HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-L1-17 -50t0
Thomas & Helen Pallizzi
New SF Residence & Garage
TBD Saddleback Road, Carbondale
Aspen Glen - Filing 6, Lot H-39
1) ALL WORK SHALL COMply W|TH THE 2015 TNTERNATTONAL RESTDENTIAL CODE (l.R.C.) AND
2009 TNTERNATTONAL ENERGY CONSERVATION CODE (l.E.C.C.)
2l tMpRovEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACHED
,,GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON PLANS
REFER TO SPECIFIC ITEMS ON THIS LIST.
3) OpEN-HOLE SOTLS REPORT REQUTRED AT FOOTTNG TNSPECTION TO VERIFY 3000 PSF.
4l pRovtDE A LOT TMPROVEMENT SURVEY AT FOUNDATION INSPECTION TO VERIFY THAT ALL
STRUCTURES ARE FULLY CONTAINED WITHIN THE PLATTED BUILDING ENVELOPE INCLUDING
ROOF OVERHANGS, DECKS & PROJECTIONS.
5) A BUtLDtNG HEtcHT ELEVATTON SURVEI SEALED BY A COLORADO PROFESSIONAL LICENSED
SURVEYOR, IS REQUIRED AT FRAME INSPECTION TO VERIFY COMPLIANCE OF AS-BUILT ROOFS
WITH GARFIELD COUNW'S 25-FEET MAXIMUM BUILDING HEIGHT LIMIT AS DEFINED IN THE
LAND USE & DEVELOPMENT CODE AND AS FOLLOWS:
6) TNSTALLATTON OF A RESTDENTTAL FtRE-SPRINKLER SYSTEM lS REQUIRED AND SHALL BE lN
ACCORDANCE TO NFPA 13D OR I.R.C., SECTION P29O4, VERIFY ALL REQUIREMENTS AND
COORDINATE INSPECTIONS WITH LOCAL FIRE DISTRICT. PROVIDE EVIDENCE OF ROUGH-IN
APPROVAL AT FRAMIING INSPECTION, AND FIRE DISTRICT SIGN-OFF AND APPROVAL REQUIRED
PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
7) TNDOOR POOL SHALL COMpLy W|TH 2015 TNTERNATIONAL SWIMMING POOL & SPA CODE,
I.R.C. (CHAPTER 42), & MANUFACTURER,S INSTALLATION REQUIREMENTS. PROVIDE MINIMUM
VENTILATION RATES PER 2015 INTERNATIONAL MECHANICAL CODE, SECTION 403 AND TABLE
403.3.1.1
s) vERtFy REQUTREMENTS AND COORDTNATE TNSPECTIONS OF VERTICAL LIFT WITH NORTHWEST
coloRADO COUNCTL OF GOVERNMENTS', (N.W.C.C.O.G.) ELEVATOR INSPECTION PROGRAM.
ALTHOUGH ELEVATOR IS SHOWN AS "FUTURE INSTALL" ON PLANS, PRELIMINARY INSPECTIONS
& ELEVATOR StGN-OFF/APPROVAL SHALL BE COMPLETED. PROVTDE N.W.C.C.O.G. REPORT PRIOR
TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY.
9) ELECTRTCAL pERMtTTtNG AND TNSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL
APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.