Loading...
HomeMy WebLinkAboutApplication- PermitI I No.5531 GARFIELD COUNTY BUILDING, SANITATION and PLANNING DEPARTMENT 109 8th Street Suite 303 Glenwood Springs, Colorado 81601 (303) 945-8212 JobAddress 0123 Creekside, Mitchell Creek Subdivision, Lot 9, Glenwood Springs Nature of Work Building Permit Use of Building Addition of Master Bedroom & Rath Owner Ken & Erin Wiencek Contractor Steve Lundin Construction Amount of Permit S 587.40 pate May 23, 1995 Permit: 356.00 Plan : 231.40 Paid $231.40 4-24-95 S. Archuelta Clerk BUILDING PERMIT APPLICATION GARFIELD COUNTY, COLORADO 11plk.nrlt to complete numbered spaces only, PERMIT NO. 553) PARCEVSCFIED NO, Joa ACORESS 1 3 LEGAL DE SCR, OWNER 0/-9 3 (rle�%!S ,dP. CONTRACTOR Lor NO CI 4 5 6 BLOCK - - I SUBI]IVI51 ,Lc1.v6Lc/ 1 n 5. . ARCIIIIECTORDESIGNER ,...5.24.16-6...5-/&/-L5 ENGINEER 5 F OF BUIL 01118, S 5- 9 USE OF BUILDING CI ASS OF WORK I)EsCRIBE WORK ADI)RC55 ADDRESS ADDRESS 0/ Sol SF01:10 , nNEVV AGFA (JOT nAL1ERAIIC,N uREPAIR i MOVE iIREP 10 b u -10/J or M size 68-424 r1 XrsT,v� /10 v� j GARFIELD COUNTY BUILDING AND PLANNING MINIMUM APPLICATION REQUIREMENTS for SINGLE FAMILY DWELLING CONSTRUCTION including N[W CONSTRUCTION ADDITIONS ALTERATIONS a1](1 MOVED BUILDINGS In order to understand the scope of the work intended under a permit Application and expedite the issuance of a permit It is important that complete information he provided. Adequate and complete information will prevent delays in the plan review process. Reviewing a plan and the discovery that required information has not been provided .by the applicant may result in the delay of the Kermit issuance and in proceeding with building construction. "Ihe owner or contractor may be required to provide this information before the plan review may proceed. This causes delays because other plans that are ti i 1i1(_ for review inay be given attention before the new information inay be reviewed after it has been provided to the Building Department. Please review this document to rletermiiie if your have enough Information to design your project and provide adequate information to facilitate a plan review. If you do not, it may he helpful to obtain a hook titled "Dwelling construction under the Lhiifonn Building Code. This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan In order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following check list prior to and during design. Applicants are required to indicate appropriately and to sulinslt completed check list at time of application for a permit: 1. Is a site ]elan included that indicates the distance of the proposed building or.addition to property lines, other buildings, set back easemeII-h and utility easements? Yes . No 0) Not necessary for this project (2) . Does the site plan include the location of the 1.S.D.S. (Individual Sewage Disposal System) and the distances to property lines, wells (on subject properly and adjacent: properties) , streams or water Courses? Yes No Not ot necessary for this project,''(z) 3. Does the site plan indicate the location and direction of the County or -- private yid accessing the properly? Yes _ No (,) Nol necessary for this project 11 �l. Do the plans include a fciundatioil plan indicating the size, location and Spacing of all reinforcing steel in accordance with the uniform 1)uilcliil r; Code or per stamped engineered design? Yes ✓ No n) Not necessary for this project (2) 5. Do the plans indicate the location and site of ventilation openings for under floor; -crawl spaces and the clearances required between wood anti ea Yes No __-- _,,, Not necessary for this project (2) d. Do the ph n's indicate the size an location of ventilation openings for the alt , roof joist spaces and soffits? Yes No (u Not. necessary for this project 7. Do the plans include design loads as required under the Uniform Building ride for roof snow loads, (a minimum of 40 pounds per square oot in Garfield County) floor loads and wind loads? Yes No (i) Nol necessary for this project (2) 8. Does tli _'plan include a building section drawing indicating foun !• lion, wall, floor and roof Construction? Yes No (() Not necessary for this project (2) 9. Does the l tflcling section drawing include size and spacing of floor joists, 11 studs, ceiling joists, roof rafters or joists or trusses? Yes - _-- No u) Not necessary for this project 10. Does the budding section drawing or other detail include the method of posit' ,e Confection of all columns and beams? 2 Yes / No („ Not necessary for this project (z) 11. Does the plan indicate the height of the building or proposed addition from We highest point of the building or addition measured at inid span between the ridge and the cave down to existing grade contours? Yes No (() Not necessary for this project (2) 1 2. Does the plan Include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase I1 certifications or phase 1-111)A certification? Yes No 0, Not necessary for this project 0) 13. Does We plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? ,�-_ Yes No (() Not necessary for this project (2) 14. Does the plan include a window schedule or other verification that egress/resale windows from sleeping rooms and/or basements complyyki-tti the requirements of the Uniform Building Code? Yes _f''_._. No _________0) Not necessary for this project (2) 15. Does the plan include a lAvindow schedule or other verification that windovyaliravicle natural light and ventilation for all habitable rooms? Yes No ISI Not necessary for this project (2) 16. Do the plans indicate 1he location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and luta encloscye's�ancl specify safety glazing for these areas? Yes A..•,., No (1) Not necessary for this project (2) 17. is the lora on of all natural and liquid petroleum gas furnaces, boilers Ad water heaters indicated on the plan? Yes '✓ No (() Not necessary for this project (2) 18. 1lave two.(2) complete. sets of constructions drawings been submitted with th application? Yes No (I) Not necessary for this project (2j 19. Have you .designed or had this plan designed while considering buildii and outer construction code requirements? Yes No (3) 3 20. Does the flan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield Building Department? Yes -v No 21. 1)o you tit .derstancl that approval for design and/or construction change are required prior_to the application of these Yes No c changes? 22. llo you understand that the Building Department will coIIect a "Plan Review" fee froin you al the time of application and that you will be required to.»pay the "Permit lee" as well as any "School impact" or Septic s 'steal " fees required, at the time yuii pick up your building permit` Yes No u► 23. Are yoti aware that you are required to call for all inspections required tinder the Uniform Building r l final inspe-rtion_prlor to receiving aCertificiateroftOccupanc ��ng approvl ona occul�a cy of the building? �' and Yes - No 24. Are you aware that the person signing the Permit Application whether the "Owner", „Agent of the Owner" "General Contractor", "Contractor" or otherwj.s6, signing the application is the party responsible for the Project (implying with the Uniform Codes". Yes _--_� No (i) I hereby acknowledge that 1 have read, understand and answered these questions accurately to t.Iie best of my ability. sib ature Phone: 377 — 47'6 10(days); Project Name: Project: Address: X55 date ,�-7617(f) (evenings) 4 Notes: O If you have answered 'No" on any of these questions you may be required to provide This Information al the request of the Building Oillcint prior to begin/dog lite plan review process. Delays to Issuing the permit are to he expected. Work may not proceed without the issuance of lite permit. (2) If you have answered No necessary for this project' (Many of the (fttesllons nod 11 k determined by the Rodding Official Thal the Information Is necessary 10 review the application and plaits to determine Inlnimum compliance wllh the adopted codes, please expect the following: A• Ilse application may be placed behind more recent applications for building permits 111 the review process and not reviewed until rCltlllrl'lt Information has been provided and the application rotates again to first position for review. B. Delay In Issuance of the permit. C. Belay In pror.ee(Ilttg with construction. (3) 11 you answered "Nu" to this question the circumstances described in the question could result In a "Slop Work Order" being Issued or a "Certificate of Occupancy" not being issued. PerA pp01.94.i 5 Effective May 1, 1994 ai ;i d V ul it i i d :Wil,. THIS CARD IS POSTED OM THE JOB 24 HOURS NOTICE REQUIRED FOR INSPECTIONS BUILDING PERMIT GA IELD COUNTY, COLORADO *Ioned Area Permit No. AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and constr tion oft e above described structure, the p it may then be revoke I ' , n s ti e from ujit : uil dip c dIMEDI �. o (f$EUV Address or " egal Description O( Owner (2,...1' . ,u Ii' Setbacks Front Side 6 Li Aid 457 - Side Side Rear This Card Must Be Posted So It Is Plainly Visible From the Street Until Final Inspection. INSPECTION RECORD Zoning Roof Covering Footing -A5 - j s ... - Electric -Final (by STATE inspector) = 7,3'//7 , - Foundation -7..--.-.",,,---, ; /-,) - ._ Plumbing -Underground k; -L' --7 -7- 1. Gas Piping cr _,._ _,-; f3= Heating Ventilation Frameq./4. .. -, c.. Insulation -7-17 ---.5--- /-__-,-- , Plumbing -Rough i Drywall 7/17/ 7..s. jig Electric -Rough (by STATE inspector) 7 -/C----c7 5 Final Cj - iq -/y 7. ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING — WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. THIS PERMIT IS NOT TRANSFERABLE Phone 945-8212 10 9 8th Street, County Courthouse, Glenwood Springs, Colo. APP poy ED DO NOT DESTROY THIS CARD