Loading...
HomeMy WebLinkAbout1.19 Existing Tower Removal Email from Caerus1 Anna Smith Subject:RE: Radio Tower From: Zane Lay [mailto:zlay@caerusoilandgas.com] Sent: Monday, August 28, 2017 8:31 AM To: Dave Hatch Subject: RE: Radio Tower   Mr. Hatch,    Do to the lack of engineering information we have concerning this tower and the resulting level of work that would be  necessary to obtain the approvals necessary to bring the tower into compliance, Caerus will be abandoning the  tower.  We are currently in the process of migrating our communications to a nearby tower and will begin removing our  equipment off of the tower as soon as that process is completed.  The tower will then be dissembled and removed and a  construction crew will complete the removal of the foundation.  Upon removal of the foundation, the resulting hole will  be backfilled and then re‐seeded.  We plan to have all work completed prior to September 30th.  Please have any non‐ Caerus equipment that has been placed on the tower removed prior to the end of this week.    Thanks,    Zane Lay Surface Land Negotiator Caerus Oil and Gas LLC Direct: 970‐285‐2816   Cell: (307)850‐4918  zlay@caerusoilandgas.com