designing pipe SS -P -S1 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: Fixed 4.0000 ft 0.8326 cfs Fixed 12.0000 in 0.3440 ft 0.3800 ft 3.4659 ft/s 1.2176 than maximum (10.00) Flow From: 4.0000 ft Upstream Slope: 0.0500 ft/ft Pipe Height: 8.0000 in Flow Status: Partial Capacity: 3.9030 cfs Flow Regime: Flow From: Chamber Length: Supercritical than maximum (10.00) Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0500 ft/ft 8.0000 in Partial 3.9030 cfs Supercritical Upstream 4.0000 ft Upstream 0.0040 ft/ft 12.0000 in Partial 3.2548 cfs Flow Regime: SuperCritical Page 35 App. B-37 Designing manhole SS -MH -S1 Results: Total Flow: Status: Chamber Width: Designing pipe TEMP-OUT1 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: HGL/EGL Computations: Table A: Struct_ID EGLdn HGLdn 0.8326 cfs Fixed 4.0000 ft 0.8326 cfs Fixed 12.0000 in 0.3440 ft 0.3800 ft 3.4659 ft/s 1.2176 SS - Output-ALL-Phl.txt Flow From: Chamber Length: D Q L V Tot_Loss EGLup HGLup Rim_Elev. (in) (cfs) (ft) (ft/s) (ft) (ft) (ft) (ft) (ft) Outfall TEMP-OUT1 5975.47 5975.28 SS -MH -S1 5975.65 5975 46 SS -P -S1 5975.85 5975 66 SS -MH -S2 5976.23 5976 05 SS -P -S2 5976.40 5976 22 SS -MH -S3 5976.60 5976 42 SS -P -S3 5976.60 5976 42 SS -MH -S4 5976.97 5976 80 SS -P -S4 5977.15 5976 98 SS -MH -S5 5977.32 5977 16 SS -P -S5 5977.52 5977 36 SS -MH -S6 5978.14 5977 97 SS -P -S6 5978.33 5978 17 Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: d (ft) Upstream 4.0000 ft Upstream 0.0040 ft/ft 12.0000 in Partial 3.2548 cfs Supercritical dc vA2/2g sf Dn_Soffit (ft) (ft) (ft/ft) (ft) (ft) - 5975.28 - 12 0.83 48.31 3.47 0.34 0.38 0.19 5975.65 5975.46 5975.65 5975.46 5992.25 12 0.83 99.41 3.47 0.34 0.38 0.19 5976.23 5976.05 - 5976.23 5976.05 5996.74 12 0.73 54.18 3.33 0.32 0.35 0.17 5976.60 5976.42 - 5976.60 5976.42 5995.40 12 0.73 97.03 3.33 0.32 0.35 0.17 5976.97 5976.80 - 5976.97 5976.80 5993.94 12 0.67 47.76 3.26 0.31 0.34 0.17 5977.32 5977.16 - 5977.32 5977.16 5994.00 12 0.67 157.44 3.26 0.31 0.34 0.17 5978.14 5977.97 - 5978.14 5977.97 5995.86 12 0.65 182.32 3.23 0.30 0.33 0.16 5979.04 5978.88 - Page 36 5975.93 5976.32 5976.90 5977.10 5977.67 5978.05 5978.86 App. B-38 SS - Output-ALL-Phl.txt SS -MH -57 - - - - - - - - - 5979.04 5978.88 - 5979.04 5978.88 5996.88 SS -P -S7 10 0.44 235.67 2.95 0.27 0.29 0.13 - 5979.41 5978.98 5978.84 - 5979.90 5979.77 - SS -MH -S8 - - - - - - - - - 5979.90 5979.77 - 5979.90 5979.77 5997.53 SS -P-58 10 0.44 166.24 2.95 0.27 0.29 0.13 - 5980.54 5980.10 5979.97 - 5980.75 5980.62 - SS -MH -S9 - - - - - - - - - 5980.75 5980.62 - 5980.75 5980.62 5998.39 55-P-59 10 0.42 181.78 2.90 0.26 0.28 0.13 - 5981.39 5980.94 5980.81 - 5981.65 5981.52 - SS -MH -S96 - - - - - - - - - 5981.65 5981.52 - 5981.65 5981.52 6004.64 SS -P -S10 10 0.42 178.69 6.94 0.14 0.28 0.75 - 5982.29 5982.35 5981.60 - 5990.56 5989.81 - SS-MH-N1B - - - - - - - - - 5990.56 5989.81 - 5990.56 5989.81 6009.12 SS -P -N1 10 0.26 125.44 2.53 0.20 0.22 0.10 - 5990.71 5990.18 5990.08 - 5990.66 5990.56 - SS -MH -N2 - - - - - - - - - 5990.66 5990.56 - 5990.66 5990.56 6009.38 SS -P -N2 10 0.26 53.32 2.53 0.20 0.22 0.10 - 5991.40 5990.87 5990.77 - 5991.07 5990.97 - SS -MH -N3 - - - - - - - - - 5991.07 5990.97 - 5991.07 5990.97 6009.40 SS -P -N3 10 0.26 135.38 2.53 0.20 0.22 0.10 - 5991.80 5991.27 5991.17 - 5991.80 5991.70 - SS -MH -N4 - - - - - - - - - 5991.80 5991.70 - 5991.80 5991.70 6010.26 SS -P -N4 10 0.24 300.00 2.46 0.19 0.20 0.09 - 5992.53 5991.99 5991.89 - 5993.17 5993.08 - SS -MH -N5 - - - - - - - - - 5993.17 5993.08 - 5993.17 5993.08 6011.70 SS -P -N5 10 0.24 214.01 2.46 0.19 0.20 0.09 - 5993.92 5993.38 5993.28 - 5994.22 5994.12 - SS -MH -N6 - - - - - - - - - 5994.22 5994.12 - 5994.22 5994.12 6012.51 SS -P -N6 10 0.24 26.56 2.46 0.19 0.20 0.09 - 5994.97 5994.42 5994.33 - 5994.51 5994.42 - SS -MH -N7 - - - - - - - - - 5994.51 5994.42 - 5994.51 5994.42 6011.75 SS -P -N7 10 0.18 61.60 2.25 0.17 0.18 0.08 - 5995.26 5994.68 5994.60 - 5994.91 5994.83 - SS -MH -N8 - - - - - - - - - 5994.91 5994.83 - 5994.91 5994.83 6010.79 SS -P -N8 10 0.18 248.66 2.25 0.17 0.18 0.08 - 5995.70 5995.11 5995.03 - 5996.09 5996.01 - SS -MH -N9 - - - - - - - - - 5996.09 5996.01 - 5996.09 5996.01 6012.00 SS -P -N9 10 0.18 115.00 2.25 0.17 0.18 0.08 - 5996.89 5996.30 5996.22 - 5996.74 5996.66 - SS -MH -N10 - - - - - - - - - 5996.74 5996.66 - 5996.74 5996.66 6012.57 SS -P -N10 10 0.18 326.28 2.25 0.17 0.18 0.08 - 5997.54 5996.95 5996.87 - 5998.24 5998.16 - SS -MH -N11 - - - - - - - - - 5998.24 5998.16 - 5998.24 5998.16 6014.59 SS -P -N11 10 0.18 155.08 2.25 0.17 0.18 0.08 - 5999.03 5998.44 5998.36 - 5999.05 5998.97 - SS -MH -N12 - - - - - - - - - 5999.05 5998.97 - 5999.05 5998.97 6014.45 SS -P -N12 10 0.18 288.75 2.25 0.17 0.18 0.08 - 5999.84 Page 37 App. B-39 5999.25 5999.17 SS -MH -N13 6000.39 6000.31 SS -P -N43 6000.52 6000.46 SS -MH -N44 6002.26 6002.20 SS -P -N44 6002.46 6002.39 SS -MH -N45 6005.47 6005.39 SS -P -N45 6005.67 6005.59 SS -MH -N46 6008.76 6008.68 SS -P -N46 6008.96 6008.89 SS -MH -N47 6015.27 6015.19 SS - Output-ALL-Phl.txt - 6000.39 6000.31 - 6000.39 6000.31 6017.03 8 0.07 279.57 2.07 0.10 0.12 0.07 - 6001.02 6002.26 6002.20 - 6002.26 6002.20 6019.57 8 0.05 304.54 2.25 0.08 0.10 0.08 - 6002.97 6005.47 6005.39 - 6005.47 6005.39 6021.42 8 0.04 209.71 2.28 0.06 0.08 0.08 - 6006.20 6008.76 6008.68 - 6008.76 6008.68 6022.45 8 0.02 319.35 2.18 0.04 0.06 0.07 - 6009.51 6015.27 6015.19 - 6015.27 6015.19 6023.15 New Branch - - - - - - - - - 5975.65 5975.46 - SS -MH -S2 - - - - - - - - - 5976.23 5976.05 - 5976.23 5976.05 5996.74 SS -P-511 8 0.10 44.17 4.74 0.08 0.14 0.35 - 5976.37 5976.13 5975.78 - 5978.13 5977.78 - SS -MH -S10 - - - - - - - - - 5978.13 5977.78 - 5978.13 5977.78 5996.65 SS -P -S12 8 0.10 128.48 4.74 0.08 0.14 0.35 - 5978.57 5978.33 5977.98 - 5984.55 5984.20 - SS -MH -S11 - - - - - - - - - 5984.55 5984.20 - 5984.55 5984.20 5999.16 55-P-513 8 0.10 266.07 3.96 0.09 0.14 0.24 - 5984.99 5984.65 5984.41 - 5992.26 5992.01 - SS -MH -S12 - - - - - - - - - 5992.26 5992.01 - 5992.26 5992.01 6004.78 SS -P -S14 8 0.09 285.34 2.98 0.09 0.13 0.14 - 5992.79 5992.36 5992.22 - 5996.58 5996.44 - SS -MH -S13 - - - - - - - - - 5996.58 5996.44 - 5996.58 5996.44 6010.72 55-P-515 8 0.07 285.33 2.76 0.08 0.11 0.12 - 5997.21 5996.75 5996.63 - 6000.96 6000.85 - SS -MH -S14 - - - - - - - - - 6000.96 6000.85 - 6000.96 6000.85 6014.83 55-P-516 8 0.05 98.66 2.50 0.07 0.09 0.10 - 6001.63 6001.13 6001.04 - 6002.55 6002.46 - SS -MH -S15 - - - - - - - - - 6002.55 6002.46 - 6002.55 6002.46 6016.26 SS -P -S17 8 0.05 145.46 2.50 0.07 0.09 0.10 - 6003.25 6002.75 6002.66 - 6004.87 6004.78 - SS -MH -S16 - - - - - - - - - 6004.87 6004.78 - 6004.87 6004.78 6018.89 SS -P -S18 8 0.05 164.87 2.50 0.07 0.09 0.10 - 6005.57 6005.07 6004.98 - 6007.49 6007.39 - SS -MH -S17 - - - - - - - - - 6007.49 6007.39 - 6007.49 6007.39 6022.75 SS -P-519 8 0.04 287.34 2.40 0.06 0.08 0.09 - 6008.19 6007.67 6007.58 - 6012.77 6012.68 - SS -MH -S18 - - - - - - - - - 6012.77 6012.68 - 6012.77 6012.68 6028.76 55-P-520 8 0.04 33.17 2.40 0.06 0.08 0.09 - 6013.49 6012.97 6012.88 - 6013.49 6013.40 SS -MH -S19 Page 38 App. B-40 SS - Output-ALL-Phl.txt 6013.49 6013.40 - 6013.49 6013.40 6028.98 SS -P -s21 8 0.02 230.40 2.73 0.04 0.06 0.12 - 6014.01 6013.50 6013.38 - 6023.39 6023.27 SS -MH -S20 6023.39 6023.27 - 6023.39 6023.27 6031.95 New Branch 5978.14 5977.97 SS -MH -S7 5979.04 5978.88 - 5979.04 5978.88 5996.88 SS -P -S29 8 0.20 103.41 5.88 0.10 0.20 0.54 - 5982.99 5982.97 5982.43 - 5987.93 5987.39 - SS -MH -S28 - - - - - - - - - 5987.93 5987.39 - 5987.93 5987.39 5998.75 SS -P -S30 8 0.20 89.41 4.04 0.13 0.20 0.25 - 5988.16 5987.88 5987.62 - 5989.37 5989.12 - SS -MH -S29 - - - - - - - - - 5989.37 5989.12 - 5989.37 5989.12 5999.77 SS -P -S31 8 0.17 78.65 3.86 0.12 0.18 0.23 - 5989.85 5989.54 5989.31 - 5990.85 5990.61 - SS -MH -S30 - - - - - - - - - 5990.85 5990.61 - 5990.85 5990.61 6001.26 SS -P-532 8 0.12 238.83 3.42 0.10 0.15 0.18 - 5991.36 5990.97 5990.79 - 5995.08 5994.90 - SS -MH -S31 - - - - - - - - - 5995.08 5994.90 - 5995.08 5994.90 6007.33 SS -P -S33 8 0.10 192.49 2.93 0.10 0.14 0.13 - 5995.67 5995.23 5995.10 - 5997.68 5997.55 - SS -MH -S32 - - - - - - - - - 5997.68 5997.55 - 5997.68 5997.55 6012.12 SS -P -S34 8 0.10 211.92 2.66 0.11 0.14 0.11 - 5998.32 5997.87 5997.76 - 5999.95 5999.84 - SS -MH -S33 - - - - - - - - - 5999.95 5999.84 - 5999.95 5999.84 6015.31 SS -P -S35 8 0.08 128.16 3.05 0.08 0.12 0.14 - 6000.62 6000.18 6000.04 - 6002.42 6002.27 - SS -MH -S34 - - - - - - - - - 6002.42 6002.27 - 6002.42 6002.27 6017.38 SS -P-536 8 0.08 83.08 2.90 0.09 0.12 0.13 - 6003.06 6002.61 6002.48 - 6003.79 6003.66 - SS -MH -S35 - - - - - - - - - 6003.79 6003.66 - 6003.79 6003.66 6019.25 SS -P -S37 8 0.08 41.92 2.90 0.09 0.12 0.13 - 6004.44 6003.99 6003.86 - 6004.56 6004.43 - SS -MH -S36 - - - - - - - - - 6004.56 6004.43 - 6004.56 6004.43 6020.01 SS -P -S38 8 0.08 32.12 2.90 0.09 0.12 0.13 - 6005.21 6004.76 6004.63 - 6005.18 6005.05 - SS -MH -S37 - - - - - - - - - 6005.18 6005.05 - 6005.18 6005.05 6020.56 SS -P -S39 8 0.08 56.01 2.90 0.09 0.12 0.13 - 6005.83 6005.38 6005.25 - 6006.16 6006.03 - SS -MH -S38 - - - - - - - - - 6006.16 6006.03 - 6006.16 6006.03 6021.76 SS -P -S40 8 0.07 251.58 2.91 0.08 0.11 0.13 - 6006.81 6006.36 6006.23 - 6010.69 6010.56 - SS -MH -S39 - - - - - - - - - 6010.69 6010.56 - 6010.69 6010.56 6024.54 SS -P -S41 8 0.05 300.06 2.79 0.06 0.09 0.12 - 6011.35 6010.87 6010.74 - 6016.79 6016.66 - SS -MH -S40 - - - - - - - - - 6016.79 6016.66 - 6016.79 6016.66 6027.82 SS -P -S42 8 0.03 350.07 2.31 0.05 0.07 0.08 - 6017.47 Page 39 App. B-41 6016.93 6016.85 SS -MH -S41 6023.85 6023.77 New Branch SS - output-ALL-Phl.txt - 6023.85 6023.77 - 6023.85 6023.77 6032.43 5981.65 5980.90 SS-MH-N1B - - - 5990.56 5989.81 - 5990.56 5989.81 6009.12 SS-P-N1B 10 0.16 12.92 2.98 0.13 0.17 0.14 - 5995.31 5994.74 5994.60 - 5994.92 5994.78 - SS -MH -N1 - - - - - - - - - 5994.92 5994.78 - 5994.92 5994.78 6009.30 SS -P -N16 8 0.16 165.29 4.60 0.10 0.18 0.33 - 5995.52 5995.28 5994.95 - 6000.24 5999.91 - SS -MH -N17 - - - - - - - - - 6000.24 5999.91 - 6000.24 5999.91 6011.29 SS -P -N17 8 0.11 48.07 3.43 0.10 0.15 0.18 - 6002.68 6002.29 6002.11 - 6003.09 6002.91 - SS -MH -N18 - - - - - - - - - 6003.09 6002.91 - 6003.09 6002.91 6011.97 SS -P -N18 8 0.11 84.94 3.38 0.10 0.15 0.18 - 6003.68 6003.29 6003.11 - 6004.70 6004.53 - SS -MH -N19 - - - - - - - - - 6004.70 6004.53 - 6004.70 6004.53 6013.77 SS -P -N19 8 0.09 82.00 3.15 0.09 0.13 0.15 - 6005.32 6004.90 6004.74 - 6006.26 6006.11 - SS -MH -N20 - - - - - - - - - 6006.26 6006.11 - 6006.26 6006.11 6015.33 SS -P -N20 8 0.09 90.87 2.59 0.10 0.13 0.10 - 6006.90 6006.44 6006.34 - 6007.31 6007.21 - SS -MH -N21 - - - - - - - - - 6007.31 6007.21 - 6007.31 6007.21 6016.60 SS -P -N21 8 0.09 181.77 2.59 0.10 0.13 0.10 - 6007.99 6007.53 6007.42 - 6009.31 6009.20 - SS -MH -N22 - - - - - - - - - 6009.31 6009.20 - 6009.31 6009.20 6019.70 SS -P -N22 8 0.09 112.61 2.59 0.10 0.13 0.10 - 6009.98 6009.52 6009.42 - 6010.61 6010.50 - SS -MH -N23 - - - - - - - - - 6010.61 6010.50 - 6010.61 6010.50 6021.70 SS -P -N23 8 0.02 109.66 1.98 0.05 0.06 0.06 - 6011.29 6010.73 6010.67 - 6012.31 6012.25 - SS -MH -N24 - - - - - - - - - 6012.31 6012.25 - 6012.31 6012.25 6021.68 SS -P -N24 8 0.02 177.04 1.98 0.05 0.06 0.06 - 6013.09 6012.53 6012.47 - 6015.13 6015.07 - SS -MH -N25 - - - - - - - - - 6015.13 6015.07 - 6015.13 6015.07 6022.01 SS -P -N25 8 0.02 164.65 1.98 0.05 0.06 0.06 - 6015.91 6015.35 6015.29 - 6017.76 6017.70 - SS -MH -N26 - - - - - - - - - 6017.76 6017.70 - 6017.76 6017.70 6022.87 New Branch - - - - - - - - - 5991.07 5990.97 - SS -MH -N4 - - - - - - - - - 5991.80 5991.70 - 5991.80 5991.70 6010.26 SS -P -N29 8 0.03 94.53 2.36 0.05 0.07 0.09 - 5992.18 5991.65 5991.56 - 5993.46 5993.37 - SS -MH -N30 - - - - - - - - - 5993.46 5993.37 - 5993.46 5993.37 6008.26 SS -P -N30 8 0.03 57.72 2.36 0.05 0.07 0.09 - 5994.22 5993.69 5993.60 - 5994.76 5994.68 - Page 40 App. B-42 SS - Output-ALL-Phl.txt SS -MH -N31 5994.76 5994.68 - 5994.76 5994.68 6006.62 SS -P -N31 8 0.03 376.78 2.36 0.05 0.07 0.09 - 5995.52 5994.99 5994.91 - 6002.45 6002.36 SS -MH -N32 6002.45 6002.36 - 6002.45 6002.36 6009.68 New Branch 5994.22 5994.12 SS -MH -N7 5994.51 5994.42 - 5994.51 5994.42 6011.75 SS -P -N32 8 0.06 83.40 2.31 0.08 0.11 0.08 - 5994.90 5994.40 5994.32 - 5995.20 5995.11 - SS -MH -N33 5995.20 5995.11 - 5995.20 5995.11 6010.39 SS -P -N33 8 0.06 75.67 2.31 0.08 0.11 0.08 - 5995.91 5995.41 5995.33 - 5996.13 5996.05 - SS -MH -N34 5996.13 5996.05 - 5996.13 5996.05 6009.76 SS -P -N34 8 0.06 265.92 2.31 0.08 0.11 0.08 - 5996.84 5996.34 5996.26 - 5998.96 5998.88 - SS -MH -N35 5998.96 5998.88 - 5998.96 5998.88 6012.15 SS -P -N35 8 0.05 225.36 2.16 0.07 0.09 0.07 - 5999.68 5999.16 5999.08 - 6001.37 6001.30 - SS -MH -N36 6001.37 6001.30 - 6001.37 6001.30 6013.33 SS -P -N36 8 0.02 400.02 1.99 0.05 0.07 0.06 - 6002.11 6001.55 6001.49 - 6007.49 6007.43 - SS -MH -N37 6007.49 6007.43 - 6007.49 6007.43 6016.70 SS -P -N37 8 0.01 175.82 1.73 0.03 0.04 0.05 - 6008.28 6007.69 6007.64 - 6011.12 6011.08 SS -MH -N38 6011.12 6011.08 - 6011.12 6011.08 6018.20 New Branch - - - - - - - - - 5999.05 5998.97 - SS -MH -N13 - - - - - - - - - 6000.39 6000.31 - 6000.39 6000.31 6017.03 SS -P -N13 10 0.07 234.50 2.97 0.07 0.11 0.14 - 6001.20 6000.57 6000.44 - 6005.18 6005.04 - SS -MH -N14 - - - - - - - - - 6005.18 6005.04 - 6005.18 6005.04 6018.37 SS -P -N14 10 0.07 217.62 2.69 0.08 0.11 0.11 - 6006.03 6005.39 6005.28 - 6008.59 6008.48 - SS -MH -N15 - - - - - - - - - 6008.59 6008.48 - 6008.59 6008.48 6017.28 New Branch - - - - - - - - - 5999.05 5998.97 - SS -MH -N13 - - - - - - - - - 6000.39 6000.31 - 6000.39 6000.31 6017.03 SS -P -N38 8 0.04 164.37 2.02 0.07 0.08 0.06 - 6001.02 6000.49 6000.42 - 6002.09 6002.03 - SS -MH -N39 - - - - - - - - - 6002.09 6002.03 - 6002.09 6002.03 6018.86 SS -P -N39 8 0.04 220.04 2.02 0.07 0.08 0.06 - 6002.84 6002.31 6002.24 - 6004.47 6004.40 - SS -MH -N40 - - - - - - - - - 6004.47 6004.40 - 6004.47 6004.40 6020.00 SS -P -N40 8 0.04 126.30 2.02 0.07 0.08 0.06 - 6005.22 6004.68 6004.62 - 6005.90 6005.84 - Page 41 App. B-43 SS -MH -N41 6005.90 6005.84 SS -P -N41 6006.11 6006.04 SS -MH -N42 6008.71 6008.65 SS -P -N42 6008.92 6008.86 SS -MH -N43 6015.58 6015.52 SS - Output-ALL-Phl.txt 6005.90 6005.84 6020.00 8 0.03 166.55 2.11 0.05 0.07 0.07 - 6006.66 6008.71 6008.65 - 6008.71 6008.65 6020.00 8 0.02 337.25 1.96 0.04 0.05 0.06 - 6009.49 6015.58 6015.52 - 6015.58 6015.52 6017.73 New Branch - - - - - - - - - - 6000.39 6000.33 - SS -MH -N44 - - - - - - - - - 6002.26 6002.20 - 6002 26 6002.20 6019.57 SS -P -N47 8 0.02 105.40 1.93 0.04 0.05 0.06 - 6002.98 6002.41 6002.35 - 6004 24 6004.18 - SS -MH -N48 - - - - - - - - - 6004.24 6004.18 - 6004 24 6004.18 6019.27 SS -P -N48 8 0.02 270.80 1.93 0.04 0.05 0.06 - 6005.01 6004.44 6004.38 - 6009 24 6009.18 - SS -MH -N49 - - - - - - - - - 6009.24 6009.18 - 6009 24 6009.18 6017.04 SS -P -N49 8 0.02 96.19 2.00 0.04 0.05 0.06 - 6010.01 6009.44 6009.38 - 6011 29 6011.22 - SS -MH -N50 - - - - - - - - - 6011.29 6011.22 - 6011 29 6011.22 6016.63 New Branch - - - - - - - - - - - 6012.77 6012.68 - SS -MH -S19 - - - - - - - - - 6013.49 6013.40 - 6013.49 6013.40 6028.98 SS -P-522 8 0.02 70.50 1.96 0.04 0.05 0.06 - 6014.21 6013.64 6013.58 - 6014.97 6014.91 - SS -MH -S21 - - - - - - - - - 6014.97 6014.91 - 6014.97 6014.91 6029.91 SS -P -S23 8 0.02 57.55 1.96 0.04 0.05 0.06 - 6015.74 6015.17 6015.11 - 6016.24 6016.18 - SS -MH -S22 - - - - - - - - - 6016.24 6016.18 - 6016.24 6016.18 6030.16 SS -P-524 8 0.02 64.37 1.96 0.04 0.05 0.06 - 6017.01 6016.44 6016.38 - 6017.65 6017.59 - SS -MH -S23 - - - - - - - - - 6017.65 6017.59 - 6017.65 6017.59 6030.21 SS -P -S25 8 0.02 54.50 1.96 0.04 0.05 0.06 - 6018.42 6017.85 6017.79 - 6018.86 6018.80 - SS -MH -S24 - - - - - - - - - 6018.86 6018.80 - 6018.86 6018.80 6030.34 SS -P-526 8 0.02 63.75 1.96 0.04 0.05 0.06 - 6019.63 6019.06 6019.00 - 6020.25 6020.19 - SS -MH -S25 - - - - - - - - - 6020.25 6020.19 - 6020.25 6020.19 6030.84 SS -P -S27 8 0.02 81.60 1.96 0.04 0.05 0.06 - 6021.02 6020.45 6020.39 - 6022.01 6021.95 - SS -MH -S26 - - - - - - - - - 6022.01 6021.95 - 6022.01 6021.95 6031.11 SS -P-528 8 0.02 74.40 1.96 0.04 0.05 0.06 - 6022.78 6022.21 6022.15 - 6023.61 6023.55 SS -MH -S27 6023.61 6023.55 - 6023.61 6023.55 6032.23 New Branch 5989.37 5989.14 Page 42 App. B-44 SS - Output-ALL-Phl.txt SS -MH -S30 - - - 5990.85 5990.61 - 5990.85 5990.61 6001.26 SS -P -S43 8 0.06 87.61 3.48 0.06 0.10 0.19 - 5991.40 5990.98 5990.79 - 5993.90 5993.72 - SS -MH -S42 - - - - - - - - - 5993.90 5993.72 - 5993.90 5993.72 6002.22 SS -P -S44 8 0.06 75.55 2.84 0.07 0.10 0.13 - 5994.52 5994.05 5993.92 - 5995.48 5995.36 - SS -MH -S43 - - - - - - - - - 5995.48 5995.36 - 5995.48 5995.36 6002.07 SS -P -S45 8 0.04 266.90 2.53 0.06 0.08 0.10 - 5996.15 5995.64 5995.54 - 6000.90 6000.80 - SS -MH -S44 - - - - - - - - - 6000.90 6000.80 - 6000.90 6000.80 6008.28 SS -P -S46 8 0.04 272.75 2.53 0.06 0.08 0.10 - 6001.61 6001.10 6001.00 - 6006.47 6006.37 - SS -MH -S45 - - - - - - - - - 6006.47 6006.37 - 6006.47 6006.37 6015.69 SS -P -S47 8 0.04 56.81 2.53 0.06 0.08 0.10 - 6007.18 6006.67 6006.57 - 6007.73 6007.63 - SS -MH -S46 - - - - - - - - - 6007.73 6007.63 - 6007.73 6007.63 6016.28 New Branch - - - - - - - - - 5997.68 5997.57 - SS -MH -S33 - - - - - - - - - 5999.95 5999.84 - 5999.95 5999.84 6015.31 SS -P -S48 8 0.01 70.01 1.59 0.03 0.04 0.04 - 6000.60 6000.00 5999.96 - 6001.32 6001.28 - SS -MH -S47 - - - - - - - - - 6001.32 6001.28 - 6001.32 6001.28 6015.65 SS -P -S49 8 0.01 109.03 1.59 0.03 0.04 0.04 - 6002.12 6001.52 6001.48 - 6003.62 6003.58 - SS -MH -S48 - - - - - - - - - 6003.62 6003.58 - 6003.62 6003.58 6017.02 SS -P -S50 8 0.01 206.63 1.59 0.03 0.04 0.04 - 6004.42 6003.82 6003.78 - 6007.87 6007.83 - SS -MH -S49 - - - - - - - - - 6007.87 6007.83 - 6007.87 6007.83 6016.51 New Branch - - - - - - - - - 5994.92 5994.59 - SS -MH -N17 - - - - - - - - - 6000.24 5999.91 - 6000.24 5999.91 6011.29 SS -P -N26 8 0.05 136.49 2.18 0.08 0.09 0.07 - 6001.68 6001.16 6001.09 - 6002.48 6002.41 - SS -MH -N27 - - - - - - - - - 6002.48 6002.41 - 6002.48 6002.41 6012.20 SS -P -N27 8 0.05 162.19 2.18 0.08 0.09 0.07 - 6003.20 6002.68 6002.61 - 6004.26 6004.19 - SS -MH -N28 - - - - - - - - - 6004.26 6004.19 - 6004.26 6004.19 6012.91 SS -P -N28 8 0.02 400.04 1.94 0.05 0.07 0.06 - 6004.98 6004.42 6004.36 - 6009.57 6009.51 SS -MH -N29 - - 6009.57 6009.51 - 6009.57 6009.51 6016.37 Table B: LOSSES -1LOSS_COEFFICENTS Page 43 App. B-45 SS - Output-ALL-Phl.txt Str_ID Hf Hb Hstr Hc He Hj Total 1 Dstr Ko CD cd cq cp cb K outfall - - - - - - - - - TEMP-OUT1 - - - - - - SuperCrt - - SS -MH -S1 - - - - - - - - - SS -P -S1 - - - - - - SuperCrt - - SS -MH -S2 - - - - - - - - - SS -P -S2 - - - - - - SuperCrt - - SS -MH -S3 - - - - - - - - - SS -P -S3 - - - - - - SuperCrt - - SS -MH -S4 - - - - - - - - - SS -P -S4 - - - - - - SuperCrt - - SS -MH -S5 - - - - - - - SS -P -S5 - - - - - - SuperCrt - - SS -MH -S6 - - - - - - - - - SS -P -S6 - - - - - - SuperCrt - - SS -MH -S7 - - - - - - - - - SS -P -S7 - - - - - - SuperCrt SS -MH -S8 - - - - - - - - - SS -P -S8 - - - - - - SuperCrt SS -MH -S9 - - - - - - - SS -P -S9 - - - - - - SuperCrt SS -MH -S96 - - - - - - - SS -P -S10 - - - - - - SuperCrt SS -MH -N16 - - - - - - - SS -P -N1 - - - - - - SuperCrt SS -MH -N2 - - - - - - - SS -P -N2 - - - - - - SuperCrt SS -MH -N3 - - - - - - - SS -P -N3 - - - - - - SuperCrt SS -MH -N4 - - - - - - - SS -P -N4 - - - - - - SuperCrt Page 44 App. B-46 SS -MH -N5 SS -P -N5 SS -MH -N6 SS -P -N6 SS -MH -N7 SS -P -N7 SS -MH -N8 SS -P -N8 SS -MH -N9 SS -P -N9 SS -MH -N10 SS -P -N10 SS -MH -N11 SS -P -N11 SS -MH -N12 SS -P -N12 SS -MH -N13 SS -P -N43 SS -MH -N44 SS -P -N44 SS -MH -N45 SS -P -N45 SS -MH -N46 SS -P -N46 SS -MH -N47 New Branch SS -MH -S2 SS -P -S11 SS -MH -S10 SS -P -S12 SS -MH -S11 SS - Output-ALL-Phl.txt Page 45 - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt 0.04 App. B-47 SS -P-513 55 -MH -S12 SS -P -S14 SS -MH -S13 55-P-515 SS -MH -514 SS -P-516 55 -MH -S15 SS -P-517 SS -MH -S16 55 -P -S18 SS -MH -S17 SS -P-519 SS -MH -518 SS -P -S20 55 -MH -S19 SS -P-521 SS -MH -S20 New Branch SS -MH -S7 SS -P-529 SS -MH -S28 SS -P-530 SS -MH -S29 SS -P-531 SS -MH -S30 SS -P-532 SS -MH -S31 SS -P-533 SS -MH -S32 SS -P-534 SS - Output-ALL-Phl.txt Page 46 - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt 0.03 App. B-48 SS -MH -533 55-P-535 SS -MH -S34 SS -P-536 55 -MH -S35 SS -P-537 SS -MH -S36 55-P-538 SS -MH -537 SS -P-539 SS -MH -S38 SS -P -S40 SS -MH -S39 SS -P -S41 SS -MH -S40 55 -P -S42 SS -MH -541 New Branch SS-MH-N1B SS-P-N1B SS -MH -N1 SS -P -N16 SS -MH -N17 SS -P -N17 SS -MH -N18 SS -P -N18 SS -MH -N19 SS -P -N19 SS -MH -N20 SS -P -N20 SS -MH -N21 SS - Output-ALL-Phl.txt Page 47 - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt 0.05 App. B-49 SS -P -N21 SS -MH -N22 SS -P -N22 SS -MH -N23 SS -P -N23 SS -MH -N24 SS -P -N24 SS -MH -N25 SS -P -N25 SS -MH -N26 New Branch SS -MH -N4 SS -P -N29 SS -MH -N30 SS -P -N30 SS -MH -N31 SS -P -N31 SS -MH -N32 New Branch SS -MH -N7 SS -P -N32 SS -MH -N33 SS -P -N33 SS -MH -N34 SS -P -N34 SS -MH -N35 SS -P -N35 SS -MH -N36 SS -P -N36 SS -MH -N37 SS -P -N37 SS - Output-ALL-Phl.txt Page 48 - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt 0.05 0.05 App. B-50 SS - Output-ALL-Phl.txt SS -MH -N38 - - - - - - - 1 0.03 New Branch SS -MH -N13 SS -P -N13 - SuperCrt SS -MH -N14 - - SS -P -N14 - SuperCrt SS -MH -N15 - - - - - - - 0.07 SS -MH -N13 - - SS -P -N38 - SuperCrt SS -MH -N39 - - SS -P -N39 - SuperCrt SS -MH -N40 - - SS -P -N40 - SuperCrt SS -MH -N41 - - - - - - - SS -P -N41 - - - - - - SuperCrt SS -MH -N42 - - SS -P -N42 - - - - - - SuperCrt SS -MH -N43 - - - - - - - 0.04 - SuperCrt - - - SuperCrt - - SS -P -N49 - - - - - - SuperCrt - - SS -MH -N50 - - - - - - - 0.04 - New Branch New Branch SS -MH -N44 SS -P -N47 SS -MH -N48 SS -P -N48 SS -MH -N49 New Branch SS -MH -S19 Page 49 App. B-51 SS -P-522 SS -MH -S21 SS -P -S23 SS -MH -S22 SS -P-524 SS -MH -S23 SS -P -S25 SS -MH -S24 SS -P-526 SS -MH -S25 SS -P -S27 SS -MH -S26 SS -P-528 SS -MH -S27 New Branch SS -MH -S30 SS -P -S43 SS -MH -S42 SS -P -S44 SS -MH -S43 SS -P-545 SS -MH -S44 SS -P -S46 SS -MH -S45 SS -P -S47 SS -MH -S46 New Branch SS -MH -S33 SS -P -S48 SS -MH -S47 SS -P -S49 SS - Output-ALL-Phl.txt Page 50 - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt 0.04 0.06 App. B-52 SS - Output-ALL-Phl.txt SS -MH -S48 SS -P -S50 - - - - - - SuperCrt SS -MH -S49 - - - - - - - 1 0.03 New Branch SS -MH -N17 SS -P -N26 - - - - - - SuperCrt SS -MH -N27 - - - - - - - SS -P -N27 - - - - - - SuperCrt SS -MH -N28 - - - - - - - SS -P -N28 - - - - - - SuperCrt SS -MH -N29 - - - - - - - 0.05 Page 51 App. B-53 SS - Output-South-B.txt Design Log InRoads Storm & Sanitary Design Log Drainage File: P:\Carbondale Investments\06.00 Design Tasks\06.02 - Task 02 Prelim Plat\Engineering & Design\Calculations\InRoads\SDB\REC-SAN.sdb Design File: P:\CARBONDALE INVESTMENTS\06.00 DESIGN TASKS\06.02 - TASK 02 PRELIM PLAT\ENGINEERING & DESIGN\CALCULATIONS\WORKING\JLA\SS WORKING.DWG Display Log: P:\CARBONDALE INVESTMENTS\06.00 DESIGN TASKS\06.02 - TASK 02 PRELIM PLAT\ENGINEERING & DESIGN\CALCULATIONS\WORKING\JLA\design.log Date: Friday, November 05, 2010 4:17:10 PM Designing manhole SS -MH -S57 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S57 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0200 cfs Flow From: Fixed 4.0000 ft 0.0200 cfs Fixed 8.0000 0.0410 0.0600 2.1740 2.3034 Designing manhole SS -MH -S56 Results: Total Flow: Status: Chamber Width: Designing pipe SS -P -S56 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: in ft ft ft/s 0.0200 cfs Fixed 4.0000 ft 0.0200 cfs Fixed 8.0000 in 0.0410 ft 0.0600 ft 2.1740 ft/s 2.3034 Designing manhole SS -MH -S55 Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Zone 4.0000 ft Upstream 0.0220 ft/ft 8.0000 in Partial 2.5890 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0220 ft/ft 8.0000 in Partial 2.5890 cfs Flow Regime: Supercritical Page 1 App. B-54 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S55 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0200 cfs Fixed 4.0000 ft 0.0200 cfs Fixed 8.0000 in 0.0410 ft 0.0600 ft 2.1740 ft/s 2.3034 Designing manhole SS -MH -S54 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S54 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0200 cfs Fixed 4.0000 ft 0.0200 cfs Fixed 8.0000 in 0.0410 ft 0.0600 ft 2.1740 ft/s 2.3034 Designing manhole SS -MH -S53 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S53 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: Velocity: Froude Number: 0.0178 cfs Fixed 4.0000 ft 0.0178 cfs Fixed 8.0000 in 0.0390 ft 0.0500 ft 2.0772 ft/s 2.2573 Ss - Output-South-B.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0220 ft/ft 8.0000 in Partial 2.5890 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Flow Regime: Page 2 Upstream 4.0000 ft Upstream 0.0220 ft/ft 8.0000 in Partial 2.5890 cfs Supercritical zone 4.0000 ft Upstream 0.0220 ft/ft 8.0000 in Partial 2.5890 cfs Supercritical App. B-55 Designing manhole SS -MH -S52 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S52 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: 0.0178 cfs Fixed 4.0000 ft 0.0178 cfs Fixed 8.0000 0.0390 0.0500 2.0772 2.2573 Designing manhole SS -MH -S51 Results: Total Flow: Status: Chamber width: Designing pipe SS -P -S51 Results: Total Flow: Status: Pipe width: Depth of Flow: Critical Depth: velocity: Froude Number: in ft ft ft/s 0.0377 cfs Fixed 4.0000 ft 0.0377 cfs Fixed 8.0000 in 0.0560 ft 0.0800 ft 2.6159 ft/s 2.3655 Designing manhole SS -MH -S50 Results: Total Flow: Status: Chamber width: Designing pipe TEMP-OUT2 Results: Total Flow: Status: Pipe Width: Depth of Flow: 0.0577 cfs Fixed 4.0000 ft 0.0577 cfs Fixed 8.0000 in 0.0680 ft SS - Output-South-B.txt Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: Upstream 4.0000 ft Upstream 0.0220 ft/ft 8.0000 in Partial 2.5890 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Capacity: zone 4.0000 ft Upstream 0.0220 ft/ft 8.0000 in Partial 2.5890 cfs Flow Regime: SuperCritical Flow From: Chamber Length: Flow From: Slope: Pipe Height: Flow Status: Page 3 Upstream 4.0000 ft Upstream 0.0220 ft/ft 8.0000 in Partial App. B-56 Critical Depth: Velocity: Froude Number: HGL/EGL Computations: Table A: SS - Output-South-B.txt 0.1000 ft Capacity: 2.5890 cfs 3.0212 ft/s 2.4741 Flow Regime: SuperCritical Struct_ID D Q L V d dc vA2/2g Sf Dn_Soffit EGLdn HGLdn Tot_Loss EGLup HGLup Rim_Elev. (in) (cfs) (ft) (ft/s) (ft) (ft) (ft) (ft/ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) Outfall - 5972.93 TEMP-OUT2 8 0.06 33.42 3.02 0.07 0.10 0.14 - 5973.53 5973.08 5972.93 - 5973.77 5973.62 - SS -MH -S50 5973.77 5973.62 - 5973.77 5973.62 5988.74 SS -P -S51 8 0.04 371.27 2.62 0.06 0.08 0.11 - 5976.65 5976.15 5976.04 - 5984.23 5984.12 - SS -MH -S51 5984.23 5984.12 - 5984.23 5984.12 5994.42 SS -P -S52 8 0.02 84.10 2.08 0.04 0.05 0.07 - 5984.93 5984.37 5984.30 - 5986.13 5986.07 - SS -MH -S52 5986.13 5986.07 - 5986.13 5986.07 5995.36 SS -P -S53 8 0.02 81.61 2.08 0.04 0.05 0.07 - 5986.89 5986.33 5986.27 - 5988.04 5987.97 SS -MH -S53 5988.04 5987.97 - 5988.04 5987.97 5996.65 New Branch - - - - - - - - - 5973.08 5972.93 - SS -MH -S50 - - - - - - - - - 5973.77 5973.62 - 5973.77 5973.62 5988.74 SS -P -s54 8 0.02 26.79 2.17 0.04 0.06 0.07 - 5974.42 5973.87 5973.80 - 5974.37 5974.30 - SS -MH -S54 - - - - - - - - - 5974.37 5974.30 - 5974.37 5974.30 5988.59 SS -P -S55 8 0.02 72.85 2.17 0.04 0.06 0.07 - 5975.12 5974.57 5974.50 - 5976.09 5976.01 - SS -MH -S55 - - - - - - - - - 5976.09 5976.01 - 5976.09 5976.01 5988.47 SS -P -S56 8 0.02 90.32 2.17 0.04 0.06 0.07 - 5976.84 5976.29 5976.21 - 5978.19 5978.11 - SS -MH -S56 - - - - - - - - - 5978.19 5978.11 - 5978.19 5978.11 5989.24 SS -P -S57 8 0.02 206.64 2.17 0.04 0.06 0.07 - 5978.94 5978.39 5978.31 - 5982.84 5982.77 SS -MH -S57 - - 5982.84 5982.77 - 5982.84 5982.77 5991.44 Table B: LOSSES Page 4 App. B-57 SS - Output-South-B.txt 1LOSS_COEFFICENTS Str_ID Hf Hb Hstr Hc He Hj Total 1 Dstr Ko CD Cd Cq Cp Cb K outfall TEMP-OUT2 SS -MH -S50 SS -P -S51 SS -MH -S51 SS -P -S52 SS -MH -S52 SS -P -S53 SS -MH -S53 New Branch SS -MH -S50 SS -P -S54 SS -MH -S54 SS -P -s55 SS -MH -S55 SS -P -S56 SS -MH -S56 SS -P -S57 - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt - SuperCrt 0.04 SS -MH -S57 - - - - - - - 0.04 Page 5 App. B-58 APPENDIX C PUMP STATION COMPUTATIONS Appendix C-1 r pp RiVenttge COU)R ADO Raw Water System Design Considerations River Edge Colorado, Garfield County, Colorado RAW WATER SYSTEM DESIGN CONSIDERATIONS Source water: Glenwood Ditch Total Raw Water system demand: 109.50 ac. ft. (0.37 cfs to 1.318 cfs) Transfer Pump (TP) or Diversion Facility • Maximum capacity and HP: 0.5 to 1.5 cfs or 224 to 673 gpm; 5 to 10 HP • Transfer pipe size and material: 18 -inch HDPE • Approximate Glenwood Ditch invert at diversion: 6014 • Approximate diversion design: 4 ft.(w) by 3 ft.(d); min. 0.5% slope Pre-treatment Detention Pond • Approximate crest and bottom elevations: 6016 and 6006 • Approximate emergency outlet elevation: 6013 • Approximate average storage volume: 120,000 to 140,000 cu. ft. (max. 72 hours of retention time) Diversion Pump (DP) • Maximum capacity and HP: 0.5 to 2.6 cfs or 224 to 1,211 gpm; <25 HP • Discharge pressure: 100 psi Distribution System: • Pipe size and material: 4- to 8 -inches; HDPE • Maximum pipe velocity: 5 fps Filing Approx. Length of Pipe (ft.) Min. Elevation Max. Elevation 1 7,975 5,998 6,024 2 2,290 6,008 6,024 3 4,325 6,000 6,024 4 3,240 6,014 6,022 5 3,280 5,989 5,998 6 6,130 6,016 6,034 Appendix C-2 Notes: RIVET -Edge C:OLORAIJO Raw Water System Design Considerations River Edge Colorado, Garfield County, Colorado RAW WATER SYSTEM PROCESS FLOW DIAGRAM (FIGURE 2) Glenwood Ditch' TP (Diversion or Pump) - 0.5 to 1.5 cfs Overflow to Conveyance 1 Channels/Wetlands or Cattle Creek (Elev. 6,013) Primary Filtration (Screen) Pretreatment Detention Basin (120,000 to 140,000 cu. ft.) DP (Pump) - 0.5 to 2.7 cfs Secondary Filtration and/or Treatment (If necessary)2 Line Pressure - 100 psi 1 Distribution 1. Treatment process considerations for Final Design include the following (at a minimum): suspended solids and organics. Due to differential and seasonal considerations, these process considerations will be tested on the Glenwood Ditch at the selected diversion site over a full irrigation season. 2. Secondary filtration and/or treatment will be evaluated based on the results of the tests conducted. Filtration technologies will very depending on the irrigation equipment requirements and operational considerations. Appendix C-3 173 Mo� 0 0 o 07, ¢wQ �mw zoLLL E Joon ' LOT 78 5267 S F vl6l' ' . *, 7 f 0 A r Y \ .'9fi•\ -'-'-'-j OUTFALL c� ` — TO CATTLE CREEK, � C \- TRAA�%�� (ELEV. 6013) �r C (COMMON I \` r 5. \ �N v�� C���. 20736 SF �I •\a •� .;e .• C ` \ II I I ' ''r - EMERGENCY / TRACT AC /7 70445/04/ AREA 173540 SFi 5 Lor 17 '5000 SF/ LOT )6 ; 5000/SF/ F/%, %'6229T 2 i\ I I + 1 + + I + + II 1 _+ +++\+++TR .AIN7'FN *58242 '0 vl 0 ; \ \ n ++ ++ + ++\++ ++ ++ + + \\`.`•� \ ,, 7— Ir I. \\+ + } 120,000-140.000 + I'+ + I —i \ + + CUBIC FEET + +' +\\ �\ .�a i. + + + \, fRACP AC+ iii i + + 207 40 f + +I + + + INTAKE + + + + + (ELEV 6008) + + + I + + -F + + + + + + +++,+ + + + / + ÷1 LOT 15 5568 SF 0 • ...... __—\1 \ � � I TRANSFER PUMP STATION (TP) OR DIVERSION FACILITY I I \' I I I I I I I\ I I I I I I 11 DISTRIBUTION STATION (DP) / / I BUILDING <100 SF I I 1 ' 1 I I 1 1 1 I \ / I \_ / I 1 `�,•.i`%', ,I6206SI LOT F\ % cry .1 .. - OVERFLOW TO CONVEYANCE S' {-�•, • CHANNEL WETLANDS / • 0 LOT 70 'l 9451 S.FI./, �- /, LOT 11 10645 SF aa /7 - F LOT 2 10717/ SE o, Owner/Developer: RftrEdge COLORADO Carbondale Investments, LLC 7999 HWY 82 Carbondale, CO 81623 Phone No: 970.456.5325 ; �♦ \ ► LOT 1 `�I 5288 SF 5 77 1 LOT 101 11 5636 SF -- 5 0 50 100 SCALE IN FEET Title: Raw Water Irrigation Schematic Prepared by: 8140 Partners, LLC Date: 01/14/2011 Exhibit: 1 Appendix C-4 itiV rat- e ASI [ )F AUH ) Estimated Flows River Edge Colorado Lift Station Calculations (Preliminary) Average Flows Peak Flows 375 EQRs 350 Gallon/EQR 131,250 Gallons/Day 5,469 Gallons/Hour 91 Gallons/Minute Sewage Pump Station Design Static Head 365 Q Pump Design Rate 913 Min. Pump Cycle Volume (V) in V=(Time)(Q)/4 10 Time (minutes) 365 Q (assumed) 6 Diameter of wet well (assumed 6 to 8) 4.32 H=V/UV - height between high and low levels 913 V 211 UV 423 V(tot)=HxUV 12 Cycle Time (T) =V(tot)/(Qd-Qi)+V/Qi 5 Cycles per hour 5975 Pump Elevation 5990 High Point in force main 5940 Low Point in Roaring Fork River crossing 5960 RFWSD WWTP Elevation (at MH 173) 50 Approx. Static Head Equivalent Length 2050 Force main length 20 Fittings 140 Manholes 2210 Total Equivalent Lengths (EQ) 375 EQRs 350 Gallon/EQR 131,250 Gallons/Day 525,000 Gallons/Day 21,875 Gallons/Hour 365 Gallons/Minute Friction Head Total Dynamic Head 7.37 Hazen -Williams Eq. 57.37 feet 2.33 Velocity in force main (fps) Design Pump Break Horsepower 15.09 HP=(Q*TDH)/(k*EFF) 3960 k 35% EFF River Edge Colorado 1/12/2011 1 of 1 APPEIIP tAon Design Fri ge { (11.012AIHM River Edge Colorado Project Wastewater Flow Calculations REC Private Potable Water and RFWSD Potable Water and Sewer Sewer System Standards System Standards Residential (Units) 366 366 Person per Unit 2.70 3.50 Residential (Population) 988 1,281 Residential Use (gpd/unit) 189 350 Residential Use (gpcd) 70 100 Residential Demand (gpd) 69,174 128,100 Commercial (Sq. Ft.) 30,000 30,000 Commercial Use (EQRs/1,000 sq.ft.) 9 9 Commercial Use (gpd/EQR) 189 350 Commercial Demand (gpd) 1,701 3,150 Average Flow with 1/I (gpd) 77,963 131,250 Peak Month Factor 1.5 1.5 Peak Month Flow (gpd) 116,944 196,875 Peak Factor 4 4 Peak Flow (gpd) 311,850 525,000 Lift Station Capacity Peak Hour Flow (gpd) Wastewater Treatment Plant Capacity 311,850 525,000 Peak Month Flow (Nominal Capacity) (gpd) 0 l7 45,000 40,000 35,000 30,000 25,000 20,000 15,000 10,000 5,000 0 116,944 196,875 Equalization Storage - - - - ■ Jiii o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 osLiry m 1n N. m rn o N m N- CO O o N m o C-1 N-1 , .--I N-1 Ni N N N Hour Hourly Flow Avg Flow Net Storage River Edge Colorado 1/12/2011 Wastewh@PFI$'VA.91culations \ ` ` • 7RACT\9N .\ \ X \\`I ,(.17'1';8/ ` \ V A A V A ''‘\ y • /RV RG /RO \ \ ,�\ \ \\ \\ \ 719o'sr \n\� \ \,\\ . \ \ \ \ POINT OF CONNECTION (4W>ER&WASTEWATER ,'j \ TO RFWSD SEWER SERVICE <14703 F \ A \ \ \ \ V A A V A'\ \V' V A A \ \\ \ \ \ \ \. \ \. \\ \\ SECURITY FENCE ,\ V \ \ \ \ 'I, • \ \ \ \ Avv av\\,\,. \ \ si,z,-\ \ \ \ ,`V• v \ x v \\ \ \ \ \'\\\\`\\\''' \ \ \�} \ \ \ \ I{II \ \ \ \ \ k a •.\\N.„,`\\ V 1 41 \ \\ \V A AV • \A� iVIIV A'\\\\\V \\\ �•�, \\v ,1 4��A \'',. A \ \ 11V' A A �`. IA * A V • A !,. ,..n _A... ��,,,, V A VV �. . ,.TRAGI AP \ \ tl1 \\ '`„�\\\\\\. \ W' \ v �\ vv \ 31 v 4 v•. 4 , /'v'4v v v y\ v \111 �I 1 'I. \.� 1 \ \ \ \ \ • 1 .V l \A , 1 —v `'. . A A\\v V• A I Sr 1� �a�. 1 V A \\ \ ��--1,, —\ FORCE MAIN \ \ \ \f ,"" \ APPRox. 2oso LF) \ \ \ as V' V I, A V 1 V � • \ • vv v v 11 v \ v v v v vI I I/ A sv v v vv :vv \ \, L \ \ \ A \ \ \ *\\ 1 /�V A�' ��� A V A V A�.• I\ e ) \ `\ 8 / \ �l (couw,Oat154) i. 1046 SF .� 16455A,I r �� \ I\ // �{7 (69 NO5E5) I`� \ F OfFO R �j T 4A1/)� i, \\p\ F fBTRE YAcEORRDABLEHOU9MG 1' \ „ \ { li \\\ \\ \ ;i\\°\ E`\ yj �V✓;'� 501 15_ - - � _ 37 SF. � `� LIFT STATION (BUILDING <100 SF) 13 TRACT RC (ROW) 225152 S.F. T N (AR1) 243291 S.F. 984Tss oTs \ 76, 9�X sF \ _- 1 109995 SF \\ , \ \ \ \ \• \ ` V° �\ v__v \ A 1 \ \ \ \ \` IRgCT Cf \ \ \ \ \ \ 6J7236 S.F (OPEN SPACE) 4� \\ \ \ \ \\ \ 11, v\ \ \\ \ \ \ • \ 1 `\O 1 \ \ /j/v��� '�\ \ ROARING FORK RIVER \ \\ \V > `a e � — AV \ v v CROSSING (OPEN CUT) \,,, \\•,,,A' '��� ^ / �7 /----, 1 Ay ViaV �V A V ( \ \ Iv /A --, / • /> • A, 1 A -� V �� A I� •\ •.1. c .< -\ vv vv ���,� v T / �\ \ \\ \ \ ivy; \ /� -v �`* v :.,.\\:\ v \ o. 1 v v ', \ v 1 �v • v 10 8791 Y \ Owner/Developer: COLORADO Carbondale Investments, LLC 7999 HWY 82 Carbondale, CO 81623 Phone No: 970.456.5325 FORCE MAIN TO A\ \'. v\ MH 173 \\�, _ (RFWSD PROPERTY) v• \ fi 100 0 SCALE IN FEET Title: Lift Station Schematic Prepared by: 8140 Partners, LLC p 200