HomeMy WebLinkAboutMisc Correspondence6t23t2017 ADU BUILDING PERMIT - OTHER ITEMS LIST - Google Docs
OTHER ITEMS:
*lf you anticipate obtaining a water-tap from the City of Rifle, please provide a letter indicating
that the City will provide water service. Required to submit building permit application. N/A - We
are not in Rifle.
*OWTS requires a septic permit application to be submitted with the building permit application
Septic is already in place with engineered installation with adequate capacity for 1 additional
bedroom.
*A separate electrical permit must be obtained from the State of Colorado Electrical Board
Electrician will obtain the permit.
*At the time of building permit submittal, you are required to show proof of legal and adequate
access to the site. This may include proof of right to use a private easement, County Road &
Bridge permit, or Colorado Department of Highway permit, including a Notice to Proceed. The
County Road & Bridge Department can be reached a|970-625-8601. Garfield County inspected
the site and a letter indicating exemption is included.
*lf you anticipate excavating or grading prior to issuance of a building permit, you will be
required to obtain a separate grading permit. We are exempt with less than the 50 yard
minimum for excavation.
*lf you belong to a Homeowners Association (HOA) it is your responsibility to obtain written
approval, if required. N/A - No HOA.
*Provide copies of any Resolutions and/or Land Use Permits associated with this property
Land Use Permit has been forurrarded from the Community Development office.
"Additional Dwelling Units may require Administrative Review. Minimum dwelling dimension is
20 ft. wide x 20 ft. long. Dimensions are greater than 20'x20'.
*A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups,
unless the homeowner is performing the work. Owner Builder project.
hltps://rlocs.google.com/docrrment/rl/l OqMalrVV963l IgD0l FYSXfs'7HF24_Fil6e7aZ9D4IIMOW4ledit 111