Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-09-17-4937 CMH Homes, Inc. New Manufactured Home TBD County Road 306, Parachute, Colorado 1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY THE COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL INSPECTION & CERTIFICATE OF OCCUPANCY. 2) FOUNDATION, CRAWL SPACE & SITE WORK SHALL COMPLY WITH 2015 INTERNATIONAL RESIDENTIAL CODE (LR.C.) 3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY BUILDING REQUIREMENTS AND DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS. 4) VERIFY DRIVEWAY LOCATION AND OBTAIN DRIVEWAY PERMIT FROM GARFIELD COUNTY ROAD & BRIDGE DEPARTMENT. 5) SEE ATTACHED FOR ENGINEERED ON-SITE WASTEWATER TREATMENT SYSTEM, AND INSTALLATION SHALL BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 6) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 7) ELECTRICAL PERMITTING AND INSPECTIONS BY STATE OF COLORADO ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 8) GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS B. FOUNDATION C. PLUMBING/GAS D. FINAL/CERTIFICATE OF OCCUPANCY