Loading...
HomeMy WebLinkAboutOWTS Installation Observations 09.01.17I i Huddleston -Berry Engineering& Testing, LLC I. - Tally Ho Construction 0145 County Road 225 Rifle, Colorado 81650 Attention: Jeff Parrington Subject: OWTS Installation Inspection Lot 4 Creek Side Estates Rifle, Colorado 640 White Avenue Grand Junction, Colorado 81501 Phone: 970-255-8005 Fax: 970-255-6818 lnfo@huddlestonbcrry.com September 1, 2017 Project#01150-0003 Reference: OWTS Design, Loi 4 Creek Side Estales, Rifle, Colorado by Huddleston -Berry Engineering & Testing, LLC for Tally Ho Construction, October 24, 2016. Dear Mr. Parrington, In accordance with Garfield County and State of Colorado regulations, Huddleston -Berry Engineering & Testing, LLC (HBET) conducted inspection of the installed Onsite Wastewater Treatment System (OWTS) at Lot 4 Creek Side Estates in Rifle, Colorado. As indicated in the referenced report, HBET completed engineering design of the system. Based upon our inspection, HBET certifies that the OWTS was constructed in accordance with the design. The as -built site plan is attached. Please contact us if you have any questions or comments regarding the contents of this letter. Respectfully Submitted: Huddleston -Berry Engineering and Testing, LLC Michael A. Berry, P.E. Vice President of Engineering Scale: 1" = 30'