HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLMF-09-17-4937
CMH Homes, Inc.
New Manufactured Home
TBD County Road 306, Parachute, Colorado
1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY THE COLORADO DEPT. OF
HOUSING (C.D.O.H.) AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES IN GARFIELD
COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT
THE JOB SITE. GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE
AFFIXED PRIOR TO FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.
2) FOUNDATION, CRAWL SPACE & SITE WORK SHALL COMPLY WITH 2015 INTERNATIONAL
RESIDENTIAL CODE (LR.C.)
3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY BUILDING REQUIREMENTS AND
DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS.
4) VERIFY DRIVEWAY LOCATION AND OBTAIN DRIVEWAY PERMIT FROM GARFIELD
COUNTY ROAD & BRIDGE DEPARTMENT.
5) SEE ATTACHED FOR ENGINEERED ON-SITE WASTEWATER TREATMENT SYSTEM, AND
INSTALLATION SHALL BE INSPECTED BY A PROFESSIONAL ENGINEER LICENSED IN THE
STATE OF COLORADO. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING
INSPECTION & CERTIFICATE OF OCCUPANCY.
6) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO
LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A
COLORADO LICENSED ELECTRICIAN.
7) ELECTRICAL PERMITTING AND INSPECTIONS BY STATE OF COLORADO ELECTRICAL
BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING
INSPECTION & CERTIFICATE OF OCCUPANCY.
8) GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING:
A. FOOTINGS
B. FOUNDATION
C. PLUMBING/GAS
D. FINAL/CERTIFICATE OF OCCUPANCY