HomeMy WebLinkAbout15 Traffic StudyTRAFFIC STUDY O\OLSSON ASSOCIATES DETAILED TRAFFIC ANALYSIS URSA OPERATING COMPANY, LLC BATTLEMENT MESA PUD PHASE II DEVELOPMENT GARFIELD COUNTY, COLORADO O\LOLSSON ASSOCIATES OA Project No. 016-3531 July 2017 760 Horizon Dr., Suite 102 1 Grand Junction, CO 81506 1 970.263.7800 1 Fax 970.263.7456 Battlement Mesa PUD Phase 11 Development July, 2017 Ursa Operating Company, LLC INTRODUCTION & OBJECTIVE This document summarizes findings of a Detailed Traffic Analysis performed for the Ursa Operating Company, LLC proposed Battlement Mesa PUD Phase II Development. The development includes two well pads with associated pipelines (BMC A Pad and BMC L Pad) and a temporary water storage facility (BMC F Temporary Water Storage Facility). There will be a natural gas pipeline and two water pipelines co -located in the same trench at both pipeline locations. A Vicinity Map is included as an attachment at the end of this document. The objective of this analysis is to provide traffic data for the construction of the well pads, temporary water storage, and pipelines, review the existing road network, and provide traffic projections for public roads impacted by construction and production traffic. EXISTING ROAD NETWORK Maps showing the access route, haul route, and county roadways in the area of the well pads are included as an attachment at the end of this document. Table 1 tabulates roadway characteristics for the county roads used by vehicles visiting the well pads and pipelines. Table 1: Roadway Characteristics Roadway Lanes Road Width Roadway Type Speed Limit Year of Impmt. Functional Classification CR 215 2 40' Asphalt 35 mph 2006 Major Collector CR 300W 4 64' Asphalt 35 mph 2009 Minor Collector CR 300N 4 64' Asphalt 35 mph -* Major Collector CR 300E 4 64' Asphalt 35 mph -* Minor Collector CR 302 2 18' Gravel 25 mph 2003 Local CR 303 2 22' Asphalt 35 mph 2006 Local CR 307 2 26' Asphalt 25 mph 2003 Local CR 308 2 22'-24' Asphalt 25 mph 2005 Local Spencer Pkwy 4 46' Asphalt 35 mph 2006 Local *Note that the improvements at CR 300W were made as part of the Battlement Mesa PUD and CR 300N and CR 300E are likely in similar condition to CR 300W. The Garfield County Road Inventory Report and 2014 Garfield County HUTF Report were used to identify the roadway geometry and characteristics of the facilities being used by construction traffic. Detailed Traffic Analysis Page 1 Battlement Mesa PUD Phase 11 Development July, 2017 Ursa Operating Company, LLC BACKGROUND TRAFFIC Background traffic volumes were obtained from Garfield County Road & Bridge. The count data was collected in 2014 at all roadways planned to be used for the Battlement Mesa Phase II Development. The background traffic volumes are shown in Table 2 below. Table 2: Background Traffic Roadway 2014 CR 215 7200* CR 300W 4770 CR 300N 6840 CR 300E 670 CR 302 120 CR 303 470 CR 307 270 CR 308 360 Spencer Pkwy 2360 *ADT estimated based on 2017 turning movement counts. In addition, turning movement counts were collected on Wednesday, January 18, 2017 during AM and PM peak hours (7:OOam — 9:OOam and 4:OOpm — 6:OOpm) at the following intersections: • CR 300W & CR 300N • CR 300W & CR 307 • CR 300E & Sipprelle Drive/CR 308 • Spencer Parkway & CR 300N Due to varying traffic trends throughout the year, it is most often appropriate to account for the time of year of data collection. The Colorado Department of Transportation (CDOT) Online Transportation Information System (OTIS) maintains a thorough inventory of roadway volumes. Based on area information a seasonal factor of 1.25 was applied to the existing volumes to obtain an adjusted volume set. The adjusted traffic volume set will be referred to as existing traffic volumes through the rest of the report. Existing traffic volumes can be seen in the exhibits at the end of the report. Detailed Traffic Analysis Page 2 Battlement Mesa PUD Phase II Development July, 2017 Ursa Operating Company, LLC BACKGROUND TRAFFIC ANALYSIS Capacity analyses were performed for the existing study intersections utilizing the existing lane configurations and traffic control. Analyses were conducted using Synchro, Version 9.1. Reported delays are based on the Highway Capacity Manual delay methodologies. For simplicity, the amount of control delay is equated to a grade or Level of Service (LOS) based on thresholds of driver acceptance. The amount of delay is assigned a letter grade A through F, LOS A representing little or no delay and LOS F representing very high delay. Table 3 shows the delays associated with each LOS grade for unsignalized intersections. Table 3: Unsignalized Intersection LOS Criteria Level of Service Average Control Delay (seconds) A <10 B 10-15 C 15-25 D 25-35 E 35-50 F > 50 The results of the capacity analysis indicate that most movements operate at LOS D or better in both peak hours. The exception is the northbound left -turning movement at the intersection of CR 300W & CR 300N which operates at LOS F in the AM peak hour. The 95th percentile queue length for this movement is approximately 15 vehicles (375 feet) in the AM peak hour. All other movements experience queue lengths of no more than one vehicle in both peak hours. The existing capacity analysis summary can be seen in Appendix A at the end of the document. Detailed Traffic Analysis Page 3 Battlement Mesa PUD Phase II Development July, 2017 Ursa Operating Company, LLC CONSTRUCTION TRAFFIC GENERATION Trip generation is generally determined using rates found in the ITE Trip Generation manual. Rates from this publication are applied to values related to the size of the proposed site to estimate the trips expected to enter and exit the site. In this case, no rates are provided for facilities similar to these. To estimate trips expected for the proposed sites, information was gathered regarding the expected construction and production traffic from the client. Because all proposed pad sites and pipelines are new, there will be a construction phase for each well pad and their respective pipelines. There will be a natural gas pipeline and two water pipelines co -located in the same trench at both proposed pipeline locations. The schedule order of construction is as follows: • BMC L Pad (31 wells) with pipelines and BMC F Temporary Water Storage concurrently • BMC A Pad (25 wells) with pipelines concurrently The construction of the BMC L Pad pipelines is to start at the BMC L Pad property just south of CR 300N along Spencer Parkway and travel north to CR 300N where it will connect to the existing Tompkins pipeline. The construction of the BMC A Pad pipelines is to start at the BMC A Pad property and work north to connect to the existing pipelines at the BMC B Pad site. Traffic is expected to originate at the 1-70 Parachute exit. Construction is set to begin in the fourth quarter of 2017 over the course of 12 weeks for the well pads, water storage facility, and pipelines assuming five working days per week. Heavy vehicles are considered to be vehicles used for hauling equipment and materials to the site. Light trucks are considered to be pickup trucks for crew transportation. Well Pad and Temporary Water Facility Construction Traffic The construction of the BMC A, BMC L, and BMC F pads will consist of approximately a 30 -day (6 week) work schedule. Approximately 12 daily vehicle trips are expected during the entire well pad construction. An additional 12 daily vehicle trips are expected for 100 proposed above grade storage tanks, including accompanying pilot vehicles, to the BMC F Pad site. These storage tanks are considered overweight and according to the 2014 Garfield County HUTF Report, all roadways within the haul route are in good or fair condition and are expected to support the anticipated vehicle loads. There is no special traffic control needed for the transport of these tanks as they are expected to adequately navigate the existing county roads. All vehicles are expected to use the 1-70 Parachute interchange through the course of construction. A detailed description of the routes to each pad site can be seen in the Haul Routes section of the report. Detailed Traffic Analysis Page 4 Battlement Mesa PUD Phase II Development July, 2017 Ursa Operating Company, LLC Pipeline Construction Traffic The first week of pipeline construction is dedicated to mobilization and materials distribution to staging areas along the project that will consist of approximately 20 vehicle trips per day. Construction weeks 2 through 8 will include 10 crew worker trips and two heavy vehicle trips per day. In weeks 9 through 11, work will be completed along the entire pipeline route for ground stabilization and reestablishing vegetation. This work will include approximately 12 one-way trips per day for crew members and four (4) one-way trips per day for heavy equipment. Week 12 of construction is dedicated for demobilization and is expected to consist of two (2) heavy vehicle trips per day to transport equipment from the construction area. All vehicles are expected to use the 1-70 Parachute interchange through the course of construction. Pipelines are anticipated to be constructed concurrently with their associated well pad. Drilling & Completions Construction Traffic Expected drilling and completions activities include the following. For the next year, there are three drilling and completion events planned that would last between 90-100 days each. During each event, there would be 4-5 days at the beginning and end for mobilization and demobilization of equipment, respectively. During that time, there would be approximately 20 round trips (40 one- way trips) per day distributed evenly through a ten-hour work day. Vehicle trips during the drilling and completions of the wells will include approximately 40 and 70 one-way trips, respectively. Drilling and completions will be performed at BMC A and BMC L pads. In addition, an injection well is proposed to be constructed at the BMC A Pad concurrently with the drilling and completions of the wells. This is anticipated to produce an additional 40 daily trips during drilling over 5 work days and 70 daily trips during completions over 10 work days. The drilling and completions phase is anticipated to generate the greatest amount of traffic of any construction phase. Detailed Traffic Analysis Page 5 Battlement Mesa PUD Phase II Development Ursa Operating Company, LLC July, 2017 Based on the expected trips discussed above, construction traffic is summarized in Table 4. Additionally, existing plus construction traffic volumes can be seen in the figures at the end of this document. Existing plus construction traffic included traffic for each well pad and its associated pipeline. To provide a conservative estimate, the drilling and completions construction traffic was used for BMC A and BMC L pads. Table 4 Construction ADT Projections Roadway Bkgd. Traffic Maximum Daily Construction Traffic Percent Increase Maximum Daily Traffic CR 215 7200 172 2% 7360 CR 300W 4770 160 3% 4860 CR 300N 6840 102 1% 6930 CR 300E 670 32 5% 690 CR 303 470 32 7% 490 CR 307 270 20 7% 290 CR 308 360 32 9% 380 Spencer Pkwy 2360 90 4% 2450 Note that there is an existing center median along Spencer Parkway that is proposed to be broken at the access for BMC L Pad. This will allow construction and production traffic to exit the site to travel north to CR 300N which follows the Garfield County preferred haul routes. A Garfield County permit will be required for this construction. A detailed analysis of this proposed median break is discussed in the Roadway Analysis section of this report. Detailed Traffic Analysis Page 6 Battlement Mesa PUD Phase II Development July, 2017 Ursa Operating Company, LLC PRODUCTION TRAFFIC GENERATION It is expected that all site traffic will originate from the 1-70 Parachute Exit 90 to the northwest of the Battlement Mesa area. Production phase traffic will be generated from several well pads, including BMC A Pad, BMC L Pad, and BMC F Temporary Water Storage facility. Each well pad produces approximately five (5) trucks (10 one-way trips) per day. In addition, two pickup trucks will visit each site daily for maintenance and inspection. These trips are assumed to arrive evenly throughout the ten-hour work day. Table 5 summarizes the expected production traffic for surrounding county roads. Table 5: Production ADT Projections Roadway Bkgd. Traffic Maximum Daily Production Traffic Percent Increase Maximum Daily Traffic CR 215 7200 20 <1% 7220 CR 300W 4770 10 <1% 4780 CR 300N 6840 20 <1% 6850 CR 300E 670 10 1.5% 680 CR 303 470 10 2% 480 CR 307 270 10 4% 280 CR 308 360 10 3% 370 Spencer Pkwy 2360 10 <1% 2370 CONSTRUCTION AND PRODUCTION CAPACITY ANALYSIS Existing traffic volumes were combined with expected construction traffic and production phase traffic to develop Existing plus construction and Existing plus production traffic volume sets. These peak hour volumes are shown in the exhibits at the end of the document. Existing plus Construction The results of the capacity analysis indicate that most movements are expected to operate at LOS C or better in both peak hours. The exception is the northbound left -turning movement at the intersection of CR 300W & CR 300N which is expected to operate at LOS F in the AM peak hour. The 95th percentile queue length is expected to exceed 17 vehicles (approximately 425 feet) for this movement in the AM peak hour. This is approximately a two -vehicle increase from existing conditions queue lengths. Existing plus Production The results of the capacity analysis indicate that most movements are expected to operate under similar LOS and experience similar queues to those in existing conditions. Turning movement operations at site drives are expected to operate at LOS B or better in both peak hours with queue lengths of no more than one vehicle. A detailed summary of both capacity analyses can be seen in Appendix A. Detailed Traffic Analysis Page 7 Battlement Mesa PUD Phase II Development July, 2017 Ursa Operating Company, LLC HAUL ROUTES Haul routes were identified for each pad and pipeline being constructed as part of this project and are detailed below. The haul routes can be observed in the exhibits included at the end of the report. BMC A Pad/Pipeline The proposed location of the BMC A Pad and pipeline is along CR 307. Vehicles visiting the site will use Exit 90 on 1-70 and turn east onto CR 215. Vehicles will travel approximately 3/4 -mile and turn south onto CR 300W. Vehicles will then travel approximately one mile and turn west onto CR 307, and finally travel 0.7 miles to the pad site. Vehicles exiting the site will take the same route out of the site. BMC L Pad/Pipeline The proposed location of the BMC L Pad is along Spencer Parkway. Vehicles visiting the site will use Exit 90 on 1-70 and turn east onto CR 215. Vehicles will travel approximately 1.5 miles east along CR 215 and CR 300N and turn south onto Spencer Parkway. Vehicles will then travel approximately 400 feet south and turn west into the pad site. Vehicles exiting the site will take the same route out of the site. BMC F Pad The proposed location of the BMC F Pad is along CR 303. Vehicles visiting the site will use Exit 90 on 1-70 and turn east onto CR 215. Vehicles will travel approximately 2.5 miles east and then south along CR 215, CR 300N, and finally CR 300E and turn east onto CR 308. Vehicles will then travel approximately 1 mile south and turn west onto CR 303, followed by 1/4 -mile to the pad site. Vehicles exiting the site will take the same route out of the site. PAD PERMITS Each pad site and its respective traffic was evaluated to determine the need for permits from Garfield County. As mentioned above, heavy equipment will be transported to the surrounding pad sites as part of the construction process. Each pad site will be required to obtain oversize/overweight permits from Garfield County Road & Bridges. Special traffic control will not be needed as the trucks are expected to navigate the existing county roads, in some cases accompanied by pilot vehicles. In addition, a driveway permit will be required for each pad site drive. Detailed Traffic Analysis Page 8 Battlement Mesa PUD Phase II Development July, 2017 Ursa Operating Company, LLC ROADWAY ANALYSIS State Highway Crossings and Access The roadway access to this site does not cross any highway rights-of-way managed by the Colorado Department of Transportation. Access to 1-70 is at the Parachute interchange located northwest of all site parcels. The ramp terminals at this grade -separated interchange are signalized intersections. Impacted Parcels The well pads and water storage facility are proposed to be constructed on two separate parcels. The pipelines are proposed to be constructed through multiple properties. Current land uses on the affected parcels include Planned Unit Development, "open space", and agricultural uses as well as existing oil and gas well pads. Intersection of CR 215 & CR 300W The intersection of CR 215 & CR 300W is a "T" intersection with CR 300W as the stop -controlled minor approach. Sight distance measured from the stop sign on CR 300W is adequate looking west and east. The curb returns at this intersection have large radii that will allow trucks to make wide turns. There is an existing eastbound channelized right -turn lane at this intersection. Because of the heavy eastbound right -turning movements, an eastbound right -turn lane should be constructed. This would improve overall safety at this intersection. Intersection of CR 300W & CR 307 The intersection of CR 300W & CR 307 is a "T" intersection with CR 307 as the stop -controlled minor approach. It is located on a horizontal curve turning away from the minor road. Sight distance measured from the stop sign on CR 307 is adequate looking north and east at this intersection. Intersection of CR 303 & CR 308 The intersection of CR 303 & CR 308 is a stop controlled "T" intersection with the east leg of CR 303 as the minor road. Vehicles traveling from CR 303 west of the intersection have a free movement onto and from CR 308. Intersection of CR 308 & CR 302 The intersection of CR 308 & CR 302 is a two-way stop controlled intersection with CR 302 as the minor road. Sight distance looking north from the east leg of this intersection is questionable with tree coverage potentially blocking vision. Sight distance is adequate looking south from CR 302. Detailed Traffic Analysis Page 9 Battlement Mesa PUD Phase II Development July, 2017 Ursa Operating Company, LLC Intersection of CR 300E & Sipprelle Drive/CR 308 The intersection of CR 300E & CR 308/Sipprelle Drive is a two-way stop controlled intersection with Sipprelle Drive/CR 308 as the minor road. Sight distance is adequate looking north from CR 308. Looking south there are multiple trees that could potentially obstruct a driver's vision as well as a horizontal curve, resulting in questionable sight distance for a truck. Intersection of Spencer Parkway & CR 300N The intersection of Spencer Parkway & CR 300N is a stop controlled "T" intersection with Spencer Parkway as the minor road. Sight distance is adequate looking west along CR 300N. There is a horizontal curve approximately 200 feet east of this intersection that may have questionable sight distance for northbound left -turning vehicles. Intersection of Spencer Parkway & BMC L Pad Drive The intersection of Spencer Parkway & BMC L Pad Drive is proposed to be a two-way stop - controlled intersection. A median break is proposed for this new access to allow site traffic to exit the pad and travel north to CR 300N. A cursory review of the proposed site drive location was performed. Typical access control would be to have as few median breaks as possible, and the proposed site drive would ideally align with the existing median break to the south. If this is not possible, the drive should be located at least 400 feet south of an existing horizontal curve to the north to provide adequate intersection sight distance. The drive should also be located as far north as possible from the existing intersection to the south to minimize the potential for interactions between turning movements or overlapping turn lanes with the BMC L Pad drive. Detailed Traffic Analysis Page 10 Battlement Mesa PUD Phase II Development July, 2017 Ursa Operating Company, LLC CONCLUSIONS Based on the expected trip generation discussed above, the increased traffic during construction of the proposed pipelines, well pads, and water storage facility is not expected to have significant impacts on roads generally used by the public. The county roads discussed will see only a minor increase in construction and production traffic as compared to existing traffic volumes. The addition of temporary construction and long-term production traffic from the Battlement Mesa Phase 11 Development do not increase existing volumes to levels required for State or County permits. The geometry at most intersections where site traffic will be turning is expected to be adequate for site traffic. The CR 300E & Sipprelle Drive/CR 308 intersection was identified as having inadequate intersection sight distance for a single -unit truck. Traffic volumes at the CR 215 & CR 300W intersection indicate that an eastbound right -turn lane should be constructed. This is expected to improve safety at the intersection by removing the high right -turn volume from the thru traffic. The raised median along Spencer Parkway is proposed to be opened to provide full movement access for the BMC L Pad. If possible, this access should be aligned with the existing median break to the south. If a new median break is permitted, it should be located at least 400 feet south of the horizontal curve on Spencer Parkway and as far north as possible from the existing median break to the south. Ursa will be required to adhere to Garfield County Road and Bridge criteria for securing heavy haul and driveway permits for each pad site. Attachments Vicinity and Traffic Volumes Maps Appendix A — Detailed Capacity Analysis Detailed Traffic Analysis Page 11 Notes / Comments Pad, Access Road, and Pipeline Source: River Valley Survey, Inc. Imagery Source: Esri, DigitalGlobe, GeoEye, i -cubed, Earthstar Geographics CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community CR 300N [ 6,840 ] (204) 104 —> (423) 124 F 193 (115) r 4 (4) 0 0 O co cc 0 CR 300N <— 50 (43) r 4(11) (100) 74 —� (95) 35 - W O O CO c1 r ODMS rAc�rn -9(11) <-11 (4) r0(3) 3ipprelle Di [360] (9) 13 -1 1 r 4r ��� (43)(10) 26 -..-1"-- >co . _o m� PO N CR 308 [ 360 ] AM (PM) Peak Hour Traffic Volume [ XX,XXX ] Existing ADTs Proposed Pipelines Proposed Pads and Access Roads Battlement Mesa Planned Unit Development Parachute Town Limits Colorado River �t�(Y Ursa OPERATING COMPANY Traffic Volumes - Existing Battlement Mesa PUD Phase II 0 Feet 750 1,500 3,000 OLSSONASSOCIATES © n Author: S. Stoddart Revision: 0 Date: 4/5/2017 CR 300N (210) 130 (429) 142 t— 202 (146) r 4 (4) 1 I 7 N op -4— 56 (58) 4(11) CR 300N (106) 82 —� (98) 48 BMC L Pad (13) 3 (0) 0 Spencer Pkwy Sipprelle W O O M 03 CO N M V N M N N (9) 13 –1 (10)4-- (43) 26 15 (29) �-- 11 (4) r 0 (3) m� N CR 3( -4— 20 (5) r 13(3) (10) 10 —4.- (0) 0 • BMC A Pad Dr er0 M O M m 0 u_ (1 � loo o f i CR 303 0 (0) F 10 (10) (6) 18 –/ (10)10—► AM (PM) Peak Hour Traffic Volume Proposed Pipelines Proposed Pads and Access Roads Battlement Mesa Planned Unit Development Parachute Town Limits Colorado River Proposed Haul Route Notes / Comments Pad, Access Road, and Pipeline Source: River Valley Survey, Inc. Imagery Source: Esri, DigitalGlobe, GeoEye, i -cubed, Earthstar Geographics CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community ��tsif Y Ursa OPERATING COMPANY Traffic Volumes - Existing plus Construction Battlement Mesa PUD Phase II 0 750 1,500 3,000 Feet OLSSONASSOCIATES © n Author: S. Stoddart Revision: 0 Date: 4/5/2017 CR 3001. CR 300N -4— 195 (120) r 4 (4) (101) 75 —0- (96) >(96) 37 1, (206) 109 —0- (425) ►(425) 127 BMC L Pad D pprelle Dr 10 (14) F11 (4) 0(3) CR CR 307 CR 307 F— 20 (5) 3 (2) (10)10—• (0) 0 -\ 0 (0) F 10 (10) (1) 3 (10) 10 —► AM (PM) Peak Hour Traffic Volume Proposed Pipelines Proposed Pads and Access Roads Battlement Mesa Planned Unit Development Parachute Town Limits Colorado River Proposed Haul Route Notes / Comments Pad, Access Road, and Pipeline Source: River Valley Survey, Inc. Imagery Source: Esri, DigitalGlobe, GeoEye, i -cubed, Earthstar Geographics CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community • X Ursa OPERATING COMPANY Traffic Volumes - Existing plus Production Battlement Mesa PUD Phase II 0 750 1,500 3,000 Feet OLSSONASSOCIATES © n Author: S. Stoddart Revision: 0 Date: 4/5/2017 APPENDIX A Detailed Capacity Analysis FIGURE Al Existing Conditions Capacity Analysis Summary Ursa Battlement Mesa Phase 11 Development Battlement Mesa, CO OkOLSSON ASSOCIATES www.olssonassociates.com LEGEND AM (PM) e Movement LOS Stop Controlled Intersection Stop Sign Lane Geometry 0 N HCM 2010 TWSC 1: CR 300W & CR 300N 04/13/2017 Intersection Int Delay, s/veh 32.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations r Traffic Vol, veh/h 104 124 4 193 444 26 Future Vol, veh/h 104 124 4 193 444 26 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 0 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 85 85 73 73 74 74 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 122 146 5 264 600 35 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 122 0 397 122 Stage 1 122 Stage 2 275 Critical Hdwy 4.15 6.45 6.25 Critical Hdwy Stg 1 5.45 Critical Hdwy Stg 2 5.45 Follow-up Hdwy 2.245 3.545 3.345 Pot Cap -1 Maneuver 1447 602 921 Stage 1 896 Stage 2 764 Platoon blocked, % Mov Cap -1 Maneuver 1447 600 921 Mov Cap -2 Maneuver 600 Stage 1 896 Stage 2 761 Approach HCM Control Delay, s HCM LOS EB 0 WB 0.2 NB 60 F Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 600 921 - - 1447 - HCM Lane V/C Ratio 1 0.038 - 0.004 HCM Control Delay (s) 63 9.1 - 7.5 HCM Lane LOS F A A HCM 95th %tile Q(veh) 15 0.1 0 Ursa Battlement Mesa Phase II Development Existing AM Synchro 9 Report Page 1 HCM 2010 TWSC 5: Spencer Pkwy & Cr 300N 04/13/2017 Intersection Int Delay, s/veh 3.9 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 44+ 44 Traffic Vol, veh/h 74 35 4 50 99 8 Future Vol, veh/h 74 35 4 50 99 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 175 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 74 74 77 77 82 82 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 100 47 5 65 121 10 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 147 0 167 74 Stage 1 124 Stage 2 43 Critical Hdwy 4.2 6.9 7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.25 3.55 3.35 Pot Cap -1 Maneuver 1411 799 963 Stage 1 879 Stage 2 965 Platoon blocked, % Mov Cap -1 Maneuver 1411 796 963 Mov Cap -2 Maneuver 796 Stage 1 879 Stage 2 962 Approach EB WB NB HCM Control Delay, s 0 0.6 10.2 HCM LOS B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 796 963 - - 1411 - HCM Lane V/C Ratio 0.152 0.01 - 0.004 HCM Control Delay (s) 10.3 8.8 - 7.6 HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.5 0 0 Ursa Battlement Mesa Phase II Development Existing AM Synchro 9 Report Page 2 13 4 26 0 11 9 64 19 1 9 21 34 HCM 2010 TWSC 11: CR 300E & Sipprelle Dr/CR 308 04/13/2017 Intersection Int Delay, s/veh 5.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 11 4 f Traffic Vol, veh/h Future Vol, veh/h 13 4 26 0 11 9 64 19 1 9 21 34 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 125 125 Veh in Median Storage, # 0 0 0 0 Grade, % - 0 - 0 - 0 - 0 Peak Hour Factor 57 57 57 50 50 50 58 58 58 61 61 61 Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5 Mvmt Flow 23 7 46 0 22 18 110 33 2 15 34 56 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 340 347 45 304 374 17 90 0 0 34 0 0 Stage 1 92 92 254 254 Stage 2 248 255 50 120 Critical Hdwy 7.6 6.6 7 7.6 6.6 7 4.2 4.2 Critical Hdwy Stg 1 6.6 5.6 6.6 5.6 Critical Hdwy Stg 2 6.6 5.6 - 6.6 5.6 - Follow-up Hdwy 3.55 4.05 3.35 3.55 4.05 3.35 2.25 2.25 Pot Cap -1 Maneuver 582 568 1005 618 549 1048 1481 1554 Stage 1 896 811 - 720 688 - Stage 2 726 688 948 788 Platoon blocked, % Mov Cap -1 Maneuver 518 521 1005 547 503 1048 1481 1554 Mov Cap -2 Maneuver 518 521 - 547 503 Stage 1 829 803 667 637 Stage 2 638 637 888 780 Approach EB WB NB SB HCM Control Delay, s 10.5 10.8 5.8 1 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1481 - - 733 657 1554 - HCM Lane V/C Ratio 0.075 - 0.103 0.061 0.009 HCM Control Delay (s) 7.6 - 10.5 10.8 7.3 HCM Lane LOS A - B B A HCM 95th %tile Q(veh) 0.2 - 0.3 0.2 0 Ursa Battlement Mesa Phase II Development Existing AM Synchro 9 Report Page 3 HCM 2010 TWSC 14: CR 300W & CR 307 04/13/2017 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations +1 Traffic Vol, veh/h 6 5 16 406 113 20 Future Vol, veh/h 6 5 16 406 113 20 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 100 - Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 72 72 72 72 86 86 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 8 7 22 564 131 23 Major/Minor Minor2 M jor1 Major2 Conflicting Flow All 469 77 155 0 0 Stage 1 143 Stage 2 326 Critical Hdwy 6.9 7 4.2 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 3.55 3.35 2.25 Pot Cap -1 Maneuver 516 959 1401 Stage 1 860 Stage 2 695 Platoon blocked, % Mov Cap -1 Maneuver 508 959 1401 Mov Cap -2 Maneuver 508 Stage 1 860 Stage 2 684 Approach HCM Control Delay, s HCM LOS EB 10.7 B NB 0.3 SB 0 Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1401 - 646 - HCM Lane V/C Ratio 0.016 - 0.024 HCM Control Delay (s) 7.6 - 10.7 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - 0.1 Ursa Battlement Mesa Phase II Development Existing AM Synchro 9 Report Page 4 HCM 2010 TWSC 1: CR 300W & CR 300N 04/13/2017 Intersection Int Delay, s/veh 2.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations r Traffic Vol, veh/h 204 423 4 115 168 8 Future Vol, veh/h 204 423 4 115 168 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length - 0 0 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 84 84 66 66 90 90 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 243 504 6 174 187 9 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 243 0 429 243 Stage 1 243 Stage 2 186 Critical Hdwy 4.15 6.45 6.25 Critical Hdwy Stg 1 5.45 Critical Hdwy Stg 2 5.45 Follow-up Hdwy 2.245 3.545 3.345 Pot Cap -1 Maneuver 1306 577 788 Stage 1 790 Stage 2 839 Platoon blocked, % Mov Cap -1 Maneuver 1306 574 788 Mov Cap -2 Maneuver 574 Stage 1 790 Stage 2 835 Approach HCM Control Delay, s HCM LOS EB 0 WB 0.3 NB 14.1 B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 574 788 - - 1306 - HCM Lane V/C Ratio 0.325 0.011 - 0.005 HCM Control Delay (s) 14.3 9.6 - 7.8 HCM Lane LOS B A A HCM 95th %tile Q(veh) 1.4 0 0 Ursa Battlement Mesa Phase II Development Existing PM Synchro 9 Report Page 1 HCM 2010 TWSC 5: Spencer Pkwy & Cr 300N 04/13/2017 Intersection Int Delay, s/veh 3.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 44+ 44 Traffic Vol, veh/h 100 95 11 43 71 8 Future Vol, veh/h 100 95 11 43 71 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 175 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 67 67 96 96 56 56 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 149 142 11 45 127 14 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 291 0 265 146 Stage 1 220 Stage 2 45 Critical Hdwy 4.2 6.9 7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.25 3.55 3.35 Pot Cap -1 Maneuver 1246 693 865 Stage 1 787 Stage 2 963 Platoon blocked, % Mov Cap -1 Maneuver 1246 687 865 Mov Cap -2 Maneuver 687 Stage 1 787 Stage 2 954 Approach HCM Control Delay, s HCM LOS EB 0 WB 1.6 NB 11.2 B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 687 865 - - 1246 - HCM Lane V/C Ratio 0.185 0.017 - 0.009 HCM Control Delay (s) 11.4 9.2 - 7.9 HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.7 0.1 0 Ursa Battlement Mesa Phase II Development Existing PM Synchro 9 Report Page 2 HCM 2010 TWSC 11: CR 300E & Sipprelle Dr/CR 308 04/13/2017 Intersection Int Delay, s/veh 5.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 11 4 11 f Traffic Vol, veh/h 9 10 43 3 4 11 33 21 0 16 43 38 Future Vol, veh/h 9 10 43 3 4 11 33 21 0 16 43 38 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 125 125 Veh in Median Storage, # 0 0 0 0 Grade, % - 0 - 0 - 0 - 0 Peak Hour Factor 42 42 42 58 58 58 67 67 67 57 57 57 Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5 Mvmt Flow 21 24 102 5 7 19 49 31 0 28 75 67 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 283 295 71 236 328 16 142 0 0 31 0 0 Stage 1 165 165 130 130 Stage 2 118 130 106 198 Critical Hdwy 7.6 6.6 7 7.6 6.6 7 4.2 4.2 Critical Hdwy Stg 1 6.6 5.6 6.6 5.6 Critical Hdwy Stg 2 6.6 5.6 - 6.6 5.6 - Follow-up Hdwy 3.55 4.05 3.35 3.55 4.05 3.35 2.25 2.25 Pot Cap -1 Maneuver 639 608 967 691 583 1049 1417 1558 Stage 1 812 753 851 781 - Stage 2 865 781 879 729 Platoon blocked, % Mov Cap -1 Maneuver 597 576 967 575 553 1049 1417 1558 Mov Cap -2 Maneuver 597 576 575 553 Stage 1 784 739 822 754 Stage 2 812 754 747 716 Approach EB WB NB SB HCM Control Delay, s 10.5 9.8 4.7 1.2 HCM LOS B A Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1417 - - 806 785 1558 - HCM Lane V/C Ratio 0.035 - 0.183 0.04 0.018 HCM Control Delay (s) 7.6 - 10.5 9.8 7.4 HCM Lane LOS A - B A A HCM 95th %tile Q(veh) 0.1 - 0.7 0.1 0.1 Ursa Battlement Mesa Phase II Development Existing PM Synchro 9 Report Page 3 HCM 2010 TWSC 14: CR 300W & CR 307 04/13/2017 Intersection Int Delay, s/veh 0.9 Movement EBL EBR NBL NBT SBT SBR Lane Configurations +1" Traffic Vol, veh/h 14 4 3 196 365 6 Future Vol, veh/h 14 4 3 196 365 6 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 100 - Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 37 37 83 83 93 93 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 38 11 4 236 392 6 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 521 199 399 0 0 Stage 1 396 Stage 2 125 Critical Hdwy 6.9 7 4.2 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 3.55 3.35 2.25 Pot Cap -1 Maneuver 478 799 1135 Stage 1 640 Stage 2 878 Platoon blocked, % Mov Cap -1 Maneuver 476 799 1135 Mov Cap -2 Maneuver 476 Stage 1 640 Stage 2 875 Approach EB NB SB HCM Control Delay, s 12.6 0.1 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1135 - 523 - HCM Lane V/C Ratio 0.003 - 0.093 HCM Control Delay (s) 8.2 - 12.6 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - 0.3 Ursa Battlement Mesa Phase II Development Existing PM Synchro 9 Report Page 4 FIGURE A2 Existing plus Construction Capacity Analysis Summary Ursa Battlement Mesa Phase 11 Development Battlement Mesa, CO OkOLSSON ASSOCIATES www.olssonassociates.com LEGEND AM (PM) Movement LOS Stop Controlled Intersection Stop Sign Lane Geometry w a o (J) co _U 11C.. Sipprelle Dr (B) B t-} B (A) ST P CR 308 N HCM 2010 TWSC 1: CR 300W & CR 300N 07/06/2017 Intersection Int Delay, s/veh 42.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations r Traffic Vol, veh/h 135 137 4 202 447 26 Future Vol, veh/h 135 137 4 202 447 26 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 0 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 85 85 73 73 74 74 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 159 161 5 277 604 35 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 320 0 446 159 Stage 1 159 Stage 2 287 Critical Hdwy 4.15 6.45 6.25 Critical Hdwy Stg 1 5.45 Critical Hdwy Stg 2 5.45 Follow-up Hdwy 2.245 3.545 3.345 Pot Cap -1 Maneuver 1223 - 564 878 Stage 1 862 Stage 2 755 Platoon blocked, % Mov Cap -1 Maneuver 1223 - 562 878 Mov Cap -2 Maneuver - 562 Stage 1 859 Stage 2 755 Approach EB WB NB HCM Control Delay, s 0 0.2 82.2 HCM LOS F Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 562 878 - - 1223 - HCM Lane V/C Ratio 1.075 0.04 - 0.004 HCM Control Delay (s) 86.4 9.3 - 8 HCM Lane LOS F A A HCM 95th %tile Q(veh) 17.9 0.1 0 Notes -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Ursa Battlement Mesa Phase II Development Existing plus Construction AM Synchro 9 Report Page 1 HCM 2010 TWSC 5: Spencer Pkwy & Cr 300N 07/06/2017 Intersection Int Delay, s/veh 3.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 44+ 44 Traffic Vol, veh/h 82 48 4 56 102 8 Future Vol, veh/h 82 48 4 56 102 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 175 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 74 74 77 77 82 82 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 111 65 5 73 124 10 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 176 0 191 88 Stage 1 144 Stage 2 47 Critical Hdwy 4.2 6.9 7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.25 3.55 3.35 Pot Cap -1 Maneuver 1376 772 943 Stage 1 859 Stage 2 961 Platoon blocked, % Mov Cap -1 Maneuver 1376 769 943 Mov Cap -2 Maneuver 769 Stage 1 856 Stage 2 961 Approach EB WB NB HCM Control Delay, s 0 0.5 10.5 HCM LOS B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 769 943 - - 1376 - HCM Lane V/C Ratio 0.162 0.01 - 0.004 HCM Control Delay (s) 10.6 8.9 - 7.6 HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.6 0 0 Ursa Battlement Mesa Phase II Development Existing plus Construction AM Synchro 9 Report Page 2 13 4 26 0 11 15 64 19 1 27 21 34 HCM 2010 TWSC 11: CR 300E & Sipprelle Dr/CR 308 07/06/2017 Intersection Int Delay, s/veh 6.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 11 4 f Traffic Vol, veh/h Future Vol, veh/h 13 4 26 0 11 15 64 19 1 27 21 34 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 125 125 Veh in Median Storage, # 0 0 0 0 Grade, % - 0 - 0 - 0 - 0 Peak Hour Factor 57 57 57 50 50 50 58 58 58 61 61 61 Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5 Mvmt Flow 23 7 46 0 22 30 110 33 2 44 34 56 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 398 405 45 363 432 18 90 0 0 35 0 0 Stage 1 150 150 254 254 Stage 2 248 255 109 178 Critical Hdwy 7.6 6.6 7 7.6 6.6 7 4.2 4.2 Critical Hdwy Stg 1 6.6 5.6 6.6 5.6 Critical Hdwy Stg 2 6.6 5.6 - 6.6 5.6 - Follow-up Hdwy 3.55 4.05 3.35 3.55 4.05 3.35 2.25 2.25 Pot Cap -1 Maneuver 529 527 1005 561 508 1046 1481 1553 Stage 1 829 765 - 720 688 - Stage 2 726 688 876 744 Platoon blocked, % Mov Cap -1 Maneuver 457 474 1005 489 457 1046 1481 1553 Mov Cap -2 Maneuver 457 474 489 457 Stage 1 768 744 667 637 Stage 2 630 637 805 723 Approach EB WB NB SB HCM Control Delay, s HCM LOS 10.9 10.8 5.8 2.4 B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1481 - - 685 677 1553 - HCM Lane V/C Ratio 0.075 - 0.11 0.077 0.029 HCM Control Delay (s) 7.6 - 10.9 10.8 7.4 HCM Lane LOS A - B B A HCM 95th %tile Q(veh) 0.2 - 0.4 0.2 0.1 Ursa Battlement Mesa Phase II Development Existing plus Construction AM Synchro 9 Report Page 3 HCM 2010 TWSC 14: CR 300W & CR 307 07/06/2017 Intersection Int Delay, s/veh 0.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations +1 Traffic Vol, veh/h 9 5 16 406 113 33 Future Vol, veh/h 9 5 16 406 113 33 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 100 - Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 72 72 72 72 86 86 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 13 7 22 564 131 38 Major/Minor Minor2 M jor1 Major2 Conflicting Flow All 476 85 169 0 0 Stage 1 150 Stage 2 326 Critical Hdwy 6.9 7 4.2 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 3.55 3.35 2.25 Pot Cap -1 Maneuver 510 947 1384 Stage 1 853 Stage 2 695 Platoon blocked, % Mov Cap -1 Maneuver 502 947 1384 Mov Cap -2 Maneuver 502 Stage 1 839 Stage 2 695 Approach HCM Control Delay, s HCM LOS EB 11.2 B NB 0.3 SB 0 Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1384 - 603 - HCM Lane V/C Ratio 0.016 - 0.032 HCM Control Delay (s) 7.6 - 11.2 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - 0.1 Ursa Battlement Mesa Phase II Development Existing plus Construction AM Synchro 9 Report Page 4 HCM 2010 TWSC 20: CR 303 & BMC F Pad Drive 07/06/2017 Intersection Int Delay, s/veh 4.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 Traffic Vol, veh/h 18 10 10 0 0 6 Future Vol, veh/h 18 10 10 0 0 6 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % Mvmt Flow 10 10 20 11 10 10 50 50 11 0 0 7 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 11 0 0 62 11 Stage 1 11 Stage 2 51 Critical Hdwy 4.2 6.9 6.7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.29 3.95 3.75 Pot Cap -1 Maneuver 1557 837 946 Stage 1 901 Stage 2 862 Platoon blocked, % Mov Cap -1 Maneuver 1557 826 946 Mov Cap -2 Maneuver 826 Stage 1 889 Stage 2 862 Approach EB WB SB HCM Control Delay, s 4.7 0 8.8 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1557 - - - 946 HCM Lane V/C Ratio 0.013 - 0.007 HCM Control Delay (s) 7.3 0 - 8.8 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Construction AM Synchro 9 Report Page 5 HCM 2010 TWSC 22: Spencer Pkwy & BMC L Pad Drive 07/06/2017 Intersection Int Delay, s/veh 0.2 Movement EBL EBR NBL NBT SBT SBR Lane Configurations 4+ + Traffic Vol, veh/h 3 0 0 107 35 13 Future Vol, veh/h 3 0 0 107 35 13 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 50 50 5 5 5 5 Mvmt Flow 3 0 0 116 38 14 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 103 26 52 0 0 Stage 1 45 Stage 2 58 Critical Hdwy 7.8 7.9 4.2 Critical Hdwy Stg 1 6.8 Critical Hdwy Stg 2 6.8 Follow-up Hdwy 4 3.8 2.25 Pot Cap -1 Maneuver 762 907 1530 Stage 1 847 Stage 2 833 Platoon blocked, % Mov Cap -1 Maneuver 762 907 1530 Mov Cap -2 Maneuver 762 Stage 1 847 Stage 2 833 Approach EB NB SB HCM Control Delay, s 9.7 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1530 - 762 - HCM Lane V/C Ratio - 0.004 HCM Control Delay (s) 0 - 9.7 HCM Lane LOS A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Construction AM Synchro 9 Report Page 6 HCM 2010 TWSC 29: BMC A Pad Drive & CR 307 07/06/2017 Intersection Int Delay, s/veh 2.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations "i Traffic Vol, veh/h 10 0 13 20 0 3 Future Vol, veh/h 10 0 13 20 0 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 10 10 10 10 50 50 Mvmt Flow 11 0 14 22 0 3 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 11 0 61 11 Stage 1 11 Stage 2 50 Critical Hdwy 4.2 6.9 6.7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.29 3.95 3.75 Pot Cap -1 Maneuver 1557 838 946 Stage 1 901 Stage 2 863 Platoon blocked, % Mov Cap -1 Maneuver 1557 830 946 Mov Cap -2 Maneuver 830 Stage 1 893 Stage 2 863 Approach EB WB NB HCM Control Delay, s 0 2.9 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 946 - - 1557 - HCM Lane V/C Ratio 0.003 - 0.009 HCM Control Delay (s) 8.8 - 7.3 0 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Construction AM Synchro 9 Report Page 7 HCM 2010 TWSC 1: CR 300W & CR 300N 07/06/2017 Intersection Int Delay, s/veh 2.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations r Traffic Vol, veh/h 213 426 4 146 179 8 Future Vol, veh/h 213 426 4 146 179 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length - 0 0 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 84 84 66 66 90 90 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 254 507 6 221 199 9 Major/Minor M jor1 Major2 Minorl Conflicting Flow All 0 0 761 0 487 254 Stage 1 254 Stage 2 233 Critical Hdwy 4.15 6.45 6.25 Critical Hdwy Stg 1 5.45 Critical Hdwy Stg 2 5.45 Follow-up Hdwy 2.245 3.545 3.345 Pot Cap -1 Maneuver 838 534 777 Stage 1 781 Stage 2 799 Platoon blocked, % Mov Cap -1 Maneuver 838 530 777 Mov Cap -2 Maneuver 530 Stage 1 776 Stage 2 799 Approach EB WB NB HCM Control Delay, s 0 0.2 15.5 HCM LOS C Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 530 777 - - 838 - HCM Lane V/C Ratio 0.375 0.011 - 0.007 HCM Control Delay (s) 15.8 9.7 - 9.3 HCM Lane LOS C A A HCM 95th %tile Q(veh) 1.7 0 0 Ursa Battlement Mesa Phase II Development Existing plus Construction PM Synchro 9 Report Page 1 HCM 2010 TWSC 5: Spencer Pkwy & Cr 300N 07/06/2017 Intersection Int Delay, s/veh 3.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 44+ 44 Traffic Vol, veh/h 106 98 11 58 71 8 Future Vol, veh/h 106 98 11 58 71 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 175 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 67 67 96 96 56 56 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 158 146 11 60 127 14 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 304 0 283 152 Stage 1 231 Stage 2 52 Critical Hdwy 4.2 6.9 7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.25 3.55 3.35 Pot Cap -1 Maneuver 1232 676 858 Stage 1 777 Stage 2 955 Platoon blocked, % Mov Cap -1 Maneuver 1232 670 858 Mov Cap -2 Maneuver 670 Stage 1 770 Stage 2 955 Approach HCM Control Delay, s HCM LOS EB 0 WB 1.3 NB 11.4 B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 670 858 - - 1232 - HCM Lane V/C Ratio 0.189 0.017 - 0.009 HCM Control Delay (s) 11.6 9.3 - 8 HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.7 0.1 0 Ursa Battlement Mesa Phase II Development Existing plus Construction PM Synchro 9 Report Page 2 HCM 2010 TWSC 11: CR 300E & Sipprelle Dr/CR 308 07/06/2017 Intersection Int Delay, s/veh 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 11 4 11 f Traffic Vol, veh/h 9 10 43 3 4 29 33 21 0 22 43 38 Future Vol, veh/h 9 10 43 3 4 29 33 21 0 22 43 38 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 125 125 Veh in Median Storage, # 0 0 0 0 Grade, % - 0 - 0 - 0 - 0 Peak Hour Factor 42 42 42 58 58 58 67 67 67 57 57 57 Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5 Mvmt Flow 21 24 102 5 7 50 49 31 0 39 75 67 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 304 316 71 257 349 16 142 0 0 31 0 0 Stage 1 187 187 129 129 Stage 2 117 129 128 220 Critical Hdwy 7.6 6.6 7 7.6 6.6 7 4.2 4.2 Critical Hdwy Stg 1 6.6 5.6 6.6 5.6 Critical Hdwy Stg 2 6.6 5.6 - 6.6 5.6 - Follow-up Hdwy 3.55 4.05 3.35 3.55 4.05 3.35 2.25 2.25 Pot Cap -1 Maneuver 618 592 967 667 567 1049 1417 1558 Stage 1 788 737 852 781 - Stage 2 866 781 854 713 Platoon blocked, % Mov Cap -1 Maneuver 557 557 967 551 534 1049 1417 1558 Mov Cap -2 Maneuver 557 557 551 534 - Stage 1 760 719 822 754 Stage 2 789 754 720 695 Approach EB WB NB SB HCM Control Delay, s 10.6 9.4 4.7 1.6 HCM LOS B A Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1417 - - 789 887 1558 - HCM Lane V/C Ratio 0.035 - 0.187 0.07 0.025 HCM Control Delay (s) 7.6 - 10.6 9.4 7.4 HCM Lane LOS A - B A A HCM 95th %tile Q(veh) 0.1 - 0.7 0.2 0.1 Ursa Battlement Mesa Phase II Development Existing plus Construction PM Synchro 9 Report Page 3 HCM 2010 TWSC 14: CR 300W & CR 307 07/06/2017 Intersection Int Delay, s/veh Movement 1.6 EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 27 4 3 196 365 9 Future Vol, veh/h 27 4 3 196 365 9 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 100 - Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 37 37 83 83 93 93 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 73 11 4 236 392 10 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 523 201 402 0 0 Stage 1 397 Stage 2 126 Critical Hdwy 6.9 7 4.2 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 3.55 3.35 2.25 Pot Cap -1 Maneuver 476 797 1132 Stage 1 639 Stage 2 877 Platoon blocked, % Mov Cap -1 Maneuver 474 797 1132 Mov Cap -2 Maneuver 474 Stage 1 636 Stage 2 877 Approach HCM Control Delay, s HCM LOS EB 13.6 B NB 0.1 SB 0 Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1132 - 500 - HCM Lane V/C Ratio 0.003 - 0.168 HCM Control Delay (s) 8.2 - 13.6 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - 0.6 Ursa Battlement Mesa Phase II Development Existing plus Construction PM Synchro 9 Report Page 4 HCM 2010 TWSC 20: CR 303 & BMC F Pad Drive 07/06/2017 Intersection Int Delay, s/veh 4.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 Traffic Vol, veh/h 6 10 10 0 0 18 Future Vol, veh/h 6 10 10 0 0 18 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % Mvmt Flow 10 10 7 11 10 10 50 50 11 0 0 20 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 11 0 0 36 11 Stage 1 11 Stage 2 25 Critical Hdwy 4.2 6.9 6.7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.29 3.95 3.75 Pot Cap -1 Maneuver 1557 868 946 Stage 1 901 Stage 2 887 Platoon blocked, % Mov Cap -1 Maneuver 1557 864 946 Mov Cap -2 Maneuver 864 Stage 1 896 Stage 2 887 Approach EB WB SB HCM Control Delay, s 2.7 0 8.9 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1557 - - - 946 HCM Lane V/C Ratio 0.004 - 0.021 HCM Control Delay (s) 7.3 0 - 8.9 HCM Lane LOS A A - A HCM 95th %tile Q(veh) 0 - 0.1 Ursa Battlement Mesa Phase II Development Existing plus Construction PM Synchro 9 Report Page 5 HCM 2010 TWSC 22: Spencer Pkwy & BMC L Pad Drive 07/06/2017 Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations 4+ + Traffic Vol, veh/h 13 0 0 79 95 3 Future Vol, veh/h 13 0 0 79 95 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 50 50 5 5 5 5 Mvmt Flow 14 0 0 86 103 3 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 148 53 106 0 0 Stage 1 105 Stage 2 43 Critical Hdwy 7.8 7.9 4.2 Critical Hdwy Stg 1 6.8 Critical Hdwy Stg 2 6.8 Follow-up Hdwy 4 3.8 2.25 Pot Cap -1 Maneuver 708 867 1461 Stage 1 782 Stage 2 850 Platoon blocked, % Mov Cap -1 Maneuver 708 867 1461 Mov Cap -2 Maneuver 708 Stage 1 782 Stage 2 850 Approach EB NB SB HCM Control Delay, s 10.2 0 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1461 - 708 - HCM Lane V/C Ratio - 0.02 HCM Control Delay (s) 0 - 10.2 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - 0.1 Ursa Battlement Mesa Phase 11 Development Existing plus Construction PM Synchro 9 Report Page 6 HCM 2010 TWSC 29: BMC A Pad Drive & CR 307 07/06/2017 Intersection Int Delay, s/veh 4.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations4 Traffic Vol, veh/h 10 0 3 5 0 13 Future Vol, veh/h 10 0 3 5 0 13 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 10 10 10 10 50 50 Mvmt Flow 11 0 3 5 0 14 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 11 0 22 11 Stage 1 11 Stage 2 11 Critical Hdwy 4.2 6.9 6.7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.29 3.95 3.75 Pot Cap -1 Maneuver 1557 884 946 Stage 1 901 Stage 2 901 Platoon blocked, % Mov Cap -1 Maneuver 1557 882 946 Mov Cap -2 Maneuver 882 Stage 1 899 Stage 2 901 Approach HCM Control Delay, s HCM LOS EB 0 WB 2.7 NB 8.9 A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 946 - - 1557 - HCM Lane V/C Ratio 0.015 - 0.002 HCM Control Delay (s) 8.9 - 7.3 0 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Construction PM Synchro 9 Report Page 7 FIGURE A3 Existing plus Production Capacity Analysis Summary Ursa Battlement Mesa Phase 11 Development Battlement Mesa, CO OkOLSSON ASSOCIATES www.olssonassociates.com LEGEND AM (PM) Movement LOS Stop Controlled Intersection Stop Sign Lane Geometry w a o (J) co _U 11C.. Sipprelle Dr (B) B t-} B (A) ST P CR 308 N HCM 2010 TWSC 1: CR 300W & CR 300N 04/13/2017 Intersection Int Delay, s/veh 34.6 Movement EBT EBR WBL WBT NBL NBR Lane Configurations r Traffic Vol, veh/h 109 127 4 195 446 26 Future Vol, veh/h 109 127 4 195 446 26 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 0 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 85 85 73 73 74 74 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 128 149 5 267 603 35 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 128 0 406 128 Stage 1 128 Stage 2 278 Critical Hdwy 4.15 6.45 6.25 Critical Hdwy Stg 1 5.45 Critical Hdwy Stg 2 5.45 Follow-up Hdwy 2.245 3.545 3.345 Pot Cap -1 Maneuver 1440 - 595 914 Stage 1 890 Stage 2 762 Platoon blocked, % Mov Cap -1 Maneuver 1440 - 593 914 Mov Cap -2 Maneuver - 593 Stage 1 890 Stage 2 759 Approach EB WB NB HCM Control Delay, s 0 0.2 64.4 HCM LOS F Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 593 914 - - 1440 - HCM Lane V/C Ratio 1.016 0.038 - 0.004 HCM Control Delay (s) 67.6 9.1 - 7.5 HCM Lane LOS F A A HCM 95th %tile Q(veh) 15.7 0.1 0 Notes -: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Ursa Battlement Mesa Phase II Development Existing plus Production AM Synchro 9 Report Page 1 HCM 2010 TWSC 5: Spencer Pkwy & Cr 300N 04/13/2017 Intersection Int Delay, s/veh 3.9 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 44+ 44 Traffic Vol, veh/h 75 37 4 51 100 8 Future Vol, veh/h 75 37 4 51 100 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 175 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 74 74 77 77 82 82 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 101 50 5 66 122 10 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 151 0 170 76 Stage 1 126 Stage 2 44 Critical Hdwy 4.2 6.9 7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.25 3.55 3.35 Pot Cap -1 Maneuver 1406 795 960 Stage 1 877 Stage 2 964 Platoon blocked, % Mov Cap -1 Maneuver 1406 792 960 Mov Cap -2 Maneuver 792 Stage 1 877 Stage 2 961 Approach HCM Control Delay, s HCM LOS EB 0 WB 0.6 NB 10.3 B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 792 960 - - 1406 - HCM Lane V/C Ratio 0.154 0.01 - 0.004 HCM Control Delay (s) 10.4 8.8 - 7.6 HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.5 0 0 Ursa Battlement Mesa Phase II Development Existing plus Production AM Synchro 9 Report Page 2 HCM 2010 TWSC 11: CR 300E & Sipprelle Dr/CR 308 04/13/2017 Intersection Int Delay, s/veh 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 11 4 11 f Traffic Vol, veh/h 13 4 26 0 11 10 64 19 1 12 21 34 Future Vol, veh/h 13 4 26 0 11 10 64 19 1 12 21 34 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 125 125 Veh in Median Storage, # 0 0 0 0 Grade, % - 0 - 0 - 0 - 0 Peak Hour Factor 57 57 57 50 50 50 58 58 58 61 61 61 Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5 Mvmt Flow 23 7 46 0 22 20 110 33 2 20 34 56 Major/Minor Minor2 Minorl Majorl Maior2 Conflicting Flow All 350 357 45 314 384 17 90 0 0 34 0 0 Stage 1 102 102 254 254 Stage 2 248 255 60 130 Critical Hdwy 7.6 6.6 7 7.6 6.6 7 4.2 4.2 Critical Hdwy Stg 1 6.6 5.6 6.6 5.6 Critical Hdwy Stg 2 6.6 5.6 - 6.6 5.6 - Follow-up Hdwy 3.55 4.05 3.35 3.55 4.05 3.35 2.25 2.25 Pot Cap -1 Maneuver 573 561 1005 608 541 1048 1481 1554 Stage 1 884 803 - 720 688 - Stage 2 726 688 936 781 Platoon blocked, % Mov Cap -1 Maneuver 507 513 1005 537 494 1048 1481 1554 Mov Cap -2 Maneuver 507 513 - 537 494 Stage 1 818 793 667 637 Stage 2 636 637 874 771 Approach EB WB NB SB HCM Control Delay, s 10.5 10.8 5.8 1.3 HCM LOS B B Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1481 - - 725 660 1554 - HCM Lane V/C Ratio 0.075 - 0.104 0.064 0.013 HCM Control Delay (s) 7.6 - 10.5 10.8 7.3 HCM Lane LOS A - B B A HCM 95th %tile Q(veh) 0.2 - 0.3 0.2 0 Ursa Battlement Mesa Phase II Development Existing plus Production AM Synchro 9 Report Page 3 HCM 2010 TWSC 14: CR 300W & CR 307 04/13/2017 Intersection Int Delay, s/veh 0.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations +1 Traffic Vol, veh/h 8 5 16 406 113 23 Future Vol, veh/h 8 5 16 406 113 23 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 100 - Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 72 72 72 72 86 86 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 11 7 22 564 131 27 Major/Minor Minor2 Ma'or1 Major2 Conflicting Flow All 471 79 158 0 0 Stage 1 145 Stage 2 326 Critical Hdwy 6.9 7 4.2 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 3.55 3.35 2.25 Pot Cap -1 Maneuver 514 956 1397 Stage 1 858 Stage 2 695 Platoon blocked, % Mov Cap -1 Maneuver 506 956 1397 Mov Cap -2 Maneuver 506 Stage 1 858 Stage 2 684 Approach HCM Control Delay, s EB 11 NB 0.3 SB 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1397 - 618 - HCM Lane V/C Ratio 0.016 - 0.029 HCM Control Delay (s) 7.6 - 11 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - 0.1 Ursa Battlement Mesa Phase II Development Existing plus Production AM Synchro 9 Report Page 4 HCM 2010 TWSC 20: CR 303 & BMC F Pad Drive 04/13/2017 Intersection Int Delay, s/veh 1.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 Traffic Vol, veh/h 3 10 10 0 0 1 Future Vol, veh/h 3 10 10 0 0 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % Mvmt Flow 10 10 3 11 10 10 50 50 11 0 0 1 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 11 0 0 28 11 Stage 1 11 Stage 2 17 Critical Hdwy 4.2 6.9 6.7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.29 3.95 3.75 Pot Cap -1 Maneuver 1557 877 946 Stage 1 901 Stage 2 895 Platoon blocked, % Mov Cap -1 Maneuver 1557 875 946 Mov Cap -2 Maneuver 875 Stage 1 901 Stage 2 893 Approach EB WB SB HCM Control Delay, s 1.7 0 8.8 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1557 - - - 946 HCM Lane V/C Ratio 0.002 - 0.001 HCM Control Delay (s) 7.3 0 - 8.8 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Production AM Synchro 9 Report Page 5 HCM 2010 TWSC 22: Spencer Pkwy & BMC L Pad Drive 04/13/2017 Intersection Int Delay, s/veh Movement 0.1 EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 1 0 0 107 35 2 Future Vol, veh/h 1 0 0 107 35 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 50 50 5 5 5 5 Mvmt Flow 1 0 0 116 38 2 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 97 20 40 0 0 Stage 1 39 Stage 2 58 Critical Hdwy 7.8 7.9 4.2 Critical Hdwy Stg 1 6.8 Critical Hdwy Stg 2 6.8 Follow-up Hdwy 4 3.8 2.25 Pot Cap -1 Maneuver 769 916 1546 Stage 1 854 Stage 2 833 Platoon blocked, % Mov Cap -1 Maneuver 769 916 1546 Mov Cap -2 Maneuver 769 Stage 1 854 Stage 2 833 Approach EB NB SB HCM Control Delay, s 9.7 0 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1546 - 769 - HCM Lane V/C Ratio - 0.001 HCM Control Delay (s) 0 - 9.7 HCM Lane LOS A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Production AM Synchro 9 Report Page 6 HCM 2010 TWSC 29: BMC A Pad Drive & CR 307 04/13/2017 Intersection Int Delay, s/veh Movement 1.2 EBT EBR WBL WBT NBL NBR Lane Configurations 4 Traffic Vol, veh/h 10 0 3 20 0 2 Future Vol, veh/h 10 0 3 20 0 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 10 10 10 10 50 50 Mvmt Flow 11 0 3 22 0 2 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 11 0 39 11 Stage 1 11 Stage 2 28 Critical Hdwy 4.2 7.6 6.7 Critical Hdwy Stg 1 6.6 Critical Hdwy Stg 2 6.6 Follow-up Hdwy 2.29 3.95 3.75 Pot Cap -1 Maneuver 1557 857 946 Stage 1 899 Stage 2 879 Platoon blocked, % Mov Cap -1 Maneuver 1557 856 946 Mov Cap -2 Maneuver 856 Stage 1 899 Stage 2 877 Approach EB WB NB HCM Control Delay, s 0 1 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 946 - - 1557 - HCM Lane V/C Ratio 0.002 - 0.002 HCM Control Delay (s) 8.8 - 7.3 0 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Production AM Synchro 9 Report Page 7 HCM 2010 TWSC 1: CR 300W & CR 300N 04/13/2017 Intersection Int Delay, s/veh 2.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations r Traffic Vol, veh/h 206 425 4 120 169 8 Future Vol, veh/h 206 425 4 120 169 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length - 0 0 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 84 84 66 66 90 90 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 245 506 6 182 188 9 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 245 0 439 245 Stage 1 245 Stage 2 194 Critical Hdwy 4.15 6.45 6.25 Critical Hdwy Stg 1 5.45 Critical Hdwy Stg 2 5.45 Follow-up Hdwy 2.245 3.545 3.345 Pot Cap -1 Maneuver 1304 570 786 Stage 1 789 Stage 2 832 Platoon blocked, % Mov Cap -1 Maneuver 1304 567 786 Mov Cap -2 Maneuver 567 Stage 1 789 Stage 2 828 Approach HCM Control Delay, s HCM LOS EB 0 WB 0.3 NB 14.3 B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 567 786 - - 1304 - HCM Lane V/C Ratio 0.331 0.011 - 0.005 HCM Control Delay (s) 14.5 9.6 - 7.8 HCM Lane LOS B A A HCM 95th %tile Q(veh) 1.4 0 0 Ursa Battlement Mesa Phase II Development Existing plus Production PM Synchro 9 Report Page 1 HCM 2010 TWSC 5: Spencer Pkwy & Cr 300N 04/13/2017 Intersection Int Delay, s/veh 3.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations 44+ 44 Traffic Vol, veh/h 101 96 11 46 73 8 Future Vol, veh/h 101 96 11 46 73 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 175 - 0 0 Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 67 67 96 96 56 56 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 151 143 11 48 130 14 Major/Minor Mjor1 Major2 Minorl Conflicting Flow All 0 0 294 0 269 147 Stage 1 222 Stage 2 47 Critical Hdwy 4.2 6.9 7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.25 3.55 3.35 Pot Cap -1 Maneuver 1243 689 864 Stage 1 785 Stage 2 961 Platoon blocked, % Mov Cap -1 Maneuver 1243 683 864 Mov Cap -2 Maneuver 683 Stage 1 785 Stage 2 952 Approach EB WB NB HCM Control Delay, s 0 1.5 11.3 HCM LOS B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 683 864 - - 1243 - HCM Lane V/C Ratio 0.191 0.017 - 0.009 HCM Control Delay (s) 11.5 9.2 - 7.9 HCM Lane LOS B A A HCM 95th %tile Q(veh) 0.7 0.1 0 Ursa Battlement Mesa Phase II Development Existing plus Production PM Synchro 9 Report Page 2 HCM 2010 TWSC 11: CR 300E & Sipprelle Dr/CR 308 04/13/2017 Intersection Int Delay, s/veh 5.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 11 4 11 f Traffic Vol, veh/h 9 10 43 3 4 14 33 21 0 17 43 38 Future Vol, veh/h 9 10 43 3 4 14 33 21 0 17 43 38 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - None - None - None - None Storage Length 125 125 Veh in Median Storage, # 0 0 0 0 Grade, % - 0 - 0 - 0 - 0 Peak Hour Factor 42 42 42 58 58 58 67 67 67 57 57 57 Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5 Mvmt Flow 21 24 102 5 7 24 49 31 0 30 75 67 Major/Minor Minor2 Minorl Majorl Major2 Conflicting Flow All 286 298 71 239 332 16 142 0 0 31 0 0 Stage 1 168 168 130 130 Stage 2 118 130 109 202 Critical Hdwy 7.6 6.6 7 7.6 6.6 7 4.2 4.2 Critical Hdwy Stg 1 6.6 5.6 6.6 5.6 Critical Hdwy Stg 2 6.6 5.6 - 6.6 5.6 - Follow-up Hdwy 3.55 4.05 3.35 3.55 4.05 3.35 2.25 2.25 Pot Cap -1 Maneuver 636 606 967 687 580 1049 1417 1558 Stage 1 809 751 851 781 - Stage 2 865 781 876 726 Platoon blocked, % Mov Cap -1 Maneuver 590 574 967 571 549 1049 1417 1558 Mov Cap -2 Maneuver 590 574 571 549 - Stage 1 781 737 822 754 Stage 2 808 754 743 712 Approach EB WB NB SB HCM Control Delay, s 10.5 9.6 4.7 1.3 HCM LOS B A Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 1417 - - 804 811 1558 - HCM Lane V/C Ratio 0.035 - 0.184 0.045 0.019 HCM Control Delay (s) 7.6 - 10.5 9.6 7.4 HCM Lane LOS A - B A A HCM 95th %tile Q(veh) 0.1 - 0.7 0.1 0.1 Ursa Battlement Mesa Phase II Development Existing plus Production PM Synchro 9 Report Page 3 HCM 2010 TWSC 14: CR 300W & CR 307 04/13/2017 Intersection Int Delay, s/veh Movement 1.1 EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 17 4 3 196 365 8 Future Vol, veh/h 17 4 3 196 365 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 100 - Veh in Median Storage, # 0 0 0 Grade, % 0 - 0 0 Peak Hour Factor 37 37 83 83 93 93 Heavy Vehicles, % 5 5 5 5 5 5 Mvmt Flow 46 11 4 236 392 9 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 522 201 401 0 0 Stage 1 397 Stage 2 125 Critical Hdwy 6.9 7 4.2 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 3.55 3.35 2.25 Pot Cap -1 Maneuver 477 797 1133 Stage 1 639 Stage 2 878 Platoon blocked, % Mov Cap -1 Maneuver 475 797 1133 Mov Cap -2 Maneuver 475 Stage 1 639 Stage 2 875 Approach HCM Control Delay, s HCM LOS EB 12.9 B NB 0.1 SB 0 Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1133 - 515 - HCM Lane V/C Ratio 0.003 - 0.11 HCM Control Delay (s) 8.2 - 12.9 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 - 0.4 Ursa Battlement Mesa Phase II Development Existing plus Production PM Synchro 9 Report Page 4 HCM 2010 TWSC 20: CR 303 & BMC F Pad Drive 04/13/2017 Intersection Int Delay, s/veh 2.6 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 Traffic Vol, veh/h 2 1 10 0 0 3 Future Vol, veh/h 2 1 10 0 0 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % Mvmt Flow 10 10 2 1 10 10 50 50 11 0 0 3 Major/Minor Majorl Major2 Minor2 Conflicting Flow All 11 0 0 16 11 Stage 1 11 Stage 2 5 Critical Hdwy 4.2 6.9 6.7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.29 3.95 3.75 Pot Cap -1 Maneuver 1557 892 946 Stage 1 901 Stage 2 906 Platoon blocked, % Mov Cap -1 Maneuver 1557 891 946 Mov Cap -2 Maneuver 891 Stage 1 901 Stage 2 905 Approach EB WB SB HCM Control Delay, s 4.9 0 8.8 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 1557 - - - 946 HCM Lane V/C Ratio 0.001 - 0.003 HCM Control Delay (s) 7.3 0 - 8.8 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Production PM Synchro 9 Report Page 5 HCM 2010 TWSC 22: Spencer Pkwy & BMC L Pad Drive 04/13/2017 Intersection Int Delay, s/veh Movement 0.1 EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 2 0 0 79 95 1 Future Vol, veh/h 2 0 0 79 95 1 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized None - None - None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 50 50 5 5 5 5 Mvmt Flow 2 0 0 86 103 1 Major/Minor Minor2 Majorl Major2 Conflicting Flow All 147 52 104 0 0 Stage 1 104 Stage 2 43 Critical Hdwy 7.8 7.9 4.2 Critical Hdwy Stg 1 6.8 Critical Hdwy Stg 2 6.8 Follow-up Hdwy 4 3.8 2.25 Pot Cap -1 Maneuver 709 869 1464 Stage 1 783 Stage 2 850 Platoon blocked, % Mov Cap -1 Maneuver 709 869 1464 Mov Cap -2 Maneuver 709 Stage 1 783 Stage 2 850 Approach EB NB SB HCM Control Delay, s 10.1 0 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1464 - 709 - HCM Lane V/C Ratio - 0.003 HCM Control Delay (s) 0 - 10.1 HCM Lane LOS A - B HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Production PM Synchro 9 Report Page 6 HCM 2010 TWSC 29: BMC A Pad Drive & CR 307 04/13/2017 Intersection Int Delay, s/veh Movement 2.1 EBT EBR WBL WBT NBL NBR Lane Configurations 4 Traffic Vol, veh/h 10 0 2 5 0 3 Future Vol, veh/h 10 0 2 5 0 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None None Storage Length 0 Veh in Median Storage, # 0 0 0 Grade, % 0 0 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 10 10 10 10 50 50 Mvmt Flow 11 0 2 5 0 3 Major/Minor Majorl Major2 Minorl Conflicting Flow All 0 0 11 0 21 11 Stage 1 11 Stage 2 10 Critical Hdwy 4.2 6.9 6.7 Critical Hdwy Stg 1 5.9 Critical Hdwy Stg 2 5.9 Follow-up Hdwy 2.29 3.95 3.75 Pot Cap -1 Maneuver 1557 886 946 Stage 1 901 Stage 2 902 Platoon blocked, % Mov Cap -1 Maneuver 1557 885 946 Mov Cap -2 Maneuver 885 Stage 1 901 Stage 2 901 Approach HCM Control Delay, s HCM LOS EB 0 WB 2.1 NB 8.8 A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 946 - - 1557 - HCM Lane V/C Ratio 0.003 - 0.001 HCM Control Delay (s) 8.8 - 7.3 0 HCM Lane LOS A A A HCM 95th %tile Q(veh) 0 0 Ursa Battlement Mesa Phase II Development Existing plus Production PM Synchro 9 Report Page 7