HomeMy WebLinkAboutObservation of Helical Pier Installations 02.23.2017H-PKUMAR
Geotechnical Engineering 1 Engineering Geology
Materials Testing 1 Environmental
5020 County Road 154
Glenwood Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: hpkglenwood@kumarusa.com
Office Locations: Parker, Glenwood Springs, and Summit County, Colorado
February 23, 2017
Valenz Construction, LLC
Attn: Edgar Cuc
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
(valenzcuc@ gmail.com)
Subject:
Gentlemen:
Project No. 17-7-159
Observation of Helical Pier Installations, Proposed Residence, Lot 78, Ironbridge,
1075 River Bend Way, Garfield County, Colorado
As requested, a representative of H-P/Kumar observed the helical pier installations at the subject
site between February 14 and 17, 2017 for suitability to support the building foundation. The
findings of our observations are presented in this report. The observations were performed in
accordance with our agreement for professional services with Valenz Construction, LLC dated
February 6, 2017. Hepworth-Pawlak Geotechnical (now H-P/Kumar) previously conducted a
subsoil study for design of foundations at the site and presented the findings in a report dated
February 27, 2015, Job No. 115 055A.
The foundation of the proposed residence was designed by Lindauer-Dunn to be supported on
forty HP288 Foundation Support helical piers or equivalent. The pier location plan is shown on
Figure 1. Our observations of the helical pier installations are presented in the attached Helical
Pier Observation Reports. The piers appeared to have penetrated the alluvial fan deposits and
achieved torque refusal in the underlying river gravel deposit. Based on the previous subsurface
exploration and our current observations at the site, the installed piers appear adequate to support
the design service loading capacity of 35 kips.
The findings submitted in this letter are based on our observation of the pier installations, our
experience in the area and the previous subsurface exploration at the site. Variations in the
subsurface conditions below the helical piers could increase the risk of foundation movement.
Our services do not include determining the presence, prevention or possibility of mold or other
Valenz Construction, LLC
February 23, 2017
Page 2
biological contaminants (MOBC) developing in the future. If the client is concerned about
MOBC, then a professional in this special field of practice should be consulted.
If you have any questions or need further assistance, please call our office.
Sincerely,
H -Pi KU MAR
Steven L. Pawlak, P.E.
SLP/lj f
155222 ,a
If •
6y ■
Attachments: Figure 1- Location of Helical Piers
Report of Helical Pier Observations, February 14, 15, 16 and 17, 2017
cc: Lindauer-Dunn — Jeff Dunn (jeff@ lindauerdunn.com)
H-PkKUMAR Project No. 17-7-159
'Dural
41t.11ItI _r
.j1 z
;!7r .
.1f !I ?;YR r
O
Af
g
4
S
t
•
.r, • nX
a ••
--
A '
f
J.
59
r�o
Y
1--
-
"M
ua,",r Tei • +'�,�
35
..f
NEW RESIDENCE
LOT 78
IRONBRIDGE SUBDIVISION
GARFIELD COUNTY, COLORADO
R. FICIAR CI IC AND 'CFI' A• VAI FN711FL A,
.•.r
,
H-PI<UMAR
Office Locations: Parker, Glenwood
Report of Helical Pier Observation
Client: Valenz Construction, LLC Project No.: 17-7-159
Attn: Edgar Cuc Sheet No.: 1
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
Project: Proposed Residence, Lot 78, Ironbridge, 1075 River Bend Way,
5020 County Road 154
Glenwood Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: hpkglenwood@kumarusa.rom
Springs, and Silverthome, Colorado
Date: 2/14/17
of 1
Garfield County, Colorado
General Contractor: Valenz Construction
Pier Manufacturer: HP 288
Design
Load
(kips)
Helical
Rig Type:
Pier Design
Load
Capacity
(kips)
Pier Contractor:
Link Belt
rotating head
Pier Ultimate
Load
Capacity
(kips)
Foundation
Western
160 Lx trackhoe
Refusal
Criteria
1500 psi
Repair
Colorado
with hydraulic
Measured
Torque
1800 psi
of
Comments
Pier
#
Pier
Location
Shaft
Type
Helix
Diameter
(in.)
Total
Depth
(ft.)
1
See plan dia.
double
17'3"
2
2%
See plan dia.
8/10
double
17 8"
1500 psi
1800 psi
3
2%
See plandia.
8/10
double
24'
1500 psi
1800 psi
cobbles'at
4
See plan dia
odouble
22'
1500 psi
1800 psi
5
2%
See plan dia.
8/10cobbles
double
23'6"
1500 psi
1800 psi
at
11/:' & 5,
6
2%
See plan dia.
8/10cobbles
double
22' 6"
1500 psi
1800 psi
at
5' & 10'
Preliminary Observations and / or Testing Results Verbally Reported To:
Notes: P = Refusal to penetration of pier. T = Refusal by torque limit. T = 8,218
T = 9,862 @ 1800 psi
All helices'/ -inch in thickness.
Torque measurements are based on pressure gauge readings recorded in field. T =
Design Loads were provided by Lindauer-Dunn Inc.
Pier Design Load Capacity is based on the measured torque and a safety factor of 2.0.
H-P/Kumar was requested to observe pier installation. H-P/Kumar did not provide pier
@ 1500 psi.
9,862 @ 1800 psi.
or helix sizing.
n L. Pawlak, P.E. _
Reviewed Byf
Copies:
Valenz Construction—Edgar Cuc ivalenSrucTtamaII.corn]
Llndauer•Dunn—Jeff Dunn (jeffR011ndauordunn.cam]
Lou Eller / Robert Duran Steve
Field Observer
/ljf
1500 psi
1500 psi
H-P� I<U MAR
Client:
Attn:
Project:
5020 County Road 154
Glenwood Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: hnkulenwood[n kumarusa.corn
Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado
Report of Helical Pier Observation
Valenz Construction, LLC
Edgar Cuc
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
Proposed Residence,
Project No.: 17-7-159 Date: 2/15/17
Sheet No,: 1 of 3
Lot 78, Ironbridge, 1075 River Bend Way, Garfield County, Colorado
Helical Pier Contractor: Foundation Repair of
Western Colorado
Link Belt 160 Lx trackhoe with hydraulic
General Contractor Valenz Construction
Pier Manufacturer: HP 288
Pier
*12
13
Pier
Location
See plan
See plan
See plan
See plan
See plan
See plan
See plan
Shaft
Type
2%
dia.
2%
dia.
2%
dia.
2%
dia.
2%
dia.
2',4
dia.
2%
dia.
2%
Helix
Diameter
(in.)
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
8110
14 See plan dia, double 24' 6"
Preliminary Observations and / or Testing Results Verbally Reported To:
Notes P = Refusal to penetration of pier. T = Refusal by torque limit. ' Pier #9, 22' from design grade.
#12, 25' from design grade.
All helices %-inch in thickness.
Torque measurements are based on pressure gauge readings recorded in field
Design Loads were provided by Lindauer-Dunn Inc
Pier Design Load Capacity is based on the measured torque and a safety factor of 2.0.
H-P/Kumar was requested to observe _pier installation H-P/Kumar did not provide pier or helix sizing
Copies
Valenz Construction — Edgar Cuc (valenzcucRomall.corn)
Lindauer-Dunn —Jeff Dunn ilsffitiPlindauerdunn.cornl
Total
Depth
(ft.)
22' 2"
22'
20' 6"
22'
19'
24'
24'
Design
Load
(kips)
Rig Type:
rotatin ! head
Pier Ultimate
Load
Capacity
(kips)
Pier Design
Load
Capacity
(kips)
Refusal
Criteria
1500 psi
1500 ps.
1500 psi
1500 psi
1500 psi
1500 psi
Measured
Torque
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
Comments
Replaced
on 2/16/17
if
Lou Eller
Field Observer
Steven L. Pawlak, P.E.
Reviewed By
Pier
Client.
Attn:
5020 County Road 154
Glenwood Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: hpkgfenwood@kumarusa.com
Office Locations: Parker, Glenwood
Report of Helical Pier Observation
Valenz Construction, LLC
Edgar Cuc
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
Springs, and Silverthorne, Colorado
Project No.: 17-7-159 Date: 2115/17
Sheet No.: 2 of 3
Project: Proposed Residence, Lot 78, Ironbridge, 1075 River Bend Way, Garfield County, Colorado
General Contractor: Valenz Construction
Pier Manufacturer: HP 288
Pier
*15
16
17
Pier
Location
See plan
See plan
See plan
*18 See plan
19
20
21
See plan
See plan
See plan
Shaft
Type
27/8
dia.
2%
dia.
2%
dia,
22 See plan
2%
dia.
27/8
dia.
27
dia.
27
dia,
27%
dia.
Helix
Diameter
(in.)
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
Total
Depth
(ft.)
24' 6"
Design
Load
Helical Pier Contractor: Foundation Repair of
Western Colorado
Rig Type: Link Belt 160 Lx trackhoe with hydraulic
rotatlnq head
23' 6"
23' 6"
23' 6"
24'
23'
23'
23'
Pier Design
Load
Capacity
(kips)
Pier Ultimate
Load
Capacity
(kips)
Refusal
Criteria
1500 psi
1500 psi
1500 psi
1500 psi
1500 psi
1500 psi
Measured
Torque
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
Comments
cobbles at
5'
cobbles at
3'
Preliminay Observations and / or Testing Results Verbally Reported To:
Notes: P = Refusal to penetration of pier. T = Refusal by torque limit. " Pier#15, 25' 6" from design grade.
Pier #18, 25' from design grade.
All helices %-inch in thickness.
Torque measurements are based on pressure gauge readings recorded in field
Design Loads were provided by Lindauer-Dunn Inc.
Pier Design Load Capacity is based on the measured torque and a safety factor of 2.0.
H-P/Kumar was requested to observe pier installation. H-P/Kumar did not provide pier or helix sizing
Copies:
Valenz Construction -- Edgar Cuc lvalenzciic stinal I. corns J
Lindauer-Dunn —Jeff Dunn IleffeblIndauerdunn.corn)
/Ijf
Lou Eller / Shane Mello Steven L. Pawlak, P.E.
Field Observer Reviewed By
5020 County Road 154
Glenwood Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: hpkglenwood@kumanisa.Com
Office Locations: Parker, Glenwood Springs, and Silverthome, Colorado
Report of Helical Pier Observation
Client: Valenz Construction, LLC
Attn: Edgar Cuc
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
Project No.: 17-7-159 Date: 2/15117
Sheet No.: 3 of 3
Project' Proposed Residence, Lot 78, Ironbridge, 1075 River Bend Way, Garfield County, Colorado
General Contractor: Valenz Construction
Pier Manufacturer: HP 288
Pier Pier
# Location
*23 See plan
Shaft
Type
2%
dia.
Helix
Diameter
(in.)
8/10
double
Total
Depth
(ft.)
Design
Load
(kips)
22'
Helical Pier Contractor: Foundation Repair of
Western Colorado
Rig Type: Link Belt 160 Lx trackhoe with hydraulic
notatin head
Pier Design ] Pier Ultimate
Load Load Refusal Measured
Capacity Capacity Criteria Torque
(kips) (kips)
1500 psi 1800 psi
Comments
Preliminary Observations and / or Testing Results Verbally Reported To
Notes' P = Refusal to penetration of pier. T = Refusal by torque limit. " Pier #23, 24' from design grade.
All helices %-inch in thickness.
Torque measurements are based on pressure gauge readings recorded in field_
Design Loads were provided by Lindauer-Dunn Inc.
Pier Design Load Capacity is based on the measured torque and a safety factor of 2.11
H-P/Kumar was requested to observe pier installation H-P/Kumar did not provide pier or helix sizing
Copies:
Valenz Construction - E=dgar Cuc tvileazqucbprnail.coJ
Lindauer•Dunn -Jeff Dunn t1eff Qllndauerdunn.corn)
nir
Lou Eller / Shane Mello Steven L. Pawlak, P.E.
Field Observer Reviewed By
H -P KUMAP
!id lr;rsa!°. 1, 5.1,+7i} I I:IlViinrirki-isl:d
Client:
Attn:
5020 County Road 154
Glenwood Springs, CO 81801
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: trpkglenwoodftumarusa.corn
Office Locations: Parker, Glenwood Springs, and Silverthome, Colorado
Report of Helical Pier Observation
Valenz Construction, LLC
Edgar Cuc
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
Project. Proposed Residence, Lot 78, Ironbridge,
General Contractor: Valenz Construction
Pier Manufacturer: HP 288
Project No.: 17-7-159 Date: 2/16/17
Sheet No.: 1 of 2
1075 River Bend Way, Garfield County, Colorado
Helical Pier Contractor: Foundation Repair of
Western Colorado
Rig Type: Link Belt 160 Lx trackhoe with hydraulic
rotatino head
Pier
#
Pier
Location
Shaft
Type
Helix
Diameter
(in.)
Total
Depth
(ft.)
Design
Load
(kips)
Pier Design
Load
Capacity
(kips)
Pier Ultimate
Load
Capacity
(kips)
Refusal
Criteria
1500 psi
Measured
Torque
1800 psi
Comments
24
See plan
dia.
double
21'9"
25
See plan
dia.
double
22'1500
psi
1800 psi
*26
See plan
p
2%
dia.
8/10
double
21' 6"
1500 psi
1800 psi
27
See plan
2%
dia,
8/10
double
21' 9"
1500 psi
1800 psi
See plan
'cobbles
dia.
double
21'9"
1500 psi
1800 psi
22%,28 at
*29
See plan
dia.
double
21 6"
1500 psi
1800 psi
30
See plan
2'/
dia,
8/10Spinning
double
21'9
1500 psi
P
at
22',
re -drilled
31
See plan
dia.
double
22
1500 psi
1800 psi
reliminary Observations and / or Testing Results Verbally Reported To:
Notes: P = Refusal to penetration of pier. T = Refusal by torque limit. * Pier #26, 23' from design grade. Pier
#29, 22' 6" from design grade.
All helices %-inch in thickness.
Torque measurements are based on pressure gauge readings recorded in field
Design Loads were provided by Lindauer-Dunn Inc.
Pier Design Load Capacity is based on the measured torque and a safety factor of 2.0.
H-P/Kumar was requested to observe pier installation. H-P/Kumar did not provide pier or helix sizing.
Copies:
Valenz Construction — Edgar Cuc (vaIunzcucaltpmall.com)
Llndauer-Dunn — Jeff Dunn gaff@lindauerdunn.com)
Lou Eller / Shane Mello Steven L. Pawlak, P.E.
Field Observer Reviewed By
Fl- P : I<LJ MAW -_...... _5020 County Road 954
Glenwood Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: hpkolenwood(kumarusa.com
Office Localions: Parker, Glenwood Springs, and Silverthorne, Colorado
Report of Helical Pier Observation
Client: Valenz Construction, LLC Project No.: 17-7-159 Date: 2/16/17
Attn: Edgar Cuc Sheet No.: 2 of 2
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
Project: Proposed Residence, Lot 78, Ironbridge, 1075 River Benxi Way, Garfield County, Colorado
General Contractor: Valenz Construction Helical Pier Contractor. Foundation Repair of
;Western Colorado
Link Belt 160 Lx trackhoe with hydraulic
Pier Manufacturer: HP 288 Rig Type:
rotating head
Pier
#
Pier
Location
Shaft
Type
Helix
Diameter
(in.)
Total
Depth
(ft.)
Design
Load
(kips)
Pier Design
Load
Capacity
(kips)
Pier Ultimate
Load
Capacity
(kips)
Refusal
Criteria
Measured
Torque
Comments
13
See plan
2%
dia.
8110
double
24'
1500 psi
1800 psi
Moved &
re -drilled
Preliminary Observations and 1 or Testing Results Verbally Reported To
Notes: P = Refusal to penetration of pier. T = Refusal by torque limit.
All helices %-inch in thickness.
Torque measurements are based on pressure gauge readings recorded in field.
Design Loads were provided by Lindauer-Dunn Inc
Pier Design Load Capacity is based on the measured torque and a safety factor of 2.0.
H-P/Kumar was requested to observe pier installation H-P/Kumar did not provide pier or helix sizing
Copies:
Valenz Construction — Edgar Cuc tvaleazeuctOgmail.cQmj
Landauer -Dunn — Jeff Dunn (jefr'Ilndauurdunn,cpml
Lou Eller / Shane Mello Steven L. Pawlak, P.E.
Field Observer Reviewed By
/ljf
1500 psi
HPE KUMAR
5020 County Road 154
Glenwood Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: hpkgtenwaod@kumarusa.coin
Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado
Report of Helical Pier Observation
Client: Valenz Construction, LLC
Attn: Edgar Cuc
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
Project No.: 17-7-159 Date: 2117117
Sheet No.: 1 of 2
Project: Proposed Residence, Lot 78, Ironbridge, 1075 River Bend Way, Garfield County, Colorado
General Contractor: Valenz Construction Helical Pier Contractor: Foundation Repair of
Western Colorado
Pier Manufacturer: HP 288 Rig Type:
Link Belt 160 Lx trackhoe with hydraulic
rotatinu head
Pier
32
33
34
35
36
37
38
Pier
Location
See plan
See plan
See plan
See plan
See plan
See plan
See plan
Shaft
Type
2%
dia.
2%
dia.
2%
dia.
2%
dia.
2%
dia.
2'/e
dia.
2%
dia.
Helix
Diameter
(in.)
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
8/10
double
Total
Depth
(ft.)
23'
22' 7"
23' 9"
22' 11"
22'7'
22' 2"
23'
Design
Load
(kips)
Pier Design
Load
Capacity
(kips)
Pier Ultimate
Load
Capacity
(kips)
Preliminary Observations and / or Testing Results Verbally Reported To:
Refusal
Criteria
1500 psi
1500 psi
1500 psi
1500 psi
1500 psi
1500 psi
Measured
Torque
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
1800 psi
Notes- P = Refusal to penetration of pier. T = Refusal by torque limit.
All helices %-inch in thickness.
Torque measurements are based on pressure gauge readings recorded in field.
Design Loads were provided by Lindauer-Dunn Inc.
Pier Design Load Capacity is based on the measured torque and a safety factor of 2.0.
H-P/Kumar was requested to observe pier installation. H-P/Kumar did not provide pier or helix sizing.
Copies:
Valenz Construction — Edgar Cuc tralenzCUsCtilsimall.corn)
Lindauer-Dunn —Jeff Dunn 0effftlndtauerdunrt.com)
Robert Duran
Field Observer
Comments
cobbles at
5'
Steven L. Pawlak, P.E.
Reviewed By
Client:
Attn:
5020 County Road 154
Glenwood Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email: hokglenwood{Wkumarusa.com
Office Locations: Parker, Glenwood Springs, and Sifverthorne, Colorado
Report of Helical Pier Observation
Valenz Construction, LLC
Edgar Cuc
167 Silver Mountain Drive
Glenwood Springs, Colorado 81601
Project:Proposed R
General Contractor: Valenz Construction
Project No.: 17-7-159 Date: 2117117
Sheet No.: 2 of 2
estdence, Lot 78, Ironbridge, 1075 River Bend Way, Garfield County, Colorado
Helical Pier Contractor: Foundation Repair of
Pier Manufacturer: HP 288
Western Colorado
Rig Type: Link Belt 160 Lx trackhoe with hydraulic
rotator head
Pier
#
Pier
Location
Shaft
Type
Helix
Diameter
(in)
Total
Depth
(ft.)
Design
Load
(kips)
Pier Design
Load
Capacity
(kips)
Pier Ultimate
Load
Capacity
(kips)
Refusal
Criteria
1500 psi
1500 psi
Measured
Torque
Comments
39
See plan
2r a
dia.
8/10
double
22' 6"
1800 psi
1800 psi
cobbles at
g'
40
See plan
dia.
double
23
retiminary Observations and 1 or Testing Res ilts Verbally Reported To.
Notes: P = Refusal to penetration of pier. T = Refusal by torque limit.
All helices %-inch in thickness.
Torque measurements are based on pressure gauge readings recorded in field.
Design Loads were provided by Lindauer-Dunn Inc.
Pier Design Load Capacity is based on the measured torque and a safety factor of 2 0.
H-P/Kumar was requested to observe pier installation. H-P/Kumar did not provide pier or helix sizing
Copies
Valenz Construction — Edgar Cuc (valanzcuc mail.comy
Landauer -Dunn —deft Dunn (ieff4ilndaugrdunn.com i
Illf
Robert Duran Steven L. Pawlak, P.E.
Field Observer Reviewed By