Loading...
HomeMy WebLinkAboutApplicationGarfield County RF3#.FæH t)cT172011G u",.64{,Ð-........ BUILDING PERMIT APPLICATIONDevelopment Department 8th street, suíte 401 Springs, CO 81601 (9701945-8212 TYPE OF Commercia ulti-Fami Residential (5F, Duplex or Townh INVOLVED PARTIES Manufactured Home lnstaller: NA Phone Mailing Address: Email Address: Describe Work:Renovation of 2 offices to construct a single conference room. E Demolition Manufactured Home si le or Multi-Leve Reroof 5-5350Property Owner: Mailing Address:P.O. Box 3609 Grand Junction, CO 81502 Walter M Gleason Estate c/o Oldcastle SW Group, ln". phon",(e70) Emait Addresr. phil@pvcmi.com Phil Vaughan Construction Management, lnc. phone:r(e70) p25-5350 Maíling Address:1038 County Road 323 Rifle, CO 81650 Email Address:phil@pvcmi.com Contractor 136 East 3rd St. Rifle, CO 81650 Phonel r(970) ç2s-0580Architect:Jeff Johnson Architectural, PC Email Address:jeff@ja rch itectu ral. com Mailing Address: Phone:(NAEngineer: Mailing Address: Email Address: Job Address:Oldcastle Sievers Pit-3794 County Road 109 Glenwood Springs, CO 81601 Assessor's Parcel Number:2393-183-00-366 Sub,Lot Block owne/s valuation of work: 5 15,000'00 Property Size (Sq' Ft. or Acres)90.433 acres Sq. Ft. of Building:1,600 s.f Height:14 feet # of Floors ,1 Class of Work:I nrew j n i n nu¿¡tion ; n nuPu¡t I Garage:Attached fl Alteratio Detached Move/Relocation t PROJECT DETAILS CONTINUED Septic:OWTS I Community Natural Gas I Propanc Electric Other it:Exempt Permit #: I , NOTICE Authoritv. This applica tion for a Building Permit must be signed by the Owner of the property, described above, oranauthorizedagent. lfthesignaturebelowisnotthatoftheOwner,aseparateletterofauthority,signedby the Owner, must be provided with this Application. Lesal Access. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Division. Other permits. Multiple separate permits may be requiredl (1) State Electrical Permit, (2) County OWTS Permit, (3) another permit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authorized is not commenced within L80 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement. CERTIFICATION I hereby certify that t havô reãd this Àppliiation and that the information conta¡ned above is true and correct. I understand that the Building Division accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy' Assuming completeness of the submittals and approval of this Application, a Building Permit will be issued granting permission to me, as Owner, to construct the structure(s) and facilities detailed on the submittals reviewed by the Building Division. In consideration of the issuance of the Building Permit, I agree that I and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Building Code, OWTS regulations and applicable land use regulations (County Regulatìon(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant permission to the Building Division to enter the property, described above, to inspect the work. I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (1) requiring the correction of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of County Regulation(s) or any other applicable law. Review of this Application, including submittals, and inspections of the work by the Building Division do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect d9s! gne¡, gllcln-e_el a n g/- o r builder I hereby acknowledge that I have read and understand the Notice and Certification above, as well as, have ed the required information which is correct and accurate to the best of my knowledge. 10t17117 Property Owner Print and Sign Date 1 I v, T OFFIC¡AI USE ONtY Special Conditions:q!, Á,At^¿lutú \iç't û Ødil'uê. Misc Fees:Manu home Fee: l,*\ / A Plan Check Fee6tua.çt Fee: IffH 2b^& usted Valuation:lb,M 0ô BP No: el-ln - qqqr)OWïS No: truis\ìrro, Fees Paid:sil,A.sr Balance Due:Øzryt.zoTotal Fees: ø 414.d" Zon ß. ing: AConst TvÞe:Y.BOCC Group:øSetbacks:flg,2g,9=lo ulrel%ryBUILDING / PLANNING DIVISION Signed Approval Date ÞuildÍEe/ Zonine PIan ReviewÇhecklitü Buildine x Engineered Foundation 30% Attach Plan Review List Subdívísíon Plat Notes Fire Department Revíew Valuation Determinatíon/ Fees Red Líne Plans/ Stamps/ Sticker 40# Snowload Letter - Manu. Homes Soils Report a ?4/^^ùt'l Planni Zonine , / Property Line Setbacks Ir/¡30 ft. Stream Setbacks Flood Plain Zoning Sign-Off Subdivision PIat General Comments: ru/¿f Road lmpact Fees / Grade/Topography40% a planníng lssues N/A Perrnit Number: WØ - lo- 11- 444Ô Qtuu¡q ùrart¿l "it/Ofi'/ Driveway Permit X Surveyed Site Plan N/A Septic Permit and Setba ømnl I. Building Heisht '/ Grade/ Topogra N/A '/ Attach Conditions Applicatíon Signed '/ Plan Revíewer to Sign Application ParceV Schedule No. N N/A \alwhon' ùtbtm. (*o gub,"4it'.d') Ruaà Inpot Fû', N/A (l:o rw q,?.) NOTE: lf any required information is missing, delays in issuing the permit are to be expected. lf determined by the Building Official that additional information is necessary to review the application and/or plans ior compliance, the application may be placed on hold until the required information is provided. Work may not proceed without the issuance of a permít' The Building Dívision will collect a Plan Review fee at tíme of application submittal. The Permit Fee, as well as any Road lmpact fees will be collected when the permit is issued. The permit application must be signed by the owner or by a person having written authority from the owner to act as their representative. I hereby acknowledge I have read, understand, and will abide with the requirements of this checklist. -\Þ.ñ.. 10117 117 Property Owner Print and Sign Date Gaffield County COMMERCIAL OR MULTI.FAMILY BUILDING PERMIT APPLICATION CHECKLIST Community Development Department 108 8th street, Suite 401 Glenwood Springs, CO 81601 (97Ole4s-821,2 www.gqlf ield-countv.com COMMERCIAL OR MULTI.FAMILY BUILDING PERMIT APPLICATION CHECKLIST ln order to understand the scope of work intended and to expedite the issuance of a permit, it is important that complete information be provided, Please review this document to determine if you have adequate information to design your project and to facilitate a plan review. All applications are required to be submitted in person. APPLICATION FORM: Please make sure the following information is provided on the application. r Parcel number obtained from the County Assessor's Office' . Job address (assigned physical address). o Legal Description: block, lot, tract, subdivision, filing, or section, township and range. o Owner's name, mailing address, phone, fax or cell. r Contactors name, mailing address, phone, fax or cell. . Architect and/or Engineer's name, mailing address, phone, fax or cell. e Building size, height, number of stories, lot size. o Use of building (Commercial). r Class of Work (New, Addition, Alteration, Repair, Demo, Move/ Relocation). o Detailed description of work. o Type of heating (natural gas, propane, electric, other)' . Sewer system (Community or OWTS), also see other items below. r Garage (Attached or Detached). o Driveway permit (please see other items below). ¡ Valuation (labor and materials), see attached worksheet. OTHER ITEMS: lf you anticipate obtaining a water-tap from the City of Rifle, please provide a letter indicating that the City will provide water service. Required to submit building permit application. OWTS requires a septic permit application to be submitted with the building permit application. A separate electrical permit must be obtained from the State of Colorado Electrical Board. At the time of building permit submittal, you are required to show proof of legal and adequate access to the site. This may include proof of right to use a private easement, County Road & Bridge permit, or Colorado Department of Highway permit, including a Notice to Proceed. The County Road & Bridge Department can be reached at 970-625-8601. lf you anticipate excavating or grading prior to issuance of a building permit, you will be required to obtain a separate grading permit. lf you belong to a Homeowners Association it is your responsibility to obtain written approval, if required. Provide copies of any Resolutions and/or Land Use Permits associated with this property. Projects with more than 10 occupants require plans sealed by a Colorado Licensed Design Professional. Occupant load shall be calculated by IBC Table 1004'1' A Colorado State Licensed Electrician and Plumber must perform installation and hook-ups. a a a a a a a a a BUILD¡NG PLANS: 2 sets of plans must be submitted. Plans must be 18"x24" minimum size, complete, identical, legible and to scale. Certain projects may also require a third copy of the plans be submitted to the local Fire District for review prior to permit issuance. All plans will be checked at the counter for completeness. lf any of the required information is missing, the building permit application cannot be accepted. SITE PLAN: Please make sure the following Information is provided on the site plan. r Property address/legal description. o North Arrow and Scale on each page. . Show all property lines, building envelopes, flood plain and easements. o Provide setback dístances from boundaries, buildings, septic, well and wateruirays. ¡ Location and direction of the county or private road and driveway accessing the property. . Proposed and existing structures. lnclude sheds, barns, decks, patios and any other buildings. r Existing and proposed grade, positive drainage around structure (to be contained on site). ¡ Streams, rivers, creeks, springs, ponds and ditches. o Existing and proposed wells, septic tanks, leach fields, and other systems (if applicable). . Retaining walls (engineer stamped detail required for walls over 4 ft., measured from bottom of footing to top of wall). NOTE: Any site plan depicting the placement of any portion of the structure within 50 feet of a property line or not within an established building envelope shall be prepared, stamped and signed by a licensed surveyor. For structures to be built within a building envelope, provide a copy of the recorded subdivision final plat with the proposed structure located in the building envelope. COVER SHEET:. Projectidentification.. Project address and/or legal description. r Design specifications to include building use and occupancy classification, type of construction, building height and area calculations, occupant load, and fire sprinkler systems. ARCHITECTURAL PLANS: Please provide the following information on the architectural plans. ¡ Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Design Professional stamped plans' Minimum of 4 elevations (N,S,E,W). Floor plans for each level, including dimensions and scale noted' Clearly label each room or space (office, storage, mechanical, elevator, etc). Walltypes; clearly labeled and referenced. ldentify allfire resistive wallconstruction. Construction details for all fire resistive elements referenced on floor plans and cross sections. lnclude wall, floor/ceiling, roof/ceiling, shaft wall assemblies and structural frame. Provide the fire resistive listing number referenced on each assembly detail. (ex. UL P123) Window and door sizes, types and operation and direction of swing noted on the floor plan. Specify roof slope/pitch, roof covering and siding materials. Energy design specifications/details for R-values, U-factors and SHGC's per IECC. Stair and guard details specifying rise, run, height and spacing. Accessibility; show compliance with accessibility requirements for all elements of the building per lBC, Chapter 11 and ICC/ANSI A 117.1, ADA, FHA, and UFAS' STRUCTURAL PLANS: Please provide the following information on the structural plans. . per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. . Engineered foundation design per soils report. Geotechnical report referenced. . DeÀign specifications to include roof and deck snow load, wind and seismic design and frost depth.. Foundation plan showing complete footing and foundation dimensions. r Footing and foundation details specifying reinforcement referenced on plans. o Framing plans for each floor level and roof. All beams, columns, joists, rafters, trusses and all liveidead loads sPecified.. Framing /connection details referenced on plans. . Pre-manufactured structures require an engineer's stamp, signature and date. MECHANICAL PLANS: Please provide the following information on the mechanical plans. . per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. . Energy design calculations and details verifying compliance with the 2009 IECC' r Floor plans for each level showing size, location and materials of all ductwork, plenums, return and outside air intake registers. . Size and location of all combustion air ductwork and openings. o size, type and termination of all gas appliance flues and vents. o Location of all fire and combination smoke/fire dampers. . Equipment schedule for all mechanical equipment (boiler, furnace, exhaust fans, etc.). . Commercial kitchen hood location, hood and duct sizes, CFM calculations. PLUMBING PLANS: Please provide the following information on the plumbing plans. ¡ Per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. . Floor plans for each level showing DWV layout and sizing, materials, slope and sewer location. ¡ Water piping materials, length and size of pipe, water meter location, fixture unit demands, location and type of backflow prevention devices. r Gas piping materials, length and size of pipe, gas meter location and BTU/hour demands. o Additional piping plans for roof/deck drains, condensate, medicalgas, etc. r Plumbing fixture schedule for all plumbing equipment. . Commercial kitchen plumbing fixtures, food preparation equipment, grease interceptors, etc. ELECTRICAL PLANS: Please provide the following information on the electrical plans. r per C.R.S. 12-4-112; Structures designed with an occupant load exceeding 10 require Colorado State Licensed Engineer stamped plans. ¡ Floor plans for each level showing location of lighting fixtures, switches, receptacles, emergency exit signs and lighting and panel location. . Diagram showing service entrance, conduiVwire size, main disconnect size, grounding electrode/conductor size, feeder conduiUwire size, transformers and generators. . Panel schedule showing bus/breaker sizes, circuit description, voltage, phase, amperage, etc.