Loading...
HomeMy WebLinkAbout6.03 Erosion Control PlanDISCHARGE INVERT 4987.44' 4988.00' EXISTING GRADE MAX. SEDIMENT BUILD-UP 4987.00' -4985.00' o.ro -0 moo. o"0� 0 0_0_0 ,0v0_0_0_0.�0. 0_0 O 0000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0`-. �/ 000�0�000�00000�00000000000000000•`' •:•:•v .•.jam,. A—A not to scale SEDIMENT BASIN TYPICAL SECTION ESTIMATED MINIMUM DETENTION VOLUME ..11111010, V=KA (acre-feet) For the 10 -year event, K10=(0.95P-1.90)(X 10/ 1000) where; P=Developed basin imperviousness (%) * P=23.50% & X10=0.26' therefore; K10=0.0053 V=0.0053(17.568)=.0933 or 4,064 cu.ft. * Reference - SWMM Dec. 2007 Mesa County Site Benchmark #5 Rebar Elev. =5000.8' County Road No.300 (old No.304) Southwest Corner Section 27 BLM Aluminum Cap NATIVE SOIL Railroad Tracks / 0 • p / / Train / / Ho�cse / 4S / / / / Telephone Pedestal / x /7 / /16 /6ti2 x r% / / / 77 / (IP) S 89°2'37','W --- 635.42' \ Existing GraveDriveway 70.347' _t.3 rl ' x • =-_� . _ 9 029 3 ' 'W / / / x / / vpo \O) \10 0 Asia "" AL/ �ti 9e' / V / / / Line 7 of / Existing l 4,57 so Shallow Drainage Swale See notes for IP description Parcel 1 4.810 Acres ± (see notes) IP Existing Building / / / / / / / / / / / Parcel 4 2.503 Acres ± (see notes) S 89°27'37" W 170.21' BURIED DRAINAGE PIPE, TYP. IN 1.6 co / / F-1 L I/ L J I t/ Y O L O S / / / 25°,° - Bud's Ways S 89°27'37" W 172.99 EC - BMP's to be straw rolls, straw bales, etc.; maintain EC's to keep sediment/ siltbuid-up below 6", typical ve°1 tl Parcel 2 2.409 Acres ± (see notes) Line of Existing Gravel I 1 1 1 1 1 1 1 Iz 0 CA) :p _ • 1►� Existing Gravel Driveway OP to be similar to RR r 1297.96' Existing Drainage Ditch .,� —r— / /� �1i V 3�O / / / / / Parcel 5 3.495 Acres ± (see notes) RR 7 7 Shallow Earthen Swale _ S. 8.9°2.7137"_W_ 232.26' RR to be 3"-4"0 river rock across swale & at least 3' down stream 0 N' w; Shallow Earthen Swale --' Parcel 3 2.789 Acres ± (see notes) Maintain SB to insure 1 maximum sediment I build-up at 4987.00' A SB ,30 X M - LDrainage & Basin Access Easement LEGEND Historic Run Off Direction & Slope Flowline (FL) Fence Easement Line — Erosion Control Rip -Rap R R Outet Protection (6) Inlet Protection CD° Sediment Basin CS_13) Storm Drain Inlet Potable Water Well SD NOTES: All off-site, up -stream runoff is diverted around this property by existing drainage improvements for 1-70. Hwy 6&24 and the railroad. All storm drain inlets to be surrounded by by 4"- 6" diameter stones extending upstream -6'. A State Construction Activity Permit will likely be required for individual lot development. Any Stormwater Management Plan required by future lot development shall not compromise this Erosion Control Plan. Install all erosion protection devices per CDOT 2002 'Erosion Control and Stormwater Quality' publication and the Stormwater Management Plan for this site. CONSTRUCTION SCHEDULE: - Permanent BMP's are in place on site as of 12/ 16/09. - Road base to complete Bud's Way will be installed between 30 & 60 days after Final Plat approval. - Construction on lots 2 thru 5 will begin after a tenant(s) has been secured. No tenants for these lots exist as of 12/ 16/ 09. ESTIMATED COST: - Refer to 'Strong PUD - Improvement Cost Estimate' seal dated 12/3/09. 12" Steel Pipe env. Elev. =4987.44' EROSION CONTROL PLAN SCALE: I" = 60' U c REVISIONS BY 12/3/09 KM 12/16/09 KM Erosion Control Plan 0 �aPC (75 ago rCi r-01 c'c1 C.) (i) co rd co 1-1 o� cv co o -1 AU – — cocts N N� 241-5623 0 Date 10/6/08 Scale as shown Drawn kpm Sheet