Loading...
HomeMy WebLinkAbout04178eQ`So,allllab ti GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 108 Eighth Street, Suite 201 Glenwood Springs, Coloradof 81601 Phone (970) 945-8212 INDIVIDUAL SEWAGE DISPOSAL PERMIT Permit 417 8 Assessor's Parcel No. c; (i71-33)-oo-o)9 This does not constitute a building or use permit. PROPERTY rI I n Owner's Name D I l l,(am S PratAtj AlPs� resent Address(oC fS {�afa . (4) C one Lf ; -2 C P'— GZ15 & lea, cJ f, t _01(n;- 33a.— bo—o ai System Location Legal Description of Assessor's Parcel No SYSTEM DESIGN Septic Tank Capacity (gallon) Percolation Rate (minutes/inch) Required Absorption Area - See Attached Special Setback Requirements. Date Other )1S— y Q2.8(L S ( (iwts0.PC•ce (kJ ctitti, Mgt Number of Bedrooms (or other) stt 3, Inspector FINAL SYSTEM INSPECTION AND APPROVAL. (as installed) Call for Inspection (24 hours notice) Before Covering Installation System Installer Septic Tank Capacity Septic Tank Manufacturer or Trade Name Septic Tank Access within 8 • of surface Absorption Area Absorption Area Type and/or Manufacturer or Trade Name Adequate compliance with County and State regulations/requirements Other Date "J - !^ f `D A Inspector a/ I RETAIN WITH RECEIPT RECO PE RDS CONSTRUCTION SITE •CONDITIONS: 1. All installation must comply with all requirements of the Colorado State Board of Health Individual Sewage Disposal Systems Chapter 25. Article 10 C.R.S. 1973, Revised 1984 2. This permit is valid only for connection to structures which have fully complied with County zoning and building requirements. Con- nection to or use with any dwelling or structures not approved by the Building and Zoning office shall automatically be a violation or a requirement of the permit and cause for both legal action and revocation of the permit. 3 Any person who constructs,alters, or installs an individual sewage disposal system in a manner which involves a knowing and material variation from the terms or specifications contained in the application of permit commits a Class I, Petty Offense ($500.00 Iine —6 months in Jail or both). Yy1 INDIVIDUAL SEWAGE DISPOSAL SYSTEM APPLICATION OWNER NlilllQNS Prv4C1M'1 �s ADDRESS !GR,,S. %aru clout Co gY6 35 PHONE 970 - "Ss = 93 77 CONTRACTOR IP-r-Tnadustr!W/ ADDRESS at/71 RiVeT R�P� GT CO VSOS PHONE 770 • —VGV PERMIT REQUEST FOR (VNEW INSTALLATION ( ) ALTERATION ( ) REPAIR Attach separate sheets or report showing entire area with respect to surrounding areas, topography of area, habitable building, location of potable water wells, soil percolation test holes, soil profiles in test holes (See page 4). LOCATION OF PROPOSED FACILITY: Near what City of Town Pa ea C e, Co Size of Lot 1 Legal Description or Address'/ a 85 CRe2/5,ParacL]c Cc7 (a/7/-33,2-oa-e7tO WASTES TYPE: ( ) DWELLING ( ) TRANSIENT USE 0 ffic •e 5p (/ COMMERCIAL OR INDUSTRIAL ( ) NON-DOMESTIC WASTES ( )OTHER - DESCRIBE ,'� BUILDING OR SERVICE TYPE: Number of Bedrooms 'v} Number of Persons /2- 4w/1 -tate emp /o7eks ( ) Garbage Grinder ( ) Automatic Washer ( ) Dishwasher SOURCE AND TYPE OF WATER SUPPLY: (t ELL ( ) SPRING If supplied by Community Water, give name of supplier: t"'�`'� el( DISTANCE TO NEAREST COMMUNITY SEWER SYSTEM: NA Was an effort made to connect to the Community System? A site plan is required to be submitted that indicates the following MINIMUM distances: Leach Field to Well: 100 feet Septic Tank to Well: 50 feet Leach Field to Irrigation Ditches, Stream or Water Course: 50 feet Septic System (septic tank & disposal field) to Property Lines: 10 feet YOUR INDIVIDUAL SE WAGE DISPOSAL SYSTEM PERMIT W11,1 NOT BE ISSUED WITHOUT A SITE PLAN. GROUND CONDITIONS: Depth to first Ground Water Table 1 C.3 ft (TH-t) � Akft (TN -2) 3 2 ft (T~' 3) ( ) STREAM OR CREEK u-� Percent Ground Slope < TYPE OF INDIVIDUAL SEWAGE DISPOSAL SYSTEM PROPOSED: 2 x f( SEPTIC TANK ci3 000e( ) AERATION PLANT ( ) VAULT PRIVY ( ) COMPOSTING TOILET ( ) PIT PRIVY ( ) INCINERATION TOILET VAULT RECYCLING, POTABLE USE RECYCLING, OTHER USE ( ) CHEMICAL TOILET( ) OTHER -DESCRIBE FINAL DISPOSAL BY: (kyr ABSORPTION TRENCH, BED OR PIT 014 X 1° 3! UNDERGROUND DISPERSAL ABOVE GROUND DISPERSAL OTHER -DESCRIBE EVAPOTRANSPIRATION SAND FILTER WASTEWATER POND WILL EFFLUENT BE DISCHARGED DIRECTLY INTO WATERS OF THE STATE? Ate PERCOLATION TEST RESULTS: (To be completed by Registered Professional Engineer, if the Engineer does the Percolation Test) rpbl(o Minutes =/ O per inch in hole No. 1 THi F1ii rtes z Yo per inch in hole NO. 3 TH3 Py 1% Minutes 40 per inch in hole No. 2 71/1 Minutes per inch in hole NO. Name, address and telephone of RPE who made soil absorption tests: Name, address and telephone of RPE responsible for design of the system: Ji'h 1 L%, ffi e r1 23o9 fiery-1mi? Aa.e, .63; Ga 10-M;417o2VS 907$ Applicant acknowledges that the completeness of the application is conditional upon such further mandatory and additional tests and reports as may be required by the local health department to be made and furnished by the applicant or by the local health department for purposed of the evaluation of the application; and the issuance of the permit is subject to such terms and conditions as deemed necessary to insure compliance with rules and regulations made, information and reports submitted herewith and required to be submitted by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to be relied on by the local department of health in evaluating the same for purposes of issuing the permit applied for herein. I further understand that any falsification or misrepresentation may result in the denial of the application or revocation of any permit granted based upon said application and in legal action for perjury as provided by law. Signed SNCI�+dr ✓. (Jargee -e Date 3/2- 7/0h (970 a sy3 — 444 p\ , ,Ps) PLEASE DRAW AN ACCURATE MAP TO YOUR PROPERTY!! 4 feren., c -74ecAn?cr,( Groin, I'no. report. Job No, al/65/ aw( s,-% pea,. 3 Geotechnical IlEngineering Group, Inc. SEWAGE DISPOSAL SYSTEM DESIGN Office / Warehouse Building Williams Gas Facility No. 3 County Road 215, South of Starkey Gulch Garfield County, Colorado Prepared For: Williams Production RMT Company Mr. Eric Miller P.O. Box 370 Parachute, CO 81635 Job No. 2,164 November 7, 2005 Geotechnical, Environmental and Materials Testing Consultants Grand Junction - Montrose - Moab - Crested Butte (970) 2454078 • fax (970) 245-7115 • geotechnicalgroup.com 2308 Interstate Avenue, Grand Junction, Colorado 81505 • TABLE OF CONTENTS SCOPE 1 SUMMARY OF CONCLUSIONS 1 SITE CONDITIONS 2 PROPOSED CONSTRUCTION 3 SEWAGE DISPOSAL SYSTEM DESIGN 4 SUBSURFACE CONDITIONS 4 DESIGN CONSIDERATIONS 5 DESIGN CALCULATIONS 6 PROPOSED DESIGN CONSTRAINTS 6 SYSTEM DESIGN 7 SYSTEM INSTALLATION 9 OPERATION AND MAINTENANCE 12 LIMITATIONS 13 FIG. 1 - VICINITY MAP FIG. 2 - SITE PLAN / LOCATION OF PROPOSED ABSORPTION SYSTEM FIG. 3 - ABSORPTION FIELD PLAN VIEW FIG. 4 - ABSORPTION FIELD CROSS SECTION APPENDIX A - LOGS AND LEGEND OF PROFILE TEST HOLE AND RESULTS OF PERCOLATION TESTING C SCOPE This report presents the results of a Sewage Disposal System Design for the proposed septic system to be located at the Office / Warehouse Building of the Williams Gas Facility No. 3 at County Road 215, south of Starkey Gulch (Parachute Creek) in Garfield County, Colorado. Our services were conducted to provide design criteria for the proposed sewage disposal system. The report includes descriptions of subsoil and groundwater conditions found in one profile test pit, percolation testing results and design and construction criteria for the proposed sewage disposal system. The report was prepared from data collected from percolation testing and developed during engineering analysis and experience with similar conditions. This report was prepared as continuing services, in general conformance with our Proposal No. 04-101, dated June 4, 2004. SUMMARY OF CONCLUSIONS 1. Subsurface conditions encountered in the proposed percolation field area consisted of sandy clay and clayey sand with variable gravelly and silty lenses noted. Groundwater was found in the area of the absorption field at depths of 10 to 20 feet. We used a design soils percolation rate of 60 minutes per inch for the proposed system area calculation. The proposed sewage disposal system for this site is an absorption field. We recommend a field of 24 feet by 103 feet dimension encompassing an area of 2,448 square feet. Detailed design, installation, and operations and Sewage Disposal System Design Williams Gas FacIllty No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 maintenance recommendations are included in the text of this report. 3. Geotechnical Engineering Group, Inc. and Garfield County Health Department should be called to observe and document system installation, prior to backfill. 4. An area located south- southeast of the proposed system is designated the "future repair area". This area should be set aside for potential septic system remediation. In no case should the proposed system area or future repair area be constructed with a structure or pavement. SITE CONDITIONS The subject site was located approximately 4 miles northwest of Parachute, Colorado, south of Starkey Gulch (Parachute Creek) and west of County Road 215, Fig. 1. The subject site was located in a northwest and southeast oriented valley bottom. Steeper slopes were noted along the sides of the valley. The subject site was located north and west of an existing gas production facility on vacant, undeveloped land. Low indigenous and non -indigenous vegetation was noted across the site. The facility No. 3 site was gently undulating and generally sloped down toward the southwest at 3 to 6 percent (measured with handheld rangefinder and hand level). Northwest -southeast trending irrigation type risers (dry at the time of our visit) were noted crossing the central portion of the facility No. 3 site. Smaller gas production structures were noted near the north, east and west portions of the site. An earth bermed ditch was noted near the north and east portion of the site. The ditch was approximately 15 to 20 feet wide and 5 to 7 Sewage Disposal System Design Wllllame Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 2 feet deep. Water in the ditch was flowing toward the south. An open excavation near the west portion of the site was 4 to 10 feet wide, more than 180 feet long and approximately 8 to 12 feet deep. The excavation sidewalls indicated clay type soils. Man Camp Road was southeast of the site; the previously mentioned gas production facility was beyond. Parachute Creek, undeveloped land and steeper upslopes of the valley sidewalls were southwest. Undeveloped land was northwest. County Road 215 was north and east of the site with steeper valley sidewalls beyond. The vicinity sloped down toward the valley bottom; the valley bottom sloped down toward the southeast at less than 1 percent (USGS Parachute, Colorado Quadrangle, 1962). PROPOSED CONSTRUCTION We understand the proposed construction will contain 2 showers, 2 toilets and 2 lavatories. We understand there will be a maximum of 12 full time employees that will use the building. The proposed sewage disposal system (SDS) location is shown on Fig. 2. A log of the profile test hole and percolation testing are included in Appendix A. If proposed construction changes or is different from what is stated, we should be contacted to review actual construction and our recommendations. Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 3 SEWAGE DISPOSAL SYSTEM DESIGN Subsurface Conditions Subsurface conditions at the site were investigated by drilling and sampling nineteen exploratory borings. Borings TH-18 and TH-19 were in the area of the proposed absorption field. Locations of the exploratory borings are shown in Appendix A on Fig. 2. Graphic logs of the soils found in the borings and field penetration resistance tests are presented in Appendix A on Figs. 7 and 8. Subsurface conditions encountered included up to 67 of sandy clay underlain by clayey gravel to the maximum depth explored of 78 feet. The sandy clay had clayey gravelly sand and sandy, silty clay lenses, was medium stiff to very stiff, dry to wet and brown. This soil had an appearance of ancient landslide / sheet flow type deposition and sulfates noted. Groundwater was encountered at 15.5, 26 and 32 feet below the ground surface on the day of drilling in exploratory borings TH-1, TH-2 and TH-16 (respectively). Percolation Testing Percolation testing was performed on August 24 and 25, 2005 in percolation holes P-1 through P-3. A profile boring was observed at TH-19. Locations of profile boring TH- 19 and P-1 through P-3 are shown in Appendix A on Fig. 2. Three percolation holes were augered to depths of 4 feet below existing grade and prewetted on August 24, 2005. Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 7,164 4 A small drainage (dry at the time of our visit) was noted more than 100 feet southwest of the proposed septic area. No other water sources were identified within 300 feet of the area of the proposed septic system. Results of the percolation testing are included in Appendix A on Figs. 16 through 18. Subsurface conditions encountered in the profile hole (TH-19) consisted of 8 feet of sandy clay to the maximum depth explored of 8 feet below the ground surface. Groundwater was not identified in the profile to the maximum depth observed. We estimate a high seasonal groundwater level of 7 feet below the ground surface. Percolation test results ranged between 20 minutes per inch to time intervals which did not measurably percolate. Groundwater was not identified in the boring to the maximum depths observed. Many of the percolation readings were 40 minutes per inch. We used a design percolation rate of 60 minutes per inch in calculations. Design Considerations Based on our site observations and percolation testing, we believe an absorption bed system can perform satisfactorily for the proposed system. Consideration should be given to the lowest floor level in order to help insure flow without the need for a lift station. Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Joh No. 2,164 5 DESIGN CALCULATIONS Calculations and design parameters used to size the absorption field follow: Proposed Design Constraints Average flow Calculation 2 showers 14.7 g/p/d x 2 = 29.4 g/p/d 2 toilets 24.8 g/p/d x 2 = 49.6 g/p/d 2 Lavatories 4.4 g/p/d x 2= 8.8 g/p/d total = 87.8 g/p/d x 12 employees = 1,053.6 gallons/day Peak flow = 150% of average = 1,580.4 gallons/day Design percolation rate = 60 minutes/inch A = Q r; where, t = Percolation rate (minutes/inch) Q = Peak flow A = Absorption field area 1580.4 A = 5 60 = 2,448 square feet (Design dimension = 24 x 102 feet = 2,448 square feet) Sewage Disposal System Design WIlllams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 6 SYSTEM DESIGN For purposes of design, we estimate a high seasonal groundwater 7 feet below the ground surface. The gravel absorption bed system should be placed 2 foot below the existing ground surface. 1. A minimum tank size of 1,976 gallon septic tank is required to accept septic effluent from the proposed system (based on a minimum detention time of 30 hours). A larger, readily available, tank size may also be used (such as 2,000 gallon). A removable, cleanable septic tank filter should be installed at the outlet. As discussed above, a gravel absorption bed system is proposed to discharge septic effluent to the underlying subsoils. The design absorption field will be 24 feet by 102 feet in lateral dimension and encompass an equivalent area of 2,448 square feet. 2. A 12" gravel seepage bed will be placed over the absorption area. The gravel seepage bed shall consist of 1.0" — 2.5" screened rock with individual aggregate components of uniform size. Four inch perforated effluent discharge lines will be embedded in the gravel seepage bed with a minimum of 6" of gravel under, and 2" of gravel over each line. The bottom of the gravel bed shall be at least 1 foot below the existing ground surface. Deeper depths may be required. 3. The piping system should consist of two laterals of four inch perforated effluent discharge lines, 96 feet in length. Details of the system are included on Figs. 2 through 4, attached. 4. After the gravel seepage bed is installed, synthetic filter fabric (140-200 mesh), hay, or untreated building paper should be placed over the gravel and the system covered with a soil cap. The soil cap should consist of 18 - inches to 24 -inches of native soil mounded 5% to promote surface run off away from the absorption area. 5. Consideration must be given to provide positive drainage away from the completed absorption field in each direction. Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 7,160 7 6. Sidewall construction of the soil cap from the perimeter of the absorption field to the existing ground surface shall consist of: • removing surface vegetation and scarifying or disking the existing ground surface under the basal extent of the soil cap sidewall to enhance subsurface absorption, followed by; • maintaining a maximum backslope of 3 horizontal to 1 vertical (33%) from the resulting perimeter elevation to the existing ground surface to reduce erosion. All relevant setbacks with respect to the absorption field shall be taken from the toe of the surface cap rather than the gravel seepage bed. 8. The area located south-southeast of the proposed absorption system is designated the future repair area, see Fig. 2. The future repair area should be set aside for potential septic system remediation. In no case should this area be constructed with a structure. The same set back and grade requirements apply to the future repair area as the absorption system area. 9. Eighteen inches to 24 inches of soil cover is recommended for all SDS elements (excepting maximum 8 inches soil cover over septic access ports) to mitigate frost concerns. The installer should confirm the feasibility of gravity discharge of sewage effluent from the residence to the absorption field. If field measurements do not confirm the design assumptions, gravity discharge of sewage effluent from the existing residence to the absorption field can not be assured and a lift pump may be required. Please contact the design engineer and Garfield County Health Department to address any design modifications necessary for effective operation of the SDS if the above design assumptions are not upheld. Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 8 The installer must also confirm the setbacks from property lines, building envelopes, and existing easements shown in the attached graphics are maintained. Additionally, any unknown utility lines, easements, or other adverse conditions disclosed during construction must maintain the required setbacks. The proposed residence must be located to maintain required SDS setbacks as well as provide compliance with Garfield County Planning Department zoning setbacks. Finally, implementation of a repair absorption field south of the proposed system may require future installation of a lift station to provide discharge of septic effluent from the tank to the repair absorption field. SYSTEM INSTALLATION The owner and system contractor should be aware of and comply with the following installation and system operation requirements. 1. All installation activities shall be conducted in accordance with Garfield County Health Department Sewage Disposal System (SDS) regulations. If at any time during construction, subsurface site conditions are encountered which differ from the design parameters stated above, construction activities should stop and the design engineer and Garfield County Health Department be contacted to address any necessary design modifications. The system contractor must be approved and licensed by the Garfield County Health Department for installation of sewage disposal systems. 3. Installation procedures including grade, location, setbacks, septic tank size, and absorption field size should conform with the attached figures. Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 9 Construction activities and system components should not encroach upon existing easements or utility corridors. A minimum of 6 feet of undisturbed soil should be maintained between individual absorption elements and the septic tank and /or adjacent absorption elements. Minimum setbacks for system components are: water line dwellin unoccupied bldg. or structure Prose lines subsoil drains oaen ditch lined/gated ditch solid pipe ditch 10 feet 10 feet 5 feet 10 feet 10 feet 50 feet 25 feet 10 feet 10 feet 50 feet 25 feet 20 feet 5 feet 10 feet 25 feet 50 feet 25 feet 10 feet 25 feet 50 feet 10 feet 10 feet 10 feet 50 feet 25 feet 10 feet 10 feet 50 feet 4. To help avoid surface flow infiltration and saturation of the new absorption system, abandonment of flood irrigation within 50 feet of any SDS element is recommended. 5. All sewer lines and effluent distribution piping should be 4 inches in diameter, have glued joints, and should looped at termination of discharge. Septic tank lines should be placed level. All lines discharging sewage from the residence to the septic tank shall maintain fall of between 1/8 inch and 1/4 inch per foot and shall employ sweep 90's or 2-45's at all turns. Sewer lines from the dwelling to the septic tank and at least 6 feet from the septic tank outlet must meet minimum standard ASTM -3034. Sewer lines under driveways shall always meet minimum Schedule 40 PVC standards and should be encased with corrugated metal pipe when covered with less than Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 10 24 inches of soil. 6. Eighteen inches to 24 inches of soil cover should be maintained over all SDS components to mitigate freezing of septic effluent (excepting maximum 8 inches cover over septic access ports). 7. The installer should not place fill in the open excavation until inspected and approved by the design engineer. Additionally, the final cover should not be placed on sewer lines, septic tank, or the absorption area until the system has been inspected and approved by the design engineer and the Garfield County Health Department. 8. The installer should provide 48 hour notice to the engineer and the Garfield County Health Department for all required inspections. 9. Four inch effluent distribution lines should be embedded in gravel with a minimum of 6 inches of gravel under, and 2 inches of gravel over each line. A layer of 1.0 to 2.5 inches screened rock with individual aggregate components of uniform size should be used. A covering of untreated building paper, hay, straw, or synthetic filter fabric should be placed on top of the gravel before placing the surface cap. 10. The system contractor shall be aware of the potential for construction activities to reduce soil permeability's at the site through compaction, smearing, and shearing. The following precautions and construction procedures should be employed during installation to mitigate disturbance to native soils: a. Excavation should proceed only when the moisture content of the soil is below the plastic limit. b. Excavation and backfill equipment should work from the surface where at all practical to avoid compaction of the soils at depth. c. The bottom and sidewalls of the excavation should be left with a rough, open surface. The appearance should be that of broken or ripped soil as opposed to a sheared, smeared, or troweled surface. Any smoothed or smeared surfaces should be removed with a toothed rake or shallow ripper taking care to remove loose residues from the bottom of the excavation by hand if necessary. Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 11 d. Care should be taken in placing fill materials in the excavation to avoid damaging the exposed soil surfaces. OPERATION AND MAINTENANCE Performance of the subject sewage disposal system will be dependent on suitable operations and maintenance practices. The owner must understand and accept responsibility for operations and maintenance of the system. Important factors include: 1. The owner should install a structural barrier if necessary and take precautions to prevent vehicular traffic, excessive surface watering, accidental flooding, or other activities in the vicinity of the absorption field which may compact, saturate, or otherwise alter the subsurface soil parameters used in designing the septic system. 2. The owner should plant and maintain grass or other shallow rooted cover crop to prevent erosion and promote evapotranspiration over the absorption area. 3. The owner should inspect and maintain the required mounding and drainage away from the absorption area to prevent saturation from precipitation and surface flows. 4. The owner should inspect and prevent intrusion of burrowing animals and deep rooted plants into the absorption area. 5. The owner should conduct periodic maintenance of the septic system by removing accumulated sludge from the septic tank every 3 to 4 years to prevent clogging of the absorption area. The septic tank filter should be inspected on a yearly basis, minimum. Sewage Disposal System Design Williams Gas Facility No.] Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 12 6. The owner should not allow disposal of harmful substances into the subject sewage disposal system. LIMITATIONS Satisfactory performance of a sewage disposal system is dependent on several factors including subsurface evaluation, design, installation, operation and maintenance procedures. It is important to understand there is an element of risk inherent with the performance of each individual sewage disposal system. The design engineer can provide design measures and recommendations to help mitigate risk. A comprehensive review by the hearth department is recommended to help mitigate risk. The risks associated with overall system operation/performance must be understood and accepted by the owner. Design notes contained in this report are based on limited subsurface data. Variations in subsurface conditions not indicated by the test pit are possible. Subsurface conditions may also change with time. The installation contractor should observe actual subsurface conditions exposed at the time of excavation. If differing conditions are suspected, installation should cease immediately. If different soil or groundwater conditions are suspected, Garfield County Health Department and our office should be contacted to review conditions and make necessary design changes. The recommendations contained in the report are also based on information supplied to Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 13 GEG by the client. Geotechnical Engineering Group does not accept responsibility for variation in the assumed design parameters. The scope of work performed is specific to the proposed construction and the client identified by this report. Any other use of the data, recommendations and design parameters (as applicable) provided within this report are not appropriate applications. Other proposed construction and/or reliance by other clients will require project specific review by this firm. Changes in site conditions can occur with time. Changes in standard of practice also occur with time. This report should not be relied upon after a period of three years from the date of this report and is subject to review by this firm in light of new information which may periodically become known. We believe this design was conducted in a manner consistent with that level of care and skill ordinarily used by geotechnical engineers practicing in this area at this time. No other warranty, express or implied, is made. If we can be of further service in discussing the contents of this report or the analysis of the influence of the subsurface conditions on the design of the proposed construction, please call. Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 14 Sincerely, GEOTECHNICAL Joh P. Withers, Principal Engineer JPW:cb (3 copies sent) 0 REG/'. eo 303it ..I I Al '••eeee••°s>> 0NAI�� Sewage Disposal System Design Williams Gas Facility No.3 Parachute Creek, Garfield County, Colorado GEG Job No. 2,164 ROUP, INC. 15 Sewage Disposal System Design Williams Gas Plant No. 3 County Road 215 and Mancamp Road Garfield County, Colorado Job No. 2,164 Vicinity Map Fig. 1 fl Proposed Building Sentic Tank Relocate Dirt Road 50' South 1_1-) ) Absorbtlopi / z// Future Repair Area Job No. 2,164 Location of Sewage Disposal System Fig. 2 Proposed Building 1/ 1 11111 Clean Out Septic Tank` 4" Perforated PVC Pipe Job No. 2,164 Looped at ends 6' 102' 24' Scale: 1" = 20' Absorption Field Plan View Clean out should be provided every 100 lineal feet. Fig. 3 12" Seepage Bed 1.0 - 2.5 inch screened rock 4 -inch Perforated Distribution Lines, typical (6" Gravel under, 2" Gravel over minimum) Synthetic Filter fabric, hay or untreated building paper over gravel Soil Cap (mound 5%) 3' - I 1' Job No. 2,164 24' Scale 1"=-5' Absorption Field Cross Section Fig. 4 APPENDIX A LOGS AND LEGEND OF PROFILE TEST HOLE AND RESULTS OF PERCOLATION TESTING TH-1 • Note: This figure was prepared based on GEG field and in house mapping, and is intended to show exploratory boring locations only. (TH-2 TH-5 TH•3 �n TH-13 TH-16 :: Antcipated location of proposed structures (typical) TH-17 T�9 H-18 P-10 O P-3 O P-2 Legend • Indicates location of exploratory borings. o Indicates location of percolation testing. Job No. 2,108 Location of Exploratory Borings Fig. 2 0 co m w TH-1 elev. 5434' TH-2 elev. 5444' TH-3 elev. 5442' TH-4 elev. 5433' 5450 5450 Anticipated Plant Finish Grade elev. 5431' & 5440' 5440 5430 5420 0 5410 5390 5380 5370 5/12 / 20/12 20/12��- 18/12 6/12 9/12 —/—/(e— 5406 5396 6/12 50/9 50/9 /7/12 8/12 7/12 4/12 5440 5430 5420 5410 4) a) c 0 a) w 5390 5380 5370 Job No. 2108 Logs of Exploratory Borings Fig. 3 m w O > a) LT TH-5 • elev. 5441' — 5450 — 5440 — — 5430 22/12 8/12 7/12 — 5420 — 5410 5400 5390 5380 5370 TH-6 elev. 5432' TH-7 elev. 5433' 8/12 4/12 77/12 TH-8 elev. 5430' Anticipated Plant Finish Grade elev. 5431' & 5440" 7-1 19/12 16/12 16/12 6/12 21/12 8/12 6/13 6/12 5450 5440 5430 5420 — 5410 5400 5390 5380 50/10 5370 50/10 Job No. 2108 Logs of Exploratory Borings Fig. 4 0) c 0 m 0 w d c 0 a) w TH-9 ' elev. 5434' 5450 — 5440 5430 — 5420 5410 TH-10 elev. 5439' TH-11 elev. 5442' Anticipated Plant Finish Grade elev. 5431' & 5440' /i 25/12 21/12 /8/12 /,� 7/12 19/12 11/12 14/12 TH-12 elev. 5448' 5450 16/12 5440 8/12 11/12 5430 5420 5410 5400 5400 Job No. 2108 Logs of Exploratory Borings Fig. 5 c 0 0 w O 0) C 0 co 0 w TH-13 • elev. 5444' TH-14 elev. 5443' TH-15 elev. 5339' TI -I-16 elev. 5442' 5450 5450 Anticipated Plant Finish Grade elev. 5440' 5440 5430 5420 — 5410 5400 5390 5380 19/12 12/12 ▪ 14/12 23/12 13/12 6/13 15/12 8/12 8/12 24/12 8/12 8/12 11/12 29/12 5440 5430 5420 5410 5400 5390 48/12 – 5380 50/5 _ 5370 5370 Job No. 2108 Logs of Exploratory Borings Fig. 6 w 0 w 0 w 0 0 w 5450 — 5440 5430 5420 5410 ` TH-17 elev. 5436' 19/12 19/12 8/12 TH-18 elev. 5431' TH-19 elev. 5429' Anticipated Plant Finish Grade elev. 5431' 21/12 17/12 7/12 9/12 5450- 5440 450- 5440 5430 5420 5410 5400 5400 Job No. 2108 Logs of Exploratory Borings Fig. 7 0 a) trtsc 0 0 w Legend Clay, sandy, Sand, clayey, gravelly and Clay, sandy, silty lenses, medium stiff to very stiff, dry to wet, brown, sulfates noted, possible ancient slide deposits. (CL) Gravel, clayey, dense to very dense, wet. (GC) Indicates drive sample. The symbol 5/12 indicates that 5 blows of a 140 pound hammer falling 30 inches were required to drive a 2.5 inch O.D. sample barrel 12 inches. Indicates bag sample taken from auger cuttings. Indicates free water level. Numeral indicates number of days after drilling that measurement was taken. I Indicates depth at which exploratory boring caved. Indicates practical drill rig refusal with augering methods. Boring terminated. Indicates penetration test. The symbol 50/9 indicates that 50 blows of a 140 pound hammer falling 30 inches were required to drive a 2.5 inch O.D. dynamic cone 9 inches. Elev. Indicates elevation of ground surfaces at test boring location as obtained 5,434 from topographic map provided by Williams Production and is approximate. Notes 1. Exploratory borings were drilled and sampled on August 24 and 25, 2005 using a 4 -inch diameter solid stem, continuous flight auger and a track mounted drill rig. 2. These logs are subject to the explanations, limitations and conclusions as contained in this report. Job No. 2,108 Legend of Logs of Exploratory Borings Fig. 8 Geotecboleal 'Eagleeerlug ,Groep, Inc. SATURATION AND PREPARATION DATE: August 24, 2005 TIME AT START OF SATURATION: 11:30 PERCOLATION TEST DATE: August 25, 2005 WATER IN BORINGS AFTER SATURATION Depth to Water YES X NO PERCOLATION TEST RESULTS HOLE NUMBER s" Diameter DEPTH (INCHES) TIME AT START OF INTERVAL TIME INTERVAL (MINUTES) DEPTH TO WATER CHANGE IN WATER DEPTH (INCHES) PERCOLATION RATE (MIN/INCH) START OF END OF INTERVAL INTERVAL (INCHES) (INCHES) P-1 @ 0' 4" DIA 48" 11:01 10 33.25 33.5 0.25 40 48" 11:11 10 33.5 34.0 0.5 20 48" 11:21 10 34.0 34.25 0.25 40 48" 11:31 10 34.25 34.25 0.0 ^" 48" 11:41 10 34.25 34.5 0.25 40 48" 11:51 10 34.5 34.75 0.25 40 * Note * -, : indicates did not percolate during this interval. Job No. 2,108 Fig. 16 Geoteehnlcal 'Frgineering ,Group, Lae. SATURATION AND PREPARATION DATE: August 24, 2005 TIME AT START OF SATURATION: 11:40 PERCOLATION TEST DATE: August 25, 2005 WATER IN BORINGS AFTER SATURATION Depth to Water YES X NO PERCOLATION TEST RESULTS HOLE NUMBER 8' Diameter DEPTH (INCHES) TIME AT START OF INTERVAL TIME INTERVAL (MINUTES) DEPTH TO WATER CHANGE IN WATER DEPTH (INCHES) PERCOLATION RATE (MIN/INCH) START OF END OF INTERVAL INTERVAL (INCHES) (INCHES) P-2 @ 0' 4" DIA 48" 11:02 10 33.25 33.5 0.25 40 48" 11:12 10 33.5 33.75 0.25 40 48" 11:22 10 33.75 34.0 0.25 40 48" 11:32 10 34.0 34.25 0.25 40 48" 11:42 10 34.25 34.5 0.25 40 48" 11:52 10 34.5 34.75 0.25 40 Job No. 2,108 Fig. 17 Geotechnieal Enalneering 1 Group, Lar. SATURATION AND PREPARATION DATE: August 24, 2005 TIME AT START OF SATURATION: 11:50 PERCOLATION TEST DATE: August 25, 2005 WATER IN BORINGS AFTER SATURATION Depth to Water YES X NO PERCOLATION TEST RESULTS HOLE NUMBER 8° Diameter DEPTH (INCHES) TIME AT START OF INTERVAL TIME INTERVAL (MINUTES) pEPTH TO WATER CHANGE IN WATER DEPTH (INCHES) PERCOLATION RATE (MIN/INCH) START OF END OF INTERVAL INTERVAL (INCHES) (INCHES) P-3 @ 0' 4" DIA 48" 11:03 10 30.25 30.75 0.5 20 48" 11:13 10 30.75 31.0 0.25 40 48" 11:23 10 31.0 31.0 0.0 48" 11:33 10 31.0 31.25 0.25 40 48" 11:43 10 31.25 31.5 0.25 40 48" 11:53 10 31.5 31.5 0.0 co ' Note * m : indicates did not percolate during this interval. Job No. 2,108 Fig. 18 JOB NO. 2,108 w m H et il 1 i V yL 0 d iu C 0 E C V 0 'Aev G7 AIM SUMMARY OF LABORATORY TEST RESULTS W 0} J Q CO U T C CO >. (0 U Clay, sandy (CL) Clay, sandy (CL) Clay, sandy (CL) U T C CO T 0) U 'Clay, sandy, silty (CL) Clay, sandy (CL) Clay, sandy (CL) U T C Ute) T 0) 00 U T C N T co Clay, sandy (CL) Clay, sandy (CL) 1 Clay, sandy (CL) U T 9C 0 T 0) U LClay, sandy (CL) Clay, sandy (CL) ,Clay, sandy, silty (CL) WATER SOLUBLE SULFATES (Ppm) PASSING NO. 200 SIEVE (%) O) 1- K) co 0 co Swell / Consolidation CONFINING PRESSURE (PSF) O o- Na in N SWELL (%) Laboratory Testing in Progress l Laboratory Testing in Progress 0. + Laboratory Testing in Progress (O O + +0.6 N O + Atterberg Limits PLASTICITY INDEX (%) 11) 0 D _)2o dJ- J co 23 DRY DENSITY (PCF) I.-- 0 107 N 0 O 0 0) .- 0 0 102 N r 107 103 114 109 0 O Cr) r r r T NATURAL MOISTURE (%) 20.8 17.9 20.8 1 N 00 0 202 f u] r 0) ao M 22.4 N co (•1 u] (0 n O m N 00 N 6 19.8 DEPTH (FEET) N Q) n n O) V Q) V O) N O) V 2 N V L 9 CD N J O = H e;1 1— c7 1- q F- '9 1- ( 4 1- r H O7 H O) H O r JOB NO. 2,108 w -J m H Wd 1ea - vE eco A CVit 'i A SUMMARY OF LABORATORY TEST RESULTS W a J_ O co Clay, sandy (CL) Sand, clayey, gravelly (SC) Clay, sandy (CL) Clay, sandy (CL) Clay, sandy (CL) Sand, clayey, gravelly (SC) Sand, clayey (SC) Clay, sandy, gravelly (CL) Clay, sandy (CL) Clay, sandy (CL) Clay, sandy, silty (CL) Clay, sandy (CL) WATER SOLUBLE SULFATES (Ppm) PASSING NO. 200 SIEVE (%) V N 30 (D V 51 1 O) Ill O) (.0 Swell / Consolidation 1 CONFINING PRESSURE (PSF) O O N 1,000 1,000 O Ul 0 O SWELL (%) N + Laboratory Testing in progress - - V o N. o t() + (n o Laboratory Testing in Progress Atterberg Limits F UX a � Z 0 a 5— o r 0I- n�i' %, J J V N co N } L.L ix U o Z a 0 O) '- el 0 r to 0 114 1 84 114 to r a) 0 V r I- 0 N- 0 NATURAL MOISTURE (%) (O n N- r m co ni 26.0 4.5 1 til n co 4 f` O m e -- tri 10.9 16.4 M r H WO) 11.1 0 LL cn O) O) O a) 4 0) N N O) •V to LllN J 0 T H I— O F V 1-- (0 F (0 I— n H N I— N 0 a 1 G of chnical IEngin ering Group, Inc. September 29, 2006 Williams Production RMT Company Mr. Tom Fiore P.O. Box 370 Parachute, CO. 81635 Subject: Sewage Disposal System "As Built" Field Drawing Gas Plant No.3, County Road No. 3, South of Starkey Gulch Parachute, Colorado Job No. 2,164 As requested, a Geotechnical Engineering Group, Inc. (GEG) representative met with the contractor representative to observe septic system installation at the subject site on September 25, 2006. At the time of our observation, the absorption system was observed to be installed. Field measurements indicated the installation was completed in conformance with the "Sewage Disposal System Design" prepared for the subject site by GEG dated November 7, 2005. A field "as built" drawing showing the system installation is attached as Fig. 1. We appreciate the opportunity to provide professional services. When we can be of further service, please call. Sincerely, NR'P REG/s), n1T+ GEOTECHNICAL ENGI �RI'P' !^'h1'?ra=ffl� • 30324 s • -O iI� `l4-l•LP i John P. Withers, P.E. �p •. • Principal Engineer "ct ..••••••••:.:0.1�' SIONALS7 JPW:jpw (1 copy sent) 2 cc: Phil Vaughan Construction Management Mr. Phil Vaughan 1038 County Road 323 Rifle, CO 81650 rtIvE, C ARF G 9 2006 sofco pL41NN NGY Geotechnical, Environmental and Materials Testing Consultants (970) 245-4078 • fax (970) 245-7115 • geotechnicalgroup.com 2308 Interstate Avenue, Grand Junction, Colorado 81505 Cleanout — 177' 22° 172' 116' 145° Williams 3 Gas Plant Existing Building / /v//////////////////////////// L 3.5' f 27' 53' 79' Cleanout 258' 27 100' _24' Job No. 2,164 241' Lat: 39° 29.241' Long: 108° 06.750' Elev: 5077' Absorption System "As Built" Drawing Fig. 1 To co