Loading...
HomeMy WebLinkAboutChevron Eng. Found .Reports Geotechnical, Environmental and Materials Testing Consultants Grand Junction - Montrose - Moab - Crested Butte - Rifle (970) 245-4078 h fax (970) 245-7115 h geotechnicalgroup.com 2308 Interstate Avenue, Grand Junction, Colorado 81505 June 29, 2009 Chevron North America Exploration & Production Company 744 Horizon Court, Suite 140 Grand Junction, CO 81506 Attention: David K. Howard Subject: Chevron Central Processing Facility-Stage 2 Garfield County Foundation Permit Nos: 11192, 11194, 11204, 11224, 11244, 11245, 11246, 11247, 11248, 11250, 11251 and 11284 GEG Job No. 3,241 Document Number: PBSR-59836AVF-CIV-RPT-GEG-03241-00001 Dear Mr. Howard, As requested, a Geotechnical Engineering Group (GEG) representative performed observation and testing services on a full time basis during construction of the structure foundations listed above by Garfield County Building Permit No. The GEG representative tested structural fill compaction beneath foundations, tested concrete properties, observed reinforcing steel placement and documented structure to foundation anchorage for each of the structures. The purpose of this letter is to present our review of observation and testing data and our conclusions regarding final foundation construction of the subject structures. In summary, each of the structures identified was constructed in conformance with the referenced engineering design documents. Following is a summary of the GarCo Permit No., Design Identification and the structure common name for each structure reviewed: 11192 ZZZ-0115 PUMP CONTROL BUILDING 11194 ZZZ-0114 CONDENSATE LOADING SKID BUILDING 11204 ZZZ-4001 CONTROL BUILDING 11224 ZZZ-0104 TELECOMUNICATIONS BUILDING 11244 ZZZ-0117 VAPOR RECOVERY UNIT BUILDING 11245 MAK-11245 GAS FILTER SEPERATOR SKID BUILDING 11246 ZZZ-103 INSTRUMENT AIR SKID BUILDING 11247 MBF-1070 FUEL GAS SCRUBBER BUILDING 11248 MBF-1090 FLARE SCRUBBER BUILDING 11250 BBC-0210 GLYCOL REBOILER/SURGE SKID BLDG, (1 of 2) Chevron Central Processing Facility-Stage 2 Page 2 of 3 Garfield County Foundation Permit Letter Shallow, 7-1-09 GEG Job No. 3241 11251 BBC-0212 GLYCOL REBOILER/SURGE SKID BLDG, (2 of 2) 11284 ZZZ-102 RESTROOM BLDG Reference Documents: Foundation design sheets by Projects Associates, Incorporated 2033-201-CL-1101-01 dated 12/27/07 and revised 11/13/08 (all permits) 2033-201-20-AP-0002-02 dated 5/14/08 and revised 5/18/09 (all permits) 2033-240-30-SP-0004-01, Rev D dated June 21, 2008 (all permits) 2033-201-30-CI-1135-01, Rev O dated 11/15/08 (#11192) 2033-201-30-CI-1120-01, Rev O dated 9/19/08 (#11194) 2033-201-30-CI-1104-04, Rev O dated 10/15/08 (#11204) 2033-201-30-CI-1141-01, Rev O dated 10/24/08 (#11224) 2033-201-30-CI-1117-01, Rev O dated 10/16/08 (#11224) 2033-201-30-CI-1111-01, Rev O dated 9/19/08 (#11245) 2033-201-30-CI-1122-01, Rev 2 dated 2/10/09 (#11246) 2033-201-30-CI-1114-01, Rev 1 dated 11/3/08 (#11247) 2033-201-30-CI-1130-01, Rev O dated 10/16/08 (#11248) 2033-201-30-CI-1116-01, Rev O dated 11/20/08 (#11250/11251) 2033-201-30-CI-1130-01, Rev O dated 10/16/08 (#11284) 2033-201-30-CI-1134-01, Rev 1 dated 2/19/09 (#11284) Conclusions Review of our records indicates proper structural fill compaction beneath foundations, proper concrete strength, proper reinforcing steel placement and proper structure to foundation anchorage for each of the structures. Based on this review, we conclude each of the structures identified was constructed in conformance with the referenced engineering design documents. We appreciate the opportunity to perform engineering services. If we can be of further service or answer any questions regarding this letter, please call. Sincerely, GEOTECHNICAL ENGINEERING GROUP, INC. Scott Godfrey, EIT Project Engineer Chevron Central Processing Facility-Stage 2 Page 3 of 3 Garfield County Foundation Permit Letter Shallow, 7-1-09 GEG Job No. 3241 Reviewed By: John P. Withers, P.E. Engineer SEG:JPW:sg 1 cc: Chevron Eroom 1 cc: emailed to Mr. David K. Howard, 1cc: emailed to Tony Chiono, Elkhorn Construction