HomeMy WebLinkAboutFooter Inspection 06.02.2017Huddleston -Berry Engineering Sr "resting, LLC Project No.: 01157 - 0026 Project Name: 62 Sweetgrass REINFORCING STEEL OBSERVATION REPORT Client Name: GJ Gardner Placement Contractor: GJ Gardner Contractor Representative: Estavan Location of Placement: Basement perimeter footings. later per GJ Gardner foreman. Observed By: BJR Work Order No.: Authorized By: client Date: 6/2/17 46546 Reviewed By: JAL Date: 6/2/17 Date: 6/16/17 The spot footing in the center will be installed Observation (checked items apply) FIC Bar Diameter Bar Grade Bar Quantity nOther: X ❑X nImbed Placement ❑X Laps and Clearances ❑ Bar Clean and Free of Debris Notes/Exceptions: arrival. The correct number of dowels at the counterfort locations had not been installed at time of Persons Notified: GJ Gardner foreman Corrective Action: The HBET representative waited on site while these dowels were tied into place, Municipal Agency: Garfield County Governing Code: Residential Reinspection Required ❑X Reinspection Not Required (Corrective action, if any, complete.) EX With Notes/Exceptions reinforcing steel was observed to be placed at the placement locations according to the referenced plans and specifications. Building Permit Number: Record No. 1 R