Loading...
HomeMy WebLinkAbout3080T SolarwallM n The Following pages contain. simple_, step by stepinstructionsforassemblingyourSolarwallr" collector. Use these instructions along with the dimensions on the blueprintFurnishedforyourparticularcollector. See E.R.I. DesignChart). SOLAR4ALL KIT INCLUDES T,HE PROPER A:1OUN'TS OF EACH OE PHESE PARTS: Collector Dishes Support Brackets PPD'I Sealant Tape lazing Caps 2'1 x 2' Solakieer Glass annealed or tempered)Expansion Caps stare)5/'8"" 8 Black Phillips ScrewsPerimeterFrame74" #8 Hex ScrewsButtPlates1BlackPhillips ScrewsSideTrim Nvlon SpacersSiliconeCaulk Rivets TOOLS NEEDED:OPTIONAL: Hammer Reciprocating Saw Circular Saw Variable. Speed Drill Tin Snips with Clutch Phillips Screw Driver 1/4" Nut Driver Drill Caulking Gun Rivet Gun Chalk Line Square Level OTHER MATERIALS NEEDED: 1/2" CDX Plywood 16 Penny Nails 5/8" Thermax Celotex Celotex Nails One of the following Air - Handling Packages: 1) Passive Package 2) Wall Fan Package Push System) 3) Duct Fan Package Pull System) For a list of Air- Handling inaterials and tools, consult appropriate section of Installation Guide. 81 1 7 INSTALL GLAZINC CAPS rA5 SHOWN BRLOW) TO PRO1IpE MF_CNANICAL SEAL, SLIDE NYLON SPACERS CN CENTRAL 501EW5 OF uLAZINC CA;' 3E-CRE ATTAC!- P..N6. INSTALL STARS AT JUNCTIONS OF GLAZING CAPS. AS SHOWN /N ENLARGEMEA?.S) PLACE SMALL CAB of CAULK ON LUPFACING CROTCHES OF STARS TO ,SEAL EXPOSED GAP. CC%3NER 3TAR s STAR EAnie A0. Nit \ X j.fI Jay • max o 1 Ii it I , NOTE : CAULK BENEATH STAR BEFORE FASTENI loll a0 II 0 II I o le I 0 1 I a,..,,1 I 0 CAULK AT ARFLOW3 A NYINGCAP L.O SPACER.GLAZ N p ETA L. 0 r I e D co° o sue pt B9