Andy,
Following are phone conversation yesterday, I reviewed the plans and determined we need to make some minor
changes:
L. We will be lowering the slab elevation by 15" to a civil height of 82.75. The average grade across the foot print
prior to construction is 83.00.
2. We will lower the upper floor plate by 6" to 8'-6" vs. 9'-0".
3. We will lower the heel height on the trusses by 6" to 47 /8" vs. LO7 f8" .
My original calculations had the midpoint of the upper roof at an elevation of t25'-87/8" . Adding6" for the barn slab at
gg'-6" put us at26'-27/8" tall. Additionally with the average grade being 83.00 and with the slab at 94'00;we were27'-
27/8" tall.
W¡th the changes above we will be at24'- LL7 /8" for the building height. I will get these changes made and to you
ASAP. l'm hoping that Dave can continué h¡s review during this time. lt may be the end of the day tomorrow before I
get those drawings to you.
Please let me know if these calculations match with yours and that this will resolve the height concerns that you had.
Thanks,
Don Eggers
Eggers Architecture, Inc
PO Box 798
Kremmling, CO 80459
O:970-724-3411
C:970-409-9790
Eggersarchitecture. com