Loading...
HomeMy WebLinkAboutApplication-PermitI Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970-945·8212 Fax: 970-384-3470 Inspection Line: 970·384-5003 Building Permit No. Parcel No: Locality: Job Address: 0306 Blue Heron GWS --------------·----~----~----~~-~-------··------·-- Owner: Contractor: Hansen Construction ------·-··-----·---···--··------··----------···· Fees: Plan Check: 838.86 Septic: ----·-·~- Bldg Permit: $ 1,290.55_ RFTA: 750.00 ~··---·· Total Fees: ___ $ ---2,879.41._ Clerk: ~:an __ Date: .J~B~OO._ I 2 3 5 6 7 8 Use of Building: 9 Describe Work: 10 Class of Work: o Addition II Garage: Septic: o!SDS Communit' 12 Driveway Permit: Owners valuation of Work: $ OTICE Authority. This application for a Building Penni[ must be signed by the Owner of the property. described above, or an atllhorized ngem. I fthc signature below is not that oft he Owner. a scpamte letter of authority. signed by the Owner. must be provided with this Application. 1 Legal Access. A Building Permit cannot be issued without proof of legal and adequate access to the prope11y for purposes of inspections by the Building Department. Other Pcnnits. Multiple scpamte pennits may be required: ( 1) State Elcct!ical Penn it, (2) County ISDS Permit. (:');mother penn it required for usc on the propeny identi lied above. e.g. Stmc 01 County Highway/ Road Access or a State \Vaste\'>'ater Disclllllli.e Permit. •II Void J>ermit. /\ Buildi11g Permit becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or ab~ndoned for n period of lfW , d~ys after commencement. CERTIFICATION I hereby certify that! have rend this Application and that the information contained above is true and cOt1·ect. I understand that the Building Department accepts the r\j)plicatiOI!, nlong with the plans ~nd specifications and other data submitted by me or on my behnlf(submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application. a Building Permit wi!! be issued granting permission to me. as Owner. to construct the strucwre(s) and facilities detailed on 1 lhe submittals reviewed by the Building Department. ln considcra!ion of!he issuance of the Building Permit.! a, nd my <~gents will comply with provisions ofnny !Cdcral, state or local law regulating the work nnd the Garfield County Building Code. !SDS regulations and applicable land use regu ons (County R >ulation(s)), I acknowledge that the Building Penni! may be suspended or revoked. upon notice ll'om the County. if the location. construction or use of the structure(s) and fadli ·es), described above, re not in compliance with County Regu!ntion(s) or any other applicable law. I het·eby grant rx:m1ission to the Building Dep ·tment to entet· the prope '· described above. to inspect the work. 1 fut1her acknowledge that the issuance oft he Building Permit does not prevent the Building Official fi·om: ( l requiring the cor ction of errors in the subn ttals. if any. discovered after issuance: or (2) stopping construction Ol' use of the structure(s) or facility(ics) if such is h! 1·iolmion of County Regul~tion(S)p any other app!ic ble law. Review of this Applicar;'m . including subm !als. and inspections oft I work by the Building Dcp~r!ment do not constitute an acceptanc\": ofrcsponsihi!i!y or liability by the County of errors. omissions or discrepancies. A· I1C wncr.! acknowlc ~c that responsibility fi compliance with federal. ~tate and local laws and County Reg1ilations rest with me and my authMizcd agents, including wirhout !imit(llion my arcb· de igne1. engineer and or builder. I ::::"I~S.SI:~,,::~ HAY, oAD ,\NO . DE::~''D 11:~-:~:~&-C~RTI:~s~~ov~5-~ ~-~-- STAFF USE ONLY ID-7-D8 DATI: The following items are required by Garfield County for a final Inspection: I) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to alllBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. .w OWNERS I NATURE DATE Bapplicaliondccc! cr2007 VALUATION FEE DETERMINATION Applicant Address Date .;Kn:::.:;:u;ts::;:o:::n-=---::-::--------Subdivision o306 Blue He11JOn Vista Lot/Block -~1:-:;0:.:;. 7;=:.0;..:;8;::-:==:._:,.;='--------Contractor Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Carport: Total Valuation Crawl Space Total Valuation Decks/ Patios Total Covered Open Valuation Type of Construction: Occupancy: Valuation Total Valuation 977 sq.ft 905 sq.ft sq.ft sq.ft X $74.68 1882 sq.lt sq.ft X $41.00 sq.ft X $33.68 556 sq.ft X $18.00 sq.ft X $12.00 sq.ft X $9.00 sq.ft X $24.00 127 sq.ft X $12.00 Commercial sf X sf X sf X sf X sf X sf X Iron Bridge P 1A \) e (,. ()..,. 286 140,547.76 0.00 10,008.00 0.00 1,524.00 0.00 152,079.76 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. TWO (2) SETS O:F CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE SUBMITTED FOR ALL APPLICATIONS. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. 1. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes')( 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do applyv Yes~-- 3. Does the site plan include when applicable the location of the !.S.O.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent propertie , streams or water courses? Yes._~~- 4. Does the site plan indicate the location and direction of the County or private road accessing the pro pert)(? Yes '-f-Y.-- 2 5. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; A County Road and Bridge permit; a Colorado Dept. of Highway Permit, including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-860 I. See phone book for other a~cies Y es _ _,P-=='----- 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in acc01~e with the IRC or per stamped engineered design? Yes __ (r>""--- 7. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearan~quired between wood and earth? Yes ~ No ____ _ 8. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and soffits\! Yes ~ No _____ _ 9. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads?'{ Y es __ j-+-'----- 1 0. Does the plan include a building section drawing indicating foundation, wall, floor, and roof ~oe~structf II. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafte s r joists or trusses? Yes ___ +-"------ 12. Does the building section drawing or other detail include the method of positive connection of all columns an beams? Yes _ _,P>----- 13. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Building height measurement usually not to exceed 25 feet) Yes JC 14. Does the plan include any stove or zero clearance fireplace planned for installation including make and mo~d Colorado Phase I certifications or phase II EPA certification? Yes~ No ____ ~~--- 3 15. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IRC? Yes. ___________ No ____ ~~~------ 16. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IRC? Yes t- 17. Does the plan include a window schedule or other verification that windows provide natural light and ventilatiy:_n for all habitable rooms? Yes ---+-"-'--- 18. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specifY safety glazing or these areas? Yes No ____________ __ 19. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes ~· 20. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivi! process, are building plans in compliance with all plat notes and/or covenants? Y es ___ P"I--'"----- 21. Do you understand that if you belong to a Homeowners Association (HOA), it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will be accepted without it, but you run the risk of the HOA bringing action to enforce the covenants, which can result in revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans have been reviewed by the Building Department prior to any action by the HOA that requires either revocation or substantial modification of the plans. Yes f 22. Will this be the only residential structure on the parcel? Yes '(:.. No lfno-Explain: ___________ __ 23. Have two (2) complete sets of construction drawings been submitted with the application? Yes 'f- 24. Do you understand that the minimum dimension a home can be on a lot is 20ft.wide and 20ft. long? Yes f 4 25. Have you designed or had this plan designed while considering building and other construction code requirements? Yes '{- 26. Do your plans comply with all zoning rules and regulations in the County related to your properties zone dis~if? Yes_---'7--'kr---- 27. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes f 28. Do you understand that approval for design and/or construction changes are reqUJred pnor to the applica~ of these changes? Yes __ ~t-=--- 29. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road Impact" or "Septic System" fees required, at the time you pick up your building permit? Yes )C 30. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made from 7:30a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in to 384-~0fl3. Yes ~ No __________ __ 31. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 r~-jilspection fee? Y es ___ "b_-'-"------- 32. Are you aware that you are required to call for all inspections required under the IRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building?V Yes. __ -1"'-P'---- 33. Are you aware that the Permit Application must be signed by the Owner or a written authority being given fcyn Agent and that the party responsible for the project must comply with the IRC? Yes. ___ -1"--F'------ 5 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person performing the work will be required at time of applicable izypection. Yes ___ _,..,.-F'~---- 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a building permit application? Your attention in this is appreciated. Yes f 36. Do you know that the local fire district may require you to submit plans for their review of fire safety . ? 1ssues. "{ Yes ---JT-""------(please check with the building department about this requirement) 37. Do you understand that if you are planning on doing any excavating or grading to the prope1ty prior to issuance of a building permit that you will be required to obtain a grading permit? Yes 'f.· 38. Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees have to be paid and the connections inspected by the service provider prior to the issuance of a Certificate of Occupancy? Yes 'f. I hereby acknowl my ability. derstand and answered these questions to the best of Date Phone97D-3'6£.t-·~ff\~(days); (evenings) ProjectName: Le:-T ~~lo :Cranbri~>PUD Ph.~ Project Address:~ B\U< , \-\ €.ri::;)Q \)\ ~ bt.J'3 6 PLAN REVIEW CHECKLIST Applicant i<l'lv«S0/11. Date /&-7-0/3 /uilding _A_ng gi neered Foundation JL/snriveway Permit Aurveyed Site Plan [{~Permit and Setbacks __ Grade/Topography 30% ~;rumtiol Plru> ""';~ u,. __ Minimum Application Questionnaire ~vision Plat Notes JJA. Fire Department Review _Lvaluation Determination/Fees ~d Line Plans/Stamps/Sticker ~ch Conditions ~ication Signed ~Reviewer To Sign Applicatio ~chedule No. 40# Snowload Letter-Manf. Hms. ~ilsReport GENERAL NOTES: Planning/Zoning __ Property Line Setbacks-~ '141· tF-'iS( A ~ Mf--/;l:()iJIA.'/tJJf'1\-> ~30ft Stream Setbacks f( fi Flood Plain !lA Building Height ~ing Sign-off ~ad Impact Fees HHOAIDRC Approval -~opography 40% ~anning.Issues 11178 No. ______________ _ Assessor's Parcel No. 2395-014-29-286 Date ____ 1_11_14_1_20_0_8...;__ BUILDING PERMIT CARD Job Address __ ..:..03.:..:0.:..:6....::B.:..:I..:..ue.::.....:...;H..:..e.:..:ro....::n....::V.:...:i..:..st....::a.o_, G..:..W....::....::S....::....::Ir..:.o_nb....::r....::id__,g,_e_P....::U.:..:D...:.,_L.:..:o..:..t _28_6 _____________ _ Owner _____ K_n_u_ts_o_n_,_B~ru_c_e_&_M_a.....:ry'----Address 104 Williams Way, Aspen Phone# ______ _ Contractor Hansen Construction Address 410 lronbridge Dr, GWS Phone #970-394-3990 Setbacks: Front _____ Rear _____ RH ______ LH _____ Zoning _____ _ s/f on foundation WI att. Garage INSPECTIONS Weatherproofing ___________ _ Mechanicai _____ -:------------ Eiectrical Rough (State) &-Z'Z-" DCj Electrical Final State) _______ --::,--- Final 'B'·A. -/Check••"+ f"ompleted?. ~ Certificate Occupancy # .,.(a:":-'?;3'""'-..?"1+-l-.-=,..----- Date .lSSU£ () I . I • 09 · Septic System #<.! .... D_...)MiJi~==·Ln'-'-'-1 M.L.~L...~------ Date _____ :::1=------- Final ___________ _ Other _______________ _ NOTES (continue on back) B\\.:~LDING PERMIT '·"' GARFIELD COl:JNTY, COLORADO DNSI'IE<Cl!l()l\! WDI.L NOT B~ Mlllll>IE ilDNUSS THUS CA!'!Dl> 1:5 i'O:SnDl> ON THIE JOil LA+ a~ Date Issued --\J\IL·_._)L\.J_··OQ~;..L...-------Permit No. _ _,\_,_\l=-/,_b"""'--------- AGREEMENT In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structured for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NULL AND VOID. ,; :::1!'"!.~~. Gws owner!mU.{S()l,~~~ contractor t\ruten ~St ... · Building Permit Type 'l2ec tdam~f1,_...( _____________________ _ This Card Must Be Posted So It Is Plainly Visible From The Stre.e~Until Final Inspection INSPECTION RECORD Footing .. j Driveway Foundation I Grouting Insulation 7-1-o't ~~ Underground Plumbing Drywall 7 0 CJ "l' 4CU, h -/~o'Z:' ~-~ ·- Rough Plumbing !Electric Finan (by State nraspector) '· 6' --'6 -/7'? .-,.., {Prior to F'inal) Rough Mechanical Septic Final GasPiping G·&-cf?-~ FINAL '6-s<G-c;c; ~~ IEiectwic Rough (by State irBspedow) (You Must Call For Final Inspection) \i . 7-'1-·tf\ .. Notes {Prior to Framing) Framing 1., ~ t,. ~0.. r--\J {h._t-,. ' ! Division of Registrations ... ., • ._.,...,. The Official State Web I'M!al Dora Division of Registrations Department of Regi,ila_tory Agencies View Permit 670251 Requestor Site Inspections Inspected Date 08/19/2009 08/03/2009 06/22/2009 Electrical and Plumbing Permits Online Company Name: MD ELECTRICAL SERVICES INC First Name: MIKE Last Name:-SEEMAN Address: 947 HICKORY DR City: RIFLE State: CO Zipcode: 816500000 Phone: (970) 930-5559 Fax: ()- Email Address: ttelinde1 @juno.com License Number: 7536 Property Type: PRIVATE Property Owner: IRON BRIDGE Job Site Address: 306 BLUE HERON VISTA City: GLENWOOD SPRINGS State: co Zipcode: County: GARFIELD Power: XCEL-CARBONDALE Building Type: RESIDENTIAL Construction Type: NEW Mise Construction: RESIDENTIAL NEW Square Feet: 1500 Trim: N Type FINAL ACCEPTED FINAL ACCEPTED PARTIAL ROUGH IN ACCEPTED Status Page 1 of2 https:/ /www.dora.state.co.us/pls/real/ep _web _permit_gui.show _page?p _user_ type=ELEC... 8/24/2009 Division of Registrations Status/Actions Permit Number: 670251 Type: ELECTRICAL Status: CLOSED Opened: 06/12/2009 Expiration Date: 06/12/2010 Closed: 08/20/2009 Replaces: NONE Replaced By: NONE Questions? Check out the Definitions Page or Frequently Asked Questions (FAQ). Please take our Survey to tell us about your experience with the online permits site. Page 2 of2 Generated: 08/24/2009 04:52 p,m. Privacy Statement 1 Disclaimer Federal Home Page II State Home Page II Department Home Page Top of Page Technical Assistance: E¥mail Information Technology Section E-Mail the Division of Registrations 1560 Broadway, Suite 1500 Denver, CO 80202 (303) 894~2985-Phone (303) 894-2310-Fax Relay Colorado (TTY (English & Spanish), Voice, VCO, ASCI!, STS Assistance Numbers) https:/ /www.dora.state.co. us/pls/real/ep _web _permit_gui.show _page?p _user _type=ELEC... 8/24/2009 February 5, 2009 Iron bridge Golf Club & Sporting Community 410 Iron bridge Drive Glen wood Springs, CO 8160 I Attn: Mike Woelke RE: Tendon Stressing Observation 0306 Blue Heron Vista Lot 286- Ironbridge Subdivision Garfield County, Colorado Dear Mike: 1205 S. PLATTE RrvER DRIVE, SUITE 200 DENVER, COLORADO 80223 OFFICE (303) 715-9885 FAX (303) 715-9890 Per your request, we visited the subject site on February 4, 2009 to observe the tendon stressing operations for post-tensioned slab-on-grade design. The stressing of the tendons were conducted within acceptable tolerances and appeared to be in general conformance with the construction. At this time, tendon tails may be cut off and the anchor cavities grouted with a high strength, non-shrink grout. This concludes the construction of the post-tensioned foundation system. Please call if you have any questions. Sincerely, Fuhrmann Engineering Services, LLC Jtf;J;-L Jeffrey R. Goben, PTI # 9160622 Reviewed by: JRG:jma attachments file --~~ l FUHRMANN IIENGINEERJING §ERVJIICE§, LlLC February 5, 2009 Iron bridge Golf Club & Sp01ting Community 410 Iron bridge Drive Glenwood Springs, CO 81601 ATTN: Mike Woelke RE: Post Tensioned Slab-on-Grade Certification 0306 Blue Heron Vista Lot 286 Ironbridge Community Garfield County, Colorado Dear: Mike 1205 S. PIAITE RivER DRIVE, SUITE 200 DENVER. CoLORADO 80223 OFFICE (303) 715-9885 FAX (303) 715-9890 As of February 4, 2009 all required construction observations for the Post Tensioned Slab-on-Grade Foundation System at the subject site have been completed by this office. From our observations, we have concluded that this foundation has been constructed in accordance with the approved construction documents and guidelines set forth by the Post Tensioning Institute. All required observations and their subsequent letters by this office for the Post Tensioned Slab-on-Grade Foundation System which includes the Trench Beam and Steel Observation including Ufer Rod, Tendon Placement (pre-pour) Observation, and Tendon Stressing Observation have been approved by this office. We also note that the required insulation has been installed per our structural details and the Jntemational Residential Code, 2003 Edition. No further observations are required. Please call if you have any questions. Sincerely, Fuhrmann Engineering Services, LLC f//i JV Jeffrey R. Goben, PTI # 9160622 Reviewed by: JRG:jma cc: file December I 0, 2008 Iron bridge Golf Club & Sporting Community 410 Iron bridge Drive Glenwood Springs, CO 81601 Attn: Mike Woelke RE: ron bridge Subdivision Garfield Connty, Colorado Dear Mike: i205 S. PLATTE RivER DRIVE, SurrE 200 DENVER, COLORADO 80223 OFFICE (303) 715-9885 FAX (303) 715-9890 Per your request, we visited the subject site on December 9, 2008 to observe the construction of the trench beams of the post-tensioned slab-on-grade. The dimensions, geometry, and required options have not been verified at this time. The contractor assumes responsibility for the accuracy of all building dimensions, locations on lot, foundation elevations, and the slab step layout The trench beam depth, width, and required steel placement appeared to be in general conformance with approved construction documents. Also, we observed the required l-inch polystyrene foam (extruded) insulation was placed in the trenches at the exterior of the building footprint per plan and is temporarily to the trench wall. We also observed that an Ufer rod was placed at the time of the wall steel installation. No other items were observed at this time. Please call if you have any questions. Sincerely, Fuhrmann ;r_eering Services, LLC J~h R~oOOo, PTI #9160622 1 .. ~-~ Reviewed by: /;/ Nathaniel P. Graf, P.E. JRG:jma attachments tile December I 0, 2008 Ironbridge Golf Club & Sporting Community 410 Iron bridge Drive Glenwood Springs, CO 81601 Attn: Mike Woelke RE: Tendon Placement (pre-pour) Inspection 0306 Blue Heron Vista Lot286 Iron bridge Subdivision Garfield County, Colorado Dear Mike: 1205 S. PIATT£ RivER DRIVE, Surtt 200 DENVER, CoLORADo 80223 OFFICE (303) 715-9885 FAX (303) 715-9890 Per your request, we visited the subject site on December 9, 2008 to observe the tendon placement and interior trench beams of the post-tensioned slab-on-grade. The dimensions, geometry, and required options have not been verified at this time. The contractor assumes responsibility for the accuracy of all building dimensions, locations on lot, foundation elevations, and the slab step layout. The installation of the tendons and interior stiffened beams appeared to be in general conformance with the construction plans. We observed the top of grade appeared to be at the correct elevation to maintain the slab thickness per plan. It is the responsibility of the contractor to verity slab thickness and tendon layout remain as observed during concrete placement. No other items were observed at this time. Please call if you have any questions. Sincerely, Fuhrmann Engineering Services, LLC . ~11 .JL. Jeffrey R. Goben, PTI # 9160622 Reviewed by: Nathaniel P. Graf, P.E. JRG:jma attachments cc: file I .FuHRMANN -----Col ]ENGINJEJERIING §JERVIICJE§, LLC June 24, 2009 Iron bridge Golf Club & Sporting Community 410 Ironbridge Drive Glenwood Springs, CO 81601 Attn: Mike Woelke RE: LVL Bearing, Hole, Truss Bearing 0306 Blue Heron Vista Lot286 lronbridge Subdivision Garfield County, Colorado Dear Mike: 1205 S. PLArrn RivER D~ Sum~ 200 DENVER, CoLORADO 80223 OFFICE (303) 715·9885 FAX (303) 715-9890 Per your email dated 23 June 2009, we understand that the (2) LVL above the Great Rm!Dining Rm only has approximately one inch of bearing on one ply and full bearing on the second ply. We have reviewed this condition and it is not a structural concern. Further more we understand that a quarter inch hole has been put at an angle into the L VL approximately 6ft from bearing. We have reviewed this condition and it is not a structural concern. We understand that the bearing wall at the laundry has been moved. We have reviewed this condition and recommend providing a 2-2x8 HF #2 or better dropped beam at the original bearing location. May I, 2009 Ironbridge Golf Club & Sporting Community 410 Iron bridge Drive Glenwood Springs, CO 8160 I Attn: Mike Woelke RE: Weathered Trusses 0306 Blue Heron Vista Lot286 Iron bridge Subdivision Garfield County, Colorado Dear Mike: 1205 S. PLATTE RivER DRIVE, SuiTE 200 DENVER. CoLoRADo 80223 OFfiCE (303) 715-9885 FAX (303) 715-9890 Per your request, we visited the subject site to observe the roof trusses for this house that have been left exposed to the elements for several months. We recommend that any truss that is split at the end bearing or within 1 '-6" of the end bearing be replaced or approved by the engineer representing the truss manufacturer. Trusses that have a split at greater than 1 '-6" from the end bearing may have a 2x Doug Fir #2 or better sistered to it with 2 rows of 1 Od nails ea side @4" 0. C. staggered. The sistered member is to be 3 times the length of the split, minimum of 3ft, and is to be centered on the split. The depth of the sistered member needs to match the depth of the member being repaired. Sincerely, Fuhrmann Engineering Services, LLC .-? ~ fi~·' ~ "~ ..;P~ Jeremiah Willis Reviewed by: JW file ! 0 '-JH'l6f.;-t~>t1 i' ;. nl'ir " " : I~ ' . / I I ' ' / / ,>, / --/0;<"'"'-/ ,o 0""'" I yO__ / / I I I I / I I j-R ENGINf\'ERING I I I I I / I I i! 'I I I i I ~ ··<:~£tech HEPWORTH-PAWLAK GEOTECHNICAL, Hepworth-Pawlak Geotechnical, Inc. 5020 County Road 154 Glenwood Springs, Colorado 81601 Phone' 970-945-7988 Fax: 970-945-8454 email: hpgeo®hpgeotech.com PRELIMINARY GEOTECHNICAL STUDY PROPOSED IRONBRIDGE VILLAS IRONBRIDGE DRIVE GARFIELD COUNTY, COLORADO A~ CO> tle.e.-116uJ 'Sci I Hep&v-4-- JoB NO. 105115-6 SEPTEMBER 14, 2005 PREPARED FOR: L.B. ROSE RANCH, LLC ATTN: AARON BEVINGTON 410 IRONBRIDGE DRIVE GLENWOOD SPRINGS, COLORADO 81601 Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY ............................................................................ -1 - PROPOSED CONSTRUCTION ..................................................................................... -1 - SITE CONDITIONS ....................................................................................................... -2 - FfELD EXPLORATION ...................................................................... : ......... : ................ -2- SUBSURFACE COJ-..'DITIONS ................................................................................ ; ..... -3- ENGINEERING ANALYSIS ......................................................................................... -4 - DESIGN RECO!viMENDATIONS ................................................................................. -5- FOUNDATIONS ........................... : ............................................................................. -5 - FOUNDATION .AND RETAlNING WALLS ............................................................ -6- FLOOR SLABS .......................................................................................................... -8 - UNDERDRAIN SYSTEM .................................... : ..................................................... -8- SITE GRADING ......................................................................................................... -9- SURFACE DRAINAGE ................................................................. ~ ................ , ........ -10- PAVEMENT SECTION ........................................................................................... -ll - LIMITATIONS ................................................................................................ , ............ -11 - FIGURES 1 AND 2-LOCATION OF EXPLORATORY BORINGS FIGURES 3 TIIROUGH 8-LOGS OF EXPLORATORY BORINGS . FIGURE 9-LEGEND AND NOTES FIGURES 10 THROUGH 16-SWELL-CONSOLIDATION TEST RESULTS FIGURES 17 AND 18-GRADATION TEST RESULTS TABLE 1-SUMMARY OF LABORATORY TEST RESULTS PURPOSE AND SCOPE OF STUDY This report presents the results of a preliminary geotechnical study for fue proposed Ironbridge Villas to be located along Ironbridge Drive, Garfield County, Colorado. The project site is shown on Figures 1 and2. The purpose offue study was to develop recommendations for the foundation and grading designs. The study was conducted in accordance wifu our agreement for professional engineering services to L.B. Rose Ranch, LLC dated June30, 2005. We previously conducted geotechnical studies for planning and . preliminary design of fue Rose Ranch Development (now known as !ronbridge) and presented our frndings in reports dated October 29, 1997 and September 10, 1998, Job No. 197 327. A field exploration program consisting of exploratory borings was conducted to obtain infonnation on the subsurface conditions within the depth of expected foundation loading. The potential for future ground subsidence due to deeper geologic conditions was to be evaluated by others. Samples of fue subsoils obtained during the field exploration were tested in the laboratory to determine their classification and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation and for fue subdivision grading. This report summarizes the data obtained during this study and presents our couclusions, design reco=endations and other geotechnical engineering considerations based on tbe proposed construction and fue subsurface conditiollS encountered. PROPOSED CONSTRUCTION The proposed Villas development is located in the central pert of !ronbridge near the main ·club and oilier common facilities and i'Yill consist of tightly spaced, single family residences in two development areas as shown on Figures 1 and 2. The access roads and drives will connect to fue existing and proposed lronbridge Drive. The residences will be 2 story, wood frame structures constructed typically 8 to 10 feet apart Ground floors will Job No. 105 IlS-6 -2- be structural above crawlspace in the residences and slab-on-grade in the garages. The entire development area will be elevated typically up to about 15 feet. The fill sections will grade into the existing Ironbfidge Drive, the golf course 18th Hole and the Robertson Ditch. The fill material will be obtained on the project site, likely from <:he Phase 2 development. The Robertson Ditch will remain open but be improved by lining to reduce leakage. After the subdivision grading, the excavation for the individual residences will be relatively minor. We assume the residences wili be relatively lightly loaded, typical of the proposed type of construction. If·building loadings, location or development plans change significantly from those described above, we should be notified to re-evall18.te the reco=endations contained in this report SITE CONDffiONS The Villas development is located downhill to the east and south of the existing pro shop and other co=ons area, see Figures 1 and 2. The north Villas site was mainly vacant and covered with field grass and weeds. The south Villas site is partly disturbed and covered with grass and weeds with miscellaneous fill piles. The ground surface slope is about 5 to 7% with 20 feet of elevation difference across the north Villas site, and about 6 to 8% with 30 feet of elevation difference across the south Villas site. The entire project site is covered with debris fan deposits that generally increase in depth with increase in ground surface elevation to the west Bedrock of the Eagle Valley Evaporite outcrops to the west of County Road 109 in the golf course fairway and the steep valley side. FIELD EXPLORATION The field exploration for the project was conducted between Juiy 6 and 8, 2005. Twenty~ five exploratory borings were drilled at the locations shown on Figures 1 and 2 to evaluate the subsurface conditions. The borings were advanced with 4 inch diameter continuous flight auger powered by a truck-mounted CME-55 drill rig. The borings were logged by a representative of Hepworth-Pawlak Geotechnical, Inc .. lob No. 105 115-6 -3- Samples of the subsoils were tal(en with a 1% inch and 2 inch I.D. spoon samplers. The samplers were driven into the subsoils at various depths with blows from a 140 pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1 586. The penetration resistance values are an indication of the relative density or consistency of the subsoils and hardness of the bedrock. Depths at which the samples were taken and the penetration resistance values are s..J,own on the Logs of Exploratory Borings, Figures 3 through 8. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Figures 3 through 8. The subsoils, below a thin topsoil root zone, consist of a variable depth of stratified silt, sand and gravel debris fan deposits overlying dense, river gravel alluvium. About 3 to 4 feet of exi~g fill was encountered above the mrtural soils in Borings 5, 6, 7 and 15, located just east of the Robartson Ditch. The debris fan soils were typically encountered between depths of 7 to 19 feet in the north parcel and between depths of 16 to 32 feet in the south parcel. In Borings 6 through 9 and 15 at the north parcel, the debris fan soils were deeper than the adjacent area to the north, with depths of22 to 38 feet before the gravel alluvium was encountered. Siltstone and gypsum bedrock offue Eagle Valley Evaporite was encountered below the gravel alluvium at a depth of 42 feet in Boring 6. The bedrock quality appeared poor to fair and included gypsum, but did not appear to be a void or cavity. Drilling in the dense gravel alluvium with auger equipment was difficult due to the cobbles and boulders and practical drilling refusal was typically encountered in the deposit. Laboratory testing performed on samples obtained from the borings included natural moisture content and density, liquid and plastic limits and gradation analyses. Results of swell-consolidation testing, presented on Figures 10 through 16, indicate the debris fan soils are typically hydrocompressive and moderately to highly compressible under load after wetting. Some of the clay soils showed a low expansion potential when wetted but JobNo.l05115·6. -4- the resulting heave potential is not expected to be significant compared to the collapse potential. Results of gradation analyses performed on small diameter drive samples (minus 1\12 inch :fraction) of the debris fan soils are shown on Figures 17 and 18. The laboratory testing is summarized in Table 1. Free water was typically not encountered in the borings and the subsoils -were relatively dry. In Borings 6 through 9 and 15, the subsoils became moist with depth and free water was encountered at depths between 26 and 3 6 feet in Borings 6 and 15. ENGINEERING ANALYSIS Development of the Villas project as proposed should be feasible based on geotechnical conditions. The upper 7 to 38 feet of soils e;ncountered in the borings consist of debris fan deposits that tend to collapse (settle under constant load) when wetted. The amount of settlement will depend on the depth of the compressible soils and the -wetted depth below the foundation. The settlement potential and risk of excessive building distress can be reduced by compaction of the soils til a certain depth below the foundation bearing level and by heavily reinforcing the foundation to resist differential settlements. The compaction should also extend to below driveway and utility areas. The soil compaction can consist of the structural fill proposed to elevate the project site but relatively deep structural fills will also have some potential fur long term settlement. Proper grading and compaction as presented below in Site Grading will help reduce the settlement risks. In areas underlain by less than 10 to 15 feet of debris fan soils, malnly the northern part of the north parcel, additional compaction below the building foundation should not be needed. A heavily reinforced mat foundation designed for large differential settlements or a deep foundation that extends down to the underlying, dense river gravel alluvium could also be used to reduce the settlement risk. Eagle Valley Evaporite that underlies the project area is known to be associated with · sinkholes and localized ground subsidence in the Roaring Fork River valley. A sinkhole opened in the parking lot of the Pro Shop to the northwest of the project site in January 2005 and other inegular bedrock conditions have been identified in the affordable Job No. 105 115-6 -5- housing site to the west of the Villas north parcel. Indications of ground subsidence were not observed in the Villas development area that could indicate a risk of future ground subsidence but the variable depth of debris fan soils in Borings 6 through 9 and 15 in the north parcel could be the result of past subsidence. In our opinion, the risk of future ground subsidence in the Villas project area is low and similar to other areas of the Roaring Fork River valley where there have not been indications of ground subsidence. We understand that the potential for future ground subsidence in the project area is being evaluated by others. The southern part of the northern parcel should be further evaluated for potential sinkhole development considering the variable subsurface profile encountered in that area. Recommendations for preliminsry design of the proposed development are presented below. When the building plans have been developed, we should review the information for compliance with our recommendations. DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsurface conditions encountered in the exploratory borings and the nature of the proposed construction, we recommend the buildings be founded with spread footings bearing on at least 5 feet of compacted on-site debris fan soils or compacted structural fill. The feasibility of footings placed on the natural soils in the north parcel where the debris fan soils are less than about 10 to 15 feet deep should be evaluated prior to construction. If a mat foundation or deep foUiidation system is considered for building support, we should be contacted for additional recommendations. The design and construction criteria presented below should be observed for a spread footing foundation system. 1) Footings placed on at least 5 feet of compacted fill in deeper debris fan areas or on natural soils where there is less than 10 to 15 feet of the natural debris fan soils should be designed for an allowable bearing pressure of Job No. 1051!5-6 -6- 1,500 psf. Based on experience, we expect initial settlement of footings designed and constructed as discussed in this section will be about 1 inch or less. Additional differential settlement between about 1 to 2 inches could occur in deeper nil areas or if the undisturbed debris fan soils are wetted. 2) The footings should have a minimum width of20 inches for continuous walls and 2 feet for isolated pads. 3) Exterior footings and footings beneath unheated areas should be provided with adequate soil c.over above their bearing elevation for frost protection. Placement of foundations at least 36 inches below exterior grade is typically used in this area. 4) The f01mdation should be constructed in a "box-like" configuration rather fuan with isolated footings. The foundation walls should be heavily reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 14 feet. Foundation walls acting as retaining structures should also be designed to resist lateral earth pressures as discussed in the "Foundation and Retaining Walls" section of this report. 5) The topsoil, existing undocumented fill and any loose or disturbed soils should be removed. The soils should be subexcavated as needed to provide at least 5 feet of structural fill below the footing bearing level compacted to at least 98% of the maximum standard Proctor density within 2 percentage points of optimum moisture content. Where footings are placed on tbe natural soils, the exposed soils in footing area should be moistened and compacted. 6) A representative of the geotechnical engineer should evaluate the compaction of the fill materials and observe all footing excavations prior to concrete placement for bearing conditions. FOUNDATION AND RETAJNlNG WALLS Foundation walls and retaining structures which are laterally supported and can be expected to undergo only a slight amount of deflection should be designed for a lateral lob No. 105 115-6 -7- earth pressure computed on the basis of an equivalent fluid unit weight of at least 55 pcf for backfill consisting of the on-site fme-grained soils. Cantilevered retaining structures which are separate from the buildings and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcffor backfill consisting of the on-site fme-grained soils. All foundation and retaining structures should be designed for appropriate hydrostatic and surcharge pressures such as adjacent footings, traffic, construction materials and equipment. The pressures reconunended above assume drained conditions behind the walls and a horizontal back:fi.ll surface. The buildup of water behind a wall or an upward sloping backfill surface will increase the lateral pressure imposed on a foundation wall or retaining structure. An under drain should be provided to prevent hydrostatic pressure buildup behind walls. Site walls with a maximum backslope of2 horizontal to 1 vertical should be designed for an active earth pressure of at least 60 pcf equivalent fluid unit weight. Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum standard Proctor density at a moisture content near optimum. Back:fi.ll in pavement and walkway areas should be compacted to at least 95% of the maximum standard Proctor density. Care should be taken not to overcompact the back:fill or use large equipment near the wall, since this could cause excessive lateral pressure on the wall. Some settlement of deep foundation wall back:fill should be expected, even if the material is placed correctly, and could result in distress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the sliding resistance of the footing on the foundation materials and passive earth pressure against the side of the footing. Resistance to sliding at the bottoms of the footings can be calculated based on a coefficient of friction of 0.35. Passive pressure of compacted backfill against the sides ofthe footings can be calculated using an equivalent fluid unit weight of 300 pcf. The coefficient of friction and passive pressure values recommended above assume ultimate soil strength. Suitable factors of safety should be included in the Job No. !05115-6 -8- design to limit the strain which \\dll occur at the ultimate strength, particularly in the case of passive resistance. Fill placed against the sides of the footings to resist lateral loads should be compacted to at least 95% of the maximum standard Proctor density at a moisture content near optimum. FLOOR SLABS The natural on-site soils, exclusive of topsoil, and compacted structural fill can be used to support lightly loaded slab-on-grade construction. The natural soils are compressible when wetted and there could be some post-construction settlement. To reduce the effects of some differential movement, nonstructural floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A min:imum 4 inch layer of free-draining gravel should be placed beneath basement level slabs to facilitate drainage. This material should consist of minus 2 inch aggregate with at least 50% retained on the No.4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs above footing bearing level should be compacted to at least 95% of maximum standard Proctor density at a moisture content near Dptimuru. Required fill can consist of the on-site soils devoid of vegetation, topsoil and oversized rock. UNDERDRAJN SYSTEM Although free water was typically not encountered during our exploration, it has been our experience in the area thet local perched groundwater can develop during times of heavy precipitation or seasonal runoff Frozen ground during spring runoff can create a perched condition. We recommend below-grade. construction, such as retaining walls and basement areas, be protected from wetting and hydrostatic pressure buildup by an Job No. 105 115-6 -9- underdrain system. An underdrain should not be provided around crawlspace and slab-on- grade areas. If installed, the drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free-drailling granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent fmish grade and sloped at a minimum 1% to a suitable gravit"j outlet. Free-draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No.4 sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 1 Yz feet deep. An impervious membrane, such as a 20 mil PVC liner, should be placedbeneath the drain gravel in a trough shape and attached to the foundation wall with mastic to prevent wetting of the bearing soils. SITE GRADING Extensive grading of the Villas area is proposed as part of the development plan. 1n addition, removal and replacement of the debris fan soils compacted is recommended in shallow fill areas to reduce the risk of excessive differential settlements and building distress. The structural fill should extend to at least 8 feet below design surface grade and to at least 2 feet below the water and sewer pipe invert levels. 1n addition, the water and sewer pipe joints should be mechanically restrained to reduce the-risk of joint separation in the event of excessive settlement. Excavation and compaction below footing bearing level may not be needed where the debris fan soils are Jess than 10 to 15 feet thick. The structural f!ll materials below footing bearing level should be compacted to at least 98% of the maximum standard Proctor density within 2 percentage points of optimum moisture content Prior to fill placement, the sub grade should be carefully prepared by removing the existing fill, all vegetation and topsoil and compacting tc at least 95% of the maximum standard Procter density at near optimum moisture content. The flil should be benched into slopes that exceed 20% grade. Based on our experience with the Phase 1 development, shrinkage of the debris fan soils due to compaction is expected to be about 15%to 20%. Job No. 105115-6 -10- Permanent unretained cut and flll slopes should be graded at 2 horizontal to 1 vertical or flatter and protected against erosion by revegetation or other means. This office should review site grading plans for the project prior to construction. SURFACE DRAINAGE Precautions to prevent wetting of the bearing soils such as proper backfill construction, positive backfill slopes, restricting landscape irrigation and use of roof gutters need to be taken to help limit settlement and building distress. The following drainage precautions should be observed during construction and maintained at all times after each residences have been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Exterior backfill should be adjusted to near optimum moisture and compacted to at least 95% of the maximum standard Proctor density in pavement and slab areas and to at least 90% of the maximum standard Proctor density in landscape areas. 3) The ground surface surrounding the exterior of the building should be sloped to drain away :from the foundation in a1l directions. The slope should be at least 6 inches in the first 5 feet in unpaved areas and at least 3 inches in the first 10 feet in paved areas. Drain gravel of retaining walls should be capped with at least 2 feet of the on-site soils to reduce surface water infiltration. 4) Roof gutters should be provided with downspouts that discharge beyond the limits of the foundation wa11 backfill. 5) Landscaping which requires regular heavy irrigation, such as sod, should be located at least 5 feet from foundation walls. Consideration should be given to use of xeriscape to reduce the potential for wetting of soils below the building caused by irrigation. Job No. !05115-6 -11 - PAVEMENT SECTION The upper soils encountered at the site consist oflow plasticity sand, silt and clay that are considered a poor support of pavement sections. A Hveem stabilometer 'R' value of 15 was assumed for the native soils and required imported soils. The traffic loadings for the Villas development have not been provided but are assumed to be relatively light for the service traffic loading condition, after the construction phase. Based on these conditions, a preliminary pavement section consisting of 3 inches of asphalt on 8 inches of CDOT Class 6 base course for the main drives and 3 inches of asphalt on 6 inches of CDOT Class 6 base course for automobile only parking is recommended. We can review the pavement section design when the roadway subgrade has been graded and the traffic loadings have been determined. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical . . -. engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory borings drilled at the locations indicated on Figures l and 2, the proposed type of construction and our experience in the area. Our services do not include detennining the presence, prevention or possibility of mold or other biological contaminants (M:OBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our fmdings include interpolation and extrapolation oftbe subsurface conditions identified at the exploratory borings and variations in the subsurface conditions may not become evident until excavation is performed. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our information. As the project evolves, we should provide continued consultation and field services during Job No. !05 115-6 ( -12- construction to review and monitor the implementation of our reconunendations, and to verify that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis or modifications to the reconunendations presented herein. We reconunend on-site observation of excavations and foundation bearing strata and testing of structural flll on a regular basis by a representative of the geotechnical engineer. Respectfully Submitted, HEPWORTH-PAWLAK GEOTECHNICAL, INC. Steven L. Pawlak, P.E. R.eviewedby: Daniel E. Hardin, P .E. . SLP/ksw cc: High Country Engineering-Attn: Scott Gregory S.K. Peightal Engineers-Attn: Jack Albright Job No. 105115·6 ~tech /~ APPROXIMATE SCALE: tn .= 80' "105115-6 \ LOCATION OF EXPLORATORY BORINGS VILLAS NORTH PARCEL \~ \\ \ Figure 1 105115-6 Figure 2 0 5 10 $ ,u.. i' /.r:::. 15. OJ 0 15 20 25 105115-6 BORING 1 ELEV.= 5952' 20/12 WC=4.5 00=106 20/6,30/4 BORING2 ELEV.= 5950' 20/12 WC=6.2 00=93 ·200=85 25/4,10/0 BORING3 ELEV.= 5944' 24/12 WC=5.1 00=94 Note: Explanation o! symbols is shown on Figure 9. BORING4 ELEV. = 5946' 25/12 WC=7.1 00=104 ·200=83 LL=28 Pl=11 20/6,40/6 T ~ LOGS OF EXPLORATORY BORINGS He worlh-Pawlak Geotoohnlcal 0 5 10 1il OJ 1.1.. ' -'= 15. 15 '" 0 20 25 Figure 3 5 0 .= 5950' 11/12 5 16/12 WC=9.3 10 DD=100 -200=54 17112 15 105115-6 I 6 ELEV.= 5953' 15/12 12/12 WC=10.3 -200=50 10/12 .WC=18.2 DD=108 -200=73 I ELEV. = 5954' 7/12 14/12 WC=16.3 DD=108 -200=62 32/12 7/12 WC=17.7 DD=107 -200=74 I 8 ELEV.= 5946' 29/12 WC=4.0 00=107 30/12 7/12 WC=6.6 DD=117 -200=44 12/12 50/2 Note: Explanation of symbols is shown on Figure 9. LOGS OF EXPLORATORY BORINGS Figure 4 0 5 10 1ii "' u. )~ ,_ a. Q) 0 15 20 25 105115-6 BORING9 ELEV. = 5942' 24/12 18/12 28/12 10/12 WC=11.4 DD=104 BORING10 ELEV.= 5938' 18/12 WC=4.0 DD=96 10/12 60/12 BORING 11 ELEV. = 5943' 9/12 11/12 wc~15.5 DD=109 -200=76 7/12 3/6,15/6 Note: Explanation of symbols is shown on Figure 9. BORING 12 ELEV. = 5938' 33/12 WC=6.1 DD~117 43/12 14/12 c~ LOGS OF EXPLORATORY BORINGS He worth-Powlok Geotechnleol 0 5 10 l ' E a. 15 "' 0 20 25 Figure 5 0 5 10 15 1i) if. 20 ' 25 30 35 40 105115-6 BORING 13 ELEV. = 5944' 22/12 T BORING 14 ELEV.= 5937' 28/12 WC=8.5 DD=109 -200=91 LL=31 P1=13 20/6,30/3 BORING 15 ELEV.= 5950' 15/12 WC=14.3 DD=112 9/12 WC=14.5 -200=71 10/12 WC=14.4 DD=112 +4=17 -200=58 24/12 32/12 Note: Explanation of symbols is shown on Figure 9. BORING 16 ELEV. = 5968' 15/6,35/5 47/12 33/12 WC=3.2 +4=34 -200=42 18/12 LOGS OF EXPLORATORY BORINGS 5 1i) 20 (J) 1.1.. ' .c -"-(J) 0 25 Figure 6 0 5 10 15 1i5 "' L.L 20 25 30 35 105115-6 BORING 17 ELEV.= 5963' 52112 34/12 WC=5.9 DD=115 23/12 50/3 BORING 18 ELEV. = 5968' 38112 40/12 WC=3.6 DD=104 -200=58 42112 WC=3.6 DD=109 45/12 BORING 19 ELEV.= 5962' 13/12 30/12 WC=1.7 DD=120 +4=38 -200=26 Note: Explanation of symbols is shown on Figure 9. BORING20 ELEV. = 5967' 18/6,25/3 WC=1.9 DD=103 -200=36 55112 ~, LOGS OF EXPLORATORY BORINGS He worth-Powlok Geoteehnlool 5 15 1i5 "' u.. ' £ 0. "' 20 0 Figure 7 BORING21 BORING 22 BORING23 BORING24 BORING25 :: ELEV. = 5976' ELEV. = 5957' ELEV. = 5985' ELEV.= 5985' ELEV.= 5990' 0 0 ] 52/12 21!12 52/12 39/12 20/6,30/3 5 WC=3.3 WC=1.3 5 +4=38 -200=27 -200=23 15/12 30/6,25/3 57/12 20/12 27/12 10 WC=2.6 WC=4.6 10 -200=46 00=105 -200=62 43/12 28/12 30/12 15 WC=3.3 WC=4.1 15 ~ 00=108 00=112 'ID -200=64 (j) l1. ' ' £ ..c )5} 0.. ·o (j) 15/12 40/12 50/6,10/0 0 20 WC=3.4 20 00=109 25 25 30 30 Note: Explanation of symbols is shown on Figure 9. 105115-6 LOGS OF EXPLORATORY BORINGS Figure 8 LEGEND: 39/12 0,2 T NOTES: FILL; silty sandy gravel, loose to medium dense. slightly moist, brown. TOPSOIL; root zone, sandy silt, slightly moist, brown. SILT AND CLAY (ML-CL); slightly sandy to sandy, scattered gravel, some sandy clay, stiff to very stiff, slightly moist, very moist with depth at Borings 6, 7 and 15. mixed brown, slightly calcareous and porous, low plasticity. SAND AND SILT (SM-ML); scattered gravel to gravelly, loose to medium dense, slightly moist, light brown. SAND AND GRAVEL (SM-GM); silty, some sandy silt layers, medium dense, brown, subangular to rounded rock. GRAVEL, COBBLES AND BOULDERS (GM-GP); slightly silty, dense, typically moist, wet at Borings 4 and 15, brown, rounded rock. SILTSTONE AND GYPSUM; medium hard to hard, moist, gray and white. Eagle Valley Evaporite. Relatively undisturbed drive sample; 2-inch I.D. California liner sample. Drive sample; standard penetration test (SP1), 1 3/8 inch I. D. split spoon sample, ASTM D-1586. Drive sample blow count; indicates that 39 blows of a 140 pound hammer falling 30 inches were required to drive the California or SPT sampler 12 inches. Free water level in boring and number of days following drilling measurement was taken. Depth at which boring had caved when checked on July 8 , 2005. Practical drilling refusal. Where shown above bottom of Jog, indicates that multiple attempts were made to advance the boring. 1. Exploratory borings were drilled on July 6, 7 and 8, 2005 with 4-inch diameter continuous flight power auger. 2. Locations of exploratory borings were measured approximately by pacing from features shown on the site plan provided. 3. Elevations of exploratory borings were obtained by interpolation between contours shown on the site plan provided. 4. The exploratory boring locations and elevations should be considered accurate only to the degree implied by the method used. 5. The lines between materials shown on the exploratory boring logs represent the approximate boundaries between material types and transitions rnay be gradual. 6. Water level readings shown on the logs were made at the time and under the conditions indicated. Fluctuations in water level may occur with time. Groundwater was only encountered in Borings 6 and 15. 7. Laboratory Testing Results: WC = Water Content (%) DD = Dry Density (pel) +4 = Percent retained on the No. 4 sieve 105115-6 He£; -Getectl HePWorl:h-Powlak Geotechnical -200 = Percent passing No. 200 sieve LL = Liquid Limit (%) PI = Plasticity Index (%) LEGEND AND NOTES Figure 9 ' Moisture Content ~ 4.5 perc ent Dry Density = 106 pel Sample of: Sandy Silt and Clay From: Boring 1 at 4 Feet 0 * --c 1 ·~ ....... ~ Compression "' upon ~ "" wetting a. 2 E '\ 0 0 3 ! . 0.1 1.0 10 100 APPLIED PRESSURE· ksf 105115·6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 10 HeDWorth-Pow!ok Geotechnlcal Moisture Content ~ 5.1 perc ent 0 Dry Density = 94 pcf Sample of: Sandy Silt --r--r-From: Boring 3 at 4 Feet 1 2 3 ~ Compression upon 4 wetting 5 *-6 \ c ·f& 7 (h ~ \ . E 0 8 (.) 9 10 1\ 11 \ \ ( 12 13 \ 14 !\ 15 0.1 1.0 10 100 APPLIED PRESSURE· ksf 105115-6 ~ He;worth Powlak Geotechnical SWELL-CONSOLIDATION TEST RESULTS Figure 11 I \ Moisture Content = 4.0 perc ent ' 0 Dry Density = 107 pel Sample ol: Very Silty Sand .._ r--r-. t'--t-.. From: Boring 8 at 4 Feet 1 2 Compression 'if [\_ upon c 3 wetting -~ ~ (/) a E 4 0 \ 0 5 \ 6 \ 7 0.1 1.0 APPLIED PRESSURE • ksl 10 100 ' Moisture Content = 11.4 perc ent Dry Density = 104 pcf Sample of: Sandy Silt From: Boring 9 at 19 Feet 0 --...... ,.... '0"-1 Compression c ~ 0 upon '(); wetting "' 2 a ~ E ~ 0 0 3 '\ 4 0.1 1.0 APPLIED PRESSURE · ksf 10 100 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 12 HeDWorth PowloK Ge~>t~hnteol 0 ._ -Moisture Content ~ 4.0 perce nt t----r-. Dry Density ; 96 pel 1 Sample of: Sandy Slit From: Boring 10 at 4 Feet 2 r---1--r--. ??-3 Compression r: .Q "' upon ({) wetting ({) 4 ~ '\ E 8 5 \ 6 \ 7 1\ 8 0.1 1.0 10 100 APPLIED PRESSURE -ksl } Moisture Content ~ 6.1 peree nt Dry Density ; 117 pel * Sample of: Sandy Silty Clay c From: Boring 12 at 4 Feet l 1 --r-..,., ' 0 c: "" ......, "-..... -~ "' 1 1\ 1£ 0. Expans on E 0 upon 0 wetting 2 0.1 1.0 APPLIED PRESSURE-ksl 10 100 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 13 HepWorth Pawlak Geote!;:hnlco\ Moisture Content = 8.5 perce nt Dry Density = 1 09 pcf Sample of: Slightly Sandy Silty Clay From: Boring 14 at 4 Feet 2 '* c: ·~ 1 P--...... c: <1) ~ &' ~ ' ' 0 c: ~ " -~ "' "' 1 " 1!: Cl. Ex pans• r E 0 upon () wetting 2 0.1 1.0 APPLIED PRESSURE • ksf 10 100 Moisture Content = 5. 9 perce nt Dry Density = 115 pcf Sample of: Sandy Silty Clay From: Boring 17 at 9 Feet 0 1fl. c: 0 1 "fi! "' ~>---......, .fr ~ 0 >--.. ' c: Expansion 0 -~ upon f', ~ 1 wetting E 8 2 0.1 1.0 10 100 APPLIED PRESSURE • ksf 105115-6 ~&tech SWELL-CONSOLIDATION TEST RESULTS Figure 14 HEPWOfmt<PAWLAK GEOTE:CHNlCAL. \ Moisture Content= 3.6 percent Dry Density = 109 pcf Sample of: Sandy Silt and Clay From: Boring 18 at 14 Feet 0 * '-...._ <" _.;; 1 c: ~ :-No movement 0 ·u; "' upon ro ~ 2 wetting E 0 0 3 0.1 1.0 10 100 APPLIED PRESSURE -ksf : j Moisture Content = 3.3 percent Dry Density = 108 pcf Sample of: Sandy Silt and Clay From: Boring 21 at 14 Feet 0 Compression -~ upon * -v 1-<.vetting 1 / c: ~ 0 ·u; "' ~ 2 E "t I'-0 0 " 3 • 0.1 1.0 10 100 APPLIED PRESSURE -kst 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 15 HePWorth-Pawlak Geotecholoo! Moisture Content = 3.4 percent Dry Density = 109 pet Sample of: Sandy Silt and Clay From: Boring 22 at 19 Feet ?f. 0 c: ---... t-- ·~ ~ 1--. en 1 ~ "' No movement c. E upon 0 2 wetting (.) 0.1 1.0 10 100 APPLIED PRESSURE -ksf i Moisture Content = 4.6 perc ent Dry Density = 105 pet Sample of: Sandy Silt and Clay From: Boring 25 at 9 Feet ?f. 0 c: '\---0 ·;; ' ~ 1 ~ ('.. E I', 0 (.) 2 No' movement upon wetting 0.1 1.0 10 100 APPLIED PRESSURE-ksf 105115-6 ~ H~WOJm+f'AWLAK Gt:!OTECHNlCAL SWELL-CONSOLIDATION TEST RESULTS Figure 16 HYDROMETER ANALYSIS I SIEVE ANALYSIS I "[ TIME READINGS I U,S. STANDARD SEAlES I CLEAR SCUARE OPENINGS I 24HR. 7HA 45 MIN.15 MIN. 60MIN19MIN.4MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8" 3/4' 1 1/Z' 3" 5"8" 8" 0 "" 10 "' 0 20 "' w <!J z 30 " z ~ 1i5 40 00 ~ a: ~ 1- 50 "'m w 0 0 a: 60 "' 0: w w CL CL 70 " 80 "' 80 " 100 ' '" ·'"' ·"'" ·"" .0\9 ·'"' '" ·'"' "" ·"" 1,18 = 4.75 9.5 12.5 19.0 $7.5 76.2 "' .. "' DIAMETER OF PARTICLES IN MILLIMETERS ct.AYTOSilT I """' ICOAASE I "" I MEOW FINt ~RAVEb I COARSE I COBBLES GRAVEL 17% SAND 25 % SILT AND CLAY 58 % LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Sandy Gravelly Silt FROM: Boring 15 at 14 Feet } I HYDROMETER ANALYSIS SIEVE ANALYSIS I 2i k~· 7 HR TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS ~. 45MIN.15 MIN.60MIN19MIN.4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8' 3/4" 11/2' 3" 5'6' 0 100 10 90 0 20 80 w (!) z 30 70 z ffi 1i5 (f) 0: 40 60 '& 1-1-z 50 50 aJ w 0 0 a: 60 40 ffi w CL CL 70 30 80 20 90 10 100 0 .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 s.s,2.5 19.0 37.5 76.2 12lp2 203 DIAMETER OF PARTICLES IN MILLIMETERS ClAI'T0$U """' GAA 1. '""'""' '"" MEOil.IM 00-FINE COM~ GRAVEL 34% SAND 24 % SILT AND CLAY 42 % LIQUID LIMIT % PLASTICITY INDEX % " SAMPLE OF: Silty Sand and Gravel FROM: Borio.q 16 at 14 Feet 105115-6 o$'£tech GRADATION TEST RESULTS Figure 17 HE:PW01l'l1+-PA.Wl.AK GEO'TECHNICAJ.. I HYDROMETER ANALYSIS SiEVE ANALYSIS u( TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS _1, 24H1't 7HA \ 45 M!N. 15 MIN. 60M!Nl9M!N.4 MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/6" 3/4" 1 112: 3' s· 6" 8" 0 '"' 10 " 0 20 " uJ 0 z 30 " z ~ i'i5 40 "' ~ 0: ,.... ,.... m 50 " z uJ if () 60 "" 0:: uJ uJ Q_ Q_ 70 so 80 "' 90 " 100 ' ·"'' "" .oos .009 .QIS ., .074 ·'"' "" ·""' 1.18 2.$6 4.75 S,$12.5 19.0 37.5 16:2 "' "" "' DIAMETER OF PARTICLES IN MILLIMETERS CtAvtOS!LT SMD GAA"' COB9l.£S ""' MEDIUM COAA" FINE CO>RSE GRAVEL 38% SAND 36 % SILT AND CLAY 26% LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Silty Sand and Gravel FROM: Boring 19 at 9 Feet HYDROMETER ANALYSIS SIEVE ANALYSIS I i ~. 7 HR TIME READINGS I U.S. STANDARD SERIES I CLEAR SQUARE OPENINGS ~· ~ I . 15 MIN. 60MIN19MIN.4 MIN. 1 MIN. #200 #100 #50 #3{) #16 #8 #4 318" 3/4' 1 1}2' 3" 5"6" 0 100 10 90 0 20 80 uJ 0 z 30 70 z ~ i'i5 en 0: 40 60 ct ,.... ,.... z 50 50 m uJ () 0 0:: 60 40 ffi w Q_ Q_ 70 30 80 20 90 10 100 0 .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 9.512.519.0 37.5 76.2 12}52 203 DIAMETER OF PARTICLES IN MILLIMETERS CLAYTOS!.T "" GAAVEl COllBI..ES FIN;: MEOW COMS€ FINE COARSE GRAVEL 38% SAND 39 % SILT AND CLAY 23 % LIQUID LIMIT % PLASTICITY INDEX % SAfvPLE OF: Si ~and Gravel FROM: Borina 22 at 4 Feet 105115-6 r -L I GRADATION TEST RESULTS Figure 18 ·,._ .. HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115·6 SUMMARY OF LABORATORY TEST RESULTS age 0 p 1 f 3 SAMPlE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL OR BORJNGS DEPTH CONTENT DENS!iY NO. 200 LIMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE (It) 1%) (ocfl (%) ("!•) (PSF) 1 4 4.5 106 Sandy silty and clay 2 4 6.2 93 85 Sandy clayey silt 3 4 5.1 94 Sandy silt 4 4 7.1 104 83 28 11 Sandy silty clay 5 81h 9.3 100 54 Silt and sand with gravel 6 14 10.3. 50 Very silty sand and gravel 24 18.2 106 73 Sandy silt 7 9 16.3 108 62 Sandy silt 24 17.7 107 74 Sandy silt 8 4 4.0 107 Very silty sand 14 6.6 117 44 Very silty sand HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115-6 SUMMARY OF LABORATORY TEST RESULTS ~e 0 p 2 f 3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE (ttl (%) (pcf) (o/o) (•(o) (PSF) 9 19 11.4 104 Sandy silt 10 4 4.0 96 Sandy silt 11 9 15.5 109 76 Sandy clayey silt 12 4 6.1 117 Sandy silty clay 14 4 8.5 109 91 31 13 Slightly sandy silty clay . 15 4 14.3 112 Sandy silty clay 10 . 14.5 71 Sandy silty clay 14 14.4 112 17 25 58 Sandy gravelly silt 16 14 3.2 34 24 42 Silty sand and gravel 17 9 5.9 115 Sandy silty clay ._J HEPWORTH-PAWLAK GEOTECHNICAL, INC. TABLE 1 Job No. 105 115·6 SUMMARY OF LABORATORY TEST RESULTS age 0 Pa 3 f3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTER8ERG UMITS UNCONFINED MOISTURE DRY . GRAVEL SAND PASSING UQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY N0.200 LIMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE (ft) {%) Jpg)_ (%) (%) (PSF) 18 9 3.6 104 58 Sandy silt with gravel 14 3.6 109 Sandy silty and clay 19 9 1.7 120 38 36 . 26 Silty sand and gravel 20 4 1.9 103 36 Silty sand and gravel 21 14 3.3 108 Sandy silt and clay 22 4 3.3 38 39 23 Silty sand and gravel 19 3.4 109 Sandy silt and clay Silty sand and gravel 23 4 1.3 27 Silty sand and gravel 24 9 2.6 46 Very silty sand with gravel 25 9 4.6 105 62 Sandy silt and clay 14 4.1 112 64 Sandy silty and clay EXHIBIT A THE ASPEN COLLECI'ION FREEDOMPROM§ONSTRU9JON CONTRACT L I .200{S._ THIS CONSTRUCTION CONTRACT ("Contract") is made and entered into between ffiONBRIDGE ASPEN ·· ooaECTioNtu:;·a·colc>riKio limited ·lliilillilfoompany·(~').·· wli.Ose3ddi'ess .. i84fo-:rr.;nt;ii(lge. R:<.IUCO:i;;;.;~;.;t Springs, Colomdo 81601, whose telOJ(hone number is (970) 945-4300, and whose facsimile nwnber is (970) 928-8865, and fOtrBJ lf8Pitfi f9lM:3f>AJ ("Owner''), \Wloae address is ID'{/J.U/.J(tfl(.? $~.0 G. tjtbl{ ,whosete!~honenmnberis'?Glf:tJZ...endwhose facsimile number is IT £.'~s Contmet is entered into this l s.rday of ;JIJL. '1 , 200 g_ (''Effective . Date,) .. This Contract is entered into in connection with and pursuant to Contractor and Owner's Freedom Program Prncbase and Sale Agreement dated ::f rJ/.'1 ( . , 200,8.. Terms defined in the Freedom Program Purehase and Sales Agreement and ·nsed in this Contract shall hold the same definition in this Contract. The. construction of the Residence on the Lot, eaeh as defined in the Freedom Program Purchase and Sale Agreement shall be referred to berein as (the ''House~). I. Confactor's Scope of Work Contractor's scope of work shall consist of construction services for the House as set forth O below, wbieh collectively shall be referred to herein as the "Work." lans Contractor has prepared the following drawings, consistent with other homes in the Project, as defined in the F~m 1Jft{'/J;"hase and Sale Agreement, and constructed by Contractor: ~: 2,Z.o2]) .-rdl~fY iii (collectively, the~'). i' 3. Construction Services a. Contractor shall procure and pay for aU pennits,licenses, approvals and inspections reqnired for the House. b. Contractor shall provide or cause to be provided all labor, materials, equipment and services to conslruct the House in a workmanlike manner, consistent with homebuilding indUS!Iy s!andards in Garfield Connty, pursuant to the Plans. Contractor shall not be mspo!ndble for furnishing or constructing any improvements or performing any worl<: unless the same are specifieaUy set forth in the Plans or in this Contract. 4. Owner's Responsibilities a. Owner shall cooperate with Contractor in securing any permits, licenses, approvals and inspections for the House. b. Upon Contractor's request, Owner shall provide all "Reqnested Information" to Contractor in a timely manner, and shall be available to meet with Contractor to approve plans and review the prowss of the Work. Requested lnfonnation shall inclnde, but not necessarily be limited to: i. proof of financing ii. Design and Architectural Option selections by the associated design selection dates iii. change order requests iv. proof of necessary insurance c. Owner specifieally agrees snd acknowledges thet finllllcing for the House is the sole and exclusive obligation of Owner, and Owner's ability to obfain financing is not a condition precedent to Owner's obligations set forth in this Contract Owner represents thet Owner is quslified to obfllin sueh fmancing and/or has available funds in the amount necessary to complete the House. Owner agrees to promptly seek and obfain any and an required financing for the House. Owner agrees to provide Contractra with proof, satisfactory to Contractor, that Owner's financing for the House has been fi.!'.elized> a.tld ag,:--ees that Contractor is not obligated io pr.Q~ with construction on the House until such proof is delivered to Contr-actor and the Closing of the Lathes oc¢.k~~· Fonn Datt: 6.'16108 150F23 d. Owner agrees not to let or enter into any other contracts in connection with the House or the Lot without the prior written approval of Contractor. Owner acknowledges and agrees that entering into any contract or permitting any other contractor onto the Lot may impede the Contractor's ahili!y to manage the cost of the House and timely complete performance of the Work as contemplated herein. Violation of this provision, shall, in addition to any other remedies set forth herein, permit Contractor to exercise its termination rights as specified herein. e. Within three (3) days after substantial completion of the Work, Owner shall notifY all utili!y suppliers that Owner is responsible for utili!y expenses from and after the date of substantial completion. -··-,.,__~,_, __ . 5. Time a. Without limiting the foregoing, Owner agrees to provide all Requested Information to Contractor to start construction within three (3) months of the date on which the Closing of the Lot occurs. Should Owner delay commencement construction beyond said three (3) months, Owner shall pay Contractor the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months ("Extension Fee"). The parties hereby agree that Contractor's actual damages for such Owner delay cannot be calculated now with certainty, and that Liquidated Damages are a re.Soriahle estimate thereof. · b. Provided that Owner has complied with all of its obligations hereunder, including but not limited to timely payment of all sums due to Contractor~ and Ownei bas secured financing for the House and delivered satisfactory proof thereof to Contractor, and Closing of the Lot has occurred, Contractor shall commence construction at the House Site within six!y (60) days after the issuance of a building permit in the Owner's name, as evidenced by accurate installation of the fo~ndation forms (the ~'Commencement Date"). c. Substantial Completion of the House shall occur within ten (10) months after the Commencement Date (the "Completion Date"). The Completion Date may be extended on account of: i. labor disputes; ii. fire or other damage to the House, including interior damage; iii. material or labor shortages; iv. transportation delays; v. governmental action; vi. unusual weather conditions; vii. change orders or delays caused by Owner; viii. the failure of Owner to provide information and/or approvals in a timely manner; or ix. any other causes which are beyond Contractor's control or which may otherwise justifY the delay; and x. Force M(\jeure events. d. Without limiting !be foregoing, Owner agrees to provide all required information to Contractor to substantially complete construction by the Completion Date. Should either party delay Substantial Completion of the House beyond the Completion Date, the delaying party shall pay the other party the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months as an Extension Fee. The parties hereby agree that actual damages for such delays cannot be calculated now with certainty, and that these Liquidated Damages are a reasonable estimate thereof. 6. Ownership ofPlans. Owner agrees and acknowledges that the Plans, and any amendments or revisions thereto, are and shttUEemain the sole and exclusive.property of Contractor~ and Owner agrees not to seU, transfer~ assign, use, copy or shafe the same with any person or entity without tile prior and express written consent of Contractor, which may be withheld in Contractor~s sole discretion. 7. Contract Price. ,.--..--_.... a. Q1!JI'<'r shaV..11.ay Cotllractor the sum of~ l/t l - 1 lt.JfJ!r-0~ --=:......,., Dollars($ ,Qli.OO) ("Contract Price") for performance of the Work; which amount shaH be paid in accordance with the paymefiiPrd'visions set forth in this Contract. b. Owner acknowledges that upon the execution of any change orders during the course of construction, the Contract Price may increase~ and in such event 0-YVner shaH pay to Contractor such increase upon execution of the change order~ and prior to Contractor's performance of any work in connection with the change order. 8. Payment Procedure. a. Owner shaH mflke. or cause Ov:ner's lender to make. progress payme.r1ts fo:r the V\lork in accordance with the schedule attached hereto as Exhibit A-1 ("Draw Schedule") or at any intermediate point based on the percentage of completion. of work at that time identified by inspection. Progress payments shaH be delivered to Contractor within Fonn Dat1:!: 6/IG!OS I60F 23 9. five (5) days after Owner's receipt of Contractor's request for payment, which reques1s for payment shall include a blanket lien waiver statement relating to all parties who provided labor and/or materials applicable to the previous request for payment. b. In the event thatatauy time the amount of Owner's loan available for distribution is less than the amount of the Contract Price remaining to be paid, Owner shall deposit the difference into a construction control account and execute a customary construction control agreement with respect to the holding and distribution of said sum prior to Contractor's obligation to commence or continue construction at the House Site. Owner shall b"re~()ll,<ii:>l~fQl:the ~·payment-ohnyfees-in connection·wltll !lie "cofisfiii¢fi6n control. . -.. ·~ . .. .. ~ . . . . c. Within ten (10) days after substantial completion of the Work, Owner shall pay all remaining amounts due under this Contract. d. All monies not paid when due as provided herein shall bear interest at the rate of eighteen percent (18%) per annum. e. In the event any insta1Jment is not paid when due, Contractor may exercise any remedy set forth in this Contract or exercise any other legal andi'or equita'bie rights which may be necessary or appropriate to enfoiCe this Contract. Changes in the Work a. Buyer understands, acknowledges and agrees that the Contract Price includes only the items set forth in the document a..ttached hereto as Exhibit B ("Features List"). These are referred to herein as (''Standard Selections"). b. Additions, upgrades, and/or optional items which are made available to Owner shall be selected, contracted and paid for in a separate contract with Contractor or by Change Order. c. Contractor may offer pre-designed and priced options for each Residence to Owner. i. Options which change the architectural design ofthe Residence, such as an additional garage bay, are referred to as architectural options ("Architectural Options"). ii. Options which change the materials and colors of the Residence, such as carpet type and/or color, are referred to as design opti(}ns ("Design Options"). m. Together these are often referred to as ("Options'). d. Changes to the Work that are not a pre-designed and priced Architectural Option or Design Options are referred to as change orders ("Change Orders"). i. All change orders shall specifY the following: I. the change in the Work, · 2. the adjustment to the Contract Price, if applicable, and 3. the adjustment to the Completion Date, if applicable. e. Changes in the Work can only occur by purchasing au Architectural Option, purchasing a Design Option or by written Change Order prepared and approved by Contractor. f. Options will be offered to the Owner, provided the following conditions have been adhered to: i. Options mnst be selected in a timely manner. Each Option is assigned one of three dates which are referred to as Design Selection I ("DSI "),Design Selection 2 ("DS2") and Design Selection 3 ("DS3"}. DSl is seven (7) days after closing, DS2 is forty five ( 45) days after DS I is executed by Owner and Contractor and DS3 is forty five ( 45) days after DS2 is executed by Owner and Contractor. ii. Should Owner fail to select Options on or before the applicable design selection date, Seller shall have the right to either stop work, install the standard selection or deny the Option. iii. Options and Change Orders shall be selected subsequent to the execution of this Agreement. Payment in the amount of!OO% of the price of each Option or Change Order shall be due when each Option or Change Order is ordered. g. ALL PAYMENTS FOR OPTIONS AND CHANGE ORDERS ARE NON-REFUNDABLE TO OWNER h. All Option purchases and Change Orders shall be executed by both the Owner and the Contractor and paid for by Owner, prior to the commencement of the work set forth therein. i. In the event that any increase in the cost of construction arises because of a change in applicable governmental regulations taking effect after the date of this Contract, such revision or condition shall be the basis for a Change Order and Contractor shall receive appropriate compensation for making such change. 10. Possession and Use of the Lot. Upon the Closing of the Lot, Owner is deemed to have conveyed to Contractor an absolute and exclusive right to possess and use the Lot. Owner shall not enter the Lot unless accompallied by an authorized representative of Contractor. Owner shall not instruct, direct or otherwise contact Contractor's laborers, sub~ontractors or consultants. Contractor shall permit access to the Lot by inspectors of Owner's lender. Contractor shall return possession of the Lot to Owner at the time that all payments and obligations required of the Owner have been fully paid a.'!d performed b;• the O;vner. If possession of the House and Lot is taken by the Owner before Owner 1s obligations set forth in this Contract are fully performed and without the prior -v';:rittcn consent of Contl-actor, Owner shaH be deemed to have accepted the Work as compiete and satisfactory, in compliance of all of Contractor's obligations hereunder. Form Date: 61!6/08 17 OF 23 11. Walk Through. a. Upon notice from Contractor to Owner, Owner and Contractor shall schedule a walk-through of Owner's home and shall compile a list of any items which are materially not in accordance with approved plans and specifications, or do not materially conform to Garfield County standards. Contractor shall repair, replace or otherwise remedy the items within a reasonable time after Substantial Completion . . •· . --· . --·-·-· . . b; .. Notwithstanding·the·facrthaniadi!ionalwoi'R maYlie required iiicoiiecfthe ilems:IfilieHousehas reached ... Substantial Completion, then no funds shall be withheld from Contractor for these items. c. After Substantial Completion, the Limited Seller's Warranty included in the Freedom Program Purchase and Sale Agreement shall apply. 12. No Assignment. This Contract shali not be assigned by Owner or Contractor to any other party except after the prior written consent of Owner or Contractor, which consent may be reserved in Owner's or Contractor's sole discretion. If Owner or Contractor assigns any ofOwner~s or Contractor~s rig4ts unf{er this Contract to any other party in violation of this provision, said assignment shall be void and ofi10 effect, and Owner shall be in default hereunder. Notwithstanding the foregoing, Contractor consents to a collateral assignment of this Contract to Owner~s lender pursuant to Owner's agreement with its ]ender. 13. Insurance. a. Owner shall procure and maintain during the term of this Contract the following policies ofinsurance: L Course of Construction insurance in the amount of the Contract Price; ii. Homeowner's insurance, and a fire and extended risk insurance policy, covering the House and Lot, in an amount not less than the Purchase Price, together with insurance covering loss or damage to Owner's personal property, and Owner's personal liability for injuries which may be sustained within the Property; and m. Comprehensive General Liability insurance in the amount of$1 ,000,000. b. Contractor shall maintain during the term of this Contract: i. Workers compensation insurance, as required by Jaw. 14. Termination of the Contract upon Termination of the Preedom Plan Purchase and Sale Agreement. This Contract shall be deemed terminated upon the termination of the Freedom Plan Purchase and Sale Agreement for any reason. In such even~ unless the cause of such termination is the default of Contractor as seller under the Freedom Plan Purchase and Sale Agreement, Contractor shall be entitled to retain all other .arnount(s) previously paid to Contractor or otherwise due to Contractor under this Contract. 15. Contractor's Right to Stop Work and Terminate Contract. In addition to all other remedies set forth in this Contract, in the event that any payment is not made in full within five (5) days after such payment is due, or Owner tails to perfurm any of its duties under this Contract within ten (10) days after written notice from Contractor, Contractor may stop the Work until payment is made or Owner fulfills its duties. Should the Work be stopped fora period of fifteen (15) days or ~~r~ lJPQD Owner's failure to make a progress payment or as a result of any other act, omission or neglect of the Owner, then _Contractor may, upon providing written notice to Owner~ tenninate this Contract. Upon such termination, the Contractor may recover from the Owner payment for all work completed and for any loss sustained by the Contractor for materialst equipment, tools, or machinery to the extent of actual loss thereon, plus an amount equal to the Contractor's anticipated profit under this Contract, plus interest on the foregoing amounts at the rate of eighteen percent (18%) per annum. 16. Alternative Dispute Resolution. Owner and Contractor agree to be bound by the alternative dispute resolution procedures set forth in the Declaration. Any and aU claims, disputes and controversies arising between Owner and Contractor1 whether before or after Closing, relating to this Contract or its subject matter, including, but not limited to, any alleged construction defect, shaH be submitted to final and binding arbitration. 17. Notices. All notices required by this Contract shall be in writing and shall be given by any of the following means to the below listed addresses or fax numbers: 3. certified or registered mai~ pos:t.age p.rt:paid, return receipt requested, in which case notice shall be deemed delivered three (3) business days a.f!er t~e postmark date; b. recognized commerciai overnight courier, in which case notice shall be deemed delivered one (1) business day after Form Date: 6/16/08 18 OF 23 receipt for delivel)' by the courier; c. electronic mail llansmission with confirmed receipt, d. telecopy llansmittal ("fax"), in which case notice shall be deemed delivered upon fax confrrmation of transmission to the intended party; or e. personal delivel)', in which case the notice shall be effective when received. f. Notice shall be given to Contractor M 410 lronbridge Dr. ··--·---· ·-·· ·-·---·--·-·Glenwood-springs; CO""Sl6Qt· · ··· g. Notice shall e given to Owner to: h. Notice of change of address shall be delivered by written notice in the manner described in this section. Rejection or other refusal to accept a notice or the inability to deliver a notice because of changed addres!l of which no notice was given shall be deemed to constitute receipt of the noiice sent. 18. Contractor~s Limited Warranty. Contractor shaH provide a one-year iimited warranty on the house as provided· for in the Freedom Program Purchase and Sales Agreement. 19. Contractor's Disclaimers. Contractor makes no representation or warranty) and shall in no event be responsible for the following: a. Hazardous materials (as defined by applicable law) in the House or on the Lot; b. Homeowner's association assessments and/or property taxes applicable to the Lot; c. Owner's financing of the Work; d. Any work or materials not supplied or installed by Contractor pursuant to this Contract; or e. All of the mailers described in the disclosures and disclaimers set forth in the Freedom Plan Purchase and Sale Agreement, which disclosures and disclaimers are fully incorporated herein by this reference. 20. General Provisions. a. This Contract shall be governed by 1he laws of the State of Colorado. Jurisdiction and venue for any action concerning this Contract shall be in Garfield County, Colorado. b. In the event of any litigation or other proceedings between the parties concerning this Contract, the prevailing party shall be entitled to the payment by the nonprevailing party of all of its reasonable attorneys' fees, court costs, and litigation expenses. c. This Contract constitutes the entire agreement between the parties and any prior understandings, ngreements or representations of any kind whatsoever preceding the date of this Contract shall not be binding upon either party except to the extent that they are specifically incorporated into this Contract. d. This Contract shall be binding upon and inure to the benefit of the parties hereto and to their respective heirs, representatives, successors and permitted assignees. This Contract is intended for the exclusive benefit of Owner and Contractor and is not intended and shall not be interpreted as conferring any benefit on any third party. e. This Contract and any amendments to this Contract may be executed in any number of counterparts, each of which shall be deemed an original and all taken together shall constitute one and the .same agreement. Fax copies of this Contract and any amendments to this Contract and fax signatures thereon shall have the same force, effect, and legal status of originals. f. If any provision of this Contract is or shall become invalid or unenforceable, the remaining provisions ofthis Contract shall not be affected. g. Time is of the essence in each and every term and provision of this Contract. All references to days herein shall be deemed to refer to calendar days unless otherwise specified. In the event that the final date for performance of any act required by this Contract falls on a Saturday, Sunday, or legal holiday, such act may be performed on the next day which is not a Saturday, Sunday, or legal holiday. h. The waiver of a breach of any provision in this Contract shall not be construed as a waiver of any other breach of the same or other provision of this Contract, including the time of performance of any provision. i. Owner understands that this Contract is a legally binding contract. Owner represents and warrants that Owner has read the terms a."l.d conditions ofthls Contmct, aud has had a fuH and fair opportunity to consuit with legal counsel of Owner's own choosing concerning this Contract. F<mn Dete: 6/i6/0S l90F23 EXECUTED to be effective as of the date oftbe date first written above. CONTRACTOR: OWNER: IRONBRIDGE ASPEN COLLECTION LLC, " " ""~ ~"-A.C<>IoradoJimited.liability.company-.. ~-·-·-"" By:--------------------~- Managing Member Fonn Date: 61J~/OS 200F23 Form Da1e: 6/16/08 EXHIBITA-1 (Draw Schedule insert) 21 OF 23 EXHIBIT A-1 DRAW SCHEDULE -----------~----lronbridgeAspen-eollection;-tLe····· ·--------·-··---···· ·--~----··---·-····--·--··· February 14, 2008 Plan No: 22020 Foundation: Post Tension Slab on Grade · Descri2tion % Cost Permits, Engineering, Survey 5% $ 11,251 Sitework 4% $ 9,001 Foundation 7% $ 15,751 Framing 20% $ 45;004 Roofing 5% $ 11,251 Plumbing 5% $ 11,251 Electrical 3% $ 6,751 HVAC 4% $ 9,001 Windows, Doors, Trim 7% $ 15,751 Insulation 1% $ 2,250 Exterior Finishes 5% $ 11,251 Painting 6% $ 13,501 Drywall 4% $ 9,001 Flooring 3% $ 6,751 Tile 2% $ 4,500 Cabinets 2% $ 4,500 Appliances 1% $ 2,250 Landscaping (if applicable), Driveways, Sitework 7% $ 15,751 General Conditions 2% $ 4,500 Total Cost 93% $ 209,269 Contractor Fee 7% $ 15,751 Total Contractor Cost and Fee 100% $ 225,021 Fonn Date: G/16/0S EXHIBITB (Features List insert) 220F 23 I:R.ON:S:R.Jt.»Gtm GOLF CLUB AND MOUNTAIN COMMIJNll"Y --~------"'-""·--·~-----··· -~---·--·-·--~---~ 1RONBRIDGEASPEN COLLECTION LLC February 7, 2008 ENERGY PERFORMANCE FEATURES • Fully-engineered .Air and Water Jnfdlration Paokage o . Double-paned Low-E Glass o Air Infi!tmtion-protected Electrical ~el>l .. o Fuli:r·wr•pped and S<o;lled Wir\dow . Openings o W<>athi:r Sllipping <>n ExteriDr Doors o Air Barrier Weather Sllipping at Foundation o Under-slab Vapor Barriers • High-efl'ieiency Furnace • High-efficiency 4& Gallon Hot Water Heater • Insulated Exterior Doors and Garage Door • Outside Fresh Air Exchanger ROOFING • 40-year Asphalt Shingles • Pre-finished Gutters and Downspouts WINDOWS & DOORS • Lifetime Warranty Energy Star-rated Wmdows • Double-paned Low-E Glass • Thennalnt Fiberglass Insulated Entry Door ELECTRICAL • Phone/DataffV Ports in Kilchen, Great Room and Master Bedroom • Photo Cell Automatic Exterior Sconces • Decorative Fixtures at Kilchen, Dining, Bathrooms, Walk-in Closets • Switched Outlets in Great Room and Bedrooms • Recessed Can Lights in Kitchen & Hallways 1 of2 HEATING & VE,.''TILATION • .. EJ<hapsl Fans: Energy Star-mted Whisper Fans, Vented to Exterior • Powet'VentedAetive Radon Mitigation System ~ Heated Ga..-age GARAGE DOORS • Insulated Door • Pre-wired Gamge Door Opener Ontlet APPLIANCES o GE Gas Range • Range Exhaust Hoed • Built-inGEDishwasher INTERIOR FINlS.HESAND FLOORING • Hand-textured Painted Walls • Square Dl:ywaU Comers • 9-ft. Ceilings • 10-ft. Coffered Ceiling in Master Bedroom • Vinyl Flooring at Kitohens, Bathrooms and Mudrooms • Crupeting in all Bedrooms and Great Room • Ceramic Tile Tub Deck in Master Bath • Full-height Fiberglass Shower and Tub Enclosures GOLt:: CLUB AND 1V10UNTAJN CQ1\II},.{UNITY ·············--···-·--· ·········· · · · ·· ···· ntbNIJRIDGE ASi>ltN-co:LtEtnoNLic· ..... February 7, 2008 INTERIOR DOORS, TRIM & CABINETS • Interior. Doors: .Sante.FeScy!e Hollow Core • Closets: Stained Rods and Painted Shelves • Pajnred Basebollrd!; and Door Casings • .J>ainied Exfeoded.Win<Jow Sills and Aprons • Laminate COwltertOps . . • Cabinets: Hickory o 30" Uppers at Kitehen o Raised Panel Style Doors o 36" High Vanities o Alljuslable Shelves 0 Raised Bar Counrertop PLUMBING FIXTURES & SHOWER ENCLOSURES • Soaker Tub in Master Bath • Pedestal Sink in Powder Rooms • Icemaker-llne to Refrigerator • Mirror over all Vanicy Cabinets EXTERIOR • Asphai!Driveway with Concrete Walk alld Covered Front Porches • L'l-ground Drainage System • Landscaping, lirigafion and Dreinage • Stucco, Stone & Rough-Sawn Wood Finishes THE TOTAL NUMBER, DESIGN, LAYOUT AND LOCATION OF LOTS, LANDSCAPING, LAKES, RES!DENCESANDUN!TMJXANDTHBLOCATION,DESIGNANDLAYOUTOF RECREATIONALFACIL!TIESMAYBECHANGEDDUETOANUMBEROFCIRCUMSTANCES, INCLUDING GOVERNMENTAL REQUIREMENTS, MARKET DEMAND AND COST CONSTRAINTS. THERE IS NO ASSURANCE THAT THE FUTURE IMPROVEMENTS AND FAClLITIES DESCRIBED WILL BE CONSTRUCTIID. DIMENSIONS AND RESIDENCE SIZEA.llli APPROXIMATEINNATUREANDARENOTINTENDEDFORFINALREFERENCEASPLANS ARE NOT TO SCALE. LEROSE RANCH LLC,IRONBRIDGEHOMES LLC,IRONBR!DGE MOUNTAINCO'JTAQESLLCAND.IRONBRIDGEASPENCOLLECTIONLLCRESERVE.THE R!GIDTOMAKEMODIFICATIONSINLOTANDRES!DENCEPR!CESANDMAKE Iv[QI)IFICATION!IIN M/l.TERIALS AND SPECIFICATIONS AT ANY TIME WITHOUT PRIOR NOTICE .. OWNERSHIP OF A RESIDENCE OR LOT OOESNOTINCLUDECLUB MEMBERSHIP OR !UG!ITS IN THB COUNTRY CLtJB FAC!LITIES'. 2of2 EXIDBIT B-1 PROJECT DOCUMENTS ACKNOWLEDGEMENT The Purchaser, as witnessed by the signature(s) below, acknowledges that as specified in the Purchase and Sale Agreement, Paragraph 5(A), Title Policy, will receive all recorded documents that relate to the Property from the Title Company within ten days from mutua~~ecujiJm~qL!hJLQ>ntr.act. .Sl!iJLds;cuments.ar.e.seferred.to ... as-'>ll.Schedule.B-2.exception.documents·as··listed·in····· · ·········· ···· ········~-the Commitment to Provide a Title Insurance Policy. Said Documents are provided on a computer disc, however the Buyer may request from the Title Company printed copies of any or all documents provided on the disc. As referenced in Paragraph 5(E) and 5(F), "Project Documents" and "The Aspen Collection Association", oflhe Purchase and Sale Agreement, there are additional documents relating to the Property which are considered to be unrecorded documents that relate to the Title of the Property. These documents are provided by the Seller and the IPOA/T A CA through thewebsite of the community which is accessible at www;ironbridgeclub;com by logging irito the site under member's login by using the password 234.S:sy signing below, the Purchaser acknowledges the ability to review and the receipt of said documents through the website listed above during the Title Review Period. Purchaser may request printed copies of said documents in the event that they are unable to access the documents through the website. Purchaser Date Purchaser Date January 1, 2008 Fonn Date: 6!16/08 23 OF 23 Parcel Detail Page I of 4 Garfield County Assessor/Treasurer Parcel Detail Information Assessor/Treasurer Property Search I Assessor Subset Query I Assessor Sales Search Clerk & Recorder Reception Search Basic Building Characteristics I Tax Information Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Improvement Detail Land Detail I Photographs I Mill Levy Revenues Detail ~ Account Parcel 2007 Mill Number Number Levy a I 090 II R043502 1123950142928611 64.976 Owner N arne and Mailing Address !KNUTSON, BRUCE C. & MARYS. II 04 WILLIAMS wAy !ASPEN, CO 81611 Assessor's Parcel Description (Not to be used as a legal description) !SECT,TWN,RNG: 1-7-89 SUB:IRONBRIDGE IPUD, PHASE II, FILING 1, 2 & 3 ILOT:286 PRE:R041509 BK:1596 PG:871 IBK: 1565 PG:600 BK: 1560 PG:438 IBK:1560 PG:431 BK:l057 PG:0745 IBK:l028 PG:768 BK:l028 PG:597 http: l/www. garcoact. com/ assessor/parcel.asp ?Parce!N umber=23 9 50 14 2 9286 I I I I I I I I I I 9/8/2008 Parcel Detail Page 2 of4 [BK:l006 PG:743 RECPT:755001 I [RECPT:755000 BK: 1822 PG:287 I [RECPT:702424 BK: 1822 PG:283 I [RECPT:702422 BK: 1822 PG:250 I [RECPT:702421 BK: 1782 PG:269 I [RECPT:694479 BK:1782 PG:264 I jRECPT:694478 BK:l747 PG:1 I JRECPT:686745 BK:1218 PG:738 I [RECPT:572583 BK:1218 PG:715 I IRECPT:572582 BK:l217 PG:266 I [RECPT:572131 BK:1206 PG:852 I IRECPT:569200 BK: 1206 PG:780 I [RECPT:569199 BK:l206 PG:768 I [RECPT:569197 BK:l206 PG:734 I [RECPT:569195 BK:l206 PG:662 I IRECPT:569194 BK:l206 PG:637 I [RECPT:569192 BK:1206 PG:629 I IRECPT:569191 BK:l206 PG:574 I [RECPT:569190 BK:l063 PG:0578 I [BK:l063 PG:0571 I Location Physical 1306 BLUE HERON VISTA GLENWOOD SPRINGS~ Address: [subdivision: IIIRONBRIDGE PUD, PHASE II, FILING 1, 2 & I [Land Acres: [ 0 [Land Sq Ft: I 3,378 I Section II Township II Range I I 1 II 7 II 89 I http://www.garcoact.com/assessor/parcel.asp?ParcelN umber=23 950 14 29286 9/8/2008 Parcel Detail Page 3 of 4 2008 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: II 82,51011 23,9301 \Improvements: \\ oil ol I Total: II 82,51 oil 23,9301 Additional Value Detail Most Recent Sale Sale Date: \\8129/2008 Sale Price: \\254,000 Additional Sales Detail Basic Building Characteristics Number of Residential jo I Buildings: Number ofComm/lnd jo I Buildings: No Building Records Found Tax Information I Tax Year II Transaction Type II Amount I I 2007 II Tax Payment: Second Half II ($640.66)\ I 2007 II Tax Payment: First Half 11 ($640.66)\ I 2007 II Tax Amount II $1,281.321 I 2006 II Tax Payment: Second Half II ($38.32)1 I 2006 II Tax Payment: First Half II ($38.32)\ I 2006 II Tax Amount II $76.6411 http:/ /www.garcoact.com/assessor/parcel.asp?ParcelN umber=23950 1429286 9/8/2008 June 24, 2009 Ironbridge Golf Club & Sporting Community 410 Ironbridge Drive Glenwood Springs, CO 81601 Attn: Mike Woelke RE: LVL Bearing, Hole, Truss Bearing 0306 Blue Heron Vista Lot 286 Ironbridge Subdivision Garfield County, Colorado Dear Mike: Per your email dated 23 June 2009, we understand that the (2) LVL above the Great Rm/Dining Rm only has approximately one inch of bearing on one ply and full bearing on the second ply. We have reviewed this condition and it is not a structural concern. Further more we understand that a quarter inch hole has been put at an angle into the LVL approximately 6ft from bearing. We have reviewed this condition and it is not a structural concern. We understand that the bearing wall at the laundry has been moved. We have reviewed this condition with the provided profile for truss f1c and it is not a structural concern. Sincerely, Fuhrmann Engineering Services, LLC Jeremiah Willis Reviewed by: Nathaniel P. Graf, P.E. JW file