HomeMy WebLinkAbout04.0 PC Staff Report 09.08.1993• •
MEMORANDUM
TO: Garfield County Board of County Co �;� s ners
FROM: Dave Michaelson, Planning Departmen
DATE: September 8, 1993
RE: WESTBANK FILING #4 PUD PRELIMINARY PLAN
On September 8, 1993, the Garfield County Planning and Zoning Commission approved the Westbank
Filing #4 PUD Preliminary Plan with the following conditions:
Proposed Conditions of Approval
The following conditions of approval, the majority of which are typical of subdivision approvals, are
as follows:
1. That all representations of the applicant, either within the application or stated at the
public hearings before the Planning Commission and the Board of County
Commissioners shall be considered conditions of approval, unless stated otherwise by
the Planning Commission and the Board of County Commissioners.
2. The Homeowner's Association shall be incorporated in accordance with Colorado
Revised Statute requirements.
3. The applicant shall prepare and submit a Subdivision Improvements Agreement
addressing all on-site improvements, prior to the submittal of a fmal plat.
4. The applicants shall submit improvement plans for all roads, bridges, utilities, fire
protection, improvements signage and drainage structures prior to the submittal of the
final plat.
5. That all proposed utilities shall be placed underground.
6. That all cut slopes created during construction shall be revegetated with native grasses
and shrubs with adequate weed control. All revegetation shall be in accordance with
the applicant's revegetation plan. Revegetation and landscaping shall be included in the
Subdivision Improvements Agreement. In addition, adequate security shall remain in
place for a period of two (2) years to guarantee the survival of all plantings.
7. That the applicant shall demonstrate that procedures are established for the
maintenance of all roadways and bridges, including snow removal, through the
Homeowner's Association.
8. That the applicant shall pay $200 per lot in School Impact Fees prior to the approval
of the Final Plat.
9. That the following plat notes shall be included on the Final Plat:
a. The recommendations of the Colorado State Forester and U.S.F.S. wildfire
prevention guidelines shall be followed in the construction of all structures.
b. Prior to issuance of a building permit, the owner of each lot shall prepare and
submit a soils and foundation report, an I.S.D.S. design, and a grading and
drainage plan prepared and certified by a professional engineer. All
improvements shall be constructed in accordance with such measures which
shall be a condition of the building permit.
c. No open-hearth solid fuel devices will be allowed anywhere within Westbank
Filing #4 PUD. All dwelling units will be allowed an unrestrictive number of
natural gas -burning fireplaces or appliances. All dwelling units will be allowed
one (1) new woodburning stove as defined by CRS 25-7-401 et. seq. and the
regulations promulgated thereunder.
10. Prior to the approval of the Final Plat, the Applicant shall submit an approved
augmentation plan providing for a legal water supply for the Westbank Filing #4 PUD
development. Said augmentation plan, together with the West Divide Water
Conservancy District Water Allotment Contract and the water rights associated with
the wells, together with well permits, shall be transferred by the developer to a
homeowner's association which shall have the power and the duty to enforce
compliance by lot owners with the terms and conditions of the augmentation plan.
Appropriate Protective Covenants shall further require compliance with the terms and
conditions of the augmentation plan.
11. That the applicants shall prepare and submit protective covenants, articles of
incorporation and other Homeowner's Association documents including by-laws will
be submitted for review by the County Attorney prior to the approval of the Final Plat.
12. That the plat and covenants will provide that there will be no re -subdivision of the lots.
13. That all roadways shall be constructed in accordance with the design standards in effect
at the time of submittal of the Final Plat.
14. The Final Plat shall identify building envelopes that are in conformance with the
recommendations of the geotechnical report.
15. That adequate easements for wells, waterlines and other attendant facilities shall
provide on the Final Plat, including those necessary to provide access to existing water
infrastructure associated with Westbank Filings #1, #2 and #3.
16. That ten (10) foot perimeter easements on each lot should be provided for utility
purposes.
17. The applicant shall provide road signage in accordance with the Uniform Manual of
Traffic Control. These should be included in the Subdivision Improvements
Agreement.
18. Prior to the approval of the Final Plat, the applicant shall submit approved plans (by
Colorado Department of Health) for the proposed community water system.
19. The bikepath easement shall be dedicated to the County at the time of Final Plat.
20. Prior to the Hearing before the Board of County Commissioners, the County shall
determine the status of the CR 109 ROW adjacent to the project. If necessary, the
ROW shall be dedicated to the County prior to Final Plat.
21. The covenants will reflect the fireplace restrictions described in plat notes.
No staff report is being submitted. Staff suggests that all issues regarding comprehensive plan
compliance and general code conformance have been addressed in prior staff reports and public
hearings before both the Planning Commission and the Board. Staff will be happy to respond to any
questions from the Board concerning any of these issues.
rl;
STATE OF COLORADO
COLORADO GEOLOGICAL SURVEY
Division of Minerals and Geology
Department of Natural Resources
1313 Sherman Street, Rrn. 715
Denver, Colorado 00203
Phone (303) 066-2611
FAX (303) 866-2461
July 21, 1993
.Mr. Dave Michaelson
Garfield County Planning Department
109 8th Street, Suite 303
Glenwood Springs, Colorado 81601
tl
'JUL 2 6 199
Roy Romer
. NV--u:iFA_L) COUNTY Governor
Re: Westbank Ranch PUD Filing No. 4, Preliminary Plan
Dear Mr. Michaelson:
Keri Salazar
Executive Director
Michael D. Long
Division Director
Vicki Cowart
State Geologist
and Director
GA -94-0001
At your request and in accordance with S.B. 35 (1972), we have
reviewed the materials submitted for and made a field inspection on
July 13, 1993, of the site of the proposed residential subdivision
referenced above. The following comments summarize our findings.
(1) Generally, the assessment of potential geology -related problems
in this subdivision presented in the analysis by CTL Thompson is
thorough and adequate. Although there are some parts of the project
area that have moderate to severe geologic hazards, these will be
adequately avoided of the subdivision is developed as shown on the
proposed plat. The lot sites are sufficiently large that a safe
building site can be selected on each one although such "safe
build" areas on some of the lots are relatively small, especially
on lots 1 and 2 and lots 35 to 43, inclusive.
(2) We strongly concur with the recommendation by CTL Thompson that
each lot and, building site be investigated by a qualified
engineering geologist and/or soils and foundation engineer who
should collaborate with the architect for proposed structure(s).
Careful siting of structures, proper control of drainage, and
properly designed building foundations (including their concrete
specifications) will be critical to minimizing construction and
maintenance problems for future homeowners in the area.
(3) It is likely that maintenence costs for roads and other
infrastructure in the subdivision will apt to be higher than that
typical of subdivisions in more gently sloping and less hazardous
terrain. The County should evaluate these costs for any facilities
13 an'