Loading...
HomeMy WebLinkAboutLetter of Design CertificationRil:IIO$rrl aumilÊ $T$rrll$ Version 2 0 I 6. 4. 2 5 (4/2 5 / I 6) January 23,2017 East Bank, LLC Pro.iect Name: Fuse Architecture+Constmction#4A & 4B 17 Cheyenne Ave Buildings: A->25'-0"x42'-0"x22'-0"(RCG,1.0:12) Ca¡bondale, CO 81623 B->96'-4"x40'-0"x15'-8"(RCG,3.0:12) Attn.: Bruce Upton Project Location: Glenwood Springs, CO 81601 Project #: U16O08054 This Letter of Design Certification ensures that the materials fumished by the metal building supplier are designed in accordance with the infomation specified to the metal building supplier on the ordet documents and summarized by the loading information listed below. The Project Engineer of Record (not the metal building supplier) is responsible for verifying that the building code and design loads meet any and all applicable local requirements. The Professional Engineer whose seal appears on this Letter of Certification is employed by the metal building manufacturer and does not serve as or represent the Engineer ofRecord for this project and shall not be construed as such. DESIGN LOAD CRITERIA: Structulal Loads Applied in General Accordance with: Risk Cateqory: rBC20rst/ II - Standard Buildines Ground Snow Load: 57 .2 psf Roof Live Load: 20.0 psf Ultimate Design Wind Velocity: Snow Exposure Factor,Ce: 1 00 Reducible As Pel Code. Snow Imp. Factor, Is: 1.00 'Wind Exposure: B tts mph/ Is Roof to rneet UL 90 Reouirements?: No Seismic Criteria: Design Sds / Sdl: Seis. Imp. Factor, Ie: Seis. Design Category: 3.0 3.0 Ss: 0.330 S1: 0.083 0.33 8/0. I 33 1.00. C/ . 20Yo of flat roof snow included in seismic calc's. Analysis Procedure: Equiv. Lat. Force Procedure Basic SFRS: Not Detailed for Seismic Site Class: I) Snow Wind Enclosure Enclosed Enclosed Seismic Ct RPs 4,00 4.0 Mezzanine Infonnation: Floor l)ead Load: N/A A B 3.0 3.0 1.0 1 .00 40.00 =r 0. 1g * 0.18 3.00 0.113 3.31 1.0 1.00 40.00 Floor Collateral Load: N/A 3.00 0.113 8.9 * Primaty Strttctural Not Included Floor Live Loacl: NIA Clane Infortration: No çranes on building. Roof-Top Unit Information No roof-top units on building. The design ofstructural nrembers supporting roofglavity loads is controlled by the more critical effect ofrooflive load or roofsnow applied in accordance with the governing building code. DESIGN STANDARDS REFERENCED: . AISC Specification for Structural Steel Buildings - Steel Construction Manual, 14th Edition, O 2010. . AISI North-American Specification for the Design of Cold-Fonned Steel Structules, O 2007 Edìtion. . IBC codes are desìgned in accoldance with ASCET- I 0 Edition. . MBMA Low Rise Building Systenis Manual, Latest Edition. ' AWS Latest Edition of Structural Welding Code. . No buyout shuctural componeÍìts provided on this project. RooflDead (psfl* Collateral Dead P¡i (psf) ' Sec (psÐ Rr::il0 $Trrl BUrlHnË ST$Ttt$ Fuse A.rchitecture{Construction #4A. & 4B I/ersiott 201 6.4.25 (4/25/l 6) Rl ol- R9t/nÑT-Page: Datc: GENERAL INFORMATION FOR COLUMN BASE REACTIONS O ron REVTEW e ron coNSTRUCTToN Project Name: Projcct Number: Customer: NBG Engineer: East Bank, LLC u160805Ä' Jacob Larnbelt Colurnn base reactions are included in this packet for a building designed by tlte metal br.rilding uranufactuler' Thsse reactions l'esult fì'om fi'ame analysis done by a qualifiecl Engineer f'ol' this specilìc job. They reflect all ioading to which the building nTay be subject. per the appropriate building cocle and loading inlbnnation provided to the metal briilding manufactnrer at the clate of design. Reaction packets urarked "FOR REVIEW" ale subject to change and are usually plovided at the request of the customer', althougli the Engineer believes he/she is working with undeflned, incomplete or assumed infbr-ruation. Reactions ale provided by load case in order to aid the foundatiou engineer ir-r deternrining tltc appropt'iate load factors ancl conlbinatiolls t0 be used ì,vith either Working Stress or Ultinrate Strength clesign nrethods. Wind load cascs arc givcrr fol' cach ptirrrary wi¡rd dilection. For ASCET-10 based building codes, the unfactol'ed load case reactions due to wind are gcnerated using the ultimate design wind speed (Vult). Sign conventions for cornputer genelated fi'alle rcactions are as follorvs ancl should be t¿rken ìn thc sensc of the frarne sketch given on the reactions sheets. GLOBAL X ( + to right) GLOBAL Y ( * uprvard) GLOBALZ ( * counter-clockwisc) ---------> +x +Y +7, A¡chor bolt dianrcter, grade, location and plo.jection is plovided orr the Atrchor- Bolt l'lirn. A¡rchor bolt cnbed¡re¡t lengths and tlpes al'e not plovided by the metal building lrânufachÌr'er'. This lni'ormation is closely l-elated to the cotnplete foundation clesign wliich should bc cionc by a }ìegisterecl Profcssional Engitreer fantiliat.with the local site conditions and constt'tlction p|acticcs. A I u1 600E054 R'f of R9 Rff:IIO fiËIX Hillurfr SrSTrrS Version 20 I 6.4,2 5 (4i2 5 i I 6) EnEcTIoN ÞRA\,YING CoVËR 9HEET Lonr¡s Informølíon tç be verilied on Ereclion Drawins Co$er Sheet: Project Name: Fuse,trchitectu re*Col¡struction #4 & 48 Proj ectNunrber: UI600805,L Customer: Ëast Bank LLL: NIIG [ngineer; Jacob Lambcrt Date: li23l2}17 Buru¡rxç Lo¡ps DESIGN CODE: ROO}'LIVE LOAD: IBC 2015 20.00 PSF REDUCIBLA ÀS PËR CODT'. GROïJ}ÌD SNOW LOAD: 57.20 PSF SNOV/ IMPORTÂNCE FACTOR, I": 1.00 ULTIMATE DESIGN V/TND SPEED: WìND EXPOSURE: Il 115 mplr IJL9O? NO Classic Roof:Const. No. 161 : Classìc Rool u'/ 'lranslucenl PanelConst. No. 167 CFR Roof-Corxt. ¡qo, 552; CFR Roof $i T¡ånsìucollt Panel-Coml, No. -i90 Coüposiro CFR Roof-Const. No. -5.524; \4.16 II RooÊConst. N*o. "1.ì2 SEISMIC INFOIIMATION: Ss: 0.330 51: 0.083 Design Sds I Sdl 0.338/0.133 RISK CATb,GORY: II - Standald Iluildings SNOW EXP. FACTOR, Ce 1.00 Site Class: Sçi¡uriu Dvsi gu Catvgur'.y. p. C Equiv. Lat. F'orce Prucedure \o{ Dctailed f<rr Seismic Suorv Ct Cs i Roof Dcad i Collateml Deacl I i,.....(n:Ð1......i..1t.(i::Ð.....!.qr".(lll).i 4.0 4.0 Scisrrric lrrrp. Faclur, Iv;1.OO ån¿lroÄX&cedure: Basic SFRS: NOTES: l) COLL¡\TERA.L DÐAD LO.A.DS. UNLESS OTÉIER\I{SE NOTED. .{RE ASSL]I\,ÍED TO BË LINIFOR¡'írY DISTRIBUTED. \VIIEN SUSPENDED SPRrlrKLER SYSl'llMS. LTCHTTNCì, rrVAC EQUIPMËN]'. CEILTNGS, ElC., .ARE SiJSPEh:DED FROÀ.I ROOF 'iEh,{BER,S" CONSULT THE À,{.8,S. IF THESE CONCENTR¡\TËD I-OADS EXCËED 5OO POI,I\¡DS (USING THE WEB À.IOI-INT DETAII,). OR ]t)(] POUNDS {t-iSING THË ITI-A\¡GIJ ]!ÍOI-;I$ DËTAII,), OR lF IÌ.¡DivIDIi.A.l. i\,ltl\dßERs ,{1ìE I-OAD}iD SIGMFIC¡\NI'1,Y \{OIìE T}Ì..$i OrtlI;Rs. 2) ffiE DESIGIi 0F STRUCTUR{L I\,IËI,ÍBERS StjPpORTIi'lG IjRÅVITY L0ADS IS CONIROLLËD AY TIIE MÕRE CRITICAL ËIIFECI' OT ROOF LI\.T LOAD T)Iì ROOF SNOW LOAD. ¡1S DETERMINËD BY TFIE ¡.PPLIC.ABLE CODË. ßUILDII{G.SPtrCIFIC LOADII{G D{I¡ORI,TATION: Wind Seisnúc CsPs (ps$.Pl:le. A i Enclosure R 3.û 3.0 1 .0 1.00 40.00 : r .0 1.00 40.00 Enclosed ,i. 0. l8 Inclosocl 3.00 0.1i3 3.3 3.00 0.1 13 8.9B *Prinr¡ y Structurul Not Include¿| ..r.'.**.rq¡HÊüA of Bgul 6008054 3.0 3.0 Excellence.front the ground up * 0,18 t¿ Joll +: Ul6C)0B05ÀFrame ¡ FrameLine A By: Bc\jacob.lambert Job Nane: Fuse Àrchitecture + Constructio¡ *** DESTGN SUMMARY - T'RAME REACTIONS BY LOAD CASE *** Page: Date:File:br--2t-t t Fl1 4 \, LI+ xz t' :9" {1,Ð å?.0* f,.,68 r- ¡3" t?0 , cüü-01 X Y (kips) (kips) (kip-ft.) dSLOU 08 -=l Member I Member X Y(kips) (kips) (kip-ft) LO,AD CÀSE COLO 1 coL02 1 - DEÀD 1 -1 I LOAD CASE I COL01 I coI.o2 8 - I{IND ÇASE 2 TO IETT 534 -80 0 o IOAD CASE co].01 coL02 2 _ COI,TATERAL I -1 IÍIND 1 1O B,ACK -3 -4 I LOAD C,CSE I COL0l, I coto2 9 - LONG 0 0 0 0 LOAD CASE coI,0l côLo2 3 ' ROOF ',IVE1 -1 0 0 I LOAD CÀ58 10 - IONG, IiIND 1 ?O FRONT I C0t01 L -2I col02 o -2 LOÀD CÀSE ÇoL0 1 coL02 4 - SNOW I LOAD CÀSE 11 I cotO1 I COr,o2 7 't IONG- WIND 2 10 BÀCK i -4I -5 0 -1 0 LOÀD CASË coI,01 coL02 I toAD CASE 12 - LONG I COr,01 I col02 WIND 2 10 FRONT -3 -3 5 - I,¡IND CASE 1 TO RIGHT -6 -3 -8 2. 0 0 LÔÀD CÀSE 6 . WINÐ CÀSI] 1 TO LEFT 55 4-1 I COL01 I COLo2 13 * SETSMTC TÕ RIGHT -5 -5 -3 5 I LOÀD CÀSE COLOl caL12 0 0 0 l,oÀD cÀsE coL0 1 cot02 ? . I,ITND CASE 2 TO R]GHT -5 -9 -3 1 I LOÀD CASE I co],01 I col02 0 0 14 _ SEISMIC TO LEFT 3 -5 u1 6008054 R3 of Rg Job {r U1600805-A Frame ; Framel-ine D By: Bc\jacob.lambert Job Nane: Fuse Àrchitect-ure I Construction *** DES¡GN SUMMARY . FRAME REACTIONS BY IOAD CASE *+* Page i _Date: 01-25-1? File: F12 Y ô.--'t\\Y Ll+ X¿ ¡' ¿t- üÐ *¿.0Ð å. ¡30 r-- ì4. ùA côL d.1,cÐL t¡z Member X ( kips ) Y (kips)( kip- ft )I Member x (kips) Y { kips ) z {kip-ft) LOAD CASE c0i,01 coLo2 ] - DEAD -1 1 0 0 I LOÄD CÂSE I COL01 I COLo2 8 . VùIND CÀSE 2 TO LEFTt3'1 -L4 LOAD CASE col0 1 COLO 2 2 _ COLLÀTERÀL 1 2 2 0 0 I LOÀD CÀSE I COLo1 I coL02 9 - toNG WIND 1 TO BACK -1 -5 0 0 LOAD CASE COLO 1 cô1,42 coL0 1 coL02 3 - ROOF L]VE 1 -1 t ôÀD cAsE 10 - LONC. [.ûIND 1 TO FRQNT1 -5 -1 -2 10 I 0 0 0 LOAD CÀSE COLO 1 coL0 2 I toÀD cÀsE 11 - l,o¡lc. IÍIND 2 TO BÂCK I COL01 ?- -9 I col02 -2 -1 4 - SNOr.i 24 15 0 0 LO¡\D CÀSE c0L0 1 c0t0 2 5 - IJTND CASE 1 TO RIGHT -9 -I'1 -5 6 12 - LONG. I,llND 2 llo PRONT 'i1 -) -40 I LOAD CÂSB I COL01 I c0t02 IOAD cAst coL0 1 cot,0 2 6 - I¡¡TND C1\SE 1 TO LDFT 65 B -11 I r,oAD CASD I col.o1 I COL02 13 - SEISI'{TC TO RTGHT -5 -1 -4 1 0 0 LoÀD CÀSE COLO 1 coLj2 ? _ Í¡IND CÀSE 2 TO RTGHÎ -B -20-6 4 I LoAD CÀSË I col"ol I co]-02 14 - SEISMIC TÔ LEFT 5? 4 -'l0 0 u 1 6008054 R4 of R9 Jot¡ #: Ul600B05A fråme : Frame.lj-nes c By: Bc\jacob.fambert Job Name: Fuse ÀrchiLecture l. Construction *** DESIGN SUMMARY - FRAME REÂCTIONS BY LOAD CÀ58 *** Page: Date: File: or-es-rr Y I Member (kj.ps)( kips ) F13 z ( kip- ft ) 4./r\ xz l' ?E, 06 å?. 0{ t.Eî] t- 1.È.,,ûâ CÐL.']f x Y z (kips) {k.ips) (kip-ft) - {ûLOZ 34,0A x l Member LOÀD CASE cot0 1 coLB2 1 . DEAD I T-OAD CASE I COLo1I cot02 8'WIND CÀSE 2 TO LEFT 5 -¿ 4 -8 1 -1 0 0 0 I,OÀD CASE col-0 1 coL02 2 - COLLÀTERAL 1 -1 9 - LONG 1 0 0 I r,oÀD cAsE I colo1 I COLO2 WÍND 1 TO BACK -'1 -A 0 0 LOAD CASE c0L0 1 coL0 2 3 _ ROOF LIVE 1 -1 '1 4 0 0 I LOAD CÀSE 10 . LONG. WTND 1 TO FRONT I C0L0L 1 -6I COL02 -1 -2 0 0 toÀD cAsE coL0 r coL0 2 4 - SNOW I toÀD CASE 11 - LONG^ WIND 2 TO BÀCK I COt01 1 -B I col02 -1 -51 16 '7 0 0 0 0 LOÀD CASE coL0l. coLa2 5 I41ND CASE I TO RTGHT -6 -12 -32 I toÀD cÀsE I col,o1 I CÔLO2 IVIND 2 TO FRONT -1 12 - LÕNG 0 0 0 0 LOAD CASE coL0r. coLq2 6 _ I^IIND CASE 1 TO LEFT 5 -1 5-1 0 0 I LOÀD CAS¡I I COt 01 I coL02 13 - SRISMIC TO RIGHT -4 -5 -3 5 0 0 LOAD CÀSE coL0 I coL0 2 ? - I¡J]NÞ CASE 2 TO RTGIJT -5 -13-3 1 I LOÃD CASE I col01I COL02 14 - SETSÌ.,IIC TO LEFT453 -5 0 0 0 0 t.J16008054 R5 of R9 .lolr #: Ui600805AFranê : Frarneline 2 By: BG\jacol:-lambert Job Nâme: Fuse Àrchilecture + CÕnstructíon *** DASIGN SUMMARY : FRAME REACTIONS BY LOÀD CÂSB **ì Þagte : Date: Fil-e: 0r-25-7't F91 .â.#r\:x2 r' ?t,. ûâ &. ED f- PORTAL FR-AME REACTTONS ÀRE ORTHOGONÀL TO AND MUST BE COMBINED WITH THE APPROPRIATE MÀIN FRAMË REACTIONS 2¡,, r1Ê X Y 2 (kips) (kips) (kip-ft) E{rLtt { L$t Membe¡ X ( kips ) Y ( kips ) z ( kip- ft )I Menber LOAD CÂSE coL0 1 coL0 2 1 _ DEAD -1 2 2 0 0 I LOAD CÀSE I coI,01 I caLoz 8 - [,¡TND CASE 2 TO T,EFT 34 3 -9 0 o LOAD CÀSE cot 01 coLo2 2 . COILÀTERÀI 1 -1 j LoAD CÀSE I co].o1 I coL02 LONG. I,ûIND 1 TO BACK -2 -6 0 0 LOÀD CÀSE coL0 1 coL0? 3 - ROOF I-IVE 1 -t I LOÀD CÀSE I COL01 I col02 1ô - l,oNG WTND:I TO FRO¡IT -1 --1 0 0 LOAD CÄSE coL0 I coLo2 4 - SNôf!¡I LOÀD CASE 11 - LONG. TIIND 2 To BÀCR I col01 -2 -6 I cor,02 -2 -210 0 0 0 0 LOÀ,D CÀ58 coL0 1 coL02 5 - I,¡I ND CASE 1 TO RIGHî -3 -B -3 4 I LOAD CÀSE 12 - LONG. WÍND 2 TO T'RONT I COt01 2 -7 I COL02 2 -'1 0 0 0 LOAD CÀSe coL0 1 coL02 6 _ 9IIND CASE Ì TO LE}'î232-1 I LOÀD CÀSE I COL01 I COL02 13 _ SEISMIC TO RIGHT -2 -4 -24 0 0 LOAD CASE coL0 1 coL02 7 - }IIND CÀSE 2 TO RTGHT -3 -9 11 I LOAD CÀSE I COto1 I côr,02 14. SEÍSMIC']'O LEFT24 u1 6008054 RG of R9 Frame : Frameline 1 .lob Name: Fuse Architecture + Construclion u1600805À BG\ j acob . lambe rt ¡t oç û, *o r- o116- tt F92 08 x ï {kips) (kips) (kip-fl) Job {: By: Page: Date : Fil-e: *** DESIGN SUMMARY - FRAME REACTTONS BY IOAD CÀSE *** ô{Lf+x ?4, W cü-flt- x Y z(k1ps) (kips) (kip-ft) PORTÄ]" FRÂME REACTIONS ARE ORTHOGONAL ÏO AND MUST BB COMBINED WITH THE APPROPRIATE MAIN FRÀME REACTiONS CÐL ûZ _l jL L Member I Member 0 0 LOÀD CASÉ cot01 coL02 1 _ DEÀD I LO,A.D CÂSE I co],01 I co],02 8 - IIIND CÀSE 2 TO LEFT25 2-5 0 LOÃD CÂSE co1,01 c0102 2 - COLLÀTERÀL 0 0 I r,oÀD cÀsE I coI,o1 I CoL02 9 - toNG I,ùIND 1 TO BÀCK 0 0 0 0 LOAD CASE coL0 1 coL0 2 3 - ROOF LIVE 0 0 0 0 0 I LOÃD CASE 10 - LONG. l,lrND 1 ',l'O l--RON',r I COL01 0 0 I COL02 o 0 LOAD CASE c0L0 1 coL0 2 4 - SNOI¡ 0 0 0 I LOÀD CÄSE 11 - LONG. t{lND 2 TO BÄCK I col01 0 0 lcor,oz 0 0 0 0 to.A.D cÀsE cot01 COLO2 5 _ !.ITND CÀSE 1TO RIGHT -2 -5 -z ) I LÔAD CÀSE f2 _ LONG. I.]IND 2 TO FRONT I col01 0 0 I coL02 0 0 0 0 LOAD CÂSE coL0 I coL02 6 _ WIND CÀSE I TO LNFT 25 2-5 I LOÀD C^SË I COl,o1 I COto2 f3 - SEISMIC TO RICH'| -1 -3 -1 3 0 0 LO¡\D CÀSE COLO 1 coL02 7 . WIND CÀ58 2 TO RIGHT -l -J -25 LOAD CÀSE COLO ] col,0 2 14 - SEISI,{IC TO L¿I-T tl1 -3 0 0 tJ1 6008054 R7 of R9 Job #: U16O08054 Frame ; Erarne]ines 3-5 By: Bc\jacob-Ianbert Job Name: Fuse Architecture + Construction *** DESIGN SUMMARY - FRAME REACTIONS BY LOAD CÀSE *** *o,,Ûâ Page: _ Dåte | 01-25-1? Fife: F21 v#.:- Eû [- å3" Cê-------'l ã. ü* ¡ü" ñ¡ Membe¡ Í.c. €7 €üLg1 ã,s,67 €0L&? X Y z (kìps) (kips) (kip-ft) X (kips) {kips) (kip-ft.)I Menber LOAD CASE c0101 col02 1 - DEAD 1 -1 J T,OAD CÀSË I COLoi I CoL02 3 3 0 9 - LONG. f{IND 1 TO BACK -l -5 2- -4 0 0 LOÀD CASE cot01 eoLo2 2 - COLLATERÀI, ì -L f LOAD ÇAsEI C0L0ìI cot,02 10 - ION6. II¡IND 1 TO FRONT-2 -41 -5 0 0 (.) LOAD CASL col0 1 cot02 3 - Roo! t,lvrJ 4 -4 1I - LUNG. W-INIJ 2 'I'O tsACK -1 -92-B 11 11 I LOÀtr CASE I co1,01 I COLo2 0 LOAD CÀsE coL0 1 coL02 4 - SNOW 9 -9 I LOÀD CASE I col01 I col02 12 - LONC, IqTND 2 TO FRONT-2 -Bi -9 0 0 0 0 LOAD CASE col0 1 coL)2 5 _ WIND CASE 1 TO RTGHT -6 -B -2 -2 13 - SEISMIC TO RIGHT-2 -2-2- 2 0 0 I r,oÀD cAsE I COr01 I Ç0L02 LoÀD CÀSE cot01 coL02 6 - I4TND CASE 1 TO LEFT 2-26 -B I LoÀD C¡{SE I COL01 I COLo2 14 ..CEISMIC TO LEFT ?2z-20 0 LOÀD CÀSE coL0 1 coL0 2 7 . VùI¡ID ÇÀSE 2 TO RiGHT -2 -6 I toAD c.qsE I COl,0 ì I COLj2 15 - ÀITER}IÀTB SNOL\} 1 1 -'1 22 L2 o 0 LOÀD CÀSE CÒLO1 coLj2 8 - WIND CÀSE 2 TO LEI'T 2 -61 -12 I LOÀD CÀSE I coLO1 I COLo2 16 - ÀI,TERNATE SNOW 2 I 13 -1 22 0 0 uJ 6ôô8ô54 R8 ol R0 Frame : Frameline 5 Job Nâme: Fuse ÀrchitechLure+Construclion Job *: Ul600B05A Bv: BG\iãcol).1ambert I Member: Page: _Date: 01-25-17 Fif e r Ii22 *** DESIGN SUMMARY. FRAME REÀCTIONS BY LOAD CASE *** 3X, ùú 1.8, 00 31,, üÐ lÞ''x¿, gÐ :, EO T- cÐL*¿ 3*, öt Member !.5.67 l_3, 0Ð ---l 1- ñß ÊÐLüT a aotß.{.tûL*1 X Y z(kips) (kips) (kip-ft) x Y(kips) (kips) (kj-p-ft) LOÀD CASE coi,01 Ç0f,02 coL03 coL04 1 - DEAD 0 0 o 1 2 2 1 toÀÐ c,csE coL01 COLO2 cot03 coL04 8 * WIND CASE 2 TO tE!'To-20 -40 -50 -3 0 0 0 0 LOAD CÀSE coL0 1 COLO2 cor,03 coL0 4 2 COLI,ÀTERAL 0 0 0 0 LOÀD CASE coL01 ctJt.02 coL03 coL0 4 9 _ LONG l,,l1ND I TO B?\CK -2 -6 -6 -2 1 1 1 1 -2 -2 -l 0 0 0 o LOÂD CÀSE coL0 1 coL02 c0L03 COLO 4 3. ROO]i LIVE I LOAD CÀSE 10 - LONG I cotO1 l cOL02 tcor,03 I C0104 I'TND ]" TO FRONT -2 -6 -6 -2 2 5 5 ? 0 0 0 0 LOAD CASE coL0 I coL02 COLO 3 COLO 4 4 - SNohr 3 9 9 3 LOAD CASE COLO 1 COLO 2 COLO 3 col-0 4 t 1 - Sl.il SI,l1C TO RIGiIT 01 0 -1 0 -1 01 0 0 0 0 LOAD CÀSE coLLl l coL\2 coL0 3 coL0 4 5 - VlIl'¡D CASE Lt'O Rlcllir 0 -l 0 -5r0 -30Ì LOÂrJ CÀSE COLOl cot02 coL03 cot0 4 12 - SEISI{IC TO IEFT 0 -1 01 01 0 -1 o 0 0 0 LOAD ÇÀ58 c0L0 1 coLj2 coL03 coL04 6 - IIIND CAS!Ì ] TO LEÍ'T 0 -10-20 -40-2 LO¡CD CÀsE COL{) 1 coL02 coL03 coL0 4 13 - ÀI,TERN¡IîE SNOW 1 03 0 11 c5 01 0 0 0 0 LOAD CÀSE cot0 l coL12 coL03 cot.0 4 ? - I4IND CAST 2 TO RIGHT 0 c û 0 -z -6 4 -1 0 0 0 c LOAD CÀSE coL01 coL0 2 ccL03 cc1,04 14 - ÀL'l'BRl.lÀTE SNOi{ 2 01 05 0 11 03 0 0 0 0 u1 6008054 R9 of R9