Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-10-17-4983 Sept -10-17-4984 CMH Homes, Inc. Cory Huck Residence — New Manufactured Home TBD County Road 331 Silt, Colorado 1) MANUFACTURED HOUSES ARE REGULATED & INSPECTED BY THE COLORADO DEPT. OF HOUSING (C.D.O.H.) AND ALL FACTORY -BUILT RESIDENTIAL STRUCTURES IN GARFIELD COUNTY MUST MEET C.D.O.H. GUIDELINES FOR MANUFACTURE AND INSTALLATION AT THE JOB SITE. GARFIELD COUNTY REQUIRES C.D.O.H. INSTALLATION INSIGNIA TO BE AFFIXED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 2) FOUNDATION, CRAWL SPACE & SITE WORK SHALL COMPLY WITH 2015 INTERNATIONAL RESIDENTIAL CODE (I.R.C.), 2009 INTERNATIONAL ENERGY CONSERVATION CODE AND MANUFACTURER'S INSTALLATION REQUIREMENTS. 3) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND DETAILED DESCRIPTION OF NUMERIC NOTATIONS AS REDLINED ON DRAWINGS. 4) VERIFY DRIVEWAY LOCATION AND OBTAIN DRIVEWAY PERMIT FROM GARFIELD COUNTY ROAD & BRIDGE DEPARTMENT. PROVIDE COPY OF DRIVEWAY PERMIT FOR INSPECTOR REVIEW. 5) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER, AND ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 6) ELECTRICAL PERMITTING AND INSPECTIONS BY STATE OF COLORADO ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) GARFIELD COUNTY BUILDING DEPT. INSPECTIONS TO INCLUDE THE FOLLOWING: A. FOOTINGS B. FOUNDATION C. PLUMBING/GAS D. FINAL/CERTIFICATE OF OCCUPANCY