HomeMy WebLinkAbout05 Site Plansr
APPENDIX 9-102.0
SITE PLAN
O\OLSSON
ASSOCIATES
THIS PAGE LEFT BLANK FOR TWO-SIDED DUPLICATION.
OLSSON
ASSOCIATES
GENERAL LOCATION MAP
Symbol Legend
SCALE : 1"=2500'
3" PVC Riser
Power Pole
Guy Wire
Well
Irrigation Riser
Abbreviation Legend
TYP = Typical
ELEC = Electric
OE = Overhead Electric
EL = Elevation
APPROX = Approximate
TWA = Temporary Work Area
II = Invert In
10 = Invert Out
TELE = Telephone
PED = Pedestal
Plan & Profile
BMC A Lateral
12" Gas Pipeline & 10" Production Water Pipeline
BMC A Pad To BMC B Pad
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
the 6th P.M. County of Garfield, State of Colorado.
Quantity Summary
Item Description
1. 12" Gas Pipeline
2. 10" Water Pipeline
3. Area of Disturbance
Quantity
1,844 If +-
1,844 If +-
2.2 Ac±
Project Map
SCALE : 1"=500'
GENERAL CONSTRUCTION NOTES
1. Pipeline installation, inspection and construction shall be in
accordance with the "Standards for Pipeline Construction" &
conditions to all pipeline grading and installation permits on file with
Garfield County, including all subsequent editions and revisions.
Engineer shall be notified of any conflicts discovered prior to or
during construction.
2. Disturbed areas shall be surface roughened and reseeded to final
stabilization in accordance to the Construction Activity Permit.
3. Salvaged Topsoil from the work area to be stockpiled for final
revegetation. Stockpile shall be protected with silt fence and/or
erosion logs around the perimeter of the stockpile.
4. BMP's shall be used appropriately, maintained regularly and removed
when appropriate. BMP's shall be installed per Ursa installation
details.
5. Fences shall be removed and replaced in kind. Contractor shall
preserve and protect fencing and utilities that are adjacent to, but not
in, the work zone.
6. Land owner to field verify Temporary Work Areas prior to
construction.
These plans were prepared under the review of C3 Group, Inc in
conformance to the Garfield County Building and Planning Department -
Major Grading Permit Application Site ;' _..,rosion Control
requirements, and with the adopt , "' �.. ilz . ing Code Section
J104.2.
Construction means and me
Application supporting m
considered part of this
Scott P Gregory, P
Professional Engineer
River Valley Survey, Inc.
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Ph: 970-379-7846
not
Project: RVS 06001-58A
Index of Sheets
1
2
3
4
5
6
Cover Sheet
Key Map
Plan & Profile, Sta: 1+00 to 8+000
Plan & Profile, Sta: 8+00 to 15+00
Plan & Profile, Sta: 15+00 to 19+44
Details
Field Date: 04-03-17
Scale: 1"= 50
Date: 05-19-17
Sheet: 1 of 6
U rsaOPERATNG
COMPANY
BMC A - Lateral
Pipeline Plan & Profile
Cover Sheet
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
1
; ±rac• k'
tirr m4.
',,, . IPL;isir,
iiilt
1 i (<fr
0,,, •y
. I .•
erClh. e J� GR
a .��
",1
. , r _ .
We;t P$ a Way
'7"
30-
�" r
."-•/ r
op
4.„-
1i
E3.4 BMC B
I'V,yr 7,.1,
S ZII
Pad ,�,
BMCA Pad
18�
. .._
r�.1,6-_..
fil
•!. t
J -'s
fir' V r•.nnT
','
GENERAL LOCATION MAP
Symbol Legend
SCALE : 1"=2500'
3" PVC Riser
Power Pole
Guy Wire
Well
Irrigation Riser
Abbreviation Legend
TYP = Typical
ELEC = Electric
OE = Overhead Electric
EL = Elevation
APPROX = Approximate
TWA = Temporary Work Area
II = Invert In
10 = Invert Out
TELE = Telephone
PED = Pedestal
Plan & Profile
BMC A Lateral
12" Gas Pipeline & 10" Production Water Pipeline
BMC A Pad To BMC B Pad
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
the 6th P.M. County of Garfield, State of Colorado.
Quantity Summary
Item Description
1. 12" Gas Pipeline
2. 10" Water Pipeline
3. Area of Disturbance
Quantity
1,844 If +-
1,844 If +-
2.2 Ac±
Project Map
SCALE : 1"=500'
GENERAL CONSTRUCTION NOTES
1. Pipeline installation, inspection and construction shall be in
accordance with the "Standards for Pipeline Construction" &
conditions to all pipeline grading and installation permits on file with
Garfield County, including all subsequent editions and revisions.
Engineer shall be notified of any conflicts discovered prior to or
during construction.
2. Disturbed areas shall be surface roughened and reseeded to final
stabilization in accordance to the Construction Activity Permit.
3. Salvaged Topsoil from the work area to be stockpiled for final
revegetation. Stockpile shall be protected with silt fence and/or
erosion logs around the perimeter of the stockpile.
4. BMP's shall be used appropriately, maintained regularly and removed
when appropriate. BMP's shall be installed per Ursa installation
details.
5. Fences shall be removed and replaced in kind. Contractor shall
preserve and protect fencing and utilities that are adjacent to, but not
in, the work zone.
6. Land owner to field verify Temporary Work Areas prior to
construction.
These plans were prepared under the review of C3 Group, Inc in
conformance to the Garfield County Building and Planning Department -
Major Grading Permit Application Site ;' _..,rosion Control
requirements, and with the adopt , "' �.. ilz . ing Code Section
J104.2.
Construction means and me
Application supporting m
considered part of this
Scott P Gregory, P
Professional Engineer
River Valley Survey, Inc.
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Ph: 970-379-7846
not
Project: RVS 06001-58A
Index of Sheets
1
2
3
4
5
6
Cover Sheet
Key Map
Plan & Profile, Sta: 1+00 to 8+000
Plan & Profile, Sta: 8+00 to 15+00
Plan & Profile, Sta: 15+00 to 19+44
Details
Field Date: 04-03-17
Scale: 1"= 50
Date: 05-19-17
Sheet: 1 of 6
U rsaOPERATNG
COMPANY
BMC A - Lateral
Pipeline Plan & Profile
Cover Sheet
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
1
Plan & Profile
BMC A Lateral
12" Gas Pipeline & 10" Production Water Pipeline
BMC A Pad To BMC B Pad
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
the 6th P.M. County of Garfield, State of Colorado.
BMC B Pad
•
Battlement Mesa
Partners
Parcel No.
2407-183-05-021
F
0 0
Dennis L. Burke
Parcel No.
2407-182-00-004
•
Dennis L. Burke
Parcel ..
2407-181 I1-00
7
0
.ice /
Sheet 4
Battlement Mesa
Metropolitan District
Parcel No.
2409-134-06-001
Orange Shade
Indicates Temporary.,
Work Area
44.
3attlement Mesa
.and Investments
Parcel No.
Battlement Mesa
Land Investments
Parcel No.
2407-081-00-152
7\
125' 0' 250'
Graphic Scale in Feet
1"= 250'
U rsa OPERATING
COMPANY
River Valley Survey, Inc.
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Ph: 970-379-7846
Project: RVS 06001-58A
Field Date: 04-03-17
Scale: 1"= 50
Date: 05-19-17
Sheet: 2 of 6
BMC A - Lateral
Pipeline Plan & Profile
Key Map
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
I
// i
�
�\\ /� 2 AI
�Z
A\ \\\ 7/I V /%/// �J \\\\\ /
\ /,
__-i/
— — \ / / r _ —
/
—Battlement Mesa —
erooansc
Sewer
/ ) ! I \ \ / / I 4III1II:
111Ma
_
`�—�co
\ / d —f +
e►t Line
�MC A -Pa — r • _
\ / — — -- rn
�to. \ //
/ i onst. Esmtl
_ _
/ - —_—�
`
..
s. _
— —
__ i�E _�
+Y
•
• m
°j
AA
• 100 �
o- i►' � s �- ice- a
—_ cz_r 7}0�
- y -- �' - '- - - - I - -
—
� -
• 2+0o
� __ --- topp-/
Proposed Gravel Access r
'
r�
G — —
Road
6— —;r — TAT
i �•1/4f '� _nom— — — rrr•_.-611a
— — - •nst. Esmt. _ 1.24G"----------
\ -----
\\ \ -
m / / / / Esme / /moi _ -_— - --P_ lines 1� — — — — — — — — — — — — — •—t — — _ sin9_--
----
_ - - — one. Esmt. -.
/ j / / /i �— �_�>----i---- • ix Easter -V25 -of -the--- _ — — — — — __— See
__ _— _ —_— — _
\\ �� \\ \ _------ ---- --� —�------------- --
j/ •i /�tiOfjinCl entjerTine6#
—� _—�W]SVSL�t10naSe��
/ jam/ / /Al'£}rl — —
— ` _ 5120 — — — _ — _ — / / / — // // /C6,f s etf• --�Irl�nt-- — — — — — — — — — — — — — — — — — — __ —_ _ —
\ ---
\ \ \� \ \�------------- -1-2"-Gas—and 10" ���////�//////i/ —
___ -- -- __-------- ---- _ —_—
-- - /// / // i� — — = — — — — — — — _ — t
_
_ _ — — — — _ _ _ __—�_ i / / / / - — — — — — —
���\ �__ ------ — zN
__5130=--_=__-- ��/ice///iii ii%_ ______—_ =____------- _ -----
��
140_
5 —_— // ///
-ti
_ ______ _
�� �\ N \� =_-_------_____—_ ____ X150 =/,�/ /ij/---13,ttl%net''
���N�_---
--_ —
----- 1
_--__
—___-- _—_—_ /-�-///
�larr,.y�s�ents
—_--
---- �—
_ ,5---�/ __
\����\---
_—__—_—___—_--
N.
5
_______—____- -_-- _-_-'__----� i/// -/i/ //ji'�� \ I__ _ _
____ _________
%�� \ ~----� —�� �\
��� ��___ _
��;__---_ —����� 1'10//-//---//
_—_ ________—�
/
5130
-
5125
----
-
-
----
-�
5120
Sta: 7+60
Gium
30" Sewer Line
511 `�
— — — -
— —
4.0'min
Proposed TOP
ontractot crossing verify
-'
—
r
5110
-
5105
5100
1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00
f\--.41, oii Ursa
O PERATING
CQMPANY
25' 0' 50'
Project: RVS 06001-58A
BMC A - Lateral
fail
River Valley Survey, Inc.
Graphic Scale in Feet
1"= 50'
RS
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Field Date: 04-03-17
Scale: 1"= 50
Pipeline Plan & Profile
Construction Layout Drawing
Ph: 970-379-7846
Date: 05-19-17
Sheet: 3 6
Section 13, Township 7 South, Range 96West
of
Section 18, Township 7 South, Range 95West
S 8"Foroe Main lines
Sta.9+08
ctor to verify
15+00 •...
/ -o
\ \
Twin 96"� Ive' sSt
C' itractor to veri
\ \�
River Bluff Road
100 Right-of--Wa
5160
/
/—
/
Z
_Dattlement Mesa
Partners
Tom_=_—_ —\ \
/
5145
5140
5135
5130
5125
5120
8+00
/
—71
8+50 9+00 9+50 10+00 10+50
25' 0' 50'
Graphic Scale in Feet
1"= 50'
11+00 11+50 12+00 12+50
13+00
5145
5140
5135
5130
5125
5120
13+50 14+00 14+50 15+00
Ursa
OPERATING
COMPANY
River Valley Survey, Inc.
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Ph: 970-379-7846
Project: RVS 06001-58A
Field Date: 04-03-17
Scale: 1"= 50
Date: 05-19-17
Sheet: 4 of 6
BMC A - Lateral
Pipeline Plan & Profile
Construction Layout Drawing
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
30" Waterline
Contractor
Sta. 9+48 -
to verify
7—
/
/
2"
Contractor
Waterline Sta. 11+55
to verify
3-8" Force Main
Sta.9+00—
Contractor to
lines
verify
Twin 96' Culverts
Contractor
—.
—
ata. 1 U1 -,ib
to verify
2" Waterline Sta.
Contractor to
8+66/
verify 1
_
\
\
/
— —
Existing
Grade
4.0' min
,-
---
�-/
�
1 ,
Ft.+-
End Bore
Sta. 12+26
- Begin
Bore
Bore 406' Lin
Bore Profile to Be Designed
By Others
Proposed TOP
Sta. b+32
8+50 9+00 9+50 10+00 10+50
25' 0' 50'
Graphic Scale in Feet
1"= 50'
11+00 11+50 12+00 12+50
13+00
5145
5140
5135
5130
5125
5120
13+50 14+00 14+50 15+00
Ursa
OPERATING
COMPANY
River Valley Survey, Inc.
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Ph: 970-379-7846
Project: RVS 06001-58A
Field Date: 04-03-17
Scale: 1"= 50
Date: 05-19-17
Sheet: 4 of 6
BMC A - Lateral
Pipeline Plan & Profile
Construction Layout Drawing
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
Battlement Mesa
Partners
Storage Area
Chain -Link Fence �c>
•s
BMC B Pad
19+44
•o,
t.
nst. Esmt.
12" Gas and 10" Production
Water Pipelines
propertY Lin
Dennis L Burke
5135
5130
5125
5120
5115
5110
5105
5100
5135
5130
5125
5120
5115
5110
5105
5100
15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 19+97
25' 0' 50'
Graphic Scale in Feet
1"= 50'
Ursa
OPERATING
COMPANY
River Valley Survey, Inc.
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Ph: 970-379-7846
Project: RVS 06001-58A
Field Date: 04-03-17
Scale: 1"= 50
Date: 05-19-17
Sheet: 5 of 6
BMC A - Lateral
Pipeline Plan & Profile
Construction Layout Drawing
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
7
txlstIng Grade
-----------------.........__________4.0'min
--- ______ _____
—
— E
nd Sta: 19+44
Proposed TOP
0
5135
5130
5125
5120
5115
5110
5105
5100
15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 19+97
25' 0' 50'
Graphic Scale in Feet
1"= 50'
Ursa
OPERATING
COMPANY
River Valley Survey, Inc.
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Ph: 970-379-7846
Project: RVS 06001-58A
Field Date: 04-03-17
Scale: 1"= 50
Date: 05-19-17
Sheet: 5 of 6
BMC A - Lateral
Pipeline Plan & Profile
Construction Layout Drawing
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West
Recommended Typical Trench Detail
Reestablish excavation area with
Noxious Weed Free Seed Mix
/\////\/\
Sides of the trenches higher than 5 -ft
above the bottom of the trench to have a
maximum slope of 1:1 or to be shored
and sheathed in accordance with OSHA
Regulations.
6" of Select grade as approved by the Geotech
engineer or 6" Class VI Bedding compacted to
95% Standard Proctor within 2% of optimum
moisture. In areas of unsuitable bedding
material encountered at grade depth, excavate
additional depth as directed by Geotech
Engineer.
......................
......................
......................
.............
.............
:::::::............
...................
...................
..................
.................
.................
Top Soil - Crowned and disced to avoid erosion
and pooling.
In trenches deeper than 5 -ft, Native material fill
Compact to 85% Standard Proctor.
Note: Trench Width to be a minimum of 8" plus
— the diameter of the pipeline, and a maximum of
24" plus the diameter of the pipe.
Graded Select Native Material. No sharp rocks,
organics or trash. Screen rock to 12" or smaller
from top of pipeline to minimum 3 -ft depth.
Compact to 85% Standard Proctor.
Graded Select Native Material. No sharp rocks,
organics or trash. Screen rock to 3" or smaller to
the Top of Pipeline. Compact to 90% Standard
Proctor.
Sand Bags for Steel Pipeline
CONDITIONS TO ALL PIPELINE GRADING AND INSTALLATION PERMITS
FOR GARFIELD COUNTY
1. All work to comply with ASME B31.8-2007 and manufacturers recommendations for steel pipelines.
2. All work to comply with ASTM D2774 for pressure poly pipe installations and ASTM D2321 for gravity flow poly pipe installations. Follow all manufacture's
recommendations.
3. Minimum cover over all installations is 48 inches.
4. Properly compacted backfill is required between parallel pipes in a common trench. Provide adequate space between the pipes to achieve adequate compaction.
5. The trench bottom should have stable (firm) soils and free of protruding rocks. A minimum of 4 inches of Class 1 bedding is required under poly pipe.
6. Compaction requirements are 85% standard Proctor for Class 1 and Class 11 backfill (including padding), 90% standard Proctor for Class III backfill, and 95% standard Proctor
for Class IVA soils and for all backfill under and within 6 feet of roads. Maximum lifts of 12 -inches for Class 1, 8- inches for Class II, and 6 -inches for all other classes.
Compaction test are required every 200 feet until compaction practices meet these requirement. Compaction once established must be spot checked every 400 ft. or when
fill materials or processes changes.
7. Padding (shading) of all pipes is required a minimum of 24 -inches around the pipe with 12 -inches of padding over the pipe. Padding particle size of no greater than 1 1/2
-inch for a 10 -inch to 15 -inch diameter pipe. If the pipe is 16 -inches or larger, the 2 inch maximum particle is allowed.
Inspection Reports shall be completed to verify the above specifications. In addition the reports shall show:
• Name of the inspector, date, time on site, and weather;
• A description of the work in progress;
• Summary of conversations with contractors/others;
• Summary of sampling and testing activities;
• Verification of pipe material, grade and alignment;
• Observation of pipe installation, placement of padding and backfill materials, and trench excavation methods;
• Verification of proper pipe storage, handling, and installation procedures are followed;
• Copies of all pressure integrity, non destructive X -Ray and compaction test; and
• Pictures to document the construction.
Stormwater management plans require routine inspections during all phases of work every 14 days and after a precipitation -related even
24" Steel Bore Detail
Install spacers/skids as
necessary
24" O.D. Steel
Casing Pipe
w/ 1/2" Wall
12" I.D. Steel Pipe
Install spacers/skids as
necessary
N_36" O.D. Steel
Casing Pipe
w/ 1/2" Wall
36" Steel Bore Detail
16" I.D. Steel Pipe
Ursa
OPERATING
COMPANY
RP!
River Valley Survey, Inc.
110 East 3rd. Street, Suite 213
Rifle, Colorado 81650
Ph: 970-379-7846
Project: RVS 06001-58A
Field Date: 04-03-17
Scale: 1"= 50
Date: 05-14-17
Sheet: 6 of 6
BMC A - Lateral
Pipeline Plan & Profile
Detail Sheet
Section 13, Township 7 South, Range 96West
Section 18, Township 7 South, Range 95West