HomeMy WebLinkAbout1.0 Application SITE APPLICATION REPORT HIGH MESA RV PARK WASTE WATER TREATMENT FACILITY September 2017 Prepared by 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 970.945.5948 fax SITE APPLICATION REPORT HIGH MESA RV PARK WASTE WATER TREATMENT FACILITY AUTHORED BY: CASEY HINKSON REVIEWED BY: CHRIS LEHRMAN, PE SGM Project # 2006-374.001 \\SGMSERV3\PROJECTS\2006\2006-374\001\D-PERMITS\CDPHE\WWTF\SITEAPP\HMWWTF-SITEAPPLICATIONREPORT.DOCX High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report ii TABLE OF CONTENTS 1.01 Executive Summary Error! Bookmark not defined. 1.02 Project Purpose 1 1.03 Service Area Error! Bookmark not defined. 1.04 Existing Facilities 2 1.05 Preliminary Effluent Limitations 2 1.06 Project Location 3 1.07 Alternatives Evaluation 3 1.08 Proposed Facilities 4 1.09 Management Capabilities 4 1.10 Institutional Arrangements 5 1.11 Project Financials 5 1.12 Project Schedule 5 High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report iii APPENDICES Appendix A. CDPHE Site Application Form, Fee Request Form, and Completeness Checklist Appendix B. One- and Five- Mile Radius Maps Appendix C. Proposed Site Plan Appendix D. Preliminary Effluent Limits (PELs) Correspondance Appendix E. Consolidated Metro District Email Appendix F. Flood Insurance Rate Map Appendix G. Geotechnical Report Appendix H. Legan Description and Property Map Appendix I. Process Flow Diagram Appendix J. Financial Commitment Letter High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report iv LIST OF TABLES No Tables. High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report v LIST OF FIGURES No Figures. High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report 1 1.01 Executive Summary Daybreak Realty, LLC is submitting this application for the construction of a new wastewater treatment facility. This report will address all the elements and guidelines of the “Regulation No. 22” Guidance Document for the Site Location and Design Approval Regulations for Domestic Wastewater Treatment Works. This executive summary will provide a brief description of the key points within the document. The proposed process for High Mesa RV Wastewater Treatment facility is a Sequencing Batch Reactor (SBR), intended to treat domestic wastewater from 120 space recreational vehicle park. This an extended aeration process that will be preceded by headworks and influent flow measurement, followed by chlorine disinfection. The plant will be designed for a max month hydraulic capacity of 0.019 MGD and a peak hour hydraulic capacity of 0.038 MGD. Organic loading is estimated at 300 mg/l, totaling 48 lbs. BOD per day. Values for flow quantities were derived from Table 1 of the CDPHE guidelines on Individual Sewage Disposal systems and local Garfield County requirements. Once the applicant receives approval from CDPHE, design drawings and contract d ocuments will be prepared by late 2017, with construction starting in May 2018. 1.02 Project Purpose The facility will serve the proposed recreational vehicle park consisting of 120 vehicle pads, a central laundry facility and bathhouse. This facility will onl y serve facilities owned and operated by Daybreak Realty, LLC. and operated by High Mesa Partners, LLC. and will not receive waste from other operations. 1.03 Service Area The proposed wastewater treatment facility will be located south of the Battlement Mesa P.U.D. on a portion of the property owned by Daybreak Realty as expressed in attached legal description and property map(see Appendix G). The facility will serve the proposed recreational vehicle park consisting of 120 vehicle pads, a central laundry facility and bathhouse. This facility will only serve facilities owned and operated by Daybreak Realty, LLC. and will not receive waste from other operations. See attached site plan in Appendix C. The WWTF is intended for the sole use of the High Mesa RV Park. No externa l flows will be incorporated. The site has limited expansion potential due to the constraints of the site topography, which is predominated by steep slopes outside of the proposed development area. Nevertheless, the plant was designed with excess treatment capacity and should be capable of supporting the development of additional portions of their property or conversion to a more permanent Mobile Home Park if the developer should chose to do so at some point in the future. The proposed RV Park consists of 120 vehicle pads, 5 coin operated washers and a bathhouse facility. Design loading assumes full capacity. The following demonstrates the expected flows: High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report 2 120 Sites @ 100 gpd/site .......................................................................... 12,000 gpd 5 washers @ 400 gpd/machine ................................................................... 2,000 gpd Bathhouse: Men Women Duration (hr/day) Flow (gal/hr) Shower 2 2 3 100 1,200 gpd Flush Toilet 2 2 1 36 144 gpd Sink 2 2 1 15 60 gpd Urinal 2 -- 1 10 20 gpd Bathhouse Total: 1,424 gpd Total 80% Capacity…………… 15,424 gpd Total 100 % Capacity.………….. 19,280 gpd Initial design loadings and flows were derived from Table 1 of the CDPHE Guidelines on Individual Sewage Disposal Systems, which suggests flows of 50 gal/day/space. However, Garfield County’s design standards specify 100 gal/day/space, of which the WWTF must be capable of handling at least 90%. Accordingly, the WWTF was sized for 100 gal/day/space, and will therefore have significant excess capacity. This excess capacity is justified by both future expansion/conversion potential and the expectation that the park Part will be extended stay facility catering to oil and gas workers, and as such is likely to experience flows greater than 50 gal/day/space. The plant will be designed for max month flow of 0.019 MGD and a peak hour flow of 0.038 MGD. The plant will be designed for organic loadings of 300 mg/l of BOD and TSS for a total of 48 lbs/day of BOD. 1.04 Existing Facilities As this is a proposed new WWTF there are no existing facility parameters to analyze or discuss. 1.05 Preliminary Effluent Limitations Initial Preliminary Effluent Limitations (PELs)-0200205 were issued on March 15, 2007 and updated on September 4, 2008. Initial PELs did not require ammonia limits but required reporting. On August 4, 2009 the stream classification for Spring Gulch changed from COLCLC13a and to COLCLC12b. Revised PELs with ammonia limits were issued on July 16, 2010. SGM requested new PELs from CDPHE on June 22, 2017. High Mesa RV Park WWTF has been issued the PEL number of PEL200522, but PELs are still in the process of being drafted and have not yet been received from CDPHE. See Appendix D for emails describing the status of new PELs. 1.06 Project Location The RV park is located on property owned by Daybreak Realty south of the Battlement Mesa P.U.D adjacent to Spring Gulch, which is a tributary to the Colorado River that is dry for extended periods of the year. The location of the plant within the RV park site was primarily chosen because of the constraints of the existing site topography. The design allows all collection mains to gravity feed to the proposed WWTF in order to avoid the initial capital and High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report 3 long term operations and maintenance costs associated with lift stations. The proposed site location was selected to take advantage of the existing natural bench above Spring Gulch and its location below the proposed RV Park spaces. The WWTF will be co-located with the RV Park’s water treatment facility. The two facilities will share the site but will be housed in separate buildings. As the water treatment plant will also use chlorine disinfection, the two will share a combined chemical storage and pumping building. HP Geotech performed preliminary site investigation and summarized their findings in the report dated December 14, 2007. Soil borings were drilled and the associated laboratory testing was performed for the proposed grading and foundations. The soils reports exhibits no groundwater concerns at the depths anticipated for process tanks and the project location. A copy of the geotechnical report is located in Appendix G. Once excavation for the plant base slab occurs, additional geotechnical information will be obtained for final backfilling and compaction efforts. The project is to be entirely located on land owned by Daybreak Realty, LLC., which will in turn lease the WWTF to High Mesa Partners, LLC for the sole use of the RV Park. Existing zoning for the land is Rural. 1.07 Alternatives Evaluation Other methods for the treatment that were considered were leach fields, lagoons, Membrane Bioreactor (MBR), Integrated Fixed Film Activated Sludge (IFAS), and consolidation with an existing plant. Leach fields were ruled out because of the topography of the site. Aside from the location of the RV Park proper, there is no sufficiently flat location on the property with enough space to construct the required area of leach fields. Similar concerns weighed against lagoon facilities, which were also ruled out. MBR and IFAS were ruled out because the cost of the systems was prohibitive for the small size of this plant. The Consolidated Metropolitan District has denied service to the property because the proposed development is outside of the District’s planned service area. This denial of service was formally expressed via email, which is included in Appendix E. After ruling out several other options, the Sequencing Batch Reactor (SBR) was determined to be the most efficient and cost effected method of treating the effluent from the proposed development. The SBR will be preceded by headworks and metering, followed by chlorine disinfection, and a disk filter. Below is a description of the anticipated individual components. 1.08 Proposed Facilities Headworks The headworks shall consist of a mechanical bar screen for preliminary processing. A bypass with a manual bar screen will also be included in case of a surge, or in the event that the primary screen becomes clogged. The headworks facility will be designed in order to High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report 4 prevent large objects from entering the treatment tanks that may clog subsequent pumps and piping systems. A Parshall flume will be installed after the bar screen in order to monitor and document the influent flows coming into the plant. The bar screens and the flume will be located in a headworks building, along with the digester blowers and a control room for the SBR controls. Treatment Facility Basins The principal structures shall include: Sequencing Batch Reactor Tanks Aerobic Digester/Sludge Holding Tank The proposed continuous flow, Intermittent Cycle Extended Aeration System (ICEAS) process is a modification of the conventional SBR package plant systems. The ICEAS process provides the ability for biological oxidation, nitrification, de-nitrification, phosphorous removal and liquids/solids separation to occur in one basin. Continuous inflow of wastewater to the basin results in no interruption of influent during the settle and decant phases, or at any other time during the operating cycle. Because settling takes place in a single tank primary and secondary clarifiers, and return sludge pumps are not needed. The SBR package plant is to be provided by Sanitaire. The aerobic digester/sludge holding tank shall provide the environment for waste sludge stabilization. Conditioned sludge shall be removed on a periodic basis and hauled to an appropriate biosolids disposal site by a certified hauler. The digester will be aerated with coarse bubble aerators designed to both mix and aerate. If needed, the digester will have the ability to return microorganisms to the SBR. All tanks are to be equipped with two-rail guardrails and toe plates, will be installed in the ground with 12 to 18-inches above finish grade. The tanks are buried to retain as much heat as possible during the winter months to keeping the process working efficiently. With the exception of the headworks area, all tanks will be outdoors and will not be covered. Disinfection After leaving the SBR, effluent will pass into an 18” chlorine contact pipe. Effluent will be disinfected using sodium hypochlorite. Chlorinated effluent will flow into an outfall box, where it is dechlorinated, and then over a V-notch weir into Spring Gulch. Initial project quotations from SBR manufacturers place the process equipment at approximately $250,000. Additional costs associated with the structural concrete, headworks, metering and filters place the total anticipated construction costs at approximately $816,000. 1.09 Management Capabilities CDPHE Regulation No. 100 “Water and Wastewater Facility Operators Certification Requirements” outlines the certification requirements as a function of plant size and process type. Plant sizes below 0.5 MGD that utilize activated sludge processes and extended aeration used beyond secondary treatment require certification level B. The sequencing batch reactor selected for this project fall into this category. It is estimated that one certified individual can operate and maintain this facility. High Mesa RV Park Waste Water Treatment Facility September 2017 Site Application Report 5 The owner will develop a comprehensive Emergency Response/Operations Plan for this facility. The plan will outline the chain of command, contacts, and instructions for different events, including emergencies (fire, medical, etc.) and less urgent events, such as equipment failure, flooding, and loss of power. In most cases, the lead operator should be called first and then, according to the event, the lead operator shall make the appropriate notifications in accordance with local, state, and federal laws. It is also important to note that under normal operation, the treatment processes will be continuously monitored and will be programmed to send alarms to designated personnel. 1.10 Institutional Arrangements Since this is a private development, the cost of operating the plant will be borne by High Mesa Partners, LLC. Fees for customers using the facility will be incorporated into general park access fees. 1.11 Project Financials The proposed treatment facility capital, operational, and maintenance costs are being funded privately by Daybreak Realty, LLC. The company has set aside appropriated funds specifically for this purpose. Letters providing assurance that the project has adequate funds are attached in Appendix J. 1.12 Project Schedule Daybreak Realty, LLC has provided the resources to design and provide for the construction of the proposed wastewater treatment facility. Construction will begin once necessary approvals are received from the various review agencies. It is anticipated construction will begin in the 15th of May 2018 and startup of the facility will be the 1st of August 2018. APPENDIX A SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 Revised October 2012 Fee Information Request Form Page 1 of 2 Water Quality Control Division Engineering Section Site Location or Design Review – Fee Information Request Form Regulation 22 - Site Location and Design Approval Regulations for Domestic Wastewater Treatment Works Directions: Please submit site location or design review request via email to the Division Unit Manager responsible for the County in which the project is located. Fill out form as completely as possible; please note all information with an asterisk (*) is required. A. Project and System Information System Name* High Mesa RV Park Wastewater Treatment Plant Project Title* High Mesa RV Park Wastewater Treatment Plant County* Garfield For existing domestic wastewater treatment works, please indicate original site location approval number and date Send Invoice to: Design Company Applicant Design Company Name SGM, Inc. Design Engineer Chris Lehrman CO License Number 42729 Address 118 West Sixth St, Suite 200 Glenwood Springs, CO 81601 Email chrisl@sgm-inc.com Phone 970-384-9043 Fax 970-945-5948 Applicant / Entity* Daybreak Realty, LLC Representative Name/Title* Robert Graham Address (include City, State, Zip Code)* 1860 Lousetown Rd. Reno, NV 89521 Email* bgraham@ridgellc.com Phone 408-391-7473 Fax B. Type of Review Requested (check all that apply) Treatment Facility Lift Station New Domestic Wastewater Treatment Works (Section 22.4 of Regulation 22) New Lift Station (Section 22.7 of Regulation 22) Existing Domestic Wastewater Treatment Works – Increasing or Decreasing Capacity (Section 22.5 of Regulation 22) Expansion of Existing Lift Station (Section 22.7 of Regulation 22) Amendment to Existing Site Location Approval Interceptors Amendment of an Existing Site Location Approval – Disinfection Changes Only (Section 22.8(2)(b)(ii) of Regulation 22) Interceptor Sewers Not Eligible for Certification (Section 22.7 of Regulation 22) Amendment of an Existing Site Location Approval – All other Amendment Requests (Section 22.8 Regulation 22) Certification for Eligible Interceptors(Section 22.6 of Regulation 22) Other Reviews and Special Cases New outfall for existing domestic wastewater treatment works Site Approval Extension Individual Sewage Disposal Systems (ISDS) C. Project Information Location (existing or proposed site) Proposed Project Capacity Address (include City, State, Zip Code)* South of Battlement Mesa P.U.D., (see legal description) Hydraulic Capacity: Maximum Month Average in million gallons per day (MGD) .019 MGD Legal Description (e.g., Township, Range) NW 1/4, SW 1/4, Section 19,Township 7S, Range R95W Hydraulic Capacity: Peak Hour in million gallons per day (MGD) .038 MGD County Garfield 4300 Cherry Creek Drive South, B2 Denver, Colorado 80246-1530 CDPHE.WQEngReview@state.co.us 303-692-6298 Revised October 2012 Fee Information Request Form Page 2 of 2 Latitude 39d25'23.25"N Organic Capacity (lbs. BOD5/day) – Treatment Facility Only 48 lbs. BOD5/day Longitude 108d02'44.6"W Estimated Project Cost $816,000 Funding Process Will a State or Federal grant or loan be sought to finance any portion of the project (e.g., State Revolving Fund)? No Yes If yes, please list project number D. Brief Project Summary and Major Project Work Description (e.g., new treatment facility, addition of a new aeration basin, request for re-rating of organic capacity where no construction is proposed, addition of larger pumps in an existing pump station) This will be a new wastewater treatment facility that includes the following: headworks with mechanical bar screens and flow measurement, extended aeration activated sludge through Sequencing Batch Reactor (SBR) process, chlorine disinfection, and aerobic digestion. FOR DIVISION USE ONLY Treatment Facility Amendment to Existing Site Location Approval New Domestic Wastewater Treatment Works (Section 22.4 of Regulation 22 Amendment of an Existing Site Location Approval – Disinfection Changes Only (Section 22.8(2)(b)(ii) of Regulation 22) Less than 100,000 gals/day (Subcategory 44.1 & 45.1) Less than 100,000 gals/day (Subcategory 44.9 & 45.9) 100,000 gals/day to 999,999 gals/day (Subcategory 44.2 & 45.2) 100,000 gals/day to 999,999 gals/day (Subcategory 44.10 & 45.10) 1,000,000 gals/day to 9,999,999 gals/day (Subcategory 44.3 & 45.3) 1,000,000 gals/day to 9,999,999 gals/day (Subcategory 44.11 & 45.11) 10,000,000 gallons/day or more (Subcategory 44.4 & 45.4) 10,000,000 gallons/day or more (Subcategory 44.12 & 45.12) Existing Domestic Wastewater Treatment Works – Increasing or Decreasing Capacity (Section 22.5 of Regulation 22) Amendment of an Existing Site Location Approval – All Other Amendments (Section 22.8) Less than 100,000 gals/day (Subcategory 44.1 & 45.1) Less than 100,000 gals/day (Subcategory 44.13 & 45.13) 100,000 gals/day to 999,999 gals/day (Subcategory 44.2 & 45.2) 100,000 gals/day to 999,999 gals/day (Subcategory 44.14 & 45.14) 1,000,000 gals/day to 9,999,999 gals/day (Subcategory 44.3 & 45.3) 1,000,000 gals/day to 9,999,999 gals/day (Subcategory 44.15 & 45.15) 10,000,000 gallons/day or more (Subcategory 44.4 & 45.4) 10,000,000 gallons/day or more (Subcategory 44.16 & 45.16) Lift Station Interceptors New Lift Station (Section 22.7 of Regulation 22) Interceptor Sewers Not Eligible for Certification (Section 22.7 of Regulation 22) (Subcategory 44.19 & 45.18) Less than 100,000 gals/day (Subcategory 44.5 & 45.5) Certification for Eligible Interceptors(Section 22.6 of Regulation 22) (Subcategory 44.20) 100,000 gals/day to 999,999 gals/day (Subcategory 44.6 & 45.6) Other Applications and/or Reviews 1,000,000 gals/day to 9,999,999 gals/day (Subcategory 44.7 & 45.7) Individual Sewage Disposal System (Subcategory 44.17 & 45.17) 10,000,000 gallons/day or more (Subcategory 44.8 & 45.8) Site Application Extension (Subcategory 44.18) Expansion of Existing Lift Station (Section 22.7 of Regulation 22) Outfall Sewers (Subcategory 44.21 & 45.19) Less than 100,000 gals/day (Subcategory 44.5 & 45.5) 100,000 gals/day to 999,999 gals/day (Subcategory 44.6 & 45.6) 1,000,000 gals/day to 9,999,999 gals/day (Subcategory 44.7 & 45.7) 10,000,000 gallons/day or more (Subcategory 44.8 & 45.8) Revised December 2013 Section 22.4: Application Form Page 1 of 5 Water Quality Control Division Engineering Section Regulation 22 Application Form Section 22.4 of Regulation 22: New Domestic Wastewater Treatment Facility A. Project and System Information System Name High Mesa RV Park Wastewater Treatment Plant Project Title High Mesa RV Park Wastewater Treatment Plant County Garfield Date Fee Paid or payment attached Invoice Number and Check Number Design Company Name SGM, Inc. Design Engineer Chris Lehrman CO License Number 42729 Address 118 West Sixth St, Suite 200 Glenwood Springs, CO 81601 Email chrisl@sgm-inc.com Phone 970-384-9043 Fax 970-945-5948 Applicant / Entity Daybreak Realty, LLC Representative Name/Title Robert Graham Address 1860 Lousetown Rd. Reno, NV 89521 Email bgraham@ridgellc.com Phone 408-391-7473 Fax B. Project Information Location (existing or proposed site) Proposed Project Capacity Brief location description South of Battlement Mesa P.U.D., (see legal description) Maximum Month Average Hydraulic Capacity in million gallons per day (MGD) .019 MGD Legal Description (e.g., Township, Range) Section 19,Township 7S, Range R95W Peak Hour Hydraulic Capacity in million gallons per day (MGD) .038 MGD County Garfield Latitude 39d25'23.25"N Organic Capacity (lbs. BOD5/day) – Treatment Facility Only 48 lbs. BOD5/day Longitude 108d02'44.6"W Funding Process Will a State or Federal grant or loan be sought to finance any portion of the project (e.g., State Revolving Fund)? No Yes If yes, please list project number Project Schedule and Cost Estimate Estimated Bid Opening Date 1 May 2018 Estimated Completion Date 15 July 2018 Estimated Project Cost $816,000 4300 Cherry Creek Drive South, B2 Denver, Colorado 80246-1530 CDPHE.WQEngReview@state.co.us 303-692-6298 Revised December 2013 Section 22.4: Application Form Page 2 of 5 Project and System Information Project Title High Mesa RV Park Wastewater Treatment Plant System Name High Mesa RV Park Wastewater Treatment Plant County Garfield Treatment Facility Information 1. Type and capacity of treatment facility proposed including major processes used Activated Sludge, Extended Aeration with Mechanical Bar Screen, Sequencing Batch Reactor Processing Tank, Aerobic Digester, and Chlorine Disinfection Site Information 2. Vicinity maps of facility location which includes the following: a) 5 mile radius map: all wastewater treatment facilities, lift stations and domestic water supply intakes b) 1 mile radius map: habitable buildings, location of public and private potable water wells, an approximate indication of the topography, and neighboring land uses See Appendix B 3. Site Location Zoning a) Present zoning of the site location? Rural b) Zoning within a one (1) mile radius of the site? Rural, Public Lands, Incorporated City or Town 4. Floodplain and Natural Hazards a) Is the facility located in a 100-year floodplain or other natural hazard area? If so, what precautions are being taken? No b) Has the floodplain been designated by the Colorado Water Conservation Board, Department of Natural Resources or other agency? If so, please list agency name and the designation. Flood Insurance Rate Maps, Panel 080205 1705B 5. Land Ownership a) Who owns the land upon which the facility will be constructed? Please attach copies of the document(s) creating authority for the applicant to construct the proposed facility at this site. Daybreak Realty 6. Nearby Facilities a) Please list all municipalities and water and/or sanitation districts within 5-miles downstream of the proposed wastewater treatment facility site. Response: Battlement Mesa Consolidated Metropolitan District, Town of Parachute, Revised December 2013 Section 22.4: Application Form Page 3 of 5 Treatment Facility Effluent Information 7. Effluent disposal method (check all that apply) Surface Discharge to watercourse (enter watercourse name below) Groundwater Discharge Land application Treated Effluent Reuse (Regulation 84) Evaporation Other (describe below) Spring Gulch 8. Preliminary Effluent Limits (please attach a copy in Engineering Report) a) Preliminary Effluent Limits received on: b) Preliminary Effluent Limits expiration date: 9. Downstream Distances a) Downstream distance from the discharge point to the nearest domestic water supply intake? Name of supply? Address of supply? Distance: 13 miles Name of Supply: Town of DeBeque Address of Supply: 2155 45 Rd., DeBeque, CO 81630 b) Downstream Distance from the discharge point to the nearest other point of diversion? Name of user? Address of user? Distance: 1500 ft Name of User: Eugene Speakman Address of User: 198 Tamarisk, Parachute, CO 81635 Project Information 10. a) What entity is financially responsible for the construction of the facility? Applicant (Daybreak Realty, LLC) 11. a) What entity has the financially responsibility for owning and long term operating expense of the proposed facility? Applicant (Daybreak Realty, LLC) 12. a) What entity has the responsibility for managing and operating the proposed facility after construction? Facility will be leased to High Mesa Partners, LLC for operation Additional Factors 13. Please identify any additional factors that might help the Water Quality Control Division make an informed decision on your site location application. The proposed facility will serve as a recreational vehicle park consisting of 120 vehicle pads, a central laundry facility and bathhous. This facility will only serve facilities owned by Daybreak Realty, LLC. and will not receive waste from other operations. Revised December 2013 Section 22.4: Application Form Page 4 of 5 Water Quality Control Division Engineering Section Applicant Certification and Review Agencies Recommendation Section 22.4 of Regulation 22: New Domestic Wastewater Treatment Facility A. Project and System Information System Name High Mesa RV Park Wastewater Treatment Plant Project Title High Mesa RV Park Wastewater Treatment Plant County Garfield 1. Applicant Certification I certify that I am familiar with the requirement of Regulation 22 - Site Location and Design Approval Regulations for Domestic Wastewater Treatment Works, and have posted the site in accordance with the Regulations. An engineering report, as described by the regulations, has been prepared and is enclosed. Applicant Legal Representative (e.g., Public Works Director) Date Typed Name Signature Robert Graham The system legal representative is the legally responsible agent and decision-making authority (e.g. mayor, president of a board, public works director, owner). The Consulting Engineer is not the legal representative and cannot sign this form. 2. Recommendation of Review Agencies As required in Section 22.4(2), the application and the engineering report must be submitted to all appropriate local governments, 208 planning agencies and State agencies for review and comment prior to submittal to the Division. By signing below, the entity or agency: 1) acknowledges receipt of the proposed site location application, 2) has reviewed the proposed site location application and may elect to provide comments, and 3) has provided a recommendation concerning the application to the Division. The recommendation should be based on the factors outlined in Section 22.4(2); for example, on the consistency of the proposed site location application with the local comprehensive plan(s) as they relate to water quality and any adopted water quality management plans(s). Please note: Review agencies are encouraged to provide project comments; however, if a review agency does not recommend approval then the agency must attached a letter describing the reason for their decision or comment on the next page. Signature of Management Agency, if different from other entities listed below Role Date Typed Name / Agency Signature Recommend Approval? Yes No Signature of County, if proposed facility is located in unincorporated areas of a county Role Date Typed Name / Agency Signature Recommend Approval? Yes No Signature of City or Town, if site is located within three miles of the City/Town boundary (if multiple, attach additional sheets as needed) Role Date Typed Name / Agency Signature Recommend Approval? Yes No Signature of Local Health Authority Role Date Typed Name / Agency Signature Board of County Commisioners of Garfield County Recommend Approval? Yes No 4300 Cherry Creek Drive South, B2 Denver, Colorado 80246-1530 CDPHE.WQEngReview@state.co.us 303-692-6298 Revised December 2013 Section 22.4: Application Form Page 5 of 5 Signature of 208 Planning Agency Role Date Typed Name / Agency Signature Recommend Approval? Yes No Signature of Other State or Federal Agencies, if facility is located on or adjacent to a site that is owned or managed by a federal or state agency. Role Date Typed Name / Agency Signature Recommend Approval? Yes No Signature of Other Basin Water Quality Authority, Watershed Association, Watershed Authority, etc., if fa cility is located in a Water Quality Control Commission Watershed Protection Control Area. Role Date Typed Name / Agency Signature Recommend Approval? Yes No Review Agency Comments: Revised October 2012 Section 22.4: Completeness Checklist Page 1 of 2 Water Quality Control Division Engineering Section Regulation 22 Application Completeness Checklist Section 22.4 of Regulation 22: New Domestic Wastewater Treatment Facility Project and System Information Project Title High Mesa RV Park Wastewater Treatment Plant System Name High Mesa RV Park Wastewater Treatment Plant County Garfield Regulation 22 Citation Submittal Requirements Applicant to fill out Included/Addressed in Site Location Submittal? Yes/No/NA Location in Submittal (page) 22.4(1) Site Application Forms including: - Signature of local authorities and 208 planning agency (see 22.4(2)) - Signature of responsible party of the proposed facility Yes App. A 22.4 (1)(b) Engineering Report including: Yes Service Area Definition Yes 1-2 22.4 (b)(i) Service Area Definition including: Yes 1-2 - Existing and Projected Population Yes 2 - Staging or phasing NA - Flow and loading projections Yes 2 - Relationship to other water and wastewater treatment works Yes 3 Proposed Site, Site Alternatives, Treatment Alternatives Yes 3 22.4 (b)(ii) Proposed Selected Site Location Description Yes 3 Evaluation of Alternative Sites No Treatment Alternatives Yes 3 Preliminary Effluent Limitations Pending 2 22.4 (b)(iii) Preliminary Effluent Limits: Pending 2 - Summary of PELs including issuance and expiration date Pending App. D - Pretreatment program or enforceable mechanism description, if applicable NA Existing Facilities within Service Area NA 22.4 (b)(iv) Analysis of loading, capacity and performance of any relevant existing facilities within the applicant’s service area NA Consolidation Analysis Yes 3 22.4 (b)(v) Analysis of opportunities for consolidation Yes 3 Floodplain or other natural hazards Yes App. F 22.4 (b)(vi) Evidence that the proposed site and facility operations will not be adversely affected by floodplain or other natural hazard Yes App. F Geotechnical Analysis Yes App. G 22.4 (b)(vii) Geotechnical site conditions evaluation material Yes App. G - Soils Report for design phase which states the selected site will support the proposed facility Yes App. G Selected Alternative Description Yes 3-4 22.4 (b)(viii) Selected Alternative Description, including: Yes 3-4 - Legal description of site Yes App. H - Treatment system description Yes 4 - Design capacities Yes 2 4300 Cherry Creek Drive South, B2 Denver, Colorado 80246-1530 CDPHE.WQEngReview@state.co.us 303-692-6298 Revised October 2012 Section 22.4: Completeness Checklist Page 2 of 2 22.4 (1)(b) continued 22.4 (b)(viii) continued - Operational staffing needs Yes 5 - Process Flow Diagram Yes App. I Control of site legal arrangements Yes 5 22.4 (b)(ix) Control of site legal arrangements for project life Yes App. J Institution arrangements for waste treatment payment Yes 5 22.4 (b)(x) Institution arrangements for waste treatment payment Yes 5 Management Capabilities Yes 5 22.4 (b)(xi) Management capabilities for controlling the wastewater loading to the proposed treatment works within capacity limitations Yes 5 Financial System Yes 5 22.4 (b)(xii) Financial system information for capital and O&M costs over project life No - Anticipated annual budget Yes App. I - Fee and rate structure NA Implementation plan and schedule Yes 5 22.4 (b)(xiii) Implementation plan and Schedule, including: Yes 5 - Estimated construction time Yes 5 - Estimated start up date Yes 5 Capacity to operate and maintain the facility No 22.4 (b)(xiv) Demonstrate owner’s capacity to operate and maintain the facility including: No - Emergency operations plan No 22.4 (1)(c) Notice of the intent to construct on private property, if applicable Pending 22.4 (1)(d) Capacity sharing agreement, if applicable NA 22.4 (1)(e) Service to new or expanded service area - Consistent with water quality management plan 22.4 (2) Site Application Review and Comments from: (a) Management Agency (b) County (c) City or Town (d) Local Health (e) 208 Planning Agency (f) Other state or federal agencies 22.4 (3) Site Location Posting Documentation (e.g., photo of the public notification sign) Pending APPENDIX B SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 / ' ( ' \ \\ I', ) \ 5056 X \,_ 13 & Batllcm nt \. • Sch -...: ...._ (r \ / I CMD= BATTLEMENT MESA CONSOLIDATED METROPOLITAN DISTRICT 3{a). 5-MILE RADIUS MAP COLORADO DIVISION OF WATER RESOURCES MAPPING r °' 751.111 ,.5111 I I I GRAPHIC SCALE 1· = 1 6 MILES APPENDIX C SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 ....... · .. .... .......... .... .... ! ~ ~ ~ 11' ~ " " ...... ... ......... ~ .... ···· ~ ~ "" "- ~ ,, " .l1 0: • .. .. · .. ....... ·· .... i7j l--"~~~1--~ ...... --~ ..... ~ ~ . 3. r ....... ~ ..... · ~I 1 ........ / "' . ~ ........... 1 ·· ... ....... .. ... .. ........................... .......... .......... ......... · I I .. - ... · I .· .·· .... I .... ··" .... ·· . ·· ... ......... ... -- .. ........ .. ... .......... ...... }, .......... 1· :: .... I .... r· ..... ~ -;:>; i l Preliminary Not For Construction .· ..... ·· .... .... .... .·" ...... ... ... . ·· ... ... ··· ...... · ................ . .. · .... ······ ... ....... -. .... . ·· ... .... ................................. ... .. .. ... . .. ..... .............. . .. ········ ............ ·· DISCHARGE POINT · ... --.. ;.:.:: ·· . ... .... .. ... ....... ............ .. .... ······ ... ···. .. ......... . . ........ .. . . ............ · .... .... .... .... · .... ·" .. .... :.:-··" ·· . .... ···· .. .. :.··· ........... ··· ...... ·····" ..... ..· Grap~ic Si::al~· 0 10. . 20 i •I -1 I._•,• ·· . .... ... / ...... /········· ... . ... ········· .·· · ......... \ . ~&'VA ~ WAJCR UNE~ ------e'VA .. .-···· .............. .... F1IOl.I ~KMAN WEl.l.S ; ,. .... NEW ACCESS DlllV£ LOCATIO/j. ....... ..... . WITH TURNAROlfNO .... · . · .. -.... ------e."'11 · 18" CHLORINE CONTi'.CT PIPE ........ · .. r .. .......... ······ ....... ···· ... .... :· ······ . .. ........... ...... (.· ..... . . . ·· ...... .·· ··········-··················· ... · .. ··. ······.... ·····:············ ... ············-.. .. ... ....... ,.. ............. . .. .... ............. ~-······ . ....... . .................. ·-. .. -=-.... .......... -. .... ·· .... ......... ... .... - ......... ... ................. .... ······ ... 6 SGM 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 970.945.1004 www.sgm-inc.com DISINFECTION DOSING POINT DIGES~R BLOWER ROOM CONTROL ROOM jfEAD MECHANICAL /BLDG. .... ........ . ........ ! .. BAR SCREEN..·· ···· .: ............ .. . · ... .......... :·· .... .. ....... ·· .... ··············· ... · . · . / t:' .. " .... · ...... ... . ... ·· ., .. ············ TllROTTU: ~ (,f° FOii FLOW CONTllOL .-·· .. . ·· .. .. ...... l/ . .. /// ··· ... •. ··. :····· ...• ......... . ............................. _ . CHLORINE FEED \LINE FROM WA~R \TREATMENT BLDG. A/WI llE:SERVEO FOii · lllON-CHLOlllNE CONTACT TANK IF NEEOE/J -~--tf---HARMSCO MUNl-1-2Fl.-J04 FILTEll llOUSl/IGS WJJ:r::~~O ,;~PLIANT JJde-_:_.---2" CHECK ~if" LOCATEIJ AT EXIT OF WAIF!\' 111EATllOIT BLOG. ! PARSHALL FLUME!/ BYPASS BAR#EN WATE'i' TREATMENT BLDG • PRIAIAK"ef OISINFECTION OOS//l/G PO//llJ ~ ~ FOii lflbN-CHLOll/NE <) 4 • SA/Vlr.'.llY SEWEii LATEllA/. F1IOl.I WATEll TllEATllOIT FLOOll OllAIN CONNECTION ro lfff7' IN HEADWOllKS fll./}G. OPEN CHAM ....... ·· ........... ( .... ··· ....... . ......... .... ............. · CONTACT TIME IF llEOl1'lf8J 6" GllATBJ Fl.OOll OllA!N ro SAN/TAllY St:WEll . ....... ... . ...................... - .. · ..... .... ... ... ....... / ······ ..... ····· .... .... · .. / .......... .. ........ .. .... .. .... · ... .· ...... ·· ... · .... · .. · .. .............. · ............. . .. · ... · ..... . · .· .. .· .... _ ... · .... .·· ... ....... ..... .. .. .· / ........ .. :/ ·· ............... . ......... · .. .. ....... '. ...... .. ........ . .. · .... .... ..·· . . ·· .... . ............ · · ... /········ .. // :/····· ... ··· . .. ........ ··.... ......... . ....... . ..... . ..... ... ...·. ......... ····· ......... . .. .... ... ······ ....... ... · . ...... . ........... ---- . ..... ·· ..... .. .. ..... ............. . ................... .. .. .. .... . ....... · .. .. . ...... . ... . ............... . ... # . ........ ...... Revision ........... ........................... IE Date By .. ... ··· ...... ... ··"·· ... .. ...... ·· ... ..... · .... .. .......... ................. ·· .. ..... · .. · .. · .... · .......... . ... ..... ... ·" "· ... _ .. . ·· .... · .. ··<·.·\ . .·.. .... · .. ."·. · ... ·· .... ·· .. .. .. ......... . "· ....... · ......... .. · . · .. ..... .... .... .............. .... ~ .... .... . .. ·· ........ .. ·· . IE . .. . .. Job No. 2006·374.001 ... "< . ·· ..... ·. ·· ...... . ·. . .. . ~~··.~·· .......... . '··......... ····· .. :. · ... .. .. ·. ·· .. ···············... · . ·· ..... ····... ·················· ... "··.... . .... · ........ .......... .. ......... . ·· ...... ··· ....... · ..... "··· ... .. .. ......... Qt Daybreak Realty High Mesa RV Park Water and Wastewater Drown by: CRH Cl 00 Date: 09/01/2017 t----+----------------'--1----1 Treatment Plants Site Layout t-a_c: __ cL ...... P_E: __ c_.L 01 File: HMRVP Site Plan APPENDIX D SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 From:DeLaria - CDPHE, Michelle To:Chris Lehrman Cc:Debbie Jessop ; Casey Hinkson Subject:Re: RE: PEL application Date:Friday, September 01, 2017 7:47:11 AM Doesn't look like it. There are a few ahead of it. The PEL number for High Mesa is: PEL200522 Michelle DeLaria Unit Manager Permits Unit 2 P 303.692.3615 4300 Cherry Creek Drive South, Denver, CO 80246 Michelle.DeLaria@state.co.us | www.colorado.gov/cdphe/wqcd 24-hr Environmental Release/Incident Report Line: 1.877.518.5608 On Fri, Sep 1, 2017 at 7:38 AM, Chris Lehrman <ChrisL@sgm-inc.com > wrote: Morning Michelle, Any chance we can get the PELs before 9/5/17 (Next Tuesday)? We have a hearing with our local planning agency (Garfield County) for this project and need to provide proof that we are making progress with the permitting of the proposed WWTF. We are ready to submit our site application but need the PELs in order to do so. Thank you, Chris Lehrman, PE Project Manager From: Chris Lehrman Sent: Tuesday, August 22, 2017 11:45 AM To: DeLaria - CDPHE, Michelle <michelle.delaria@state.co.us >; Debbie Jessop <debbie.jessop@state.co.us> Subject: RE: RE: PEL application Thank you for the update Michelle. Thank you, Chris Lehrman, PE Project Manager From: DeLaria - CDPHE, Michelle [mailto:michelle.delaria@ state.co.us ] Sent: Tuesday, August 22, 2017 11:43 AM To: Chris Lehrman <ChrisL@sgm-inc.com >; Debbie Jessop <debbie.jessop@state.co.us> Subject: Re: RE: PEL application The PEL has been drafted and is being reviewed. Michelle DeLaria Unit Manager Permits Unit 2 P 303.692.3615 4300 Cherry Creek Drive South, Denver, CO 80246 Michelle.DeLaria@state.co.us | www.colorado.gov/cdphe/wqcd 24-hr Environmental Release/Incident Report Line: 1.877.518.5608 On Tue, Aug 22, 2017 at 11:03 AM, Jessop - CDPHE, Debbie <debbie.jessop@state.co.us> wrote: ---------- Forwarded message ---------- From: "Chris Lehrman" <ChrisL@sgm-inc.com >Date: Aug 22, 2017 8:41 AMSubject: RE: PEL applicationTo: "debbie.jessop@state.co.us" <debbie.jessop@state.co.us >Cc: "rmss@sopris.net" <rmss@sopris.net>, "Casey Hinkson" <CaseyH@sgm-inc.com > Morning Debbie, Can you give us an update on where CDPHE is at on this PEL request? Looks likewe are at the two month mark today. Thank you, Chris Lehrman, PE Project Manager From: Shannon Linnehan Sent: Thursday, June 22, 2017 11:52 AMTo: debbie.jessop@state.co.usCc: Chris Lehrman <ChrisL@sgm-inc.com >; rmss@sopris.netSubject: PEL application Hi, Debbie, Attached is a PEL application prepared by SGM for a new wastewater treatment facility in Parachute, CO. Thank you, Shannon Linnehan, EI Engineer I APPENDIX E SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 Nick Kilbourn From: Bob Graham [bgraham@ridgellc.com] Sent: Wednesday, March 28, 2007 4:37 PM To: Nick Kilbourn Subject: FW: High Mesa RV Page 1 of 2 6/8/2009 Ridge Partners, LLC 408-391-7473 From: robert jasper [mailto:rjasper@acsol.net] Sent: Wednesday, March 28, 2007 3:21 PM To: bgraham@ridgellc.com Subject: Re: High Mesa RV I have discussed the issue with the Chairman of the Board. Your property is located outside the Consolidated Metropolitan District Boundary and outside our planned service area. We are therefore unwilling to provide water and wastewater service to your property. Thanks for checking with us. ----- Original Message ----- From: Bob Graham To: 'robert jasper' Sent: Monday, March 26, 2007 9:01 PM Subject: RE: High Mesa RV Bob, Thanks for your quick follow up. An Email is fine. If they need more at the state I’ll let you know. Bob Ridge Partners, LLC 408-391-7473 From: robert jasper [mailto:rjasper@acsol.net] Sent: Monday, March 26, 2007 1:01 PM To: bgraham@ridgellc.com Cc: Anne Huber; Sandy Yeager; George Cathey; Bill Nelson; Bill Wilde; Frank Lancaster; Fred Inman Subject: Re: High Mesa RV Thanks- I am forwarding your e-mail to my Board to give them a heads up. Give me a couple of days and then, unless I hear other wise from the Board, I will send you an email (or do you need a letter) advise we will not provide service. ----- Original Message ----- From: Bob Graham To: rjasper@acsol.net Sent: Monday, March 26, 2007 10:59 AM Subject: High Mesa RV APPENDIX F SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 WESTBATTLEMENTPARKWAYMURRAY CTMURRAY LN4TH ST4TH ST2ND ST3RD ST RAIL R O A D AV HILL CTHALLETTAV 2ND STGREENST RAILROAD AV N BATTLEMENTPKWYGRANDVALLEYWYSFRONTAGERDSSECONDCT1ST STFISHER AVSTJOHNSCIRUSSE Y AV WAT S ON A V EVANS AV AV 3 YA R R OW C I496COLORADO AVYAMPA AVRIO GRANDE AVLA PLATA CISOUTHBATTLEMENTPARKWAY300SPENCER PARKWAYEASTBATTLEMENTPARKWAYCLEARCREEKCIRLOCUSTALDERLODGEPOLE C IRSNOWBERRYNORTHSTARTRAILASTERPOPPYLIM B ER PINECIRSTONE QUARRY ROADHACKBE R R Y LNSAGEMONT C IRSPRUCECEDA RLARKSPUR PINE-TREEP LW A YASPENC O L U M BINELNPONDERO SACIRCOTTONWOODPINYONPLWILLOWVIEWWAYJUNIPERLNOAK CTDOGWOODLNBRISTLECONEWINTER-GREENWAYCTS UMAC M O N U M ENTTRAILLUPINELNROSEWOODWAYCAC T U S C T ROSEWOODLNHAWTHORNEWYEMERALDLNHILLCTSMOKEYSILVERQUEENCIR S M O K E Y H IL L C I R ORO CTRAINBOWTRAILSILVERTONSILVERTONSILVERTONCTMAHOGANYCIR LOGAN S LNTAMARISKTRAILCEDAR CIRTAMARISKSULPHUR PLBLACKCRESTONEPARADOXWBONANZAHORIZO N C IR PHOENIX WYEMPIREBENTCRCIRQUEEN CI T YCIWTAMARACKCIRE TAMARACK CIRPLACERDREBONANZAPLSTONEQUARRYROADBAKER HILLGOLDFIELDCTPINNACLETHUNDERBERGTRAILELDORA DRCOBRE PL PARAC HUTE WAYTAMARISKTRAILSILVER PLUME DRBLACKHAW KTRAILIRONWEDGECIWCARSONCIRECARSONCIRW SILVERBELLE SILVERBELLMORNING STAR DRLITTLERCHODRNORTHBATTLEMENTPARKWAYPAR A C H UT E A VMEADOWCREEKDRMEADOWCREEKCTFAIRW A Y D R BATTLEMENTCRTRAILBOULDERRIDGEDREAGLEROCKPLRAMPA R T ROANCREEKDRCR PLROANM ESA V IS T AVIEW PLVALLEYPLP ROMONTORYWILLOWCRCTRIDGEVIEWPLWILLOWCRTRAILGREEN MESA PLRIVERVIEWPLWILDROSELNLAURELDRCOLUMBINE DRHILL CTBILLTER AV PL BAINTER 300300LYONSSTSIPPRELLE DRARROYO DRW RIDGE CTN RIDGE CTS RIDGE CTRIVERBLUFF RD OLD S T O N E Q U A R R Y R O A D GARDNER LNFOUR CORNER RDUNDERWOOD LNLITTLE374373C374C374373CC300373373W373V300373D372A A 372372CC372L372I372V300372EE 373O 373L373373373A370G370G370374E374D374F374B374A374QPL374P374NPL374GCT371I374HPL374J373KCT373J3 7 3 I374K374LPL374M373H373EPL373F373G373T373B373UPL373Y373XPL373BB373Z373AA373M373NPL373P 373QCIR373R373S372FFCT372R372S372O372N372Q372I3 7 2 M C T 372J372K372P372F372G 372H372AWAY372BCT H O LLY372DD372D372C 372ECT372XCT372YCT 372Z CT372U372V WAY372T372WPL372EE372BBPL371E371F371G371371D371C371A317B370I370H370 J PL 370F 370370E370D370A PL 370C370B300Parachute C re e k MonumentGulchDryCreekBattle m e n t C re e k KellyG ulch309302300301215355310338300A307300B303337340308300C300 OLD305353304BATTLEMENT MESAMORISANIA RANCHBATTLEMENT MESAParachute70DISCLAIMER:This map was produced by Garfield County Geographic Information Services utilizing the ArcInfo GeographicInformation System (GIS). The GIS and its components are designed as a source of reference for answeringqueries, modeling, and planning. The GIS is not a substitute for official government records maintained by thePlanning Department, the County Clerk and Recorders Office, the Assessor's Office, or for any legal descrip-tion information in the chain of title. In addition, the representation of geographic locations by the GIS maynot be substituted for actual legal surveys. Always refer to the sources cited for the most current legal docu-mentation utilized in the composition of this map.The information contained herein is believed to be accurate and suitable for the limited uses set forth above.Garfield County makes no warranty as to the accuracy or suitablity of any information contained herein for anyother purposes. The user shall assume all risk and responsibility for any and all damages, including conse-quential damages, which may propagate from the user's application of this information.Flood Plain, Vicinity Town of Parachute,Garfield County, COl:\flood_plain\parachute1711 Revision 2: 2-26-030 2,500 5,0001,250Feet1 inch equals 0.51 milesLegend100 Year Flood Plain1) Federal Emergency Management Agency, Flood Insurance Rate Maps (FIRM),(revised January 3, 1986).2) Army Corp of Engineers Colorado River Flood Plain Study, prepared in cooperationwith the Colorado Water Conservation Board, (revised July 1987).FLOOD PLAIN PROFILE SOURCE:6 13 18 17 ZONEC Monument Gulch 24 \ \ \ ZONEC APPROXIMATE SCALE IN FEET LIMI t----------------STU NATIONAL FLOOD INSURANCE PROGRAM FIRM FLOOD INSURANCE RATE MAP GARFIELD COUNTY, COLORADO (UNINCORPORATED AREAS) PANEL 1705 0 F 1900 (SEE MAP INDEX FOR PANELS NOT PRINTED) COMMUNITY~PANEL NUMBER 080205 1705 B MAP REVISED: JANUARY 3, 1986 Federal Emergency Management Agency This is an official copy of a portion of the above referenced flood map. It was extracted using F-MIT On-Line. This map does not reflect changes or amendments which may have been made subsequent to the date on the title block. For the latest product information about National Flood Insurance Program flood maps check the FEMA Flood Map Store at www.msc.fema.gov APPENDIX G SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 ~tech HEPWORTH · PAWLAK GEOTECHNICAL SUBSOIL STUDY Hepw orth -Pawlak Geotech111ca l, In c. 5020 County Road 154 Glenwood Spnng;, Ct1 lorado 8 1601 Ph one : 970-945 -7988 Fax: 970-945-8454 emai l: hpgeo@ hpge otech .co m FOR FOUNDATION DESIGN PROPOSED HIGH MESA RV PARK NEAR BATTLEMENT MESA GARFIELD COUNTY, COLORADO JOB NO. 107 0639 DECEMBER 14, 2007 PREPARED FOR: HIGH MESA PARTNERS, LLC ATTN: BOB GRAHAM 1860 LOUSE TOWN ROAD RENO, NEV ADA 89521 Parker 303-84 1-7119 • Colorado Springs 719-63 3-5 562 • S i l\'erthorne 970-468-1989 TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY ........................................................................ -1 - PROPOSED DEVELOPMENT .................................................................................. -1 - SITE CONDITIONS ................................................................................................... -2 - FIELD EXPLORATION ............................................................................................ -2- SUBSURFACE CONDITIONS .................................................................................. -3 - DESIGN RECOMMENDATIONS ............................................................................. - 4 - FOUNDATIONS .................................................................................................... -4 - FOUNDATION AND RETAINING WALLS (WASTEWATER TREATMENT PLANT) .................................................................................................................. -5 - NON-STRUCTURAL FLOOR SLABS (SPREAD FOOTINGS) ............................ -6 - UNDERDRAIN SYSTEM ...................................................................................... - 7 - SITE GRADING .................................................................................................... -7 - SURF ACE DRAINAGE ......................................................................................... -8 - LIMITATIONS .......................................................................................................... -9 - FIGURE 1 -LOCATIONS OF EXPLORATORY BORINGS FIGURES 2 to 4 -LOGS OF EXPLORATORY BORINGS FIGURE 5 -LEGEND AND NOTES FIGURES 6 to 8 -SWELL-CONSOLIDATION TEST RESULTS FIGURES 9 and 10 -GRADATION TEST RESULTS TABLE 1-SUMMARY OF LABORATORY TEST RESULTS PURPOSE AND SCOPE OF STUDY This report presents the results of a subsoil study for the proposed High Mesa RV Park facility to be located near Battlement Mesa, Garfield County, Colorado. The project site is shown on Figure 1. The purpo se of the study was to develop recommendations for the foundation design. The study was conducted in accordance with our proposal for geotechnical engineering services to High Mesa Partners, LLC dated March 28, 2007, Propo sal No. 122-06. A field exploration program consisting of exploratory borings was conducted to obtain information on the subsurface conditions. Samples of the subsoils obtained during the field exploration were tested in the laboratory to determine their classification, compressibility or swell and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundations. This report summarizes the data obtained during thi s study and presents our conclusions, design recommendations and other geotechnical engineering considerations based on the proposed construction and the subsurface conditions encountered. PROPOSED DEVELOPMENT The facility is currently proposed to consist of 120 RV spaces, 3 s mall amenities buildings, wastewater treatment plant and storage building as s hown on Figure 1. Water storage for the facility consisting of above ground tanks will be located southeast of the main facility s ite. We ass ume that the amenities and storage buildings will be singl e story, steel structures with s lab-on-grade ground floors and the wastewater treatment plant will be a "package" type system. Grading i s ass umed to be relatively minor with cut and fill depths between about 2 to 6 feet at the main facility site, on the order of 10 or 12 feet at the wastewater treatment plant and on the order of 5 to 6 fee t at the water storage site. We assume relatively light foundation loadings, typical of the proposed types of construction. Job No. I 07 0639 ~tech -2 - If development plans change significantly from those described above, we should b e notified to re-evaluate the recommendations contained in this r eport. SITE CONDITIONS The main facility site is vacant. A rough graded dirt road accesses the site along the south (uphill) sid e. Deeply incised drainages cross through the site. The overall s lop e is moderate down to the north. Vegetation consists of scattered grass and weeds with sage brush and dense groves of piiio n pine trees . Basalt cobbles and boulders are visib l e on the ground surface. The water storage site is located on a north trending ridge in relatively hilly t errain southeast of the main facility site. The ground surface slopes moderately down to the north in the propos ed development area and drops off steeply on the sides of the ridge. Vegetation consists of scattered grass and weeds with sage brush and piiion pine trees. FIELD EXPLORATION The field exploration for the project was conducted on October 18 and 19, 2007. Ten exploratory borings were drilled at the locations s hown on Figure 1 to eva lu ate the s ub s urface conditions. The borings wer e advanced with 4-inch diameter continuous flight augers powered by a track-mount ed CME -55LC/300 drill rig. The borings were logged by a representative of Hepworth-Pawlak Geotechnical, Inc. Samples of the subsoils were taken with 1 % inch and 2 inch I.D. sp oo n sampler s. The samplers were driven into the subsoils at various depths w ith blow s from a 140 pound hammer falling 30 inches. This t est is s imilar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency of the subsoi ls. Depths at whi ch the samples were taken and the p enetration resistance values are shown on the Logs of Exploratory Borings, Job No. 107 0639 ~tech -3 - Figures 2 through 4. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Figures 2 through 4. The subsoils are variable throughout the proposed development. The subso ils at the main facility site (Borings 1, 2 and 6 through 10), below about Yi foot of topsoil (root zone), generally consist of up to about 4 12 feet of mixed sand, silt and clay soil overlying r e latively dense, silty to clayey sandy gravel with cobble and small boulders down to the maximum explored depth of 15 feet. Drilling in the dense granular soil s with auger equipment was difficult due to the cobbles and boulders and drilling refusal was encountered in the deposit at most of the borings. The subsoils at the water storage s ite (Boring 3), below about Yi foot of topsoil (root zone), consist ofrelatively dense, silty sandy gravel with cobbles and boulders down to the maximum explored depth ofl5 feet. The subsoil s at the wastewater treatment plant site (Borings 4 and 5), below about Yi foot of topsoil (root zone), consist of26Yi to 2912 feet of medium dense/medium stiff to so ft , silt y sand and clay overlying relatively dense, gravel with cobb les and boulders down to the maximum explored depth of 33 feet. Laboratory testing performed on samples obtained from the borings included natural mois ture content, dens ity, gradation analyses and Atterberg limits. Results of swell- consolidation testing performed on relatively undisturbed drive samples, presented on Figures 6 to 8, indicate low compressibility under existing moisture conditions and light loading, and a lo w to moderate collapse potential (settlement under a constant load) after wetting. The samples showed moderate to high compressibility with increased loading after wetting. Results of gradation analyses performed on s mall diameter drive samples (minus % and 1 Yi inch fractions) of the coarse granular subsoils are shown on Figures 9 and 10. The laboratory testing is summarized in Table 1. Job No. 107 06 39 ~tech - 4 - Groundwater was encountered in Borings 4 and 5 at the depths of 15 and 17 feet at the time of drilling. The remaining borings were dry. The subsoils were typically slig htly moist to moist and wet b e low the groundwater level at Borings 4 and 5. DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsurface conditions encountered in the exploratory borings and the nature of t he proposed construction, we recommend the buildings be founded with spread footings or thickened-edge slabs bearing on the natural so ils. We should review the wastewater treatment plant foundation and grading plans when available. The design and constructio n criteria presented b elow should b e o b served for a spread footing or thickened-edge s lab foundation system . 1) Foundations placed on the undisturbed natura l so il s sh ould be desig n ed for an allowable bearing pressure of 1,000 ps£ Foundations bearing entirely on the natural d ense granular soil s can b e desig ned fo r an allowable b earing pressure of2,500 ps£ Based on experience, we expect initia l settlement of foundations designed and constructed as discussed in this section will b e about I inch or less . Additional post-construction differ ential settlement, on t he order of 1 to 2 inches, is possible if the upper-finer grained soils are wetted. 2) Footings should have a minimum width of 16 inches for continuous walls b earing o n the r elativel y dense granular so il s and a minimum width of 20 inches for the upper fine-grained so ils. Iso lated pads sh ould h ave a minimum w idth of2 feet. 3) Exterior foot ings, edges of slabs and footings beneath unheated areas should be provided with ad equ ate soil cover above their bearing e levation for frost protection. P lacement of foundations at least 36 inches below exterior grade is typically u sed in this area. A shallow frost protection J ob No. I 07 06 39 ~tech -5 - system consisting ofrigid foam insulation can be used in the thickened- edge s lab alternative. 4) Continuous foundation wall s sho uld be reinforced top and bottom to span local anomalies such as by ass uming an unsupp orted length of at least 12 feet. Foundation w alls acting as r etaining structures, such as at the wastewater treatment plant, should also be des igned to resist lateral earth pressures as discussed in the "Foundation and Retaining Walls" section of this repo rt . 5) Topso il and any loo s e or disturbed so ils should b e removed and the footing bearing level ext ended down to undisturbed natural soils. The exposed soils in footing area should be moistened and compacted prior to pl acing concrete. If water seepage is encountered in d eeper cut areas such as the wastewater treatment plant, the excavation s ho uld be dew atered before concrete placement. Voids created b y remo ving boulders at the bottom of the excavation s hould be backfilled with compacted road base or concrete. 6) A representative of the geotechnica l engineer should observ e all foot ing excavations prio r to concrete placement to eva lu at e bearing conditions. FOUNDATION AND RETAINING WALLS (WASTEWATER TREATMENT PLANT) Foundation walls and reta ining st ructures which are laterally suppo1ied and can be expected t o undergo o nly a s li ght amount of deflection s hould be d esigned for a lateral earth pressure computed on the b as is of an equival ent fluid unit weight of at least 55 pcf for b ackfi ll consisting of the on-site so il s. Cantilevered r etainin g structures which are separate from the main plant structures and can be expected to deflect sufficiently to mobilize the full active earth pressure condit io n sho uld be des igned for a lat eral earth pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcf for b ackfi ll consisting of the on-site soils. A ll foundat ion and ret aining structures should be des ign ed for appropriate h ydro static and surcharge pressures s uch as adj acent footings , traffic, construction materials and Job No . I 07 0639 ~tech -6 - equipment. The pressures recommended above as sume drained conditions behind the walls and a horizontal backfill surface. The buildup of water behind a wall or an upward s loping backfill surface will increase the lateral pressure impo sed on a foundation wall or retaining structure. An und erdrain should be pro v ided to prevent hydrostatic press ure buildup behind walls. Backfill should be placed in uniform lifts and compacted to at least 90% of the ma ximum standard Proctor dens ity at near optimum moi sture content. Backfill in pavement and walkway areas should be compacted to at least 95% of the max imum standard Proctor density. Care should be taken not to overcompact the backfill or use large equipment near the wall, since thi s could cause excess ive lateral pressure on the wall. Some settlement of deep foundation wall backfill should be expected, even if the material is placed correctly, and could result in di st ress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the s liding resistance of the footing on the foundation materials and p assive earth press ure against the side of the footing. Resistance to s li din g at the bottoms of the footings can be calculated based on a coefficient of fric tion of 0 .35 for fin e-grained so ils and 0.45 for coarse grained so il s. Passive press ure of compacted backfill against the sides of the footings can be calculated using an equivalent fluid unit weight of 350 pc£ The coefficie nt of friction and pass ive pressure va lues recommended above assume ultimate soil s trength. Suitable facto r s of safety should b e included in the d es ign t o limit the strain w hi ch w ill occur at the ultimate strength, particul arly in the case of p ass ive r es istance. Fill pl aced against the sid es of the footings to r es ist lateral lo ads sho uld be a predominantly granular so il compacted to at least 95% of the maximum standard Proctor density at near optimum moisture content. NON-STRUCTURAL FLOOR SLABS (SPREAD FOOTINGS) T he natural on-site soils, exclusive of topsoil, are suitabl e to support lig htly load ed s lab- on-grade constru ction. The upper fine-grained soil s are compressible and there is a risk Jo b No . I 07 0639 ~tech -7 - of slab settlement and distress, especially ifthe sub grade soils are wetted. To reduce the effects of some differential movement, floor slabs should be separated from all bearing walls and co lumns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be estab lished by the designer based on experience and the intended slab use. A minimum 4 inch layer of sand and gravel should be placed beneath interior slabs to act as a leveling course and provide subgrade support. This material should consist of minus 2 inch aggregate with at least 50% retained on the No. 4 sieve and le ss than 12% passing the No. 200 s ieve. All fill materials for support of floor s labs sho uld be compacted to at least 95% of maximum standard Proctor density at near optimum moisture content. Required fill can consist of the on-site soils devoid of vegetation, topsoil and oversized rock. UNDERDRAIN SYSTEM Free water was encountered at the Borings 4 and 5 below the expected cut depths for the propo s ed wastewater treatment plant site. It has been our experience in the area that the groundwater level can rise and local perched groundwater can develop during times of heavy precipitation or seasonal runoff Frozen ground during spring runoff can create a perched condition. We recommend below-grade construction be protected from wetting and hydrostatic pressure buildup by an underdrain system. As an alternative, it may be feasib le to design the wastewater treatment structures to be water tight and resist buoyancy forces if it is anticipated that the groundwater level will rise above the bottom e levation of the foundation. We should review the wastewater treatment plant foundation and grading designs when availab le to provide additional underdrain recommendations. SITE GRADING The risk of construction-induced slope instability at the site appears low provided the buildings are located as planned and cut and fill depths are limited. We assume the cut Job No. I 07 0 639 ~tech -8 - depths for the wastewater tre atment plant will b e up to about 10 to 12 feet , and the cut depths will be significantly le ss throughout the remaining parts of the development. Fills should be limited to about 8 to 10 feet deep, especially where they are near the top of steep s lopes. Embankment fills should be co mpacted to at leas t 95% of the maximum standard Proctor dens it y n ear optimum moisture content. Prio r to fill placement, the subgrade should be carefully prepared b y removing all vegetation and topsoil and compacting to at least 95% of the maximum standard Proctor dens it y. The fill should be benched into slopes that exceed 20% grade. Permanent unretained cut and fill s lopes s hould be graded at 2 horizontal to 1 vertical or flatter and protected against erosion by revegetation or other means. The risk of s lope instability will be increased if seepage i s encountered in cuts and flatter slopes may be necessary. If s eepage is encountered in permanent cuts, an investigation s hould b e conducted to determine if the seepage w ill adversely affect the cut stability . This office should review site grading plans for the project prior to construction. SURF ACE DRAINAGE The following drainage precautions s hould be observed during co nstruction and maintained at all times after the structures have b een completed: 1) Inundation of the foundation excavations and unders lab areas s hould be avoided during construction. 2) Exterio r backfill should b e adjust ed to n ear optimum moisture and co mpacted to at least 95% of the maximum stand ard Proctor dens it y in pavement and slab areas and to at least 9 0% of the maximum standard Proctor density in landscap e areas. 3) The gro und surface sun-ounding the exterio r of the structures sho uld be sloped to drain away from the fo undation in a ll directions. We reco mmend a minimum s lop e of 12 inches in the first 10 feet in unpaved areas and a minimum s lope of2 Yi inches in the first 10 feet in paved areas. Job N o. I 07 0639 ~tech -9 - Free-draming wall backfill should be capped with about 2 feet of the on- s ite soils to reduce surfac e water infiltration. 4) Roof downspouts and drains should dis charge well beyo nd the limits of a ll backfill. 5) Landscap e should consist of low irrigation demand and plants within at least 5 feet of the buildings. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical engin eer ing principles and practices in this area at this time. We make no warranty either express or implied. The co nclusions and r eco mmendations submitted in this report are ba sed upon the dat a obtained from the exploratory borings drilled at the lo cations indicated on Figure 1, the propo sed type of construction and o ur experience in the area. Our services do not include determining the presence, prevention or po ss ibility of mold or other biological contaminants (MOB C) deve lo ping in the future. If the cli ent is concerned abo ut MOBC, then a professio na l in this speci al field of practice should be con sulted. Our findings include interpolation and extrapolat ion of the sub surface conditio ns id entified at the exploratory b orings and variations in the subsurface conditions may not beco me ev ident until excavation is p er~ormed. If conditions encountered during con struction appear different from tho se d escribed in this report, we should b e not ified so that r e-eva lu at ion of th e recommendations may be made. Thi s r eport has b een prepared for the exclu s ive u se b y our client for design purposes. We ar e not responsible fo r technical interpre t ations by others of our information. As the project evo lves, we should provide continued consultatio n and field s ervices during construction to r eview and monitor the implementation o f our recommend ations, and to verify that the recommendations have b een appropriately int erpreted. Significant des ign chan ges may r equire add itional analysis or modifications to the r eco mmendations presented herein. We recommend on-sit e observation of excavations and foundat ion Jo b No. I 07 0639 ~tech -10 - bearing strata and testing of structural fill by a representative of the geotechnical engineer. Respectfully Submitted, HEPWORTH -PAWLAK GEOTECHNICAL, INC. Trevor L. Knell , P.E. Reviewed by: Steven L. Pawlak, P.E. TLK/ksw cc: Rocky Mountain Steel Structures, Inc. -Attn: Jerry Ru sch Job No. 107 06 39 ~tech '--(-z BOR IN G 3 '" ~-8(!] i ~ NOTTO SCALE 107 0639 ~tech LOCATIONS OF EXPLORATORY BORINGS FIGURE 1 HEPWORTH -PAWLAK GEOTECHNICAL 0 5 10 f- UJ UJ u. I f-a.. UJ 0 15 20 25 107 0639 BORING 1 31/12 WC=6.6 DD=110 -200=30 34/12 WC=6.8 +4=33 -200 =22 BORING2 55/1 0 Ameni ti es Buildings Note: Explanation of symbols is shown on Figu re 5 . BORING 3 0 36/12 WC =8.4 5 +4=31 -200 =33 42/12 10 15 Water Tank 20 25 f- UJ UJ u. I f-a.. UJ 0 ~tech LOGS OF EXPLORATORY BORINGS FIGURE 2 HEPWORTH-PAWLAK GEOTECHN ICAL 0 5 10 15 I-UJ UJ LL I I-a.. UJ a 20 25 30 35 107 0639 BORING4 .. .... -:::· -:··· :::. :.:· :··· .... :::· :··· .... :::· :··· .... :::· :··· ::·:·: :··· 7/12 WC=1 1.2 00=106 6/12 WC=13.7 00=103 -200=66 6/12 3/12 Sewer Treatment Plant BORINGS BORING 6 0 8/12 29/12 WC=7.7 5 00=79 -200=91 8/12 30/6,10/0 WC=S.3 10 00=105 -200=23 6/12 Storage Bui lding 15 I- UJ UJ . ... LL :::· :··· I I-a.. 2/12 UJ 20 a . ... :::· :··· . ... :::· :··· 25 30 35 Note: Explanation of symbols is shown on Figure 5. ~tech LOGS OF EXPLORATORY BORINGS FIGURE 3 HEPWORTWPAWLAK GEOTECHN ICAL BORING? BOR INGS BORING 9 BOR IN G 10 0 0 22/11 16/6, 15/3 18/12 17/12 WC=9.5 5 WC=11.7 WC=7.6 +4=8 WC=9.6 5 00=77 00=95 -200=58 +4=6 -200=54 -200=55 -200 =55 LL =50 Pl=20 40/6,10/0 10 10 I-I- UJ UJ UJ UJ u_ u_ I I I-I- o._ a.. UJ 40/5,10/0 UJ 0 15 15 0 RV Parking 20 20 25 25 Note: Explanation of symbols is shown on Fi gure 5. 107 0639 ~tech LOGS OF EXPLORATORY BORINGS FIGURE 4 HEPWORTH-PAWLAK GEOTECHNICAL LEGEND: TOPSOIL; silty sandy clay with scattered gravel and cobbles. soft to medium stiff, moist, brown to dark brown, root zone. CLAY AND SILT (CL-ML); slightly sandy, with scattered gravel, very stiff, slightly moist, light brown, slightly porous and calcareous. SAND AND CLAY (SC-CL); si lty, scattered gravel, medium dense/medium stiff to stiff and slightly moist to loose/soft and wet with depth at Borings 4 and 5, light brown to brown , low to medium plasticity. GRAVEL, COBBLES AND BOULDERS (GM); silty to clayey, medium dense to dense, slightly moist to wet at Borings 4 and 5, light brown to brown, slightly calcareous, angular to subangular rock. Relativel y undisturbed drive sample; 2-inch l.D. California liner sample. Drive sample; standard penetration test (SPT), 1 ~-inch l .D. split spoon sample, ASTM D-1586 . Drive sample blow count; indicates that 31 blows of 140 pound hammer falling 30 inches were required to drive 31 112 the California or SPT sampler 12 inches. T Practical drilling refusal. Where shown above the bottom of the log indicates that multiple attempts were made to advance the boring. -Depth at which boring had caved immediately following drilling. --Free water level in boring at the time of drilling. NOTES: 1. Exploratory borings were drilled on October 18 and 19, 2007 with 4-inch diameter continuous f light power auger. 2. Locations of exploratory borings were measured approximately by pacing from features shown on the site plan provided. 3. Elevations of exploratory borings were not measured and the logs of exploratory borings are drawn to depth. 4. The exploratory boring locations should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory boring logs represent the approximate boundaries between material types and transitions may be gradual. 6. Water level readings shown on the log s were made at the time and under the conditions indicated. Fluctuations in water level may occur with time. 7 . Laboratory Testing Results: WC = Water Conte nt ( % ) DD = Dry Density ( pcf ) +4 = Percent retained on the No . 4 sieve -200 = Percent passing No. 200 sieve LL = Liquid Limit ( % ) Pl = Plastici ty Index ( % ) 107 0639 ~tech HEPWORTH -PAWLAK GEOTECHNICAL LEGEND AND NOTES FIGURE 5 - Moistu re Co ntent = 11 .2 percent Dry Density = 106 pct Sample of: Sa ndy Silty C lay From: Boring 4 at 4 Feet 0 I I I I I 11 I I l 1 I I r-t"ro ' --Compressio n * (~ I I I 11 upon -wetting z 2 0 I N D Ci5 (/) I ) w 3 a: I a.. 'tJ :::;? 0 () 4 5 LJ I I I I I I • I I LJ 0 .1 1.0 10 100 A PPLIED PRESSURE ( ksf ) 107 0639 ~tech SWELL-CO N SOLIDATION TEST RESULTS FIGURE 6 HEPWORTH -PAWLAK GEOTECHN ICAL Moisture Content = 5.3 percent Dry Density = 105 pct Sample of: Silty Clayey Sand From: Bori ng 5 at 9 Feet I I I 0 I I --+-r-l 111 I I I I 1 I 11 -r > I _JJrr Compre ss ion i--upon 2 wetti ng L----T I 3 I I ~ ff< 4 ~ ~ ) z \ 0 Ci5 5 CJ) \ UJ cc: a.. ~ 6 0 ~ 0 7 8 1 9 l 1 I ~ D 10 I I L 0 .1 1 .0 10 100 APPLIED PRESSURE ( ksf} 107 0639 ~tech SWELL-CONSOLIDATION TEST RESULTS FIGURE 7 HEPWORTH-PAWLAK GEOTECHN ICAL Moisture Content = 7.7 percent 0 Dry Density = 79 pct I I I I I I I Sample of: Slightl y Sandy Clayey Silt I l ·11 From: Boring 6 at 4 Feet 1 2 3 I I I I I 111 C o mpression I I II 11 upon 4 wetting 5 6 LJ I -#. 7 -z ( 0 Ci5 8 \ (/) UJ a: a. ~ 9 0 \ (_) 10 I 11 I 12 \ I 1 ' 13 I 14 \I L 15 4> 16 I 0.1 1 .0 10 100 APPLIED PRESSURE ( ksf) 107 0639 ~tech SWELL-CONSOLIDATION TEST RESULTS FIGURE 8 HEPWORTH-PAWLAK GEOTECHNICAL 0 w z ~ a: 1-z w () a: w Cl.. 0 w z ~ w a: 1-z w () a: w Cl.. HYDROMETER ANALYSIS SIEVE ANALYSIS TIME READINGS U.S. STANDARD SER IES CLEAR SQUARE OPENINGS 24 HR. 7 HR 45MIN. 15MIN. 60MIN. 19MIN. 4MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 ~ 314' 11/'Z' 3" 5' 6' 8' or::::=::r:==::=i:=::r:=::=r:=::=t=::=r:::::=r:::::=r:::::=t=::=r:::::=:i=::=:i=::=:i=~~==:i=::=:i===r:i==:J100 .001 .002 .005 .009 .019 .037 .150 .300 .600 1.18 2.36 4.75 9.5 12.5 19.0 37.5 76.2 203 DIAMETER OF PARTICLES IN MILLIMETERS SANO GRAVEL CLAY TO SILT COBBlES FINE MEDIUM COARSE FINE COARSE Gravel 3 3 % Sand 45 % Silt and Clay 22 % Liquid Limit % Plasticity Index % Sample of: Sil ty Sand and Gravel From : Boring 1 at 9 1/2 Fe et HYDROMETER ANALYSIS SIEVE ANALYSIS TIME READ INGS U.S. STANDARD SER IES CLEAR SQUARE OPENINGS 24 HA. 7HR 45 MIN. 15 MIN. 60MIN. 19MIN. 4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 318' :J/4' 1 1/'Z' 5' 6' 8' 100 o~~~~~~~~ .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.16 2.36 4.75 9.5 12.5 19.0 37.5 76.2 127152 203 DIAMETER OF PARTICLES IN MILLIMETERS CLAY TO SILT SANO GRAVEL COBBLES FINE MEDIUM COARSE FINE COARSE Gravel 31 % Sand 36 % Silt and Clay 33 % Liquid Limit % Plastic ity Index % Sample of: Silty Sand and G ravel From : Bor ing 3 at 4 Feet (!) z Ci) ~ 1-z w () a: w Cl.. (!) z Ci) ~ Cl.. ~ w () a: w Cl.. 107 0639 ~tech GRADATION TEST RESULTS FIGURE 9 HEPWORTH-PAWLAK GEOTECHNICAL Cl w z ~ cc: 1-z w () cc: w a.. Cl w z ~ cc: 1-z w () cc: w a.. HYDROMETER ANALYSIS SIEVE ANALYSIS TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 24 HA. 7HR 15 MIN. 60MIN. 19MIN. 4 MIN. 1 MIN. #200 1100 150 130 #16 #8 #4 314' 11/2' 3' 5' 6" .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 9.5 12.5 19.0 37.5 162 127152 203 DIAMETER OF PARTICLES IN MILLIMETERS GRAV8.. CLAY TO SILT COBBLES FINE MEDIUM COARSE FINE COARSE Gravel 8 % Sand 34 % Silt and Clay 58 % Liquid Limit % Plasticity Index % Sample of: Sand and Clay with Grave l From: Boring 9 at 3 1/2 Fe et HYDROMETER ANALYSIS SIEVE ANALYSIS TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 24 HR. 7 HR 15 MIN. 60MIN. 19MIN. 4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 3/4' 11/2' 3' 5' 6" .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 9.5 12.5 19.0 37.5 162 127152 203 DIAMETER OF PARTICLES IN MILLIMETERS SANO GRAV8.. CLAY TO SILT C088LES Flt-E COARSE Flt-E COARSE Gravel 6 % Sand 39 % Silt and Clay 55 % Liquid Limit % Plast ic ity Index % Sam p le of: Sand and Clay with Gravel From: Bori ng 10 at 4 Feet (.!) z Ci) ~ 1-z w () cc: w a.. (.!) z Ci) ~ a.. 1-z w () cc: w a.. 107 0639 ~tech GRADATION TEST RESULTS FIGURE 10 HEPWORTH ·PAWlAK GEOTECHNICAL HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No . 107 0639 SUMMARY OF LABORATORY TEST RESULTS SAMPLE LO CATION N AT URAL NATURAL GRADATION PERCENT ATTE RBERG LIMITS UNCONFINED BORING MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL NO . DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX STRENGTH TYPE (%) (%) S IEVE (ft) (%) <o cn (%) (%) (PSF) 1 4 6.6 110 30 Silty sand with gravel 9 1h 6 .8 33 45 22 Silty sand and gravel 3 4 8.4 31 36 33 Silty sand and gravel 4 4 11.2 106 Sandy silty clay 9 13.7 103 66 Sandy silty clay 5 9 5 .3 105 23 Silty clayey sand 6 4 7.7 79 91 Slightly sandy clayey silt 7 4 11.7 77 54 50 20 Very sandy silt and clay 8 4 7.6 95 55 Very sand7 clayey silt 9 3 1/2 9 .5 8 34 58 Sand and clay with gravel 10 4 9.6 6 39 55 Sand and clay with gravel APPENDIX H SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 11111111111111111H rn n111 H1mm 111111 u11111 11M121 ea121J/2M2 82:9' iu.3151 me tt AL.SOORF 1 0, 3 R 11,1118 D e.ee CMr'ltLl:I CCIUNT'l' cc SPECIAL WARRANTY DEEl'.l • Co...it:y ()(' Sau ta Cl11:r~ California 95033 Los Gatos 3auta Clara the: l'allowinl nal property in tru: Colorado, m wit: '=il:..l\IAl<::I lllL::. ud Stat: of al!ll State or Celif<1rnia !iljOJ'3 The prorc:i:cy d.csc.ribed in £:Khi~it~ "A" and 1111•1 atta~hed togetber with th~~~ Vt\ter. t:'i&htg de5c-ribac in de.ed recorded Apr!l 27, 20'11 in ~oe~ 1248 at Pa*e S45 (nece,t£c~ #579951) Ct:r~ield CO\l.nty ~e;ord~ )lq. !IOI. a... 1-91. -~IWl9-- --l<!d ... l'l&'l-II<-. ""1"", Cl!>l!et!Ol-l!J'lom.~-www---- I' •'' , .. EXHIBIT A Order :'iumber: 01 oooaoe LEGAL DESCRIPJION A PARCEL OF LAND SITUATED IN SECTIONS 19 AND 30~ I'OPlNSHIP 7 SOUTH,, RANGE !15 WRST .ANii IN SECTIONS 25 AND 36, TOWNSHIP 7 SOOTH,. RANGE 96 WBST OF THE SIXTH PRINCIPAL MBRIDIAN, COUNTY OF GARFIELD? STATE OF COLORADO, SAID PARCEL BEING MOU PllTICULARLY DESCRIBED AS FOLLOWS; :BEGINNING AT THE WEST 1/4 CORNER OF SAID SECTION 19; THJ!NCE N. 89~40'32tt E. 1266.57 YEET ALONG THE CENTERLINE OF SAID SECTION 19 TO THE C-Wl/16 CORNER OF SAID SHC'l'ION 19; THENCE N. 89~41'25~ E. 1327.91 FBET ALONG THE CENTERLINE OF SAID SECTION 19 TO ':'HE Cl/4 CORJ."ER OF SA:tD SECTION 19; THENCE N, 89~41'00 8 H. 1317,77 FEET ALONG THE CENTERLINE OF SAID SECTION 19 TO TH1! C-El/16 CORNER OF SAID SECTION 19; THENCE S. 01g23'48" E. 1369.29 FEET ALONG THE EASTERLY LINE OF THE NW1/4SEl/4 TO THE SEl/16 OF SAID SECTION 19; THENCE S. 01Q23'48n E. 1369.29 FEET ALONG THE EASTERLY LINE OF THE SW1/4SE1/4 OF SAID SECTION 19 TO THE E1/16 COR.iVER OF SAID SECTION 19; THENCE N. 89~02'29u W. 67.48 FEET ALONG THE SOUTHERLY LINE OF SAID SECTION 19 TO THE El/16 CORNER OF SAID SECTION 30; THBNCE s. 00~02-osu E. 1282.91 FEET ALOJ!IG THE EASTERLY LINE OF THE NWl/4NEl/4 BEING GLD LOT 4 OF SAID SECTION 30 TO THS NE1/16 CCJR.NRR OF SAID SECTION 30; THENCE S. 00;.02£05" E. 1307.09 FEET ALONG THE .EASTERLY LINE OF THE SWl/41'iEl/4 OF SAID SECTION 30 TO THE C-E1/16 CORNSR OF SAID SECTION 30; THENCE N. 89°43'37" W, 1314.26 FEET ALONG THE CRNTERLINB OF SAID SECTION 30 1'0 THE Cl/4 CORNER OF SAID SECTION 30; THE..~CJE s. oo~o7'02" E. 1322.30 FBET ALOnG THE CENTERLINE OF SAID SECTION JO TO THE C~Sl/16 CORNER OF SAID SECTION 30; THENCZ N. 89,40'19H W. 1317.65 PEET ALONG THE SOUTHERLY LINE OP THE NEl/4SW1/4 OF SAID SECTION 30 TO THE SW1/16 CORNER OF SAID SECTION 30; THXNCS N, 89°40~19" W. 1252.60 FEET ALONG THE SOUT~tfERLY LINE OF '!'HE NW1/4SW1/4 BEING GLO LOT 8 OF SAID SECTION 30 TO THE S1/16 CORNER OF SAID SECTION 30 SAID POINT BEING ON TH1! l:t'ASTERLY LINH OF SAID SECTIOn 25; THENCE s. 00°53'10" R. l268.09 PEET ALONG THE EASTERLY LINE OF SAID SECTION 25 TO THE SE CORNES OF SAID SECTION 25, SAID POINT ALSO BEING THE NE CORNER OF SAID SECTION 3 6; THENCE 5. 00°55r11u W. 53.27 FEJ!T ALONG THE EASTERLY LINE OF SAID SECTION 30 TO THE SW CORNER OF SAID SECTION 30; 'l'HENCB S. 00°08'00" W. 1272. 71 FHET ALONG THE EASTERLY LINE OF SAID SECTION 36 TO THE Nl/16 CDRNltR OF SAID SECTION 35; '!'HENCES. 89"05?1/Ju W. 1345.45 PEET ALONG THE SOUTHERLY L·INB OF '!'RB NE1/4NE1/4 OF SAID SECTION 36 TO THE NEl/16 CORNER OF SAID SECTION 36; THENCE S. 89°05~10" W. 1345.45 FEET ALONG THE SOUTHERLY LINE OF TRE NW1/4NE1/4 OF SAID SECTION 36 TO THE C-Nl/16 CORNER OF SAID SECTION 36; THENCE N. 00"00'09" B. 1335.54 FEET ALONG THE CENTERLINE OF SAID SECTION 36 TO THE 1/4 CORNER OF SAID SECTION 36 AND SECTION 25; THENCE N. ao~19'38" E. 1305.99 FEET ALONG THE CENTERLINE OF SAID SECTION 25 TO THE C-Sl/16 CORNER OF SAID SECTION 25; THENCE N. 88"55,.03" E. 1334.04 FEET ALONG THE NORTHERLY LINE OF Tm!! SW1/4SE1/4 OF SAID SECTION 25 TO THE SE1/16 COR..VER OP SAID SECTION 25; THENCE N. ae~ss~o3n B. 1334.04 FEET ALONG THE NORTHE.'RLY LINE OF THE SE1/4SE1/4 Continued on next page Continuation of schedule A -Legal Description Order Number: 01000008 OF SAID SECTION 25 TO THE Sl/16 CORNER OF SAID SECTION 25, SAID POINT ALSO BEING ON THE WESTERLY LINE OF SAID SECTION 30; THENCE N. 00°54'47" W. 1264.99 FEET ALONG THE WESTERLY LINE OF SAID SECTION 30 TO THE Wl/4 CORNER OF SAID SECTION 30; THENCE N. 00°02'23" E. 57.16 FEET ALONG THE WESTERLY LINE OF SAID SECTION 30 TO THE El/4 CORNER OF SAID SECTION 25; THENCE N. 00°11'36" W. 1263.65 FEET ALONG THE WESTERLY LINE OF SAID SECTION 30 TO THE Nl/16 CORNER OF SAID SECTION 30; THENCE S. 89°23'46" E. 1271.44 FEET ALONG THE NORTHERLY LINE OF THE SWl/4NW1/4 BEING GLO LOT 7 OF SAID SECTION 30 TO THE NWl/16 CORNER OF SAID SECTION 30; THENCE N. 00°08'19" W. 1310. 67 FEET ALONG THE WESTERLY LINE OF THE NE1/4NW1/4 BEING GLO LOT 5 OF SAID SECTION 3 0 TO THE Wl/16 CO~'WER OF SAID SECTIOli 3 0; THENCE S. 86°59'10" E. 10.87 FEET ALONG THE NORTHERLY LINE OF SAID SECTION 30 TO THE Wl/16 CORNER OF SAID SECTION 19; THENCE N. 00°24'16" W. 1337.86 FEET ALONG THE WESTERLY LINE OF THE SE1/4SW1/4 OF SAID SECTION 19 TO THE SWl/16 CORNER OF SAID SECTION 19; THENCE N. 89°37'32 11 W. 1275.53 FEET ALONG THE SOUTHERLY LINE OF THE NW1/4SW1/4 OF SAID SECTION 19 TO THE Sl/16 CORNER OF SAID SECTION 19; THENCE N. 00°03'35 11 W. 1322. 76 FEET ALONG THE WESTERLY LINE OF SAID SECTION 19 TO THE TRUE POINT OF BEGINNING. COUNTY OF GARFIELD STATE OF COLORADO BOUNDARY LINE ADJUSTMENT PLAT A Parcel of Land Situate in Sections 19 and 30, Township 7 South, Range 95 West ' I and in Sections 24, 25 and 36, Township 7 South, Range 96 West of the Sixth Principal Meridian, County of Garfield, State of Colorado, \ I \ ,,,..., /1 \ v<> ~·~" I \ &>~4'' I \ \# (jJ Center 1( 4 Corner Section 24 A 3-1/ 4" BLM Aluminum Cap in Place West 1/ 4 Corner Section 19 3" Brass Cap LS No. 12770 in Place Center West 1/ 16 Corner Section 19 3-1( 4" BLM Aluminum Cap in Place \ County \f?oadNo. ', 300 \ I Basis efflearings S 88°50'42" W 2671.80' N 89°41 '05" E 1266.57' N 89°41'58" E 1327.91' N 89°41'33" E 1317.77' \ ' \ / . ' > / '-..'-/ '"'-... ------Apparent Southerly Riglrt-of-Way 1YE1/4SW1/4 SECTION24 I I ~: 01 ~, •1 ~I '"":'.1 ... I ... I '1 "i I I I I ~, t; 1 o1 • I ~: -1 I I zn Aluminum Cap on No. 5 Rebar LS No. 5933 Nl/2SE1/4 SEC110N24 Parcel No. 24Q924400124 (Book 1248, Page 571) New Boundary Line James Eugene & Monique Teresa Speakman 5242 County Road 300 Parachute, co 81635 2" Cap on No. 5 Rebar LS No. 5933 1329.85' P.O.B. ~ Daybreak Parcel NW1/4SW1/4 SECTION 19 Boundary Line to be Adjusted I I ~I I 01 01 "3 I <n' tii I IC I ~: "i I I I I ~1 C,, I C,, I Col • I >v I IQ, I I NE1/4SW1/4 SECTION 19 Parcel No. 240719300162 (Book 1248 Page 543) Daybreak Realty LLC 400 Panamint Road Reno, NV 89521 I I I I I I I I I I I I I I I I I I I I I I I I I I I nter 1( 4 Comer Section 19 NW1/4SE1/4 SECTION 19 1322.72' 559.59' --------1-----------~,,_ __ ......;!;;;::.~s~8:;8::.3;;:9;::;,4;44": .. 'Qw-;--E..-....;.;~2~64'455..~3~7'~= "'""'"""1!111~~~~~~~~~~~~~--------------------------~--------------------------- 24 : 19 N 89°36'59" W 1275.53' ' South West 1/16 Comer Section 19 3-1/ 4" BLM Aluminum Cap in Place PROPERTY DESCRIPTION SPEAKMAN PARCEL Center South 1I16 Corner Section 24 3-1/4" BLMAluminum Cap 1982inPlace A PARCEL OF LAND SITUATE IN THE Sl/2 SECTION 24, TOWNSHIP 7 SOUTH, RANGE 96 WEST OF THE 611f P.M., COUNTY OF GARFIEW, STATE OF COWRADO. SAID PARCEL OF LAND BEING A PORTION OF A PARCEL OF LAND PREVlOUSLY DESCRIBED IN BOOK 1248, PAGE 571 AS FILED WffHTHE GARFIEWCOUNTYCLERK AND RECORDER'S OFFICE AND NOW BEING MORE PARTICULARLY DESCRIBED AS FOLWWS: SECTION24: N1/2SE1/4, AND THAT PORTION OF THENE1/4SW1/4 LYING SOUTHOFGARFIEWCOUNTY ROAD NO. 300, TOWNSHIP 7 SOUTH, RANGE 96 WEST OF THE 6TH P.M., COUNTY OF GARFIEW, STATE OF COLORADO LESS AND EXCEPT A PARCEL OF LAND SITUATE IN THE NEl/ 4SE1/4 OF SAID SECTION 24 BEING MORE PARTICULARLY DESCRIBED AS FOLWWS: COMMENCING AT THE CENTER SOUTH 1/ 16 CORNER OF SAID SECTION 24, A BLM ALUMINUM CAP IN PLACE; THENCE N88"39'44''E 1882.31 FEET TOA POINTON THE SOUTHERLYIJNE OFTHEN1/2SE1/4 OF SAID SECTION 24, THE TIWEPOINT OF BEGINNING: THENCE DEPARTING SAID SOUTHERLY UNE N00"03'02"W 960.40 FEET; THENCE N89"15' 1 O''E 762.92 FEET 10 A POINTON THE EASTERLY IJNE OF THE Nl/2SE1/4 OF SAID SECTION 24; THENCE S00"03'02'EALONGSAIDEASTERLY IJNE 952.55 FEET TO THE SOUTH 1/ 16 CORNER OF SECTION 24 AND SECTION 19, A 3" HLM ALUMINUM CAP IN PLACE; THENCE S88"39'44"W ALONG THE SOUTHERLY LINE OF SAID N1/2SE1/ 4 A DISTANCE OF 763.06 FEET TO THE TRUE POINT OF BEGINNING. SAID PARCEL OF LAND CONTAINING 16. 751 ACRES, MORE OR LESS. I South 1I16 Corner Sections 24 & 19 3-1( 4" BLM Aluminum Cap in Place I I I I I I I N 00"02'56" E 57.16' I I I I I I I I I "t) I ~ ~ : :;c ~: ~ ~ I • ~I~ i§l l 0:: "' I "' ~1-~:~ "-I "- ~ :~ ~ I " ~ : § 01~ "1 I I I I I I I I I I I I I I I I SE1/4SWJ/4 SECTION 19 I I I I I I I I I I I SW1/4SE1/4 SECTION 19 I North 1/ 4 Corner Section 30 S 86°58'37" E J 9 l1 r 10.87' f-- S 89°23'13" E 1271.44' SW1/4NW1/4 SECTION30 West 1/ 4 Corner Section 30 30-------------------------, --------------------------- NE1/4NW1/4 SECTION30 I I I I I I I I I I I I I I I I I I I I I I I I I NW1/4NE1/4 SECTION30 l---------------------------+--------------------------- 1 I I I I I I I I I I I I I I I I I I I I I I I 1 SEl/ 4NW1/ 4 I : SECTION 30 l I I I I I I I I I I I I I I I I 1 Center 1/ 4 Corner Section 30 1 I I SW1/4NE1/4 SECTION30 I I --------------------------+---------------------------"'1-~~~~~~~~~~~~...J NW1/4SW1/4 SECTION30 I I I I I I I I I I I I I NE1/4SW1/4 SECTION 30 Cl> 8 0 0\ IS "' • N 89°43'04" W 1314.26' N 89°01 '56" W 67.48' N 88°55'36" E 1334.04' N 88"55'36" E 1334.04' 30 LEGEND Reba.rand 11/4"Pl.asti.cCap LS #36572 Set in Place @ SW1/4SE1(4 SECTION25 North 1 I 4 Corner Section 36 I I I I I I I I I I I I I I I I I I I I I I I I I I 25 I SEI/4SE1/4 SECTION25 25 North East Comer Section 36 ---------------------------~---------------------------- NW1/4NE1/4 SECTION-36 s 89°05'43" w 1345.45' : 36 I I I I I I I I I I I I I I I I I I I I I I I I I NEl/41\'El/4 SECTION36 s 89°05'43" w 1345.45' N 89°39'46" W s 00'55'44" w 53.27' 1252.60' N 89°39'46" W 1317.65' NOTES 1.) DATEOFSURVEYWASOCTOBER 10, 2008. 2.) BASIS OF BEARINGS FOR THIS SURVEY IS A BEARING OF S88°50'42"W BETWEEN THE WEST 1/ 4 CORNER OF SECTION 19, A 3" BRASS CAP LS NO. 12770IN PLACE AND THE CENTER 1/4 CORNEROFSECTION24,A 3-1/4" BLM ALUMINUM CAP IN PLACE AND SHOWN HEREON. 3.) THIS BOUNDARY LINE ADJUSTMENT PLAT WAS PREPARED WITHOUT BENEFIT OF A CURRENT TITLE COMMITMENT AND DOES NOT REPRESENT A TITLE SEARCH BY THIS SURVEYOR OR BOOKCLIFF SURVEY SERVICES, INC. THIS SURVEY IS BASED ON BOOK 1248, PAGE 543 AND BOOK 1248, PAGE 571 OF THE GARFIELD COUNTY CLERK AND RECORDERS OFFICE, DOCUMENTS OF RECORD AND MONUMENTS IN PLACE AND SHOWN HEREON. 4.) THIS BOUNDARY UNEADJUSTMENT PLAT DOES NOT REPRESENT ANY OTHER TYPE OF SURVEY SUCH ASAN IMPROVEMENT SURVEY, EXISTING CONDmONS OR IMPROVEMENT LOCATION CERTIFICATE, ETC. 5.) ACCORDING TO COWRADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN TilIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. GRAPHIC SCALE ( IH FEBT) 1 Inch = 500 ft. PROPERTY DESCRIPTION DAYBREAK REALTY PARCEL A PARCEL OF LAND SITUATED IN SECTIONS 19 AND 30, TOWNSHIP 7 SOUTH, RANGE 95 WEST AND lN SECTIONS 24, 25 AND 36, TOWNSHIP 7 SOUTH, RANGE 96 WEST OF THE SIXTH PRINCIPAL MERIDIAN, COUNTY OF GARF1EW, STATE OF COWRADO. SAID PARCEL OF LAND BEING A PORTION OF A PARCEL OF LAND PREVIOUSLY DESCRlBEDIN BOOK 1248, PAGE 543 AS FILED WITH THE GARFIEW COUNTY CLERK AND RECORDER'S OFFICE AND NOW BEING MORE PARTICULARLY DESCRIBED AS FOLWWS: BEGINNING AT THE WEST 1/ 4 CORNER OF SAID SECTION 19, A 3" BRASS CAP LS NO. 12770 IN PLACE; THENCE N89'41 '05"E 1266.57 FEET ALONG THE CENTERLINE OF SAID SECTION 19 TO THE C-Wl/16 CORNER OF SAID SECTION 19; THENCE N89"41 '58"E 1327. 91 FEET ALONG THE CENTERLINE OF SAID SECTION 19 TO THE Cl/ 4 CORNER OF SAID SECTION 19; THENCE N89"41 '33"E 1317. 77 FEET ALONG THE CENTERLINE OF SAID SECTION 19 TO THE C-El/ 16 CORNER OF SAID SECTION 19; THENCE S01°23'15"E 1369.29 FEET ALONG TifE EASTERLY UNE OFTHENW1/4SE1/4 TO THE SEl/ 16 OF SAID SECTION 19; THENCE SOl °23'15"E 1369.29 FEET ALONG TifE EASTERLY LINE OF THE SW1/ 4SE1/4 OF SAID SECTION 19 TO THE Ell 16 CORNER OF SAID SECTION 19; THENCE N89°01 '56"W 67.48 FEET ALONG THE SOUTHERLY LINE OF SAID SECTION 19 TO THE Ell 16 CORNER OF SAID SECTION 30; THENCE S00°01'32"E 1282.91 FEET ALONG THEEASTERLYIJNE OF THE NW1/4NE1/4 BEING GW LOT4 OF SAID SECTION 30 TO THE NEl/ 16 CORNER OF SAID SECTION 30; THENCES00"01'32''E 1307.09FEET ALONG TifE EASTERLY UNE OF THE SWl/ 4NE1/4 OF SAID SECTION 30TOTHEC-El/16 CORNER OF SAID SECTION 30; THENCE N89"43'04"W 1314.26 FEET ALONG THE CENTERLINE OF SAID SECTION 30 TO THE Cl/ 4 CORNER OF SAID SECTION 30; THENCE S00"06'29"E 1322.30 FEET ALONG THE CENTERLINE OF SAID SECTION 30 TO THE C-Sl/ 16 CORNER OF SAID SECTION 30; THENCE N89"39'46"W 1317.65 FEET ALONG THE SOUTHERLY IJNE OFTHENE1/4SW1/4 OF SAID SECTION 30 TO THE SWl/ 16 CORNER OF SAID SECTION 30; THENCE N89°39'46''W 1252.60 FEET ALONG THE SOUTilERLY UNE OF THE NWl! 4SW1/ 4 BEING GLO LOT 8 OF SAID SECTION 30 TO THE Sl/ 16 CORNER OF SAID SECTION 30 SAID POINT BEING ON THE EASTERLY UNE OF SAID SECTION 25; THENCE S00°52'37''E 1268.09 FEET ALONG THE EASTERLY IJNE OF SAID SECTION 25 TO THE SE CORNER OF SAID SECTION 25, SAID POINT ALSO BEING THE NE CORNER OF SAID SECTION 36; THENCE S00'55'44"W 53.27 FEET ALONG THE EASTERLY UNE OF SAID SECTION 36 TO TifE SW CORNER OF SAID SECTION 30; THENCE S00°08'33"W 1272. 71 FEET ALONG THE EASTERLY LINE OF SAID SECTION 36 TO THE Nl/ 16 CORNER OF SAID SECTION 36; THENCE S89"05'43"W 1345.45 FEET ALONG THE SOUTHERLY LINE OF THE NEl/ 4NE1/ 4 OF SAID SECTION 36 TO THE NEl/ 16 CORNER OF SAID SECTION 36; THENCE S89'05'43"W 1345.45 FEET ALONG THE SOUTHERLY LINE OF THE NW1/4NE1/4 OF SAID SECTION 36 TO THE C-Nl/ 16 CORNER OF SAID SECTION 36; TifENCE N00'00'42''E 1335.54 FEET ALONG THE CENTERLINE OF SAID SECTION 36 TO THE 114 CORNER OF SAID SECTION 36 AND SECTION 25; THENCE N00'20'11 "E 1305.99 FEET ALONG THE CENTERLINE OF SAID SECTION 25 TO THE C-Sl! 16 CORNER OF SAID SECTION 25; THENCE N88°55'36"E 1334.04 FEET ALONG THE NORTHERLY UNE OF TifE SW1/4SE1/4 OF SAID SECTION 25TOTHESEl/16 CORNER OF SAID SECTION 25; THENCE N88"55'36"E 1334.04 FEET ALONG THE NORTHERLY UNE OF THE SE1/4SE1/4 OF SAID SECTION 25TOTHESl/16 CORNER OF SAID SECTION 25, SAID POINT ALSO BEING ON THE WESTERLY UNE OF SAID SECTION 30; THENCE N00°54'14"W 1264.99 FEET ALONG THE WESTERLY UNE OF SAID SECTION 30 TO THE Wl/ 4 CORNER OF SAID SECTION 30; THENCE N00°02'56"E 57.16 FEET ALONG THE WESTERLY LINE OF SAID SECTION 30 TO THE Ell 4 CORNER OF SAID SECTION 25; THENCE N00°11 '03"W 1263. 65 FEET ALONG THE WESTERLY UNE OF SAID SECTION 30 TO THE Nl/ 16 CORNER OF SAID SECTION 30; THENCE S89°23'13"E1271.44FEETALONGTifENORTHERLYUNEOFTHESW1/4NW1/4BEINGGWLOT70FSAIDSECTION30TOTHE NWl/16 CORNER OF SAID SECTION 30; TifENCE N00°07'46"W 1310.67 FEET ALONG THE WESTERLY IJNE OF THE NEl/ 4NW1/4 BEING GW LOT 5 OF SAID SECTION 30 TO THE Wl/ 16 CORNER OF SAID SECTION 30; THENCE S86"58'37''E 10.87 FEET ALONG TifE NORTHERLY UNE OF SAID SECTION 30 TO THE Wl/ 16 CORNER OF SAID SECTION 19; THENCE N00°23'43"W 1337.86 FEET ALONG THE WESTERLY UNE OF THE SEl/ 4SW1! 4 OF SAID SECTION 19 TO THE SWl/ 16 CORNER OF SAID SECTION 19; THENCE N89"36'59"W 1275.53 FEET ALONG THE SOUTHERLY LlNEOFTHE NW1/4SW1/4 OF SAID SECTION 19 TO THE Sl/16 CORNER OF SAID SECTION 19; THENCE S88°39'44''W 763.06 FEET ALONG THE SOUTHERLY LINE OF THE N1/2SE1/4 OF SAID SECTION 24; THENCE DEPARTING SAID SOUTilERLY UNE N00°03'02"W 960.40 FEET; THENCE N89'15'10"E 762.92 FEET TO A POINTON THE EASTERLY LINE OF THE Nl/2SE1/4 OF SAID SECTION 24; THENCE N00"03'02"W ALONG SAID EASTERLY UNE 370.21 FEET TO THE POINT OF BEGINNING. COUNTY OF GARFIEW STATE OF COWRADO SURVEYOR'S STATEMENT CLERK AND RECORDER'S CERTIFICATE THIS PLAT IS ACCEPTED FOR FIIJNG IN THE OFFICE OF THE CLERK AND RECORDER OF GARFIEW COUNTY, COWRADO, AT __ 0 'CLOCK_ .M., ON THE __ DAY OF , 2008, AS RECEPTION NO.-------- CLERK AND RECORDER BY: ________ ~--- DEPUTY "' < "' ~ < ::::t ~ .... ::::t g .... t 0 _J t "' LU 0 ~ "' LU "' ~ LU g J: z z 0 0 LU J: :J F z ?i ~ 1$! 0 0 Cl) 0 ::::t ~ 0 LU < "' z co ~ 0 ~ iii "' 0 :> ~ ~ w "' ---- FILE: 08071-01 OFT. SRB CK. MJL DATE: 10/22/08 PROJECT NO. 08071-01 SHEET 1 1 APPENDIX I SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 Headworks Building ----------------------, I Manual Bar Screen I I By-Pass /fl Channe1~--~/fH-//-----------, I I I lnff ;~nt ..... : I 1 If~ 1 ~a~J~~ : • -I . 0 :CRND I FL ---,--SCRND INFL --1 I., i. I Mechanical Screen & I Washer Compactor I I Digester ~ 'O Blowers I I V> 'ii ~ I \() I I ________ _ -----i--·----·t-- ' ~~00~ To Landfill ' . ' ' V> " -. . -- (Toto/ Vol= 16, 158 Go/, 2 Basins) ~ Sequencing Batch Reactor A Sequencing Batch Reactor B Digester f f f At t t t tAIR t t t t i t t t t Overflow & Supernate I-- - - - - - - - - -I I I I I Chemical Feed I Water Treatment I Building I Disinfection I ,..------!4(' '.ll--i...· ~--CO-' ' 1 '"' I I I I I I I ,, I I Liquid Sodium Hypochlorite I_ - - - - - - - - -_I .. -scu ...... . SSlt'i SSll'l - ~ -- V> 0 c I V> 0 f;: . - V> (") c I V> (") c I V> (") ~ =--0 MLSS--MLSS--MLSS_. 1.::C=~I ~MLSS Outfall Structure W/ Effluent 90" V-notch Weir souosl : Digester Solids g :1l '---SUP----SUIP----SUP----SUP----SUP----su SUIP---' ., -t Prelimifnary 6 SG M -Not or 118 West Sixth Street, Suite 200 # Daybreak Realty 1 Revision ~~00~ Liquid Solids to Landfill Date By Process Flow Diagram SPRING GULCH Job No. Drown by: Date: 2006-374.001 C3 XXX/XXX XX/XX/XXXX ~ C t t" Glenwood Springs, CO 81601 ~l_~~o~n~s~r~u~c~1o~n:_ ________________________ l__j9~7~oi.9~4~5.ll~00~4~www~~-s~g~m~-in~c~.c~om:::..__j ______________________________________________________ .l. __ .l.. ____________________________ ..L. ____ J.......J~--------------------------....1.;.;;;;; ____ .;;;.;......;.. ____ ...,..._ ________ __ High Mesa RV Park QC: xxx I PE: xxx Of 00 File: HMWWTF-ProcessSchematic APPENDIX J SGM 118 W. 6TH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 High Mesa Partners, LLC 1860 Lousetown Rd. Reno Nevada, 89521 408-391-7473 Robert Pennington and Nick Kilbourn Schmeueser, Gordon, and Myer RE: Operational plan for the Daybreak Realty Waste Treatment Plant Daybreak Realty is constructing a waste treatment plant to initially service a planned RV park located on the property adjoining the plant. The RV Park owned and operated by High Mesa Partners, LLC. is being developed by the owners, The park will be financially supported by Robert Graham, John Hayes, Eugene Speakman, Bainco International and other financing institutions. High Mesa Partners, LLC will enter into a 15 year renewable agreement to use the waste treatment facility for the RV Park. This agreement will be for payments of $20k in 2008, and $40k per year thereafter. The RV Park is being constructed for use by the energy industry and will contain 120 spaces, of which 96 will be for use by monthly rentals, and the balance will be for transients. The park is forecasted to have revenue of approximately $400k per year at 50% occupancy with a net income after operating expenses of approximately $150k per year. The plant will be maintained by trained staff from High Mesa Partners with back up support from SGM in Glenwood Springs. The plant will be located per the attached Topo Map and will drain into Spring Gulch and then onto Spencer Spring Ditch and on to the Colorado River. (See attached Map) Sincerely, Managing Partner High Mesa Partners, LLC Sept. 20, 2007