Loading...
HomeMy WebLinkAbout2.0 BOCC Staff Report 08.04.1986• • BOCC 8/04/86 PROJECT INFORMATION AND STAFF COMMENTS REQUEST: Exemption from the Definition of Subdivision APPLICANT: LOCATION: James G. Snyder, Personal Representative of the Estate of Evelyn E. Snyder A parcel of land located in Lot 5, SE 1/4 SE 1/4, and Lot 6 of Section 12, and the NW 1/4 NE 1/4, Lot 1, and the NE 1/4 NE 1/4 Section 13, T6S, R93W. SITE DATA: The site consists of 127 acres. WATER: Individual wells. SEWER: Individual Sewage Disposal System. ACCESS: Access of the I-70 Frontage Road EXISTING ZONING: A/R/RD ADJACENT ZONING: A/R/RD I. RELATIONSHIP TO THE COMPREHENSIVE PLAN The site is located in the subdivisions rural servicable areas, 1/2 to 1 mile radius of the Garfield County Comprehensive Plan Management District Map. II. DESCRIPTION OF THE PROPOSAL A. Site Description: The site lies between the Colorado River and the I-70 Frontage Road. Improvements on the site include a single dwelling unit and several sheds and farm buildings. Adjacent land uses are primarily agricultural, single-family residences and open space, with the Garfield County Airport approximately 1/4 mile south of the site. B. Project Description: The applicant proposes to divide the 127 acre parcel into two lots, 27 acres and 100 acres in size. III. MAJOR ISSUES AND CONCERNS 1. Soils information on the site indicates severe limitations for septic systems and dwelling units based on wetness, flooding, and shrink swell soils. 2. No approved or adopted FEMA flood plain information exists for the Colorado River on the site. A plat note should be included stating this fact and indicating the potential for flooding on the site. • • IV. SUGGESTED FINDINGS 1. That proper posting and public notice was provided as required for the meeting before the Board of County Commissioners. 2. That the meeting before the Board of County Commissioners was extensive and complete, that all pertinent facts, matters and issues were submitted and that all interested parties were heard at that meeting. 3. That for the above stated and other reasons, the proposed exemption is in the best interest of the health, safety, morals, convenience, order, prosperity and welfare of the citizens of Garfield County. V. RECOMMENDATION APPROVAL, subject to the following conditions: 1. That the following plat notes be included on the recorded exemption plat: A. That all irrigation ditches and easements be recognized and maintained as existing and in place. B. Each lot may be subject to engineered foundations and septic systems. C. No FEMA approved or adopted 100 year flood plain information was available for the site at the time of approval. The site does have low lying areas that may be subject to flooding. Any development or building on the site should take these facts into consideration. 2. That School Impact fees in the amount of $200 per lot be paid for the creation of one new lot. 3. That shares of irrigation water associated with the property be divided proportionally between the lots. 4. All representations of the applicant, either within the application or stated at the hearing before the Board of County Commissioners, shall be considered conditions of approval. ,