Loading...
HomeMy WebLinkAbout2868Hti GARFIELD COUNTY DEPARTMENT OF DEVELOPMENT PLANNING: 945-8212 / ENVIRONMENTAL HEALTH: 945-2339 / BUILDING: 945-8241 October 18, 1983 Mr. Michael and Mrs. Robin Petrocco P.O. Box 81 New Castle, CO 81647 Dear Mr. and Mrs. Petrocco: Pursuant to Mrs. Petrocco's visit to the Building Division of the Department of Development and your subsequent telephone call to this office in SeptEnker of 1983, I will repeat those procedures required to obtain a refund on your Building Permit. We must have written application or request from you in order to process any type of rebate." The above request is required by the Uniform Building Code, Section 304, 2 (e). This Section does-not allow a refund on the plan check since it has been performed, however, an 80% refund is allowed on the building permit fee. Section 304, c) allanrs an extension of the building permit of 180 days upon submittal of a request shoring cause by the applicant. The total fee was $367.90 (three hundred sisty -seven and 90/100 dollars). The plan check fee was $84.90 (eighty -four and 90/100 dollars) and the building ennit charge was $283.00 (two hundred eithy -three and no /100 dollars). The refund from the building permit portion is 80% of $283.00 for a total of $226.40. In order to process the request for the above refund, we will need a letter from you with the paperwork on Building Permit #2868 so we may cancel the permit. When we receive the foregoing documents, we will process the refund request thru the Garfield County thnmissioners. The Septic Permit will not be refunded, since the application has been processed and the percolation test performed and field design established. Sincerely, JP, B.Thomps Chief Building Official BJT /eh 2014 BLAKE AVENUE GLENWOOD SPRINGS, COLORADO 81601