Loading...
HomeMy WebLinkAbout1.14 Aspen Glen Master Design GuidelinesMASTER DESIGN GUIDELINES ASPEN GLEN Homeowners Association at Aspen Glen, Inc. Design Review Committee Adopted by the Aspen Glen Board of Directors Effective 2016 Table of Contents SECTION 1 INTRODUCTION & OVERVIEW 1 1.0 Introduction 1 1.1 Water Resource Stewardship 1 1.2 Design Guidelines for Aspen Glen 1 SECTION 2 DESIGN REVIEW PROCESS 3 2.0 Improvement to Property 3 2.1 Review of Plans 4 2.2 Review Fees 4 2.3 Submission of Plans 4 2.4 Criteria for Approval 5 2.5 Outline of Review Procedure 5 2.6 Pre -Design Meeting 6 2.7 Preliminary Submittal & Review 6 2.8 Final Submittal & Review 8 2.9 Building Envelope & Lot Line Adjustments & Lot Mergers 11 2.10 Re -Submittal of Plans/Amendment to Approved Plans 13 2.11 Subsequent Changes 13 2.12 Variance to Design Guidelines 13 2.13 Fine Schedule 14 SECTION 3 CONSTRUCTION 14 3.0 Builder's Completion Deposit 14 3.1 Certification of Workman's Compensation Coverage 14 3.2 Occupational Safety & Health Compliance (OSHA) 14 3.3 Pre -Construction Conference 15 3.4 Temporary Structures 15 3.5 Fencing 15 3.6 Building Materials Sample Board 16 3.7 Debris & Trash Removal 16 3.8 Sanitary Facilities 16 3.9 Vehicle & Parking Areas 16 3.10 Blasting & Drilling 17 3.11 Restoration or Repair of Other Property Damages 17 3.12 Construction Access 17 3.13 Construction Deliveries 17 3.14 Miscellaneous Practices 18 3.15 Hours of Construction Operation 19 3.16 Signs 19 3.17 Work in Progress & Stop Work Notice 19 3.18 Completion of Work after Approval 21 3.19 Completed Work 22 3.20 No Implied Waiver or Estoppels 25 3.21 Estoppels Certificates 25 SECTION 4 SITE DESIGN GUIDELINES 25 4.0 General Site Design Guidelines 25 4.1 Building Envelopes & Lot Merger 26 4.2 Driveways 28 4.3 Parking Requirements 29 4.4 Drainage & Grading 30 4.5 Fences & Privacy Walls 33 4.6 Basement Window Wells 33 4.7 Accessory Equipment 34 4.8 Swimming Pools, Tennis Courts & Recreational Surfaces 34 4.9 Signs, Address Monuments & Mailbox Enclosures 34 4.10 Exterior Lighting 35 4.11 Patios, Courtyards, Spas, Hot Tubs, Outdoor Grilles & Fireplaces 39 4.12 Solar & Wind Applications 40 4.13 Residential Backup/Standby AC Power Generators 40 SECTION 5 ARCHITECTURAL DESIGN GUIDELINES 41 5.0 Building Construction Methods 41 5.1 Engineered Foundations 42 5.2 Building Height 42 5.3 Scale & Massing 43 5.4 Wall Configuration & Design 44 5.5 Roof Configuration & Design 46 5.6 Building Materials 48 - Stone Percentage Table 49 5.7 Color Palette 51 5.8 Interior Lighting 51 5.9 Fireplaces & Solid Fuel Stoves 52 5.10 Storage 52 5.11 Fire Sprinkler Systems 52 5.12 Interior Window Coverings 52 5.13 Duplex 52 SECTION 6 LANDSCAPE GUIDELINES 54 6.0 General Design Considerations 54 6.1 View Plane Considerations 55 6.2 Planting Plans 55 6.3 Pre -Construction Lot Maintenance 56 6.4 Preservation or Removal of Existing Vegetation 57 6.5 Irrigation 58 6.6 Typical Planting Treatments 60 6.7 Application of Typical Planting Treatments 61 6.8 Minimum & Maximum Landscape Planting Criteria 63 6.9 Minimum Tree & Shrub Requirements 63 6.10 Installation & Maintenance 64 SECTION 7 FLAGS 66 7.0 Rights 66 7.1 Display Guidelines 66 7.2 Flag Poles 67 7.3 Game Day/Holiday Flags 67 APPENDIX A Suggested Plant List for High Intensity Planting Areas APPENDIX B Suggested Plant List for Natural Planting Areas APPENDIX C Submersible Irrigation Pump System for Ditch and Pond APPENDIX D Approved Road Cut Reparation APPENDIX E Sample Pictures: Address Monuments; Driveway Surfaces; Utility Box Screening; Solar Panels; Pergolas; Wall Plane & Garage Door Setbacks; Hot Tubs/Spas APPENDIX F Exterior Lighting APPENDIX G The Fairways APPENDIX H Roaring Fork Mesa APPENDIX I Applications SECTION 1 INTRODUCTION AND OVERVIEW 1.0 INTRODUCTION Aspen Glen was carefully planned to take advantage of a site with remarkable natural beauty and to create a private residential community surrounded by a premier country club with a broad range of recreational opportunities. The purpose of the Design Guidelines is to ensure that the potential of Aspen Glen is fully realized. Historically, the Rocky Mountain area is known for rustic architecture characterized by native materials that are coarse and heavily textured. At Aspen Glen, the vocabulary of mountain architecture integrates materials characteristic of the region creating an "architectural presence" that is best described as "Mountain Sophistication." 1.1 WATER RESOURCE STEWARDSHIP Water is a precious resource in the arid West. It is a goal of Aspen Glen to use the least amount of water necessary to achieve a quality lifestyle and to preserve as much water as possible for the use and enjoyment of future generations. The Roaring Fork Water and Sanitation District which provides water and sewer service for Aspen Glen makes available a variety of information for effective water resource management. Specific irrigation criteria and methodologies are defined in Section 6, Landscape Guidelines. 1.2 DESIGN GUIDELINES FOR ASPEN GLEN The Design Guidelines for Aspen Glen have been prepared to improve the quality of your living experience at Aspen Glen. The purpose of the Guidelines is to: A. Encourage aesthetics and design adapted to the environment in Aspen Glen. B. Promote harmonious residential and landscape design. C. Protect and enhance property values. The Guidelines are periodically revised and updated. While some prior construction may not conform to current Guidelines; all new construction must comply with the current Guidelines at the time of final design approval. The Guidelines are administered by the Design Review Committee (DRC), which is comprised of experienced landscape and architectural consultants, as well as homeowners. This committee is responsible for assisting Aspen Glen property owners and their design team in the creation and development of their property. The DRC supports advances in the building industry. Builders and applicants are encouraged to bring innovative technology to the DRC for consideration. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 1 The Guidelines contained herein apply to: A. Construction activities related to new buildings, additions, or exterior repairs or improvements. B. Remodels, demolition, and additions, including patio and pergola additions, painting and exterior repairs. For interior remodels for which a building permit is required and outdoor dumpster and/or a porta potty are used, the project must adhere to the Construction Regulations found in Section 3 of these Guidelines. C. Any alteration or any improvement to property must be concluded within 18 months from commencement unless a written request for approval of a longer construction period is approved. D. Grading. E. Landscaping, including removal and installation of vegetation. The preparation and application of these Guidelines is accomplished under the authority and direction of Article 4 of the Amended Master Declaration of Covenants, Conditions and Restrictions for Aspen Glen, filed with the Clerk & Recorder of Garfield County, herein referred to as the Master Declaration. Any breach of these Guidelines is subject to potential fines and penalties, as set forth in the Master Declaration. Variances to these Guidelines can only be made if it can be demonstrated to that the overall intent of the Guidelines is adhered to and a unique situation prevents the strict compliance contained herein. Review and approval of any application is made on the basis of aesthetic considerations in addition to specific criteria as set forth herein: A. Neither the DRC, nor any member of the DRC, will bear any responsibility for insuring the structural integrity or soundness of approved new construction or modifications. B. The DRC will not be responsible for postponing or disapproving proposed "Improvement to Property." C. The DRC will not be responsible for ensuring compliance with building codes and other governmental requirements, and the applicable codes and regulations of other entities holding authority over improvements within Aspen Glen, including but not limited to: water, sewer, and fire protection districts. D. The DRC will not be held liable for any injury, damages or loss arising out of the manner or quality of approved construction on, or modifications to, any residence or improvement, as "Improvement to Property" is defined in Article 4 of the Master Declaration. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 2 SECTION 2 DESIGN REVIEW PROCESS Improvements to Property requiring approval must be submitted in accordance with the following procedures. 2.0 IMPROVEMENT TO PROPERTY Pursuant to Section 4.1 of the Master Declaration, DRC approval is required for any Improvement to Property on any Lot, except: "(a) where the DRC determines that approval is not reasonably required to carry out the purpose of the Master Declaration; (b) where prior approval of Improvements to Property may be waived or certain Improvements to Property may be exempted in writing or under written guidelines or rules promulgated by the DRC, and (c) construction of Improvements pursuant to the Golf Course Easement." According to Section 4.2 of the Master Declaration, "Improvement to Property" requiring DRC approval will include, without limitation, any of the following occurring within the Community Area: "(a) The construction, installation, erection, or expansion of any building, structure, or other Improvement, including utility facilities and fences (b) the demolition, destruction or removal, by voluntary action, of any building, structure, tree, vegetation or other Improvement (c) the grading, excavation, filling, or similar disturbance to the surface of the land including, without limitation, change of grade, change of ground level, change of drainage pattern, or change of stream bed and (d) any change or alteration of any previously approved Improvement to Property, including any change of exterior appearance, color, or texture occurring." All residential design for existing residences must be performed and stamped by a U.S. licensed architect with substantial experience in high quality, mountain residential design. It is the intent of Aspen Glen to have each residence individually designed for each specific site. All landscape plans for new and existing residences must be submitted and stamped by a licensed landscape architect. It is recommended that the selected landscape architect have experience in high quality, mountain landscape design. Additionally, landscape plans may be required for residential remodel/additions, landscape improvements proposed for adjacent vacant lots, or unimproved lots that are to be merged with improved properties via the amended plat process. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 3 2.1 REVIEW OF PLANS Review of plans and all submittals will occur during regular DRC meetings or at such other times as deemed appropriate. A response in writing is required within ten (10) working days after the review is complete. Any response the owner or applicant may wish to make to a decision of the DRC must be made in writing. 2.2 REVIEW FEES A Review Fee is required and will be collected at the beginning of the first review meeting of an Improvement to Property. This fee may change from time to time at the discretion of the Homeowners Association Board of Directors (HOA Board of Directors). The fee is expressly for the purpose of covering administrative costs of the design review process and for the professionals hired to review all applications. A submittal is not complete until the Review Fee is submitted. In the event that reviews and on-site inspections exceed the number of hours that the fee is intended to cover, the applicant will be charged an additional fee at the applicable rate and notified of the additional charges as soon as possible but no later than 30 days after the hours have been exceeded. A good faith estimate as to the remaining time and charges needed to complete the review process will be included. Additional fees will also be assessed including the Construction Road Access Fee (CRAF) and a Security Access Fee (SAF). A Builder's Completion Deposit is also required. All additional fees are due at the time an Improvement to Property is approved. A fee may also be assessed for: A. Minor reviews such as building envelope adjustments, lot line/lot tie adjustment. B. Major amendments to approved plans. C. Any addition to a residence that requires a building permit, or any separate/detached new structure. D. All tear downs and remodels. These fees are subject to change at the discretion of the HOA Board of Directors. 2.3 SUBNIISSION OF PLANS A. Submission of Plans. Prior to submission of building plans to the County for a building permit, when applicable, and prior to commencement of work to accomplish any proposed Improvement to Property, the person or entity ("Applicant") proposing to make such Improvement to Property must first obtain DRC approval of the Improvement. To initiate the review process, the Applicant must submit a completed application. B. Authority to Require Additional Information. Additional plans, specifications or other information may be required prior to approving or disapproving the proposed Improvement to Property. A certificate of insurance is a requirement for a licensed general contractor Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 4 working in Aspen Glen. A first time builder in Aspen Glen may be requested to submit three references of example projects for consideration. An Applicant may be required to provide a copy of the building permit application and the set of plans submitted to the County, to ensure consistency with the DRC approved plans. If required, this information must be provided by an Applicant prior to commencement of construction. C. All assessments and fees due and payable to the Aspen Glen Homeowners Association (the "Association") must be paid in full at the time of the initial review meeting of the submitted application. A receipt for payments will be provided upon request. D. Complete Submission. A review of a proposed Improvement to Property will not be scheduled until a completed application, including all of the above mentioned plans and materials, has been received. 2.4 CRITERIA FOR APPROVAL The review of an Improvement to Property will consider aesthetically pleasing, quality architectural design, quality of materials and construction "best practices". The DRC may deny any proposed Improvement to Property at its sole discretion. Approval of an Improvement to Property will be based upon the following: A. Improvement to Property will not be detrimental to the appearance of the surrounding areas of the Community Area as a whole. B. Improvement to Property will not detract from the enjoyment of the Community Area by Owners. C. Upkeep and maintenance of the proposed Improvement to Property will not become a burden on the Association. D. Improvement to Property does not affect the drainage plan for the Community Area or any portion thereof. E. The submittal meets the design review criteria of the Design Guidelines. F. An approval of any proposed Improvement to Property may be conditioned upon changes to the submitted application and plans that are deemed appropriate. 2.5 OUTLINE OF REVIEW PROCEDURE A. Pre -Design Meeting (if necessary or requested by the applicant) B. Preliminary Plan Submittal Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 5 C. Posting of Notice on Property & Notification of Neighbors D. Referral to Garfield County if Necessary E. Preliminary Review of Submitted Plans F. Final Plan Submittal G. Final Review of Submitted Plans H. Pre -construction Meeting with DRC Administrator I. Pre Dry -in Inspection by the DRC Administrator and DRC Architect. Height verification survey required. J. On-site Dry -in Inspection by DRC. K. Final Grading Inspection by the DRC Administrator and DRC Landscape Architect. This should occur once the driveway is staked and before plant material installed. L. On-site Final Inspection by DRC M. Notice of Completion Issued to Applicant and Return of Deposit 2.6 PRE -DESIGN MEETING Prior to preparing plans for any proposed Improvement to Property, it is recommended that an Applicant and/or architect become familiar with the Design Guidelines. It may be helpful to meet with the DRC Administrator or the DRC, to discuss proposed plans. The intent of this informal meeting is to offer guidance and assistance to those unfamiliar with Aspen Glen and held at no charge to the applicant. 2.7 PRELIMINARY SUBMITTAL & REVIEW A preliminary application and preliminary plans must be submitted to the DRC Administrator at least three weeks prior to the preliminary review meeting. The more complete the preliminary submittal, the more comprehensive the preliminary review can be. The preliminary meeting also provides an opportunity for the Applicant to discuss any questions concerning the Design Guidelines, construction procedures, colors and materials, etc., prior to committing to a final design. The Preliminary submittal package must consist of the following: A. Preliminary Application Form B. Checks for the Design Review Fee C. Site Plan at an appropriate scale (not less than 1" = 10') showing the location of buildings, building envelope, zone district setbacks, the residence and any other buildings or structures, Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 6 driveway, parking areas, grading plan and drainage plan (including existing and proposed topography) and preliminary landscape plan. The preliminary landscape plan may be combined with the Site Plan. D. Floor Plan at no less than 1/4" = 1'-0" E. Roof Plan showing all Roof Pitches F. All exterior elevations with both existing and final grade lines at same scale as floor plans. G. Grading and Drainage Plan. A plan which clearly indicates undisturbed site grade contours (one (1) foot intervals) and proposed finished grade contours. Undisturbed site grade contours and a reference bench mark tied to absolute elevations must be established and certified by a professional land surveyor who is licensed in the state of Colorado. The plan must clearly indicate proposed drainage paths and collection points for the completed site. The drainage portion of this plan must be developed by a registered Colorado Civil Engineer. Note: C, D, E, F and G above must consist of 2 complete full size sets (maximum size 24" x 36") and 5 reduced size (11" x 17") sets. An electronic file in PDF format of the site plan (indicating the location of all proposed improvements), the landscape plan and all exterior elevations must also be sent to the DRC Administrator. H. Statement of Building Height. Maximum Height Limit per the zone district and actual building height as defined by Garfield County. Building height calculations must be clearly indicated on the architectural plans and tied to undisturbed site grade. Actual reference grade on site must be shown with the height calculation. I. Samples of Exterior Materials and Colors J. Exterior Material Calculations. Material calculations must be shown on exterior elevations (i.e. percentages of stone). Please refer to Section 5.6 C for specific criteria. K. Soils Report. A report prepared and stamped by a Colorado registered professional engineer, addressing soils conditions on the site, verifying soils bearing capacities, and identifying any other sub -surface conditions relevant to foundation and waterproofing design. Soils are very complicated in this area of the Roaring Fork Valley and extreme caution should be practiced when being analyzed. L. Improvement Location Survey. The Applicant must provide a survey stamped and signed by a licensed Colorado land surveyor, showing the location of all property lines accurately established on a plat, building envelope, building setbacks, all easements, and Aspen Glen PUD Zone Regulations. (See also Section 6.2 B of these Guidelines regarding existing trees or shrubs to be shown on the Improvement Location Survey.) Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 7 M. Accessory improvements (e.g. patios, decks, landscape walls, pergolas, hot tubs, fire pits, etc.) must be shown in the Preliminary Submittal. N. Scaled Massing Model or computer generated 'fly around' is required. Computer visuals may be presented on personal laptop or Aspen Glen large screen monitor. Other drawings, materials, or samples may be requested. O. Staking. Applicant must provide preliminary staking at the corners of the contemplated improvements, building envelope corners and property corners. P. Story Poles may be required. Q. Landscape Plan. The plan must be stamped by a licensed landscape architect, including the identical final grade contours as the site plan. The location and dimensions (including height) of all berms must also be shown. R. Construction method disclosure must be included in writing with the preliminary submittal. (See Section 5.0 of these Guidelines for an outline of allowed methods.) S. The DRC Administrator must post a public notice on-site and must attempt to notify adjacent property owners of the proposed Improvement to Property. Interested parties may provide written comments and/or may attend the preliminary review meeting. T. Written Response. Within ten business days after the preliminary review, the DRC Administrator must provide the Applicant a written response indicating approval or reasons for non -approval. 2.8 FINAL SUBMITTAL & REVIEW Final Review of the final application will be subject to the applicable Guidelines and any additional Design Review fees relevant at the time of final review. The final application will be used for other improvements to property such as a significant addition to a residence, minor reviews or amendments to previously approved plans, or significant landscaping improvements. Final submittal will include the following documents: A. Final Application Form B. Check for the Builder Completion Deposit, made payable to then Aspen Glen HOA and a completed IRS W-9 form are required at the final review meeting. C. A separate check for "CRAF", "SAF" and other applicable fees is required, made payable to Homeowners Association at Aspen Glen, Inc. The current fee policy can be found on the Aspen Glen website, aspenglenhoa.com. (On the left side of the homepage toggle "Design Review" then "Guidelines" and this entire document will load). Final review will be delayed and rescheduled if the CRAF and SAF fees and Builder's Completion Deposit are not provided at the beginning of the final review meeting. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 8 D. An approximate time schedule indicating commencement and completion dates of construction, completion of landscape work and anticipated occupancy date. E. Site plan at an appropriate scale (not less than 1"=10') showing the location of the building envelope, including zone district setbacks, the residence, other buildings and landscape structures, driveways, parking areas, recreational surfaces, proposed grading and drainage, utility connections, and finish floor elevations including garage. F. Floor Plans at a Scale not less than 1/4"= 1'-0". G. Roof Plan showing all roof pitches. H. All exterior elevations at a scale of not less than '/4" = 1"0" with both existing and proposed grades shown. I. Complete grading and landscape plan at scale of one inch = ten feet (1"=10') minimum showing the following: 1. Property line, building envelope, setbacks, labeled easements. 2. Existing vegetation to be preserved and proposed to be removed. 3. Existing topography at minimum one foot (1') contour interval. 4. Proposed contours, drainage swales, area drains, catch basins and drywells. 5. Site elevations of proposed residence and exterior hardscape elements, i.e., paving, walkways, patios, decks, spa/hot tub, fire pits, and pergolas. 6. Address Monumentation. The house number must be displayed in a prominent manner, monument must be made of stone and low voltage lighting may be used to light the address on the monument only. 7. Graphic representation of trees, shrubs, planting beds, lawn and native grass areas. Identify percentage of native grass versus high intensity ground cover. Please refer to Section 6.6 of these Guidelines for maximum irrigated area per lot that is allowed for Aspen Glen lots. 8. Identification of the irrigation system to be installed, i.e., drip vs. spray head, etc., and identify the High Intensity Planting (H.I.P.) areas to be zoned separate from the native and transitional landscaping zones. 9. Label hardscape construction materials, colors, and sizes. 10. Proposed vegetation and sizes of all planting materials clearly labeled on plan. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 9 11. Provide plant list of trees and shrubs including common name, botanical name, quantities and sizes. Refer to appendices of these Guidelines for approved trees and shrubs and minimum sizes. 12. Location and types of exterior light fixtures. Provide a cut sheet of the fixture (s) as referenced in Section 4.10 Exterior Lighting. 13. Location of all utility meters, enclosures, transformers, fire hydrants, HVAC units & water meter remote readouts. Ensure that these are screened from view by minimum 4' height, B&B (balled and burlap) landscape plantings. 14. Landscape lighting which is limited to 20 (twenty) watts incandescent or halogen or 300 lumens for LED per fixture per 150 (one hundred fifty) square feet of landscaped area. 15. A landscape lighting legend that defines the number of fixtures per 150 (one hundred fifty) square feet of landscaped area. Pathway lights are limited to 24" above grade. 16. A landscape plan will be required for minor additions, minor reviews and amendments to an existing landscape scheme. The plan, whether it is a sketch or a fully developed plan by a licensed Landscape Architect, may be discussed with the DRC prior to submittal of the application. For minor additions and/or reviews, a simple plan or photos of the existing landscaping may help determine the scope of a new submittal. J. Cross section of the structure indicating existing and proposed grades. K. Exterior material calculations, shown on exterior elevations. L. The following notes must be on all approved plans: 1. "All utility boxes, wall vents, roof vents and plumbing stacks/risers must be painted to compliment adjacent exterior surface color." 2. `Plywood soffits or facias are not permitted in Aspen Glen." 3. "Real mullions/muttins are required." Note: E, F, G, H, I, J, and K above must consist of 2 complete full size sets (maximum size 24" by 36") and 5 reduced size (11" x 17") sets. Copies of the Final Review Application, including plans, must be submitted five days prior to the scheduled meeting. To expedite the design review process make sure that your Final submittal is complete according to the Design Guidelines. Incomplete submittals will cause delays in receiving approval. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 10 M. Scaled Massing Model or Computer generated 'fly around' is required. Computer visuals may be presented on personal laptop or Aspen Glen large screen monitor. Other drawing, materials, or samples may be requested. N. Actual samples of all exterior materials to be utilized and color samples of all finishes on actual pieces of the materials over which they will be applied. 2.9 BUILDING ENVELOPE & LOT LINE ADJUSTMENTS & LOT MERGER REVIEW A Building Envelope Adjustment (BEA) or lot line adjustment/merger is an amendment to a recorded plat and the DRC makes a recommendation to the Garfield County Building and Planning Department. The process requires a review of the proposal by the DRC and applicable fees are required. In addition the submittal must include an application and draft survey. For lot mergers a master landscape plan will be required if the property is already improved and the lot merger does not propose future improvements. The BEA, Lot Line Adjustment/Merger application must be used for this submittal. This is typically a one step review and adjacent property owners are noticed. If, a BEA or lot line/lot merger, is approved by Garfield County an amended plat must be recorded before an applicant may submit an application for preliminary review of a proposed residence. It is the applicant's responsibility to contact the Garfield County Building and Planning Department to inquire about their review process to amend a recorded plat. A submittal must consist of the following: A. A statement detailing the reason the applicant is seeking a BEA or lot line/lot tie adjustment. Please support this text with illustrations or graphics if necessary. B. Site plan at an appropriate scale (not less than 1" = 10') showing the location of the existing building envelope, the proposed envelope adjustment, all zone district regulations that affect the particular parcel i.e. front and rear yard setbacks, side yard setbacks, and any easements that may encumber the property. 1. The site plan must also include directional arrows that identify significant landmarks such as Mt. Sopris, the Roaring Fork River etc. and any significant features and topographic features of the property. 2. In addition, the building envelopes of all properties adjacent to the subject parcel must be indicated on the site plan. The site plan must be a draft plat and must be produced and signed by a professional land surveyor licensed in the state of Colorado. 3. The site plan must also clearly indicate undisturbed site grade contours (one foot intervals) and proposed finished grade contours. Undisturbed site grade contours and a reference benchmark tied to absolute elevations and undisturbed site grade and Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 11 must be established and certified by a professional land surveyor who is licensed in the state of Colorado. C. For Lot Line Adjustment/Mergers, a master landscape plan must be submitted with the draft plat. The landscape plan must consider the transition from the existing landscape of the improved property onto the adjoining property as one master landscape. Irrigation will be required to ensure growth of new plants and grass. The adjoined lot must meet the minimum high intensity square footage planting area for that lot's zone district. Please refer to Section 6.6 of the Guidelines. The minimum amount of trees and shrubs required for the adjoined lot must be one half (1/2) the plant material required for that lot's zone district. Please refer to Section 6.7 of the Guidelines. D. Statement of building height: Building heights within the area of the proposed adjustment must be clearly indicated on the elevations and be tied to undisturbed site grade. Actual reference grade on site must be shown along with the height calculation. E. The site plan must clearly indicate proposed drainage paths and collection points for the completed site. F. Exterior elevations for those sides of the proposed residence where the adjustment is located with both existing and final grade lines at same scale as floor plans. G. A schematic floor plan of the proposed residence. H. Improvement Location Survey: the applicant must provide an Improvement Location Survey showing the site configuration and location of all property lines accurately established on a site map and topographical survey produced by a professional land surveyor licensed in the state of Colorado. (See also Section 6.2 regarding existing trees or shrubs to be shown on the Improvement Location Survey). Note: B, C, D, E, F, G, and H, above must consist of two (2) complete full size sets, and five (5) reduced size (11 1/2 X 18) sets. All of the above must be submitted electronically in a PDF format to the DRC Administrator. I. Any drawings, graphics, materials or samples as requested. J. Staking: If requested, the applicant must stake the property indicating the existing building envelope and the proposed adjustment. If requested, the adjacent property building envelopes that are proximate to the proposed BEA must also be staked at the corners and any other locations for an accurate reference. K. For lot line adjustment/merger applications the information requested in B-H as outlined above, may be adjusted depending upon the nature of the proposal. For example, if property with an existing residence is being tied to adjacent vacant property and the building envelope is not being adjusted the applicant may seek to provide a simple draft survey with Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 12 the existing residence located on the survey and any other items deemed necessary for this review process. Alternatively, additional materials and/or analysis may be required in order to determine the impacts any adjustments to the building envelope or lot may have upon the surrounding neighborhood. L. Public Notice: fourteen days prior to the review, the DRC Administrator will post a sign on the property and adjacent property owners will be notified stating drawings have been submitted for a proposed BEA or lot line/lot tie adjustment on the site and such drawings are available for review during the period stated on the notice. 2.10 RE -SUBMITTAL OF PLANS /AMENDMENT TO APPROVED PLANS In the event individual items in either a preliminary or a final review are not approved a resubmission should follow the same procedure as an original submittal. If, the time required for all reviews and on-site inspections exceeds that covered by the standard Design Review Fee, there may be additional time charged as described elsewhere in these Guidelines. If, an Applicant proposes a substantial change to approved plans then compliance with current Guideline standards may be required. 2.11 SUBSEQUENT CHANGES Any changes in construction versus approved plans, including revised features or structures, landscaping, or other improvements and/or changes, either during construction or after completion of an approved structure, must be submitted for approval prior to making such changes and/or additions. If, changes are made without prior review and approval, a fine may be assessed in an amount determined by the DRC and the Association Board. 2.12 VARIANCES TO DESIGN GUIDELINES A. Committee Power to Grant Variances. Variances from compliance with any of the provisions of these Design Guidelines may be considered when circumstances such as topography, natural obstructions, hardship, aesthetic or environmental require such variance. Variances must be evidenced in writing and will become effective when approved by at least a majority of the members of the DRC. B. Compliance with Other Jurisdictions. If, any such variance is granted, no violation of the provisions of these Design Guidelines must be deemed to have occurred with respect to the matter for which the variance was granted; provided, however, that the granting of a variance must not operate to waive any of the provisions of these Design Guidelines for any purpose except as to the particular property and particular provision hereof covered by the variance. The granting of a variance must not affect in any way the Owner's obligation to comply with all governmental laws and regulations affecting the property concerned, including, but not Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 13 limited to, zoning ordinances and setback lines or requirements imposed by any governmental authority having jurisdiction. 2.13 FINE SCHEDULE The Homeowners Association at Aspen Glen, Inc. has adopted a schedule of fines to ensure compliance with the Design Guidelines and Construction Regulations. The schedule is amended from time to time. Please consult the DRC Administrator for the latest fine schedule. SECTION 3 CONSTRUCTION The following Construction Regulations are established to assure the preservation of the natural landscape, to minimize the impacts on the waterways of Aspen Glen and to avoid undue disturbance to other residences of Aspen Glen. All owners and builders are bound by these regulations and any violation by a builder will be deemed to be a violation by the owner of the property. 3.0 BUILDER'S COMPLETION DEPOSIT Each owner or builder, prior to beginning any construction, must post a cash deposit, made payable by check to the Homeowners Association at Aspen Glen, Inc. in an amount to be determined by the DRC. In the event of action by the Association or the DRC to remedy any violation of these regulations, the cost of such remedy must be charged against the deposit. Following issuance of a Notice of Satisfactory Completion of Improvements to Property any funds held by the Association in said Builder's Completion Deposit must be released to owner or builder (subject to any deductions for violations of the regulations or added DRC costs) within thirty (30) days of issuance of Notice of Satisfactory Completion. 3.1 CERTIFICATION OF WORKERS' COMPENSATION COVERAGE Prior to commencement of construction or the making of any improvements on a lot, the general contractor and all subcontractors, or if there is not a general contractor, then all contractors and subcontractors, together with all independent contractors and independent subcontractors, must provide, upon request, certification that they and all their employees are either properly registered under the State of Colorado Workers' Compensation Scheme or are the subjects of a bona fide exemption. In both cases, certification may be of such standard forms as have been adopted by the State of Colorado. 3.2 OCCUPATIONAL SAFETY AND HEALTH ACT COMPLIANCE (OSHA) All applicable OSHA regulations and Guidelines must be strictly observed at all times. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 14 3.3 PRE -CONSTRUCTION CONFERENCE A. After successful completion of all reviews and approvals required by the Design Guidelines, the Builder must: 1. Complete the Pre -Construction Conference with the DRC Administrator to review construction procedures and to coordinate the activities of the Builder in Aspen Glen. 2. Coordinate with the Gatehouse staff access for all vehicles that will be entering the Community Area. 3. If, requested, file a Certification of Workers' Compensation Coverage with the DRC Administrator. B. All relevant County Building Permits must be issued and posted at the site before any construction activity can take place on the site. 3.4 TEMPORARY STRUCTURES Any Owner or Builder who desires to bring a construction trailer, field office or the like to Aspen Glen must obtain approval of the DRC Administrator at the Pre -Construction Conference. To obtain such approval, he/she must submit a copy of the site plan with proposed locations of the construction trailer or field office, the portable toilet, trash receptacle or other construction related structures or equipment noted thereon. Such temporary structures must be removed upon completion of construction. 3.5 FENCING A. Any natural vegetation located on the lot and not approved for removal must be fenced at the drip edge and in a manner that will prevent construction equipment and other vehicles from damaging the plant material in any way. B. Construction sites adjacent to fairways, the Roaring Fork River, or any water bodies at Aspen Glen must install sediment control fencing as necessary to prevent erosion of any sediment onto fairways or into the water bodies. Failure to prevent sediment erosion will result in a draw from the Builder's Completion Deposit for any necessary clean up and strictly to enforce this regulation. C. Lots under construction must be fenced. Construction fencing must be installed on all sides of the property on the property boundary unless waived due to location, geography, geographic features or the scope of the project. A chain link fence anchored into the ground, no shorter than 6 feet tall, must be used and a gate provided at the entrance to the job site. Green opaque fabric mesh must be attached to the fence. D. All items that support the construction such as porta-potties, construction trailers and dumpsters must be located behind the screened fence. All dumpsters must be equipped with Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 15 a cover that can be secured over the whole top at the end of each day. No fencing or other related construction items, including signs, may be installed on site before the pre - construction meeting. 3.6 BUILDING MATERIALS SAMPLE BOARD A material and color mock-up must be built on site at the start of construction and installed on the outside of the construction fence. Exterior wall and roof colors must harmonize with the site and surrounding structures. The predominant tones should tend toward muted, warm, earthy hues. Bold or dramatic earthy colors may be used, provided they are used sparingly and confined to entries and walls of recessed areas hidden from general view. 3.7 DEBRIS AND TRASH REMOVAL A. Owners and Builders must clean up all trash and debris on the construction site daily. All builders are required to use dumpsters for collecting debris and trash materials. Dumpsters must be emptied when the debris accumulates to a visible height above the sides. Lightweight material, packaging and other items must be covered or weighted down to prevent wind from blowing such materials off the construction site. Owners and Builders are prohibited from dumping, burying or burning trash anywhere on the lot or adjacent lots. B. At the end of each day all dumpsters must be covered and the cover securely tied down to prevent debris from blowing away, animals from rummaging through the dumpsters, or others from dumping their trash into the dumpster. C. Excess excavation not utilized in the site grading must be hauled away from Aspen Glen or used on another site in Aspen Glen with prior approval. D. During the construction period, the construction site and routes to the construction site must be kept neat and clean and policed so as not to become an undue visual distraction. E. The Builder's Completion Deposit will be drawn upon to strictly enforce violations of this section. 3.8 SANITARY FACILITIES Each Owner or Builder must be responsible for providing adequate sanitary facilities for the construction workers on the site. Portable toilets or temporary toilet facilities must be located on the site. These temporary facilities must be maintained regularly to prevent obnoxious odors or unsightly appearance. 3.9 VEHICLES AND PARKING AREAS Construction crews must not park on, or otherwise use, any part of other lots without prior written permission from the lot owner. Vehicles and machinery must be parked only in designated areas and in such a manner that is not damaging to existing vegetation on adjacent property. Parking restrictions may be instituted in certain areas in connection with the construction of residential Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 16 improvements. Generally, parking roadside on "Bald Eagle Way" is to be avoided when possible due to its high volume of traffic from cars, pedestrians, and golf carts. 3.10 BLASTING AND DRILLING No blasting, impact digging, or drilling will be allowed without approval. The DRC's only responsibility is to require evidence that the proposed activities are to be under the guidance of a qualified consultant, proper permits have been obtained, and that the DRC and Homeowners Association at Aspen Glen, Inc. will have no liability. 3.11 RESTORATION OR REPAIR OF OTHER PROPERTY DAMAGE Damage and scarring to any property, open space or other lot, including, but not limited to roads, driveways, concrete curbs, gutters, utilities, vegetation and/or other improvements, resulting from construction operations, will not be permitted. If, any damage occurs, it must be repaired and/or restored promptly and any expenses are those of the Builder, and, in the event of default by the Builder in meeting these obligations, the Lot Owner who has retained the Builder must be responsible. Note: All curb/road cuts made in Aspen Glen must be made and restored to current specifications found in Appendix D of these Guidelines. The DRC must be notified of any pending curb/road cuts and all work will be inspected for compliance. 3.12 CONSTRUCTION ACCESS A. All commercial and construction related vehicles entering into the Community Area may be required to obtain a permit. Such permit must be displayed prior to entering into the Community Area. B. Construction access, during the time a residence or other improvements are being built, must be over the approved driveway for the residence. 3.13 CONSTRUCTION DELIVERIES A. Construction delivery truck sizes must not exceed standard construction vehicle sizes. All vehicles requiring any special permits (i.e., CDOT, sheriff, county or bridge approval), or oversized vehicles need prior approval. At the time of the initial submission of all documents, a proposed delivery schedule for such vehicles must also be submitted. The Builder must present any change in such special deliveries two weeks prior to the earliest estimated revised delivery date for approval. B. The DRC or its agent has the authority to reject any deliveries not allowed, scheduled, or otherwise authorized. This will be based on nondisclosure of special deliveries, oversized, lack of approval, or any pre -manufactured building components not disclosed. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 17 3.14 MISCELLANEOUS PRACTICES All Owners will be absolutely responsible for the conduct and behavior of their agents, representatives, builders, contractors, and subcontractors in Aspen Glen. The following practices are prohibited in Aspen Glen: A. Changing oil on any vehicle or equipment on the site itself. B. Allowing concrete suppliers and contractors to clean their equipment other than at locations included in the approved site plan. C. Removing any rocks, plant material, topsoil, or similar items from any property of others within Aspen Glen, including construction sites, except in accordance with approvals. D. Discharging any type of firearms on the property or creating any other unduly loud or offensive noises. E. Using disposal methods other than those approved. F. Careless disposition of cigarettes and other flammable material. At least one 10 -pound ABD-rated dry chemical fire extinguisher must be available in a conspicuous place on the construction site at all times. G. Careless treatment or removal of any plant materials not approved for removal. H. Allowing excessive dust or noise on the construction site. Radios and other audio equipment will not be allowed to play at levels that are disruptive to the neighbors and to golf play on the Country Club Properties. I. No pets, particularly dogs, may be brought into Aspen Glen by construction personnel. In the event hereof, the Association or the DRC has the right to contact the authorities to impound the pet, to refuse to permit the Builder or subcontractor involved to continue work on the project, impose a fine, or to take such other action as may be permitted by law, the Master Declaration or these Design Guidelines. J. Construction crews are not to fish within the Aspen Glen properties without proper permission and credentials. Absolutely no trespassing on any common areas of Aspen Glen is acceptable unless required and authorized. No trespassing on golf course Country Club properties is allowed. Construction crews will not use loud and/or profane language while on Aspen Glen properties. Crews must at all time respect adjacent property owners properties and privacy. Offender(s) will be asked to leave and escorted off Aspen Glen properties by security if required. K. No open fires or burning of waste of any kind will be allowed in Aspen Glen at any time. Exceptions, there are scheduled and managed burns in Aspen Glen which are permitted. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 18 L. Drugs or alcohol must not be consumed on construction sites. 3.15 HOURS OF CONSTRUCTION/OPERATION A. Contractors, construction workers and their suppliers, who have legitimate business in Aspen Glen may have access to their construction site on weekdays Monday through Saturday during: 1. Fall/Winter/Spring - Tuesday after Labor Day until the Friday before Memorial Day Weekend: 7:00 A.M. through 7:00 P.M. However, loud noises created by workers (i.e. power saws, compressors, jackhammers, heavy equipment, on-loading/off-loading of tools or materials, etc.) may not begin before 8:00 A.M. or after 6:00 P.M. On Sunday, access is prohibited. 2. Summer - Saturday of Memorial Day Weekend through Saturday of Labor Day Weekend: 7:00 A.M. through 6:00 P.M. However, loud noises created by workers (i.e. skill saws, compressors, jackhammers, heavy equipment, on-loading/off-loading of tools or materials, etc.) may not begin before 8:00 A.M. or after 5:00 P.M. On Sunday, access is prohibited. B. Contractors and construction workers are not allowed access to Aspen Glen on certain holidays. The recognized holiday schedule is: New Year's Day; President's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving; and Christmas Day. 3.16 SIGNS During construction, one sign may be erected on site and could include the names of general contractors, architects and/or landscape architects. Signs, inclusive of border, must be a maximum 3 feet wide and to the top of the sign no taller than 6 feet from ground level. In addition, one other sign may be attached to the construction fence identifying the fence company. That sign must be a maximum of 1 foot by 2 feet. No sign will be erected prior to final design review and approval. The sign must be removed no later than ten (10) days after the final on-site inspection. 3.17 WORK IN PROGRESS AND STOP WORK NOTICES A. During the construction of property improvements within Aspen Glen, the DRC or its authorized representatives may inspect all work in progress at any time. 1. Typically three routine inspections are conducted: pre -construction meeting, dry -in inspection and final inspection before Certificate of Occupancy. 2. Reasonable prior notice of inspection for pre -construction meeting, dry -in and final inspections must be given to the property owner or their representative. After an inspection, a notice of noncompliance or notice of satisfactory completion with approved plans may be issued. However, the absence of an inspection or notice of Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 19 noncompliance during the construction period must not be construed or interpreted as approval of the work in progress. B. The DRC may determine at any time that the work in progress is not in compliance with: 1. the plans, samples of materials, or other information approved as part of its final design approval; 2. conditions specified in the letter to the Applicant granting final design approval; or 3. the Design Guidelines. In such an event, the DRC must notify the Applicant of the noncompliance in writing within ten (10) business days of the next regularly scheduled DRC meeting. This notice must identify the specific noncompliance issues and will require the Applicant to correct them promptly. (An Applicant's right of appeal of such a determination is set forth in Section 4.19 of the Master Declaration and in Section 3.19 below.) C. Correcting a noncompliance may only require an Applicant to request and obtain DRC approval of an amendment to the approved plans, samples of materials, or other information, so long as the proposed change is consistent with the Design Guidelines. D. If, at any time a determination that a noncompliance is not being adequately, diligently and promptly corrected in good faith given the circumstances of the corrective work to be performed, a Stop Work Notice may be issued to the Applicant. Once a Stop Work Notice is delivered to the Applicant and posted at the construction site, no work will proceed on any improvements to the property, except work approved to correct the noncompliance or otherwise comply with the Notice. E. Upon issuing a Stop Work Notice, the DRC must promptly notify the HOA Board of Directors and provide all relevant facts relating to the noncompliance determination. F. Following a Stop Work Notice, a fee may be assessed in accordance with the current schedule of fees as adopted by the HOA Board of Directors. The fee will include the time and expenses incurred in identifying and reviewing measures to correct a noncompliance, including the DRC's professional time. G. The procedure for issuing and enforcing a Stop Work Notice will be as follows: 1. The DRC must deliver a Stop Work Notice to the Applicant or his representative at the work site or via certified mail. 2. A Stop Work Notice must be posted by the DRC at the work site. All work at the site must stop as of 7:00 AM the following morning. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 20 3. No contractors, sub -contractors, their employees or other workers will be allowed onto the work site in question. The DRC must, with the concurrence of the HOA Board of Directors, notify the Aspen Glen security staff to enforce Stop Work Notices. 4. Failure to comply with a Stop Work Notice is a direct violation of the Design Guidelines and the Master Declaration. 5. Before resuming work at the site, Applicant must meet with the DRC or their designated representative to review the changes proposed for correcting the noncompliance. Given the nature of the noncompliance, corrective measures in some circumstances may include a request that the DRC amend the original approved design. After the DRC approves the proposed changes and/or amends the approved design, it must remove the Stop Work Notice at the work site and notify Applicant that work may resume only as required to correct noncompliance issues. 6. When the DRC is satisfied that corrective work has been satisfactorily completed, is sufficiently in progress, or will be carried out promptly to resolve all noncompliance issues, and that any monetary fees and/or penalties have been paid in full, it must notify Applicant that all work may resume at the work site. 7. When the DRC determines that noncompliance issues have been fully corrected, it must notify the Applicant in writing of satisfactory completion. This notice must be given as soon as practicable of the determination of completion. 8. Nothing herein will preclude the HOA Board of Directors from exercising its rights to effectuate compliance on its own pursuant to the authority granted to it in Section 4.20 of the Master Declaration and Section 3.19 below. In addition, nothing herein will preclude the homeowner from exercising its rights pursuant to the authority granted to it in Section 4.19 of the Master Declaration. 3.18 COMPLETION OF WORK AFTER APPROVAL A. Following approval of final plans for any proposed Improvement to Property, the proposed Improvement must be completed by the Applicant as follows: 1. As promptly and diligently as possible, but in no event in excess of the time periods set forth below. 2. In substantial conformance with all plans, specifications, materials and colors as approved. 3. In accordance with any and all conditions specified in the final approval. B. Unless otherwise prescribed, all Improvements must be completed: Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 21 1. Within 18 months from the date of final approval; provided, however, that any and all landscaping and planting must be completed within 6 months of the issuance of the Certificate of Occupancy for such residence or within 18 months of final approval of the plans, or any significant amendments, whichever is sooner. 2. Failure to comply with the terms and conditions of this provision will constitute noncompliance with the terms and provisions of the Master Declaration. The DRC and the Association has the right to invoke all rights and remedies provided to the Association hereunder, including, but not limited to, the imposition of fines and penalties in accordance with the Master Declaration, as well as retention of the Builder's Completion Deposit 3. If, a project does not start within 18 months of final approval the 18 month period to construct the approval will expire and a new Design Review process for any Improvements to Property will be required. The purpose of this provision in the Master Declaration is twofold: to ensure timely construction once construction starts and to ensure that the design of new residences is consistent with the Guidelines. Fees may apply at the time of review and current Design Guidelines will be applied to the review. C. If, any alteration or Improvement to Property has not been completed within the required 18 month period, the DRC, upon written notice to the property owner or owner's representative, may impose a fee of $50.00 per day which will be deducted from the Builder's Completion Deposit. This provision is in addition to any other remedies afforded to the DRC and the Association. D. Construction Period Exception. If, construction of an Improvement to Property is proceeding with due diligence, the DRC may at its sole discretion extend the allowed construction time and elect not to impose the above fee, provided that, during the course of any such construction, nothing is done which will result in a violation of the Master Declaration upon completion of construction and nothing is done which will constitute a nuisance or unreasonable interference with the use and enjoyment of other property. 3.19 COMPLETED WORK A. Notice of Completion. Upon completion of the Improvement to Property, the Applicant must give written Notice of Completion to the DRC. Until the date of receipt of such Notice of Completion, the DRC must not be deemed to have notice of completion of such Improvement to Property. B. Inspection of Work. The DRC or its duly authorized representative has the right to inspect any Improvement to Property prior to or after completion in accordance with the Master Declaration. C. Notice of Satisfactory Completion of Improvement to Property. After inspection of the Improvement to Property, a Notice of Satisfactory Completion of Improvement to Property Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 22 will be issued if the improvements appear to be completed in conformity with the plans, specifications, and materials furnished and approved, and any conditions imposed. An Improvement Location Certificate produced by a professional land surveyor licensed in the state of Colorado, is required before the Notice may be issued. Items of noncompliance may still be reviewed as they come to the attention of the Committee. D. Notice of Noncompliance. If, as a result of inspections or otherwise, there is a finding that any Improvement to Property has been done without obtaining an approval or was not done in complete conformity with the description and materials furnished to, and any conditions of approval, or was not completed within eighteen (18) months after the date of approval or such shorter period as specified herein or in writing, the DRC must notify the Applicant in writing of the noncompliance, which notice must be given within fourteen (14) day's after a Notice of Completion is received from the Applicant. The notice must specify the particulars of the noncompliance and must require the Applicant to take such action as may be necessary to remedy the noncompliance. If, a Notice of Noncompliance has been issued, the Applicant must post a Performance Guaranty, as herein after defined, sufficient to bring the Improvement to Property into compliance; provided, however, that the DRC will not be required to accept such Performance Guaranty. Such Performance Guaranty must be in an amount sufficient to remedy any noncompliance, as determined by the DRC in its sole and absolute discretion. After posting such Performance Guaranty with the Association, a Conditional Notice of Satisfactory Completion of Improvement to Property may be issued. E. Performance Guaranty for Noncompliance or Incompletion. If, the Applicant wishes to apply for and obtain a Certificate of Occupancy from the County prior to completion of landscaping and/or prior to correction of a minor noncompliance, the Applicant may request to post a bond, letter of credit or cash escrow in an amount equal to the estimated cost of completing such work ("Performance Guaranty"); provided, however, the DRC must not be required to accept such Performance Guaranty. The Performance Guaranty must be used by the Association to ensure completion of such work in accordance with the time periods for completion established hereunder and the plans for such work as approved. The form, content and terms of the Performance Guaranty must be determined by the DRC in its sole and absolute discretion. If, the Performance Guaranty is accepted for the completion of landscaping and/or remedy of noncompliance, a Conditional Notice of Satisfactory Completion of Improvement to Property will be issued. Such Conditional Notice must grant authorization for Applicant to request a Certificate of Occupancy from the County. All premiums, costs and expenses related thereto must be the obligation at the Owner. Any surety or financial institution issuing a payment and performance bond of letter or credit hereunder must be authorized to do business in Colorado and must be acceptable to the DRC. If, any Owner fails to complete the landscaping work or fails to remedy the noncompliance, in accordance with the provisions of the Master Declaration, subject to delays beyond the reasonable control of such Owner, the Association is authorized under the provisions of the Master Declaration to enter upon the Lot of such Owner to complete the landscaping work and/or remedy the noncompliance in accordance with the plans therefore, draw upon the Performance Guaranty for all costs incurred by the Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 23 Association relating to the completion of the landscaping work or relating to the remedy of noncompliance and levy a reimbursement Assessment against such Owner for all costs and expenses incurred by the Association in completing such landscape work or in remedying such noncompliance which are not otherwise covered by the Performance Guaranty, including any costs and expenses of collection and attorneys' fees. Upon satisfactory completion of landscaping and/or remedy of noncompliance, the Applicant must give written Notice of Completion as outlined in Section 3.18 herein. If, the improvements are found to be satisfactory, a Notice of Satisfactory Completion of Improvements to Property must be issued within fourteen (14) days of receipt of Notice of Completion and any funds being held by the Association as a Performance Guaranty must be released to Applicant within seven (7) days of the issuance of the Notice of Satisfactory Completion of Improvements to Property. F. Failure of Committee to Act after Completion. If, for any reason other than the Applicant's act or neglect, the DRC fails to notify the Applicant of any noncompliance within fourteen (14) days after receipt of written Notice of Completion from the Applicant, the Improvement to Property will be deemed in compliance if the Improvement to Property was, in fact, completed as of the date of Notice of Completion and the Applicant may proceed to request a Certificate of Occupancy from the County. G. Appeal to HOA Board of Directors of Finding of Noncompliance. If, the DRC gives any notice of noncompliance, the Applicant may appeal to the HOA Board of Directors by giving written notice of such appeal to the Board and the DRC within thirty (30) days after receipt of the notice of noncompliance by the Applicant. If, after a notice of noncompliance, the Applicant fails to commence diligently to remedy such noncompliance, the DRC must request a finding of noncompliance by the HOA Board of Directors by giving written notice of such request to the Association and the Applicant within sixty (60) days after delivery to the Applicant of a notice of noncompliance. In either event, the HOA Board of Directors must hear the maker in accordance with the provisions of the Bylaws for Notice and Hearing and the Board must decide whether or not there has been such noncompliance and, if so, the nature thereof and the estimated cost of correcting or removing the same. H. Correction of Noncompliance. If, the HOA Board of Directors determines that a noncompliance exists, the Applicant must remedy or remove the same within a period of not more than forty-five (45) days from the date of receipt by the Applicant of the ruling of the HOA Board of Directors. If, the Applicant does not comply with the Board ruling within such period, the Board may, at its option, record a Notice of Noncompliance against the real property on which the noncompliance exists, may enter upon such property and remove the non -complying Improvement to Property, or may otherwise remedy the noncompliance, and the Applicant must reimburse the Association upon demand, for all expenses incurred herewith. If, such expenses are not promptly repaid by the Applicant or Owner to the Association, the Board can levy a Reimbursement Assessment against the Owner of the Lot for such costs and expenses. The right of the Association to remedy or remove any noncompliance must be in addition to all other rights and remedies which the Association may have at law, in equity, or under the Master Declaration. The Applicant and Owner of the Lot will have no claim for damages or otherwise on account of the entry upon the property and removal of the non -complying Improvement to Property. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 24 3.20 NO IMPLIED WAIVER OR ESTOPPEL No action or failure to act by the DRC or by the HOA Board of Directors will constitute a waiver or Estoppel with respect to future action by the DRC or the HOA Board of Directors with respect to any Improvement to Property. Specifically the approval of the DRC of any Improvement to Property will not be deemed a waiver of any right or an Estoppel to withhold approval or consent for any similar Improvement to Property or any similar proposals, plans, specifications or other materials submitted with respect to any other Improvement to Property. 3.21 ESTOPPEL CERTIFICATES The HOA Board of Directors must, upon the reasonable request of any interested Person and after confirming any necessary facts with the DRC, furnish a certificate with respect to the approval or disapproval of any Improvement to Property or with respect to whether any Improvement to Property was made in compliance herewith. Any person, without actual notice to the contrary, is entitled to rely on said certificate with respect to all matters set forth therein. SECTION 4 SITE DESIGN GUIDELINES These site Design Guidelines have been prepared to assist the lot owners in developing residential living environments that maximize the qualities of their Aspen Glen building site and help preserve and enhance the overall character of the Aspen Glen community for the enjoyment of all residents. 4.0. GENERAL SITE DESIGN GUIDELINES A. Views. Changes to the proposed massing of the residence to preserve neighboring views will not be considered unless building envelopes are proposed to be amended. If an amendment to the building envelope or a lot tie is proposed„ a view corridor study and staking of envelopes and property boundaries may be required. B. Easements. It must be the responsibility of the lot owner to observe all restrictions applicable to any easement established by the Aspen Glen PUD/Subdivision Final Plat or amended plats or by Garfield County. Additionally, golf course lots may have an easement on individual lots and restrictions may apply. C. Preservation of Existing Vegetation. Existing trees and shrubs outside of the building envelope must not be removed whether dead or alive (including, but not limited to, Gambrel Oak, Juniper, Cottonwoods, Aspen, and others) without specific approval. Proposed lot improvements must be designed with consideration for existing trees and shrubs. D. Golf Course Lots. It is the lot owner's responsibility to consider potential safety issues related to living in close proximity to golf play. These issues can be appropriately minimized by careful building and landscape design. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 25 E. Water Resource Stewardship. Water is a precious resource in the arid West. It is the goal of Aspen Glen to use the least amount of water necessary to achieve a quality lifestyle. The Roaring Fork Water and Sanitation District and Garfield County have implemented specific requirements and guidelines for water conservation. Specific irrigation criteria and methodologies are defined in Section 6, Landscape Guidelines. F. High Intensity/Native Landscape. Areas must be sprinkler -zoned separately from the Native and Transitional landscape zones to allow watering native landscape less frequently than high intensity landscaping. G. Water Features. All proposed water features must be reviewed in detail. Evaporation rates, size of the feature, and the source of water will be considered. 4.1 BUILDING ENVELOPES & LOT MERGERS Property boundaries and building envelopes have been established for each lot within Aspen Glen. They are shown graphically on the various final plats for Aspen Glen along with metes and bounds descriptions which provide for the specific survey location of the building envelopes. Any plat amendment, including a building envelope modification, must be reviewed and approved prior to submittal to Garfield County. Prior to final review, the lot owner is responsible for the staking of the lot, building envelope, and the footprint of all proposed buildings by a land surveyor licensed to practice in the State of Colorado. A. Decks and upper story balconies must not extend beyond building envelopes. For roof eaves, overhangs and window wells consult Garfield County regulations. B. Habitable space, including garages, and as defined by Garfield County Code must be completely inside the approved building envelope. All other structures and artwork/yard art are strongly encouraged to be located within the building envelope. Landscape plantings, driveways and landscape walls, 30 inches or less in height, as measured from the natural grade, and other uninhabitable space such as patios, decks and swimming pools may be allowed outside of the building envelope, but require review and approval prior to installation and must comply with Garfield County regulations. C. Modification of a building envelope is discouraged and requires review and approval prior to submission to Garfield County. The building envelopes are bound by Garfield County Zoning Regulations and Garfield County Subdivision Regulations and require a County review process to amend the configuration of a platted building envelope. All costs of any such modification must be the responsibility of the lot owner. Prior to review, the lot owner may be responsible for staking the lot by a land surveyor licensed to practice in the State of Colorado. Staking may include: existing and adjusted building envelopes, and the footprint of all proposed structures. Building envelopes of adjacent properties may be required to be staked. A draft amended plat must be submitted with the application. The draft plat must indicate any proposed modifications to the building envelope. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 26 D. Merging two or more lots may be accomplished through a Plat amendment process under the jurisdiction of Garfield County but must be reviewed and approved prior to submittal to Garfield County. If, a property owner elects to merge two or more lots, the newly created lot cannot be re -subdivided later without review and County subdivision approval. Prior to review, the lot owner may be responsible for staking the lot by a land surveyor licensed to practice in the State of Colorado. Staking may include: building envelope and the footprint of all proposed structures. Building envelopes of adjacent properties must also be staked. For the lot line adjustment/merger review process, a draft amended plat and application must be submitted for review. The draft plat must indicate any proposed modifications to or elimination of the building envelope(s). Per Section 3.33 of the Master Declaration all lots must be fully landscaped. If, a vacant lot is proposed to be merged to an already improved property, a master landscape plan must be submitted with the draft plat for review. The landscape plan must consider the transition from the existing landscape of the improved property into the adjoining property as one master landscape. The condition of existing native grass areas on vacant lots does not meet Aspen Glen standards therefore irrigation will be required to ensure growth of new plants and grass as required in these Guidelines; temporary irrigation, topsoil and soil amendments will be necessary to further establish the existing native grasses. The adjoined lot must meet the minimum high intensity square footage planting area for that lot's zone district, please refer to Section 6.6 of the Guidelines. The minimum amount of trees and shrubs required for the adjoining lot must be one half (1/2) of the minimum plant material required for that lot's zone district, please refer to Section 6.7 of the Guidelines for minimum requirements. Landscape establishment and maintenance of the newly merged property must be the responsibility of the property owner. This master landscape plan requirement for lot line adjustment/mergers only applies to those properties that are proposed to be merged after the date of the revised Design Guidelines, effective in 2014. Previous lot ties are not affected by this revision, however if a property owner seeks to amend the building envelope, renovate their property, propose an addition to the residence, or alter the previously approved landscape plan, a master landscape plan may be required for the vacant parcel that was previously merged with the improved property if landscape improvements were not installed. (As outlined in the Master Declaration, any Improvement to Property requires DRC approval. Therefore, if landscape improvements are proposed to a vacant property that has not been merged, those improvements require review and approval before installation.) If, an applicant proposes to merge unimproved properties then landscaping of the newly merged properties will be considered at the time of any future development proposals. E. Duplex Lot Re -subdivision. A duplex lot may be subdivided into two fee simple properties. The procedure for subdivision is defined in the Aspen Glen PUD Zoning Regulations, Duplex Residential Zone District. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 27 4.2 DRIVEWAYS (See Appendix E for sample pictures) A. Entry. All entry features require approval. 1. Only one driveway will be allowed and asphalt driveways are not allowed. 2. Each lot must have an address monument. The house number must be displayed in a prominent manner. The monument must be made of stone and the massing of the monument must complement the residence's exterior. Low voltage lighting may be used to illuminate the address on the monument only (refer to Section 4.10, Exterior Lighting). Light fixtures are not permitted atop the address monument. Details and dimensions of the address monument must be on the site plan or landscape plan. 3. No entry feature, exclusive of landscape plantings, should be less than thirty (30") inches or exceed four (4') feet in height. Details and dimensions must be indicated on the site plan or landscape plan. B. Site Design. 1. On larger lots, driveway alignments must be sensitive to terrain and vegetation features. 2. Garage entrances must not face the adjacent roadway if at all possible. Straight driveway alignments from the street to the garage entry are strongly discouraged except on 1/4 acre lots. It is recognized that this design goal will not be possible on all lots. 3. Driveways must be a maximum of 19 feet (19') in width at the curb. The maximum width must be 14' at the setback. See Diagram 4.2 a. Diagram 4.2 a Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 28 4. Driveways within the property must be a maximum of 14 feet (14') in width except as approved for parking, turn out and turn around areas. Driveways on 1/4 acres lots, because of their dual function as parking areas, may be allowed widths up to 18 feet (18') continuously from the property line to the garage entry. 5. The recommended maximum grade of a driveway is 10 percent (10%). Steeper grades will be considered in unique situations with appropriate justification. C. Construction. 1. Approved materials and colors must complement the residence and may include: a. Poured concrete must be colored and textured, with banding. All details, including color and patterns must be indicated and dimensioned on both the landscape plan and architectural plans. b. Solid concrete interlocking paving units with a tumbled cobble appearance. c. Granite or other natural stone cobbles. d. Grass-crete style concrete (unitized or monolithic). 2. Drainage from driveways must be directed across landscaped areas to appropriate drainage easements, dry wells or roadside drainage swales. This provides greater opportunity for runoff water to be absorbed into the soil and to benefit from the cleansing properties of vegetation. Discharge of driveway runoff onto public roadway surfaces or into the Roaring Fork River must be avoided. 4.3 PARKING REQUIREMENTS (specific garage design standards are found in Section 5.3) A. Minimum Required Parking. 1. The minimum number of parking spaces required on a lot is documented for each zone district by the Aspen Glen PUD Zone Regulations. In general, every residence within Aspen Glen is required to provide four (4) parking spaces on the same lot as the residence, except for attached single family dwellings within the Club Villa Residential Zone District where two (2) parking spaces are required for each attached residence. 2. Enclosed parking spaces will count towards satisfying the minimum parking requirements of this section. Exterior tandem parking will also count toward the required on-site parking. A driveway turnout can also act as the non -stacking parking space if the size of the lot permits an appropriate space. 3. The minimum exterior parking space size must be 9 feet by 18 feet (9'x18'). It is encouraged to provide more paving space for circulation around the parked vehicle. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 29 4. Garages Required. Each lot must provide the following minimum number of enclosed vehicular parking spaces: a. Single Family or one duplex unit: under 3,500 sq. ft. (this includes the basement but excludes the garage square footage): 2 spaces. b. Single Family: over 3,500 sq. ft. (which includes the basement): 3 spaces. c. Minimum size of each space must be 9 feet by 18 feet (9'x18) unobstructed. The third space may be reduced to a minimum of 8'x16'. B. Parking on the Streets and Cul de Sacs: Homeowners must avoid parking in streets and cul de sacs, and must use their garages, and occasionally their driveways, for vehicle parking. To achieve this goal a "Street & Driveway Parking Policy" adopted in June of 2010 outlines the rules which may inform Improvements to Property within Aspen Glen. 1. No more than two (2) vehicles are allowed to be parked in the driveway at any given time. Additional vehicles not belonging to the homeowner may be parked in the driveway or in the street during special occasions for the duration of such occasions. 2. Vehicles that are not allowed to be parked or stored in, on, or about any Lot or street within the Community Area except within the attached garage are defined in Section 3.27 of the Master Declaration. 3. Please refer to the entire Street & Driveway Parking Policy for Aspen Glen's goals and purpose related to parking on the streets. 4.4 DRAINAGE AND GRADING A. General Guidelines. 1. No design, construction or post construction activity will be allowed to negatively impact the drainage or runoff patterns on or across the lot of another or common areas. Nor will any improvement be constructed or any landscaping (other than grasses or other low ground cover) installed or any condition whatsoever be allowed that negatively alters or impacts the drainage pattern or runoff on or across the lot of another or common areas. Any alteration of drainage on each lot being developed must be mitigated and approved. Such mitigation may include the installation of dry wells, drainage swales, etc. Exceptions to this general rule, due to the particular features of some lots, must be reviewed and approved. This includes all irrigation ditches constructed by the Aspen Glen Club or HOA. 2. Grading and drainage plans must be submitted as part of the Preliminary Application. Plans must be reviewed, approved, and stamped by a Certified Professional Civil Engineer licensed in the state of Colorado. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 30 3. Applicants must become familiar with the platted drainage, utility, golf course or other easements that influence the lot. Within these easements no grading, structure, planting, or other improvement will be permitted which may damage or interfere with the installation and maintenance of utilities or drainage, golf facilities or play, or which may change the direction of flow or obstruct the flow of water through drainage channels or irrigation ditches. 4. Runoff from roofs, patios, courtyards, parking areas and driveways must be reintroduced into the soil within the boundaries of the lot whenever possible. The use of dry wells is encouraged. Caution: any effort to introduce water into the sub -soil should be reviewed by a licensed soils engineer and/or hydrologist. Excessive water in the sub -soil could produce undesirable soil stability conditions in proximity to structures or steep slopes. 5. Erosion and Sediment Control. On lots that border the Roaring Fork River, ditches, or water features within Aspen Glen, a drainage plan is required detailing methods for erosion and sediment control. a. Temporary erosion and sediment control measures must be provided prior to clearing and earthwork or as soon as practical after site work progresses. b. Permanent erosion and sediment control features must be installed as soon as practicable. These control measures must be maintained throughout construction. c. Inspect straw bales and filter fabric barriers immediately after each rainfall and at least daily during prolonged rainfall. Make necessary repairs promptly. Pay close attention to end runs and undercutting beneath bales. d. Sediment deposits should be removed when the level reaches approximately half the height of the erosion control barrier. e. Remove straw bales and filter fabric when they have served their usefulness, but not before upslope areas have been permanently stabilized. Any sediment deposits remaining after straw bales or filter fabric are removed are to be dressed and re -seeded. f. Areas that fail to establish vegetative cover or appear susceptible to rill/gulley erosion must be re -seeded as soon as these areas are identified. g. Erosion Control Matting. On highly erodible soils and slopes steeper than 4:1, erosion control matting will be required to establish vegetative cover. B. The 100 Year Flood Plain. Certain lots, as noted on the subdivision final plats within Aspen Glen, are subject to shallow fringe area flooding during a one hundred year storm event on the Roaring Fork River. These lots are subject to Garfield County regulations and must meet certain construction guidelines for building within a designated 100 Year Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 31 Floodplain as mandated by Garfield County regulations. The applicant should advise the DRC of any regulations that could affect the review. C. Grading. 1. Site grading, when required, must be designed to result in curved, undulating (not sharp or squared) contours, to create a rolling and natural appearance. 2. Undulating, soft and natural earth forms are encouraged to create privacy, screening and visual interest on the site. Sharp, dike -like berms will not be allowed on residential lots, except under extremely severe site conditions where no other type of element provides an adequate design solution. Berms may not be higher than three (3) feet nor consist of more than a 4:1 slope, and the length may not exceed more than 60% of the lot line between any two property corners. 3. Most lots within Aspen Glen should require only minimal site grading, but where more extensive earthwork is necessary the following Guidelines must be observed: a. The preferred maximum slope for areas of cut and fill must be four (4) feet horizontal to one (1) foot vertical (4:1). b. The maximum cut or fill slope allowed in limited severe conditions must be two and one-half (2.5) foot horizontal to one (1) foot vertical (2.5:1). c. Slope length for cut or fill slopes of three foot horizontal to one (3:1) grades or steeper should not exceed twenty (20) feet. 4. Landscape retaining walls are encouraged where excessive cuts or fills are required. a. Retaining walls must not be higher than four (4) feet without a minimum of a three foot step back in the wall. b. Materials for retaining walls must be appropriate to the design of other structural features on the lot and to the overall integrity of the Aspen Glen character. c. Railroad ties (not to be confused with milled and preservative treated wood timbers) are specifically not allowed within Aspen Glen. d. If, retaining walls are proposed outside of the building envelope, please check with Garfield County to ensure compliance. 5. Horizontal and vertical variations in the grade of cut and fill slopes create a more natural ridge and valley configuration. Such undulations should relate to the adjacent natural slope variations if possible. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 32 D. Drainage Away from River. Wherever possible, including the re -grading of the natural contours of a building site, runoff from maintained landscape areas must be directed away from the Roaring Fork River and the Glenwood Ditch. This is desired for the purpose of directing runoff water which may carry diluted fertilizers, pesticides and herbicides into Aspen Glen's internal drainage swale and pond system, which are designed to "clean up" surface runoff before it enters the natural stream flows of the Roaring Fork River and Glenwood Ditch. The use of dry wells on the site may assist in achieving the desired result. 4.5 FENCES AND PRIVACY WALLS A. Fencing in Aspen is discouraged however limited placement of fencing may be approved. All fences, walls and barrier features require approval prior to construction. B. No fences will be allowed that define lot perimeters or building envelopes. All proposed fencing must be located within the building envelope. No fencing will be allowed adjacent to golf course fairways. C. Sound barriers or walls may be used for privacy and screening purposes, and must be integrated with the total residential structural design. The maximum running length must not exceed ten (10) feet. D. Dog Kennels. The design and construction of these items must be reviewed and approved prior to installation. 1. Dog kennels/dog runs must be within the building envelope and hidden from view of neighbors and common areas. Landscaping in clusters (not in a single line) along fences must be used to screen all fencing from view. The design of the dog run must be integral to the design of the residence and the site. It is encouraged to tuck the dog run within architectural spaces and use materials and colors of the residence. 2. Installation of "invisible fences" on property other than the dog owner's fencing cannot encroach into the platted setbacks except the common property line between the two consenting parties and requires prior approval. Fencing the entire perimeter of the property is not permitted. 3. All proposed lots west of County Road 109 require dog kennels/dog runs for homeowners who choose to have a dog. 4.6 BASEMENT WINDOW WELLS All window wells or exterior stairwells must have a guardrail or egress grate to provide fall protection and to prevent injury to people or animals. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 33 4.7 ACCESSORY EQUIPMENT (See Appendix E for sample pictures) A. Wires, poles, aerials, antennae, and other facilities (except for satellite dishes, as defined below, and broadband receivers) for the transmission or reception of electronic signals will not be allowed. B. Satellite dishes, limited to 24 inches or less in diameter, must be discreetly located to minimize their visual impact. C. Utility equipment: All meters and power boxes must not be located on the street side(s) of the residence. A mixture of coniferous and deciduous landscaping is required for adequate screening for all utility equipment. Plants must be a minimum of 48" in height. However, adequate clearance, per utility company standards, must be maintained in front of power transformers. Utility equipment includes heating accessories, air conditioning condensers, irrigation controls, vents, fans, refrigeration equipment, gas and electric meters, solar devices, etc. located on or near the residence. In addition, all utility equipment should be painted or stained to match background materials. 4.8 SWIMMING POOL, TENNIS COURT AND RECREATIONAL SURFACES A. Swimming pools, tennis courts and basketball courts are not recommended on Aspen Glen lots. If installed, they should be designed to be visually connected to the residence through walls or courtyards, and they should be screened from view by neighboring residential sites golf course and common areas. B. Night lighting is not permitted. Above ground pools are expressly prohibited. Any pool equipment must be screened from view and located to minimize any noise pollution to adjacent residences. C. Basketball hoops and backboards tend to be intrusive and noisy in private residential areas. It is the desire of the HOA to preserve the quiet, peaceful ambience within the community area. For these reasons, basketball hoops and backboards will not be permitted unless a variance is received. A variance will only be considered if the applicant can demonstrate that the above adverse factors will not apply in this particular case. If, a variance is received, the approved recreation surface must be screened from adjacent roadways, common areas, golf course and all neighbors' views. Water drainage and runoff must also be adequately addressed in the design. 4.9 SIGNAGE, ADDRESS IDENTIFICATION AND MAILBOX ENCLOSURES All signs and mailbox enclosures design and materials must be approved. No entry feature, exclusive of landscape plantings, should be less than thirty (30") inches or exceed four (4') feet in height. The massing of the monument must complement the exterior mass and scale of the residence. Details and dimensions must be on the site plan or the landscape plan. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 34 4.10 EXTERIOR LIGHTING (See Appendix F for definitions and sample pictures of appropriate and inappropriate lighting fixtures.) A. Purpose: this Section of the Guidelines is to provide direction for outdoor lighting that will: 1. Establish ground rules for residential lighting with the basic overarching directive: Use the least wattage energy efficient lamps as possible, minimize your light trespass on neighbors, and establish a night time curfew for exterior lights. 2. Encourage thoughtful design of exterior lighting. There is a large difference between lighting a building and putting lights on a building. 3. Permit the use of outdoor lighting that does not exceed the minimum levels specified in IESNA recommended practices for night-time safety, utility, security, productivity, and enjoyment. 4. Refine the current Design Guidelines related to exterior lighting to enhance the overall aesthetic of the Aspen Glen community. 5. Minimize adverse offsite impacts of lighting such as light trespass and obtrusive light. 6. Curtail light pollution, reduce sky glow and improve the nighttime environment for astronomy and enjoyment. 7. Help protect the natural environment from the adverse effects of night lighting from gas or electric sources. 8. Recognize that new technologies in lighting have resulted in higher -efficacy light sources (lumens per Watt). This section encourages the use of high -efficacy light sources within Aspen Glen to conserve energy and resources to the greatest extent possible. 9. Recognize that control of glare, light trespass and pollution, and reduction of energy consumption are critical to the creation and maintenance of our environment. 10. Encourage upgrades to existing residences to support Aspen Glen's dark sky goals. It is realized that many existing homes in Aspen Glen do not comply with parts of this new section, however as residents adjust and upgrade their exterior lighting fixtures, these Guidelines must be followed. There are several items in this section that can simply reduce excessive lighting for existing properties such as the 10:30 pm curfew or switching to lower lumen lamps (bulbs). B. Background. This community is Lighting Zone 1/Lighting Zone 2 (LZ1/LZ2) as defined by the International Dark -Sky Association (IDA). Lighting Zone 1 is an area where low ambient Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 35 lighting might adversely affect flora and fauna or disturb the character of the area; Lighting Zone 2 is an area where moderate ambient lighting, where the vision of human residents and users is adapted to low light levels. After curfew, all lighting should be extinguished or reduced as activity levels decline unless a variance is approved. These Guidelines use the Model Lighting Ordinance drafted by the IDA, adopted June 2011. C. Developing a Light Plan. A lighting design that is not in strict compliance with these Guidelines may not be approved as a part of the normal review process. To encourage creative solutions to exterior lighting; each proposed design is assessed on a case-by-case basis. Any exterior lighting plan or light fixture that appears excessive, inappropriate, or not in conformance with the lighting philosophy of Aspen Glen will be rejected. If, requested, a mock-up of the proposed lighting on site may be required prior to permanent installation. The DRC accepts no liability for costs or hardships associated with the mock-up presentation for alternative lighting solutions that are found to be unacceptable. All such findings shall be at the sole and final discretion of the DRC. All installations of exterior lighting such as driveway lighting, pathways, landscape accents, security lighting, entryway features, art objects, statues and water features must comply with the lighting standards of the Design Guidelines. D. Non -Compliance Exterior Lights Exterior remodels or renovations of homes that have pre- existing non -conforming light fixtures must be brought into compliance with these lighting standards to the extent practicable. E. Lighting subject to review: 1. General exterior lighting. Illumination of exterior living areas such as patios, spa decks, entry monumentation, and landscaping may be used only during waking hours. Downward directed lighting is strongly encouraged for this use. All exterior lighting, except for address monuments, must be turned off nightly by 10:30 pm with the exception of a special event. 2. Safety Lighting. Lights illuminating vehicular and pedestrian circulation areas used when receiving guests or circulating outdoors, such as pathway and driveway lighting. 3. Security Lighting. Bright illumination lighting intended for use during emergency situations only, must be circuited and controlled separately from other lighting. It is understood that security lighting rarely, if ever, is useful for wildlife control. Aspen Glen does not encourage security lighting intended to chase away wildlife. 4. Landscape Lighting. This lighting is limited to 20 (twenty) watts incandescent or halogen or 300 lumens for LED per fixture per 150 (one hundred fifty) square feet of landscaped area. A lighting legend must be on the landscape plan that defines the number of fixtures per 150 (one hundred fifty) square feet of landscaped area. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 36 Pathway lights are limited to 24" above grade. 5. Holiday/Winter Lighting. This lighting will include, but is not limited to, lighting in outdoor trees, and may be illuminated only between November 15 and January 15. All other lighting associated with any national, local or religious holiday or celebrations may be illuminated two weeks prior to the holiday and extinguished within two days after the holiday. Wrapping trees and shrubs with string lighting is considered Holiday lighting. Lighting must be turned off nightly by 10:30 pm with the exception of a special event. 6. Address Monuments shall light the address monument only. Lamps and point sources shall be shielded from direct view. The exterior lighting curfew of 10:30 does not apply to address monument lighting. 7. Motion Sensor lighting is allowed. Lighting controlled by a motion sensor may operate for a maximum of 15 minutes. Sensors must be adjusted so that they do not detect motion beyond the property lines. Fixtures must not contribute to light trespass over the property lines. F. Design Standards. 1. All exterior lighting shall be designed so that the lamp point light source is not directly visible from adjoining properties, public rights of way, or the golf course. Placement of a fixture shall minimize light glare and trespass to an adjoining property -maximum of 0.1 footcandle (fc) at the property line. 2. Maximum lamp lumens as noted below shall not be exceeded, regardless of type. Cut sheets of all exterior light fixtures are required with the design review submittals. Lumens per lamp, total lumens, and the Kelvin must be included in the cut sheets. Ideally, the light bulb nutrition label should be submitted as well. 3. All lamps must have warm color temperature light, of 2700-3000 KELVIN (K) or below. 4. The total output per luminaire shall not exceed the following: Lighting Application Allowed Initial Lumens Maximum Allowed Luminaire Lumens for at entries only or garages 400 lumens Maximum Allowed Luminaire Lumens for each Luminaire excluding entries and garages 300 lumens 5. Any replacement lamps shall conform to the current Design Guidelines. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 37 6. Mounting. Unless otherwise approved, exterior lights shall be mounted in a well in the ground, on the ground on a post not exceeding 18" above ground, or in or upon a wall or eave. 7. Shielding. Light sources (lamps or bulbs) of all exterior lighting must be completely shielded from view to eliminate glare from any normal standing, sitting or driving view angles from any neighboring property or Common Area by concealing the light source inside the light fixture. If, the light source is fully concealed inside a metal cap or lid and is not visible, clear glass may be used. If, the light source is not concealed by the luminaire housing, glass panes must be honey opal, amber, mica, or darker glass. Frosted or sandblasted clear glass or white opal glass must not be used. 8. Highlighting or illumination of residential facades, driveways, and landscaping are allowed with the following conditions: a. Up -lighting is only permitted if the light distribution from the fixture is effectively contained by an overhanging architectural or landscaping element. Such elements may include awnings, dense shrubs or tree canopies, which can functionally reflect illumination back to the ground. b. Pathway lighting and landscape lighting that perform a dual function of way finding and landscape aesthetic is limited to: deciduous vegetation; trees no more than 20 feet from the building or 5 feet from the edge of the driveway; the fixture is in a well in the ground and is not directed toward the street, adjacent properties, or the golf course. c. Up -lighting an address monument is allowed with lighting that complies with these lighting standards. d. Flag lighting. One (1) luminaire shielded such that the point source is not visible beyond a fifteen foot (15') radius. e. Lighting intended to illuminate the Roaring Fork River, ponds or other water features is prohibited. G. Prohibited Lighting. 1. Roof Lights. Light sources shall not be affixed to the top of a roof. 2. Unshielded Light Sources. 3. Building Illumination. Flood illumination of buildings from the ground or on pole mounted lights or by lights mounted on adjoining structures. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 38 4. Nuisance Lights. Lights which flash, move, revolve, blink, flicker, vary in intensity, change color, or use intermittent electrical pulsation are prohibited (winter holiday lights are exempt). 5. Metal Halide, Ceramic Metal Halide, Mercury Vapor, High-pressure Sodium and Low-pressure Sodium lighting are prohibited. Linear and Compact Fluorescent are strongly discouraged. 6. Linear lighting such as rope light or neon. 7. Photocells are not recommended. A programmable time clock for management of exterior lighting is preferred. All time clocks shall be set to comply with the exterior lighting curfew. 4.11 PATIOS, COURTYARDS, SPAS, HOT TUBS, OUTDOOR GRILLES AND FIREPLACES (See Appendix E for sample pictures) A. Enjoyment of the Roaring Fork Valley climate can best be captured by well designed outdoor spaces with patios and courtyards integrated into the design of the residence with special care for proper orientation to the sun, summer breezes and the creation of desirable winter micro -climates. Drainage systems should be incorporated into any paved patios and courtyards to reintroduce storm water runoff into the soils. B. Pergolas, gazebos, loggias, breezeways, porte-cocheres, attached patios, spas and outdoor grills, etc., can be attached to houses within the building envelope. Careful attention should be given to the design and structure of these, so they will weather and remain sturdy for the future. The design and color must be compatible with the house. Minimum size for posts must be 6"x 6". Horizontal members must be a minimum size of 4"x4"s. All canvas awnings must be retractable. C. Spas and hot tubs require specific approval. Spas and hot tubs are required to be: 1. within the building envelope; 2. located to minimize noise and visual impacts to adjacent residences and Community Ways; 3. screened from all views external to the property; 4. integrated with the existing architecture; and 5. preferably flush with grade. 6. Location of hot tubs must comply with Garfield County building codes. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 39 4.12 SOLAR AND WIND APPLICATIONS (See Appendix E for sample pictures) A. Solar Panels (collectors). Solar panels must be selected, located and installed so as to minimize their appearance on the house and visibility from neighboring properties and common areas. The design, color, configuration and location of the proposed solar collectors must be compatible with the architecture of the house. 1. Only roof mounted solar panels are permitted. 2. Solar panels must, to the extent possible, be designed within roof areas that are not visible from any common areas. 3. Solar panels must match the color of roofing material, or be very inconspicuous upon, the roofs. 4. Only dark anodized panels, framing, piping, control devices, wiring, panel mounts and all exposed material will be allowed. 5. The size and number of panels should be in proportion to the roof area where they are installed. 6. Solar panels must be of the same slope as the roof they are attached to, and only have a minimal spacing from the roof. 7. The Builder's Completion Deposit may be held for one year following the final on- site inspection approval. Holding the deposit for a year will allow for required changes in the panels or landscaping, if reflectivity impacts surrounding neighborhood houses or common areas. B. Wind generators, clothes lines, and swamp coolers are strongly discouraged. They must be reviewed and approved prior to installation. C. The use of passive and active solar design elements is encouraged. Orientation of the residence to maximize winter solar heat gain will reduce winter energy demands. D. Geo -thermal installations must receive review and approval and must follow the construction regulations for Aspen Glen. 4.13 RESIDENTIAL BACKUP/STANDBY AC POWER GENERATORS The use of residential backup/standby ac power generators in Aspen Glen is strongly discouraged due to the environmental noise and exhaust emissions associated with operating the units. Installation of a power generator must be reviewed and approved prior to installation subject to the following guidelines. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 40 A. Natural Gas is the only approved fuel. The generator must not be powered by gasoline, kerosene, or diesel fuel. B. Proximity of the installation to adjacent properties and consideration of exhaust emissions effects will be reviewed and evaluated. C. Installation must use either a manual or automated switchover system connected to the residential power grid. D. Complaints of noise or odor from adjacent properties will be evaluated and will be subject to review. E. Approved exercise times for this equipment will be Monday through Friday, operating between 12:OOPM and 2:OOPM. Exercise time may not exceed twelve (12) minutes duration weekly. F. All applicable Garfield County building codes must be followed. SECTION 5 ARCHITECTURAL DESIGN GUIDELINES The following design criteria and standards are presented to assist owners and their designers in implementing the mountain sophistication that generates Aspen Glen's unique "sense of place." Each residence must be designed individually taking into account each property's unique constraints and characteristics, including views, solar, wind, and vegetation; and consideration should be given to the orientation, color exterior materials, mass and scale of neighboring residences. House designs should not be duplicated within Aspen Glen. 5.0 BUILDING CONSTRUCTION METHODS A. Aspen Glen residences are required to be "site built residences", predominately fabricated, constructed, installed and assembled on the job site. They may include prefabricated wall panels and other components as defined herein. B. Prefabricated components may include (but are not limited to) roof trusses, cabinetry, kitchen components, foundation panels, metal fireplace inserts, exterior or interior handrails, or prefabricated stairs. All other prefabricated components must be disclosed in writing at the time of design review, together with a description of the method of construction, installation, and assembly on site and delivery to the site. Prefabricated wall panels need special approval during design review, must be delivered in panel form, and must be installed and assembled on a panel -by -panel and component by component basis on site. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 41 C. Modular residences are not permitted in Aspen Glen. Modular residences will mean residences built in a factory in sections. Modular residences are generally built off site and delivered in sections in various stages of assembly to job sites. 5.1 ENGINEERED FOUNDATIONS A. Analyses of geologic conditions, foundation design and drainage studies must be prepared by a registered professional engineer. B. All lot development, including improvement construction, must be carried out in accordance with the engineer's stipulations. C. An Improvement Location Certificate produced by a professional land surveyor licensed in the state of Colorado is required. 5.2 BUILDING HEIGHT A. Height Limit by Zone District. The maximum height of buildings must be as set forth in the Aspen Glen PUD Zone District Regulations adopted by Garfield County Board of County Commissioners, Resolution No. 92-156. The maximum building height for all areas of Aspen Glen is 25 feet except for the 2 Acre Residential Zone District which is 32 feet (currently there are no platted lots within this zone district as of January 2014). B. The methodology for calculating height must be measured according to the rules and regulations promulgated by the Garfield County Community Development Department. C. Site Plan. Prior to the start of construction, the lot owner (or his agent) must submit a site plan as part of the review process, prepared by a Colorado professional land surveyor, showing the lot property boundaries and building envelope. Plan must clearly locate the reference point used to establish "natural ground elevation" for future measurement of building height. The plan must show lot topography on one foot (1') contours. Surveyor must also locate, and show on the plan, the reference benchmark and its elevation. If, a relative elevation is used, surveyor must establish a permanent reference point that may not be disturbed during construction. D. Building Plan. Building plans must show building height relative to "natural ground elevation" at the reference point established by surveyor. A height verification certificate must be completed by the professional surveyor, certifying that the building height complies with the height limits of the Aspen Glen PUD. This certificate must be submitted prior to dry -in inspection. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 42 Note: The DRC may elect to have its own Colorado professional land surveyor verify the certification that the proposed residence is in compliance with the building height rules. If, this survey indicates that it is not, construction may not proceed until the issue is resolved. 5.3 SCALE AND MASSING A. Scale and massing of all buildings must emphasize a harmonious relationship with the site and surrounding buildings as well as creating spaces and experiences that reflect a comfortable "human scale". Buildings should not be dominated by long unbroken elements in either the walls or the rooflines. Dormers and chimneys are encouraged to break up large roof masses. All residences should have at least three distinct masses visible in each building elevation, with the masses distinguished by a minimum 2'-0" (two foot) horizontal and vertical offset. See Diagram 5.3 a. Diagram 5.3a B. Minimum Size of Residence. Square footage must be measured from outside of exterior wall to outside of exterior wall, exclusive of basements and garage square footage. The minimum size per residence specified for each zone district is listed below: 1. Club Villa --1,500 Sq. Ft. - Clubhouse Cottages; Eagle's Nest; Peaks; Fairways; Club Lodge; 2. Duplex -- 4,000 Sq. Ft. (total two unit dwelling) - D1 -D42; when a single family residence is proposed in the duplex zone district the minimum square footage is 2,500 square feet exclusive of basements and garage. 3. 1/4 Acre -- 2,000 Sq. Ft. - Roaring Fork Mesa; Sl -S18 4. 1/2 Acre -- 2,500 Sq. Ft. - A10 -A14; A17 -A23; C1 -C11; E1 -E56; F1 -F19; GV1- GV13; H1 -H42; IS1-IS23; L1, L2, L16 -L25; RG1-RG11; Sundance; WP1-WP20 5. 3/4 Acre -- 3,000 Sq. Ft. - Al -A9; A-15; A-16; B1 -B10; F20 -F27; G1 -G5 Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 43 6. 1 Acre -- 3,000 Sq. Ft. -no platted lots 7. 2 Acre -- 3,000 Sq. Ft. - no platted lots C. Maximum Size of Residence. The maximum size of a residence will be determined by applicable Garfield County building codes regarding the underlying Aspen Glen Zone District. D. Garage Configuration. 1. Wall configuration must follow Section 5.4. 2. Roof configuration must follow Section 5.5. 3. Three car garages must have at least one car space offset by a minimum of 4'-0" (four feet) from the face of the other garage spaces. See diagram 5.3 b. 416 P' g r.ar" .5.31, -Nov • E. Garage door will not exceed 10'- 0" (ten feet) in height. Exterior materials: see Section 5.6. F. Garages on 1/2 acre and larger lots must orient the garage such that entry doorways are not seen from adjacent roadways, wherever possible. G. Garages may be detached from the residence but must be integrated with the residence by architectural elements, walls or fences. All such detached garages must be located within the building envelope and require specific approval. 5.4 WALL CONFIGURATION AND DESIGN (See Appendix E for sample pictures) Wall design must have sufficient fenestration to create visual interest and to prevent blank wall areas. This can be accomplished with window placement, fenestration changes or wall plane changes. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 44 A. Residential wall length must be a maximum running length of 20'-0" (twenty feet). Garage wall length must be a maximum running length of 25'-0" (twenty-five feet). This running length can be along the same plane. After the maximum length, there must be a "pop - out" or recess in wall plane of not less than 2'-0" (two feet). This change in wall plane should allow for a change in building materials (i.e. so as not to allow continuous stone wainscot.) See Diagram 5.4 a. % 2.0' Min . 20`-0" Dfayrar 5-4 B. Stone wainscots can be used, however, they must be broken up with full walls of stone, or columns, so as not to present excessive linear expanse of one material. If, columns are used they must be a minimum of 2'-0" (two foot) change of plane. See diagram 5.4 b. Diagram 5.4 b C. On roof pitches less than 8:12 pitch, wall fenestration under gable roofs exceeding 10'- 0" (ten feet) wide must be of at least two different materials. See diagram 5.4 c. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 45 Diagram 5.4 c D. Columns/posts must be stone covered or heavy timber wood posts. Wood posts must be a minimum size of 8"x 8" (eight inches x eight inches), with a maximum height of 12'-0" (twelve feet). Stone covered bases can be combined with wood posts to allow for taller columns. See diagram 5.4 d. Diagram 5.4 d 5.5 ROOF CONFIGURATION AND DESIGN A. Roof Pitch. All roofs must be sloped, with a pitch between 8/12 and 12/12 for primary roof elements. Secondary roof elements, including entries, porches, breezeways, and dormers, must be no less than a minimum pitch of 4/12. All residences should have at least three distinct masses visible in each building elevation, with the masses distinguished by a minimum 2'-0" (two foot) horizontal and vertical offset. Again, see Diagram 5.3 a. above. 1. Primary roofs. Only gable and hipped configurations are permitted for primary roof elements. The main roofs of the residence must not exceed 40'-0" in length before a change in slope or elevation height. Chimneys can be used as the change in elevation however the ridgeline beyond the chimney cannot exceed 20 feet. Roof elements used to break up the maximum ridge line must transverse both sides of the ridge and be of appropriate mass and scale, see diagram 5.5 a. This can also be accomplished by a roof element transverse to the long element, see diagram 5.5 b. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 46 Dia9r4r015.5a 11 D iagram5.517 2. Secondary Roofs. Shed roofs or eye brow roofs are allowed only on secondary roofs. The maximum size for any one secondary roof must be 18'-0" (eighteen feet) by 18'-0" (eighteen feet); the minimum size must be 6'-0" (six feet) out from the wall and running length of 8'-0" (eight feet). The 18' (eighteen foot) maximum may be broken by a dormer or chimney See diagram 5.5 c. f2 Diagram 5.5 c f.- / \\ i8-n`M X. 12- 8 Ti �`;-14 3. All single story residences (above grade) must have a minimum 10:12 roof pitch for the main roof. B. Snow diverters and/or retainers are required at the eaves of entries and areas of outdoor human activity. Such devices must be integrated into the design of the roof as much as possible. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 47 C. All vents, stacks, gutters & down spouts and flashing (except copper) must be painted a similar exterior color to that used on the residence to camouflage their appearance. D. Roof overhangs must be a minimum of 18" (eighteen) from the face of the wall in conformance with Garfield County building codes. 5.6 BUILDING MATERIALS (See Appendix E for sample pictures) Only the following materials are permitted on the exterior of buildings erected within Aspen Glen. A. Roofs. 1. Cedar shingle or cedar shakes. 2. Concrete or "engineered" synthetic tiles. 3. Slate. 4. Standing seam non -reflective metal (copper preferred) with a weathered appearance. Metal roofs are subject to review and approval and may be rejected based on color or reflectivity. 5. Fiberglass/asphalt shingles must be GAF Timberline Ultra HD shingles with a lifetime warranty or equal (a tri -lam shingle or better.) 6. Rusted corrugated steel, limited to secondary roofs. Steel material must be fully rusted prior to installation. 7. Samples must be submitted of all proposed roofing materials and require approval. B. Other Exterior Features. 1. All exterior vents, flue caps, roof jacks, covers, boxes, ducts, etc., must be finished with a color that matches or coordinates with the exterior colors of the residence. 2. Dormers and Skylights. Clerestories, monitors and skylights may be permitted, provided they are compatible with the overall design of the building and the theme of Aspen Glen. Darkly tinted glazing must be used on all skylights and clerestories to reduce light spill from interior spaces. 3. All residences must have at least one chimney and chimney chase. Chimney veneer must be similar materials on the exterior of the residence. Multiple chimneys must be constructed with similar materials. Chimney caps are required for all chimneys. Roof saddles and downdraft preventers are required for all chimneys. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 48 4. Accessories and Architectural Features Chimney caps, crickets, flashing, downspouts, gutters, utility boxes, ornamental iron railings, weather vanes, fences and stairways, etc. must observe the following: a. All metal must be anodized or completely weathered (artificially or naturally) or painted to match the surrounding material prior to Notice of Satisfactory Completion. b. Vents and mechanical equipment must be centralized as much as possible, and grouped with other roof elements or masses, and screened from view. They must also be painted to match adjacent material color. c. Gutters and downspouts must be anodized metal or copper; no PVC (plastic) will be allowed. If, radon vents are installed after a residence is built those pipes must be painted to match the exterior color of the residence to camouflage their appearance. 5. Greenhouses/conservatories must be within the building envelope, incorporated within the residential design, and use exterior materials compatible to the residence. Any interior lighting must conform to existing Guidelines, Section 5.6 B 2. Any exterior lighting must conform to the existing Guidelines, Section 4.10. 6. All trusses must be fully detailed with all beam sizes specified. Trusses must be a minimum of 6"x8". Show enlarged detail of truss with minimum scale %2"=1'-0". C. Exterior Walls. The minimum percentage of elevation wall surface areas which must be covered with stone are as follows: (To calculate the percentage of stone, the required amount is based upon the total square footage of the wall plane elevation including windows and doors.) Exterior Wall Finish Community Way Neighboring Way All Wood 30% Stone 20% Stone Wood & Stucco 40% Stone 20% Stone Stucco 40% Stone 20% Stone Wood Logs 30% Stone 20% Stone "Community Way" refers to elevations facing streets, golf course areas, cart paths, ponds, clubhouse, or other common community areas. "Neighboring Way" refers to elevations facing only neighboring residences. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 49 1. Natural Stone. Each residence must have at least one significant stone design element on at least three (3) sides of the residence or on all community ways including ponds and rivers. Or a minimum of one full height stone element on each elevation. a. Stone must be characteristic of stone native to the Rocky mountain region. b. Full cut stone is recommended and preferred. c. Thin cut stone may be used, with corner returns of 6" minimum or greater on all exposed ends. d. Stone must extend to grade. e. All exterior stone must be shown on all floor plans with full height or wainscot heights shown adjacent to the wall. f. Exterior stone must turn the corner for at least two (2) feet to the intersection or to the nearest wall. g. The approved stone must be applied in a consistent manner. Any deviation must be identified on the plans and approved. 2. Stucco. Stucco application should be a heavy textured and rough finish. 3. Plywood. The use of plywood, plywood based materials, particle board, or man-made products intended to imitate wood or stone for exterior siding, soffits or any other exterior trim, is strictly prohibited. 4. Wood. Wood siding, wood shingles and heavy timber may be used. 5. Log Residences. High quality log residences are allowed. 6. In order to encourage creative design solutions, alternative exterior materials may be used as an accent after review and approval. A proposed design will be reviewed and approved on a case by case basis. The DRC may approve or reject the alternative materials in its sole discretion. D. Windows. 1. Windows designed to reduce heat loss will be required (i.e., dual glazed minimum). 2. Glazing must be insulating units of clear, obscure or bronze tinted glass. 3. Stained or etched glass may be placed inside or outside of primary glazing, or in limited areas (e.g. front entry) without primary glazing. 4. Frames, sash, mullion or muntin bars and trim must be wood with natural, semi- transparent or painted finish, or clad with color -fast vinyl or aluminum, or copper Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 50 clad. (Alternative materials may be considered with prior approval.) Mullions and muntins must either be true frames which mount individual glazing units, or must be surface mounted and exposed on the exterior of windows. 5. Window mullion or muntin bars are required however some windows may not include these features given the views, proposed window patterns or other design features. E. Doors. 1. Glazing must be insulated units of clear, obscure or bronze tinted glass. For stained or etched glass please see above. 2. On main entry doors, muntin bars and trim must be wood (stile and rail, solid core or insulating with natural, semi -transparent or painted finish). Secondary entry doors, glazed doors or French doors may be treated as above, or may be clad with color -fast vinyl or aluminum, or copper clad. 3. Exterior windows and doors must be trimmed with materials complimentary to the overall material palette of the residence. 4. Garage doors must be of high quality materials. The use of plywood, plywood based material, or man-made materials intended to imitate solid wood is strictly prohibited. Small windows are allowed, and must comply with the above window requirements. The doors must have trim to break up the large massing of the doors. (See Appendix E for sample pictures). 5.7 COLOR PALETTE A. A material and color mock-up wall must be built on site within 30 days of the start of construction and installed on the outside of the construction fence. Exterior wall and roof colors must harmonize with the site and surrounding buildings. The predominant tones should tend toward muted, warm, earthy hues. Bold or dramatic earthy colors may be used, provided they are used sparingly and confined to entries and walls of recessed areas hidden from general view. B. Samples of all materials and colors must be submitted during the review process. 5.8 INTERIOR LIGHTING Dramatic views from the site will tend to encourage large expanses of glazing. This could result in excessive amounts of interior lighting spilling out to the exterior, causing glare when seen from neighboring properties or Common Areas. Special care and attention should be given to the aiming and brightness of display lighting, and to other intense accent lighting, as it may be reflected to the exterior, particularly through high windows, clerestories or skylights. No light sources pointed up or out or visible through high windows, clerestories or skylights will be Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 51 allowed. Darkly tinted glazing and frames must be used on all skylights and clerestories, and dark tinting of glass areas or the use of window coverings at doors and windows may be required to reduce light spill from interior spaces. 5.9 FIREPLACES AND SOLID FUEL STOVES To protect against degradation of air quality and wildfire hazard from the utilization of wood - burning devices, the following restrictions are imposed within Aspen Glen: A. No open-hearth solid fuel fireplaces will be allowed within or outside any new residences located within Aspen Glen. Some typical examples of solid fuel are, wood, wood pellets, combustible composite fire logs, paper/cardboard, and coal. B. No solid fuel (see above solid fuel examples) open burning of any kind on residential property. This includes burning contained within a fire ring, rock/stone ring, fire pits, fire pit grills, chimaeras, and outside open hearth fireplaces. Inserts conforming to the State of Colorado (C.R.S. 25-7-406 thru 412 et seq. and the regulations promulgated there under) will be allowed. C. All dwellings will be allowed an unrestricted number of natural gas -burning fireplaces or appliances, subject to current Garfield County codes. 5.10 STORAGE Trash, refuse, pet foods and other materials must be stored safely and in totally enclosed containers, so as not to be unattractive to neighbors or to attract rodents and other animals. It is encouraged that these storage areas are integrated into the residence. No temporary or pre - manufactured storage buildings are allowed. Dumpsters will be allowed only during active construction. 5.11 FIRE SPRINKLER SYSTEMS Sprinkler systems may be required and specified by the Garfield County Building Code and the Carbondale and Rural Fire Protection District. 5.12 INTERIOR WINDOW COVERINGS Only permanent materials intended for use as window coverings will be allowed. (No temporary use of paper, towels or sheets, etc.) 5.13 DUPLEX RESIDENCES A. No Mirror Images. No duplex unit will be constructed such that one residence is the architectural mirror image of the adjacent residence. B. Overall Design. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 52 1. All duplex units must be designed so that the overall appearance of the combined units is of one of a single family residence. Designs should take care to minimize the outward appearance of a two family dwelling. 2. Floor area square footage of one of the residences within the duplex must not exceed 40% of the floor area square footage of the total combined duplex. However, a variance may be granted if the split of the design of the proposed duplex is enhanced without the strict application to the 60%/40% split. 3. All duplex units will be required to maintain all exterior surfaces, colors and landscaping so that the appearance is that of one single family residence. To this end, identical building materials and surface finishes must be used on both units. Future maintenance must be coordinated between the owners of the individual units. 4. Landscaping should also create the illusion of a single family residence, and no perimeter fencing will be allowed on the common property line. Privacy walls may be allowed as appropriate and in compliance with other Guidelines contained herein. C. Duplex Common Area Agreement. 1. As required by Section 3.42 of the Master Declaration, a Duplex Common Area Agreement (or "Party Wall Agreement", as the document is commonly referred to and entitled) must be submitted for review and approval at the time of final design review. 2. Each Duplex Common Area Agreement must provide for the allocation of common costs and expenses among the owner of units within the duplex unit, including costs and expenses related to: a. The gradual deterioration, damage or destruction of improvements common to both units, including, but not limited to, the foundation of the building, supporting walls, ceilings, and roofs. b. The maintenance, repair or replacement of utility systems which service both units, but not limited to, water, sewer, electric and gas systems. c. The complete destruction of the duplex. d. The regular maintenance of duplex units, including, but not limited to, maintenance and painting of exterior walls and other improvements, roof maintenance or replacement, and all matters related to regular upkeep of exterior surfaces. e. Such other matters which may be peculiar to the particular duplex unit, including, but not limited to, the maintenance of yards and landscaping. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 53 f. The DRC has the authority to require the Duplex Common Area Agreement to contain such additional terms and provisions as it deems reasonable and necessary. g. Prior to the issuance of a Certificate of Occupancy for a duplex unit, the owner(s) of the lot must record in the records of the Clerk and Recorder of Garfield County the 'Duplex Common Area Agreement", in the form approved. 3. Regular Maintenance of Duplex. All future maintenance of exterior surfaces and landscaping must be executed as if it were for one single family residence, with costs shared between owners. SECTION 6 LANDSCAPE DESIGN GUIDELINES Aspen Glen is characterized by a diverse mix of vegetation communities. The east and west valley walls are dominated by pinyon and juniper trees and sagebrush fields on the valley floor. The majority of the former ranch property was cultivated hay fields interrupted by the gently winding Roaring Fork River. Along the banks of the Roaring Fork are found a variety of shrub and tree species some of which have historically relied on excess irrigation water from the adjacent fields for survival. 6.0 GENERAL DESIGN CONSIDERATIONS Aspen Glen has invested extensive forethought into the development of a master plan that will preserve existing tree and shrub masses on the site. Although most large scale existing vegetation is contained in Common Areas or in the country club properties, some important stands of natural vegetation are located on private lots and their preservation will be monitored. Since the predominance of building sites are located in previously cultivated fields, new landscape plantings on the residential lots will be critical in the creation of a highly desirable living environment. Introduced plantings will serve to soften the architectural statements of each lot, instill a more comfortable human scale to the site, moderate seasonal weather cycles, provide habitat for wildlife and enhance the visual appearance of the community. Therefore, these Guidelines set forth numerous recommendations as well as specific landscape criteria to assure the achievement of a living environment that reflects a gracious balance of intense landscape plantings, residences and open spaces. These Guidelines are intended to promote creativity while giving the lot owner a conceptual pattern for how the residential sites at Aspen Glen can be landscaped to enhance the living environment and value of the entire Aspen Glen community. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 54 6.1 VIEW PLANE CONSIDERATIONS Although there are no mapped view planes or view corridors in Aspen Glen, there are obvious views that property owners would want to preserve. It is during the design review process that the DRC will consider views and any negative impacts from proposed landscaping on neighbors views. This will include the addition of trees to an already improved property. Pursuant to the Amended Covenants Conditions & Restrictions all improvements to property must be reviewed by the DRC and this includes the addition of trees and shrubs. As a property owner prepares a landscape plan the owner and the landscape architect will consider: their neighbors views in the immediate area in order to avoid obstructing more pleasing views (i.e. Mt. Sopris, the golf course fairways, public water features, etc.); the ultimate height of various species at maturity; screening specific area of the residence such as utilities, garage doors, hot tubs, etc.; and summer as well as winter screening. Plantings in the Common Areas of the community are intended to benefit the entire community and serve to transition between the residences and natural open spaces. Therefore specific view corridors from individual property will only be considered from the perspective of the entire community. 6.2 PLANTING PLANS Recommended plant lists are included in the appendices to assist the owner's designer. A. The recommended plant lists are intentionally limited to create harmony throughout the Community Area. These lists are not all inclusive nor does the inclusion of a plant guarantee that this species will survive in all habitat conditions at Aspen Glen. The extremely low humidity and intense sun, and cold winter temperatures characteristic of the arid Rocky Mountain region, often challenge the survival of even the hardiest cold climate plants. Micro -climate conditions created on each site by the proposed residences, earth forms and landscape plantings play heavily in the selection of appropriate plant materials. A licensed landscape architect familiar with the local growing conditions and appropriate plant palette is required to develop a landscape plan for review. B. In recognizing the intentional limitations of the recommended plant lists, the applicant is encouraged to consider innovative waterwise landscape solutions that can be supported with sound design and horticultural logic. It is the sole responsibility of the lot owner to maintain all plant material in a manner characteristic to the plant species and promptly to replace all plants that die or fail to achieve a healthy and characteristic form. C. Lots adjacent to the golf course require special consideration with respect to how the proposed plantings will influence visibility for golf play and safety for the lot's resident, as Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 55 well as the appropriate landscape transition between intense plantings associated with the residence and the open green belt characteristic of the golf course. D. Planting designs for each lot must endeavor to be sympathetic to and integrated with the plantings of adjacent lots, Common Areas and Country Club Properties so as to minimize the visual presence of property lines. Ground cover, mulch, or gravel must be natural materials and natural browns and black colors. Avoid red, orange, pink, or similar colors. E. The landscaping on each lot adjacent to the street is of particular importance in order to create a harmonious feeling throughout the Community Area. The landscaping in this area should strive to create a feeling of gentle rolling terrain with groupings of trees and shrubs that blend into the individual landscaping of the lot. This theme is intended to create a strong visual context and continuity throughout the entire Community Area. For this reason, air conditioner condensers, utility meters and irrigation clocks must be located in the side yard and screened from view with a mixture of evergreen and deciduous plant material in a larger size (minimum 48" height B&B). F. All proposed water features must be reviewed in detail and may require Roaring Fork Water and Sanitation District approval as well. Evaporation rates, size of the feature and the source of water will all be considered. Refer to Section 1.1 Water Resource Stewardship. G. Landscape lighting is limited to 20 (twenty) watts incandescent or halogen or 300 lumens for LED per fixture per 150 (one hundred fifty) square feet of landscaped area. A lighting legend must be on the landscape plan that defines the number of fixtures per 150 (one hundred fifty) square feet of landscaped area. Pathway lights are limited to 24" above grade. H. All Aspen Glen property owners are required to submit for review and approval a landscape plan. The approved landscape plan must be implemented. The landscape plan should incorporate both fast growing, shorter lived species and slow-growing, longer lived species to provide immediate coverage and a sense of maturity of growth on the property. For example, aspen trees grow fast, providing immediate shade and screening but are short lived while maple trees grow slower and live much longer than aspen. 6.3 PRE -CONSTRUCTION LOT MAINTENANCE Each lot owner must be responsible for maintaining any unoccupied lot in such a manner as to minimize fire hazard, control wind and water erosion, and to minimize the presence of noxious weeds and dust. In the event that a lot is not maintained, the DRC has the authority to enter the property and conduct such seeding or maintenance measures as may be required to bring the lot into compliance with these terms. The Lot owner will be assessed the cost of performing these tasks. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 56 6.4 PRESERVATION OR REMOVAL OF EXISTING VEGETATION A. Wetlands. All areas designated as wetlands on any Aspen Glen Final Plat must be preserved in their present natural character and condition to as great a degree as possible. Approval for any changes to designated wetlands lies entirely with the U.S. Army Corps of Engineers. 1. No removal of trees and shrubs will be allowed within the areas designated as wetlands. 2. No domestic animals of any kind will be allowed to graze in areas designated as wetlands. 3. No filling or excavation of any kind will be allowed in areas designated as wetlands. 4. No activity within the wetlands that will modify or in any way change the character of the wetlands will be allowed. 5. The land designated as wetlands must not be subdivided nor have its exterior boundaries changed in any way. 6. No building envelope for any lot will be amended within any areas designated as wetlands. B. Existing Vegetation. No naturally existing tree or shrub will be removed from a lot without approval. At times there is a necessity to remove some existing plants in order to appropriately site a residence, especially on potential lots west of County Road 109 and removal of some existing plants will be allowed but only after being presented with adequate evidence that there is no reasonable alternative site design or the residence that would better preserve the existing plants. Limited removal of existing vegetation will also be considered if it is the only opportunity to achieve quality views from the building site. When it is determined that a naturally existing tree or shrub should be removed it is strongly encouraged that the naturally occurring tree or shrub be moved to another location within the lot whenever possible. A location improvement survey showing existing plant species and their location is required whenever the existing vegetation's trunk diameter exceeds six (6) inches, or overall shrub diameter exceeds six (6) feet. For improved properties, landscaping must be taken care of and the maintenance of the landscaping is an ongoing endeavor. However, if a property owner seeks to remove a tree or shrub and replace those removed in the same location then DRC review is not required. If, for whatever reason the tree or shrubs are to be removed permanently or relocated to another part of the property then the DRC must be consulted before any work may occur. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 57 6.5 IRRIGATION A. Sources. Water for irrigation of private lots is available from two sources. 1. Domestic water supply to each residence. 2. Raw water from irrigation ditches, lakes or other water features adjacent to some of the Aspen Glen Lots. However, the Roaring Fork River and the Thompson Glen ditch are not approved sources for lot irrigation. Such use is strictly and specifically prohibited unless shares are purchased from the various entities that moderate water rights. Aspen Glen Lots in the Fairways, Sundance and Saddleback Ridge must use the Association's irrigation system. Note: The Roaring Fork Water and Sanitation District and the Aspen Glen Homeowners Association may, from time to time, revise the regulations regarding water use. In addition, the flow of water in the irrigation ditches may be turned off for reasons due to maintenance or other related circumstances. B. Availability. 1. Lots with access to a usable raw water irrigation ditch, lake, or other water features will be required to use this raw water only for all irrigation on the lot. Engineered sketches for typical pumping systems and configurations are included in Appendix C of these Guidelines. However, as stated above, Aspen Glen Lots in the Fairways, Sundance and Saddleback Ridge must use the Association's irrigation system. 2. Lots without access to a raw water irrigation ditch must use the domestic water system as a source of irrigation water. Typical water supply data that an irrigation designer will need to design an irrigation system supplied by the domestic water system will be available from the Roaring Fork Water and Sanitation District. C. Irrigation Systems Required. All lots will be required to install an underground, automatic timer controlled irrigation system. The irrigation system must be installed within 180 days from the issuance of the Certificate of Occupancy. Any landscaping bond, if applicable, must include the cost of the required irrigation system. For those lots that cannot irrigate from a raw water source, all systems will be required to install a moisture sensing apparatus, other than a rain gauge, or consider the installation of other weather based automated control systems that will monitor water usage. D. Restricted Use of Irrigation Water. In acknowledgement of the limited supplies of water in the arid west and wise water stewardship, Aspen Glen has placed restrictions on the total area of intense landscape irrigation allowed on each lot. These restrictions apply to Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 58 permanent lawn sprinkler type of irrigation. Controlled flow drip irrigation of trees and shrubs will be allowed outside of these square footage restrictions with approval. Maximum Irrigated Area per Lot as specified per zone district is as follows: 1. Club Villas 1,000 sq. ft. - Lots Clubhouse Cottages; Eagle's Nest; Peaks; Fairways; Club Lodge; (except for lots RG1-RG11) 2. Duplex 9,000 sq. ft. - Lots D1 -D42 3. 1/4 Acre 6,000 sq. ft. - Lots Roaring Fork Mesa; Sl -S18 4. 1/2 Acre 9,000 sq. ft. - Lots A10 -A14; A17 -A23; CI -C11; E1 -E56; F1 -F19; GV1- GV13; H1 -H42; IS1-IS23; L1, L2, L16 -L25; RG1-RG1; Sundance; WP1-WP20 5. 3/4 Acre 10,800 sq. ft. - Lots Al -A9; A-15; A-16; Bl -B10; F20 -F27; Gl-G5 6. 1 Acre 12,000 sq. ft. — currently, there are no platted lots 7. 2 Acre 9,000 sq. ft. — currently, there are no platted lots E. Ditch Maintenance Easements. Please be aware that landscape elements within ditch maintenance easements are subject to removal, relocation or destruction as the water system is maintained over time. Landscape elements placed within the easement are there at the owner's risk. F. Temporary Irrigation. Landscape areas planted with native or drought resistant plants outside the above restricted areas will be allowed an establishment period of up to two years for grasses and wildflowers and up to four years for trees and shrubs during which time these areas may be irrigated by sprinkler or drip systems or hand watering for the purpose of assisting in the initial establishment of these plantings. A separate irrigation zone must be established for irrigation within these areas. G. Types of Irrigation Systems. 1. Intensely planted areas of lawn and flower and shrub beds will require sprinkle type systems with moisture sensors. 2. Drip type systems are recommended for watering of trees and shrubs outside of the intensely landscaped areas. The drip system will deliver water directly to the root zone to maximize the efficient utilization of water. It must be demonstrated that these areas of irrigation be zoned separately from the allowable intensely irrigated areas. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 59 3. All irrigation systems, temporary or permanent, must be reviewed for approval prior to installation. 6.6 TYPICAL PLANTING TREATMENTS A. High Intensity Plantings. 1. High Intensity Plantings include manicured lawns and other irrigated ground covers, flowerbeds, intense shrub beds and deciduous and evergreen trees. Water is a precious resource; use of native waterwise plant materials is encouraged even within high intensity planting areas. This area would be typically irrigated with permanent underground sprinkler systems and would represent the highest irrigation water consumption on an Aspen Glen lot. These plantings should be utilized in areas where they will have the greatest visual impact upon the residents of a lot. High Intensity Plantings would be appropriate in close proximity to the residence and other high use areas of the site (patios, pool areas) whether adjacent to the residence or at a removed location. A node of High Intensity Planting may also be used in association with the driveway entry treatment. 2. Use of waterwise annual and perennial flowers to add color and beauty to the landscape is strongly encouraged due to the limited palette of adaptable herbaceous plants. 3. Appendix A for a list of suggested plants and ground covers appropriate for use in the High Intensity Planting areas. B. Natural Plantings. 1. Areas of Natural Plantings, whether existing or introduced, are those areas which will receive no irrigation water following the initial establishment period. Ideally, Natural Planting Areas introduced on a lot will blend into other Natural Areas on neighboring lots and Common Areas to create a cohesive pattern of vegetation without the unnatural reflection of property boundaries. Some lots will have areas of existing vegetation which will be classified Natural Planting Areas. In some cases, these existing areas may require some remedial planting efforts to restore a healthy and diverse stand of native plants. Representatives of the DRC may provide some guidance in the restoration of existing areas of native vegetation. Most introduced natural areas will be characterized by dry land grasses, wildflowers and a few native brush species. Occasional plantings of pinyon and juniper trees may be approved in the Natural Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 60 Planting Areas and authorized to receive irrigation water beyond the initial establishment period. Not all Natural Planting Areas will be characterized by the lack of water. A few locations with natural subsurface water availability will support riparian type plant material. 2. Appendix B contains lists of plant materials suitable for use in the Natural Planting Areas. C. Transitional Plantings Areas. 1. The purpose of the Transitional Planting areas is to reduce the consumption of irrigation water while maintaining a strong impact of landscape plantings. The seed mix (See Appendix B) used in the rough areas of the golf course are recommended for these transition areas because of their ability to survive with significantly reduced amounts of water. These grasses may be mowed and maintained in a semi - manicured character although they will generally turn brown and dormant during the hotter and dryer portions of the summer season. Grasses and ground covers in the Transitional Planting Areas will not need irrigation water following an initial establishment period. Trees and shrubs are the most important element of the Transitional Planting Area because of the ability to create significant landscape impact with only moderate consumption of irrigation water. All tree and shrub plantings in this area must be irrigated by "drip" type irrigation systems. All irrigation lines must be installed underground. Individual plant emitters may be located at the surface. Design of the Transitional Plantings should take into consideration previously approved planting designs on neighboring lots, Common Areas and Country Club properties. 2. Tree and shrub plant species may be selected from both the High Intensity Plant List and the Natural Area Plant List found in the Appendices. Not all plants listed will be appropriate for all situations in the Transitional Areas. 6.7 APPLICATION OF TYPICAL PLANTING TREATMENTS A. Club Villa Zone District: Clubhouse Cottages; Eagle's Nest; Peaks; Fairways; Club Lodge; with the exception of RG1-RG11. Club Villa lots are anticipated to be landscaped entirely as High Intensity Planting areas. The emphasis in areas maintained by individual Villa owners should be flower and shrub beds with limited amounts of lawn area. The surrounding common areas of the Club Villa site will also be intensely landscaped. The areas will contain more of the tree plantings and larger lawn areas. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 61 B. Duplex Zone District: D 1-D42. Duplex lots will require significant square footage of Transitional Planting even after complete utilization of the allotted irrigation square footage for High Intensity Plantings. Typically, the plantings will transition into the Transitional Plantings of the adjacent duplex lot or the rough areas of the Country Club Properties. It is possible that some Natural Plantings may be located on the Country Club Properties. In such case, Natural Plantings are encouraged to be extended onto the duplex lot. C. 1/4 Acre Zone District: Roaring Fork Mesa; Sl -S18. Lots in the 1/4 Acre Zone District are typically 11,000 square feet in total area. The 6,300 square foot irrigation allowance should allow the entire lot to be intensely landscaped. D. 1/2 Acre Zone District: A10 -A14; A17 -A23; C1 -C11; E1 -E56; F1 -F19; GV1-GV13; H1- H42; IS1-IS23; L1, L2, L16 -L25; Sundance; WP1-WP20, and lots RG-RG11. These lots may require 50% Transitional and Natural Planting treatments. Natural Plantings are encouraged, where appropriate, but will not be required on all 1/2 acre lots. E. 3/4 & 1 Acre Zone Districts: Al -A9; A-15; A-16; B 1-B 10; F20 -F27; G 1-G5. Wise stewardship of available irrigation water dictates that a minimum square footage of Natural Area Plantings will be required beginning with lots in the 3/4 Acre Zone District and increasing as lot sizes increase. Natural Plantings must be integrated with Natural Plantings on adjacent lots, Common Areas and Country Club Properties. As a general guide, Transitional Plantings should be 1.25 to 2 times the square footage of the High Intensity Planting areas. F. 2 Acre Zone District (West of County Road 109): Currently, there are no platted lots in this zone district. These lots are dominated by existing Natural Plantings and lot owners are strongly encouraged to minimize disruption of the existing vegetation both in the design of the building site and during construction. Abrupt transitions, defined by architectural elements (walls, fences, landscape walls, etc.), between High Intensity Plantings and the existing natural vegetation is encouraged. If, used at all, transitional plantings should represent a very small percentage of the total introduced landscape plantings. Permanent drip irrigation systems will be allowed in the Natural Planting areas, existing and introduced, to encourage the planting of pinyon pine and juniper trees on these sites. Due to their potential sensitivity to excessive water, pinyon pines should be used cautiously in the High Intensity Planting areas. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 62 6.8 MINIMUM AND MAXIMUM LANDSCAPE PLANTING CRITERIA Zone District Max. H.I.P. Min. H.I.P. Min. N.P. A. Club Villa; Clubhouse Cottages; Eagle's Nest; Peaks; Fairways; Club Lodge 1,000 Sq. Ft. 1,000 Sq. Ft. B. Duplex - D1 -D42 9,000 Sq. Ft. 6,000 Sq. Ft. C. 1/4 Acre - Roaring Fork Mesa; S1 -S-18 6,300 Sq. Ft. 5,000 Sq. Ft. D. 1/2 Acre - A10 -A14; A17 -A23; C1 -C11;; E1 -E56; F1 -F19; GV1- GV13; H1 -H42; IS1- IS23; L1, L2, L16 -L25; RG1-RG11; Sundance;WP 1-WP20 9,000 Sq. Ft. 6,000 Sq. Ft. E. 3/4 Acre Bl -B10; Al - A15 -A16; F20 -F27-; G1 -G5 10,800 Sq. Ft. 6,000 Sq. Ft. 10,000 Sq. Ft. F. 1 Acre 12,600 Sq. Ft 6,000 Sq. Ft. 20,000 Sq. Ft. G. 2 Acre 9,000 Sq. Ft. 5,000 Sq. Ft. Definitions: Maximum H.I.P. - Maximum High Intensity Plantings (Same as Maximum Irrigated Area in Section 6.3 D.) Minimum H I P - Minimum High Intensity Plantings Minimum N P - Minimum Natural Plantings 6.9 MINIMUM TREE AND SHRUB REQUIREMENTS Note: All trees must be of varied sizes with no more than thirty percent (30%) being of the minimum plant size required. (See Appendix A for plant recommendations and minimum size requirements.) An applicant may propose a reduction in the number of trees or suggested tree species required based upon extenuating circumstances such as: properties adjacent to the proposed site are fully vegetated and provide enough screening between residences; meeting the requirements would Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 63 significantly impair a view(s) of property owners in the immediate area; and an applicant proposes a legitimate xeriscape plan, developed by a licensed landscape architect. Zone District Minimum Tree & Shrub Requirements A. Club Villa/1/4 Acre — Clubhouse Cottages; Eagle's Nest; Peaks; Fairway; Club Lodge; Roaring Fork Mesa 9 Evergreen Trees 12 Deciduous Trees 40 Shrubs (6) 4' height B&B, (34) 5 gal (a mixture of deciduous & at least 15% evergreen must be used) B. 1/2 & 3/4 Acre — A 1-A23; B 1-B 10; C 1- C11; D1 -D42; E1 -E56; F1 -F27; G1 -G-5; GV1-GV-13; H1 -H42; IS1-IS-23; L1, L2, L16 -L25; RG1-RG11; Sundance; WP -1 -WP - 20 12 Evergreen Trees 18 Deciduous Trees 50 Shrubs (8) 4' height B&B, (52) 5 gal (a mixture of deciduous & at least 15% evergreen must be used) C. 1 & 2 Acre 18 Evergreen Trees 24 Deciduous Trees 60 Shrubs (10) 4' height B&B, (50) 5 gal (a mixture of deciduous & at least 15% evergreen must be used) 6.10 INSTALLATION AND MAINTENANCE A. Performance. 1. Each lot must be fully landscaped in compliance with the approved plans within 180 days of the issuance of the Certificate of Occupancy of the residence. 2. Extensions of this performance period may be approved due to weather conditions that are not conducive to the survival of the plantings. 3. In the event the landscape is not complete before winter or there is concern that the landscape is not going to survive the winter season then only a portion of the builder's Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 64 completion deposit will be returned and the remainder held until the landscape has been determined complete. 4. If, upon final inspection, it is determined that the approved landscape plan has not been followed an amended landscape plan will be required. An amended plan must be submitted and then approved, before the builder's completion deposit is returned and a Notice of Satisfactory Completion is issued to the property owner. B. Maintenance. The lot owner must diligently maintain the landscape plantings in a manner that is consistent with the normal character of the plants. This must include cooperation with the Association to minimize fire hazard through appropriate mowing and irrigation schedules and removal of dead branches and brush. C. Maintenance Practices Restricted. 1. Fertilization. a. Only natural organic based fertilizers will be used on residential lawns and gardens. b. A maximum of three applications of fertilizers are allowed annually. c. Fertilizers are prohibited from lot areas located within 20 feet of the normal high water line of the river. More stringent limitations on some lots depending on a lot's drainage patterns and vegetation conditions may be required. These restrictions are necessary to comply with the Association's commitment to the protection of the quality of native waters at Aspen Glen. Certain of these restrictions have been required by Garfield County. 2. Pesticides and Herbicides. a. These must be applied no more than three times annually and only when justified by the actual existence of a professionally verified future threat to the health of the plants on a lot. b. All chemicals are prohibited from areas within 20 feet of the normal high water line of the river or other water body on the lot, Common Areas, or Country Club Properties. More stringent limitations on some lots depending on a lot's drainage patterns and vegetation conditions may be required. D. Wetlands Protection. No criterion established above in any way alters the restrictions of Section 6.4 of these Guidelines. Existing wetlands must be preserved without interference from any landscape maintenance activities except for fire hazard elimination activities that are specifically required in wetland areas during unusually dry weather conditions. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 65 E. The Aspen Glen Homeowners Association Authority to Remedy. 1. The Association has the authority to enter upon a lot and undertake such maintenance measures as may be required for the landscaping to meet the minimum quality of appearance, health and fire safety that is consistent with the character of Aspen Glen. 2. The Association may then levy a Reimbursement Assessment against such lot owner for all costs and expenses incurred by the Association in completing such landscape maintenance work, including any costs and expenses of collection and attorney's fees. SECTION 7 FLAG GUIDELINES 7.0 RIGHTS Displaying the Flag of the United States of America is protected by federal law under the "Freedom to Display the American Flag Act of 2005". The location and the size of flags flown within the community may be restricted as well as the display of other types of flags such as, but not limited to, State, holiday, and game day/team flags and will ordinarily discourage the display of such. 7.1 DISPLAY GUIDELINES Any homeowner may display one personal United States Flag, no larger than 3' x 5' in a respectful manner as defined in the US Code 36 Sections 171-178. The Flag may be flown on a staff attached to the owner's property or may be flown on a freestanding portable telescopic or retractable flagpole no more than 20 feet high as measured from ground level to the top of the pole. For safety considerations, portable flagpoles should be supported in the ground by an in - ground liner or casing buried not less than 20 inches below ground level and encased or set in cement. A. The Flag of the United States is the "only" approved flag that may be flown on a homeowner's flagpole. B. The Flag should always be flown in a respectful manner and must be maintained in good condition. C. The Flag should never be displayed with the union down, except as a signal of dire distress in instances of extreme danger to life or property. D. No other flag may be flown either above or below the Flag of the United States. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 66 E. Aspen Glen encourages flag poles to be unlighted as aligned with our dark sky policies, and realizes that this policy may be in conflict with certain statues and protocols in flying the flag at night. If, lighted, no more than one luminaire may be used. The luminaire must be shielded such that the point source is not visible outside a radius of fifteen feet (15'). A luminaire that causes light spill into the sky will not be approved. F. All-weather flags may be flown in all weather conditions. Excessive wear and tear of a displayed flag may be grounds for a possible violation. A warning letter to applicant will first go out as a courtesy to homeowner indicating the nature of the discrepancy. Example discrepancies may include but are not limited to, flying a torn or tattered Flag, flying a flag other than the Flag of the United States on a flagpole, excessive noise being created by flag whipping or lanyard rattling on windy days, flagpole being in disrepair or leaning from vertical. Upon receipt of a violation, the homeowner must immediately remedy the situation within 24 hours or remove the flag from display until the violation is resolved. If, a Flag is removed for a period of 5 days or more, the flagpole must be retracted and/or removed from ground casing until Flag is again displayed. 7.2 FLAG POLES Flagpoles are subject to local building codes, zoning setbacks, and other applicable governmental regulations, including, but not limited to, noise and lighting ordinances within Garfield County and all setback, easement, and location criteria contained in the Aspen Glen building guidelines or governing documents. Approved flagpoles in Aspen Glen may only fly/display the Flag of the United States of America. The homeowner must consult with the DRC in regards to the placement of a personal flagpole. View lines and view corridors of affected neighbors will be used in the approval/disapproval process. Affected neighbors will need to be notified by applicant no less than 30 days prior to the submission of a plan indicating the flagpole location. Sample flag poles are available for reference. 7.3 GAME DAY/HOLIDAY FLAGS Game day flags may be flown on homeowner's property, only on game days. Game day flags may not be flown on approved flagpoles. Holiday flags may be flown on homeowner's property as desired but are discouraged in Aspen Glen. Holiday flags may not be flown on approved flagpoles. No unapproved flags may be flown in any manner on homeowner's property within Aspen Glen and are subject to a possible violation and/or fine. Aspen Glen 2016 Revised Design Guidelines - May 2016 Page 67 APPENDIX A SUGGESTED PLANT LIST FOR HIGH INTENSITY PLANTING AREAS Minimum tree and shrub plantings required by Section 6.7 of these Design Guidelines shall be selected from the following list of plants and shall conform with the below listed minimum size at the time of planting. Within the Roaring Fork Valley a wide range of climate conditions exist. It is important to realize that these variations, sometimes extreme, may cause stress to all plant material. This can lead to disease and infestation. Therefore, proper monitoring and maintenance is recommended, and the responsibility of the homeowner. This list is subject to change from time to time. EVERGREEN TREES: Botanical Name Abies concolor Picea pungens Pinus aristata Pinus edulis Pinus contorta Pinus nigra Pinus ponderosa Pinus sylvestris Pseudotsuga menziesii DECIDUOUS TREES: Shade Trees Botanical Name Acer negundo Acer platanoides Common Name White Fir Colorado Blue Spruce Bristlecone Pine Pinyon Pine Lodgepole Pine Austrian Pine Ponderosa Pine Scotch Pine Douglas Fir Common Name Sensation Boxelder Minimum Size (height) 10' 10' 8' 8' 10' 10' 10' 8' 8' Minimum Size (caliper) 3,, Norway Maple 3" (Varieties: Columnar, Deborah, Emerald Queen and other locally available varieties) Acer rubrum Acer x freemanii Red Maple Freeman Maple Hybrids 3" 3" Varieties: Autumn Blaze, Autumn Fantasy, Celebration, Sienna Glen) Celtis occidentalis Hackberry 3" DECIDUOUS TREES: Shade Trees cont. Botanical Name Gleditsia triacanthos inermis (Use in protected areas only. Populus angustifolia Populus deltoides Siouxland Populus x acuminata Populus tremuloides Populus tremuloides Sorbus aucuparia Common Name Minimum Size (caliper) Honeylocust 3" Varieties: Imperial, Skyline and Shademaster) Narrowleaf Cottonwood 3" Cottonless Cottonwood 3" Lanceleaf Cottonwood 3" Quaking Aspen 2" Prairie Gold Aspen 2" European Mountain Ash 3" Tilia Americana `Redmond' Redmond Linden DECIDUOUS TREES: Ornamental Trees Botanical Name Acer ginnala `Flame' Common Name Amur Flame or Ginnala Maple Acer grandidentatum Bigtooth Maple Acer tataricum Tatarian Maple (Varieties: Hot Wings, Pattern Perfect) Amelanchier canadensis Amelanchier x grandiflora `Autumn Brilliance' Crataegus viridis `Winter King' 3" Minimum Size(caliper) 2" Caliper or 8' Clump 2" 2" Caliper or 8' Clump Shadblow Serviceberry 8' Clump Autumn Brilliance 8' Clump Winter King Hawthorn 2" 2" Serviceberry Prunus armeniaca Apricot (Varieties: Moongold and Sungold) Prunus cerasifera Flowering Plum (Varieties: Newport and Thundercloud) Prunus padus Mayday Tree 2" 2" Prunus virginiana `Shubert' Shubert or Canada Red 2" Chokecherry EVERGREEN SHRUBS: Botanical Name Common Name Minimum Size(gallon) Juniperus chinensis var. Chinese Juniper var. 5 Juniperus communis var. Juniper var. 5 Juniperus horizontalis Horizontal Juniper var. 5 Juniperus Sabina var. Juniper var. 5 Juniperus scopulorum var. Upright Juniper var. 4' Height Mahonia aquifolium & Oregon Grape Holly 5 compacta and Compact (Use in protected north and east locations) Picea pungens `Glauca Globosa' Dwarf Globe Spruce 10 Pinus mugo Mugo varieties 10 (Varieties: Big Tuna, Miniature, Dwarf, Slowmound, White Bud) Buxus Boxwood 5 (Use in protected north and east facing locations. Varieties: Green Velvet, Winter Gem and Julia Jane) DECIDUOUS SHRUBS: Botanical Name Acer glabrum Common Name(5 gallon) Rocky Mountain Maple Aronia arbutifolia Brilliant Red Chokeberry `Brilliantissima' Berberis thunbergii var. Barberry Buddleja davidii var. Compact Butterfly Bush Caranga frutex `Globosa' Globe Russian Peashrub (Varieties: Blue Mist, Dark Knight, First Choice) Cornus alba Variegated Dogwood (Varieties: Bud's Yellow, Ivory Halo, Red Gnome) Cornus sericea Dogwood varieties (Varieties: Arctic Fire, Bailey, Cardinal, Colorado, Isanti, Dwarf Kelsey) Cotoneaster apiculatus Cranberry Cotoneaster DECIDUOUS SHRUBS cont. Botanical Name Cotoneaster dammeri (Use in protected locations) Cotoneaster horizontalis (Use in protected locations) Cotoneaster lucidus Common Name (5 gallon) Coral Beauty Cotoneaster Rock Cotoneaster Peking / Hedge Cotoneaster Forsythia Forsythia varieties (Varieties: Arnold Dwarf, Northern Sun, Show Off, Sunrise') Ligustrum vulgare (Varieties: Cheyenne, Lodense) Lonicera Perovskia atriplicifolia Physocarpus opulifolius Privet varieties Honeysuckle varieties Russian Sage Ninebark varieties (Varieties: Center Glow, Coppertina, Dart's Gold, Diabolo, Little Devil, Dwarf, Summer Wine) Potentilla fruticosa var. Prunus besseyi Prunus x cistena Prunus tomentosa Prunus virginiana Potentilla varieties Western Sand Cherry Purple Leaf Plum Nanking Cherry Chokecherry Rhus typhina Sumac varieties (Containment must be considered with some varieties. Varieties: Staghorn, Cutleaf Staghorn, Tiger Eyes) Ribes alpinum var. (Varieties: Alpine and Green Mound) Ribes odoratum Rosa foetida `Bicolor' Rosa hugonis Rosa Morden var. Alpine Currant Crandall Clove Currant Austrian Copper Rose Father Hugo Shrub Rose Morden Varieties Shrub Rose DECIDUOUS SHRUBS Cont: Botanical Name Salix purpurea nana Common Name(5 gallon) Dwarf Arctic Willow Sambucus nigra Elder varieties (Varieties: Black Beauty, Black Lace, Variegated) Spirea Spirea (Varieties: 'Flowering Choice, Goldmound) Spirea japonica var. Spirea (Varieties: White, Anthony Waterer, Froebel, Goldflame, Limemound, Little Princess, Magic Carpet, Neon Flash) Spirea nipponica `Snowmound' Spirea x vanhouttei `Renaissance' Symphoricarpos oreophilus Syringa vulgaris Viburnum x burkwoodii Viburnum carlesii Viburnum dentatum Viburnum lantana Viburnum opulus `Roseum' Viburnum trilobum `Bailey Compact' Viburnum trilobum `Wentworth' GROUNDCOVERS: Botanical Name Snowmound Spirea Renaissance Vanhoutte Spirea Mountain Snowberry Lilac varieties Burkwood Viburnum Koreanspice Viburnum Arrowwood Viburnum Mohican Wayfaring Tree Snowball Viburnum Compact American Cranberrybush Wentworth Highbush Viburnum Common Name Ajuga repans Arctostaphylos x coloradoensis Arctostaphylos x coloradoensis Delosperma cooperi Carpet Bugle Mock Bearberry Manzanita Panchito Manzanita Iceplant GROUNDCOVERS cont.: Botanical Name Common Name Dianthus plumarius Pinks Mahonia repens Creeping Colorado Holly Rhus aromatic `Gro -Low' Dwarf Fragrant Sumac Potentilla neumanniana `Nana' Dwarf Spring Cinquefoil Vinca minor `Bowles Variety' Bowles Periwinkle There are other groundcover species that may be appropriate in Aspen Glen and will be reviewed by the DRC. Blue Avena Helictotrichon sempervirens Purple Maiden Miscanthus sinensis _ f_,/ 7 1 -• / .. / , ` � - \ yam. .lam v. _ / .e1--- .- \ % fl ``'+ Photorte�y/ Count. ryGGrde14' % :: Prairie Dropseed Shenandoah Switchgrass Sporobolus heterolepis Panicum virgatum Shenandoah APPENDIX B SUGGESTED PLANT LIST FOR NATURAL PLANTING AREAS EVERGREEN TREES: Natural Areas Botanical Name Common Name Juniperus monosperma One Seed Juniper 8' Minimum Size(height) Juniperous scopulorum Juniperous utahensis Pinus edulis Rocky Mountain Juniper 8' Utah Juniper 8' Pinyon Pine 8' DECIDUOUS TREES: Natural Areas These trees are suggested only where natural moisture availability is high, such as adjacent to a pond or irrigation ditch or in a low area where surrounding runoff collects frequently. Botanical Name Common Name Celtis occidentalis Hackberry Populus angustifolia SHRUBS: Natural Planting Areas Botanical Name Minimum Size(caliper) 3" Narrowleaf Cottonwood 3" Artemesia tridentate Cercocarpus ledifolius Cercocarpus montanus Chrysothamnus sp. Prunus virginiana Quercus gambelii Rhus aromatic "Gro -Low' Rhus glabra cismontana Common Name Tall Western Sagebrush Curlleaf Mountain Mahogany Mountain Mahogany Rabbitbrush Green Chokecherry Gambel Oak Dwarf Fragrant Sumac Rocky Mountain Sumac Minimum Size(5 gallon) SHRUBS: Natural Planting Areas Botanical Name Rosa foetida `Bicolor' Common Name Minimum Size(5 gallon) Austrian Copper Rose Shepherdia argentea Buffaloberry Yucca baccata Banana Yucca Yucca filamentosa Ivory Tower Yucca NATIVE GRASS SEED MIXES Important Note: Wildflowers do not consistently sustain themselves and cannot be preserved with weed control efforts. Dryland Pasture Mix (10 lbs. / acre) 15% Crested Wheatgrass 15% Slender Wheatgrass 5% Pubescent Wheatgrass 15% Intermediate Wheatgrass 15% Green Needlegrass 5% Western Wheatgrass 10% Tall Fescue 20% Smooth Brome Low Grow Native Mix (5 lbs / 1,000 SF) 25% Idaho Fescue 25% Sandberg Bluegrass 25% Rocky Mountain Fescue 25% Canby Bluegrass APPENDIX C SUBMERSIBLE IRRIGATION PUMP SYSTEM FOR DITCH & POND ASPEN GLEN APPROVED PUMP FOR DITCHES STEEL POSTS OR OTHER SUPPORTS TO HOLD GRAVEL BED VERTICAL, INSTALL W/ SLIGHT BATTER TO DITCH EXPANDED METAL OR CH- LINK RETAINING MESH SELF CLEANING FILTER/STRAINER W/ AUTOMATIC FLUSHING RECIRCULATING PIPE PLUMBED BACK TO DITCH /-PITLESS ADAPTER ELECTRICAL JUNCTION BOX JUMBO REMOVABLE LID VALVE BOX WATER SOURCE 1" WASHED ROCK LOW WATER CUT OUT FLOAT TO TURN PUMP OFF IN CASE OF LOW WATER CONCRETE BASE FABRIC SOIL BARRIER TO IRRIGATION SYSTEM PLUMB BACK TO DITCH W/ VALVE SUBMERSIBLE PUMP WITH SHROUD TO COOL MOTOR 2' 1. D. CONC. MANHOLE CASING W/ PERFORATIONS AS SUITABLE FOR 1" ROCK NOTE: DITCH MUST BE NARROWED 10-15Z FOR PROPER CLEANING ACTION OF GRAVEL FILTER MATERIAL, FLOW AT FULL FLOW MUST BE <.5 FPS THROUGH FILTER MATERIAL, N.TS. SCUMU1SER GORDON MEYER EHcINEER$ a suave+oas SCHMUESER GORDON MEYER INC. 1f8 W. 6th Street, Suite 200 Glenwood Springs, Colorado 81001 (9701 946-1004 IFAX 945-59481 Aspen, Colorado (970) 925-6727 GRAVEL FILTER SET-UP FOR SUBMERSIBLE PUMP INSTALLATION IN AN IRRIGATION SYSTEM Job No, 93028H-33 Para: 5/6/a2 Dawn by RW /RR— Me= PUMPS - 4 aY • •i i r&S 1 970 945 5948 SCHMUY;SE!( GUKDoN NI: Y$1( ASPEN GLEN APPROVED PUMP DESIGN FOR PONDS O b O 0 Ct ti U 11 =1- MIN. 8' DEEP _ DITCH WATER SURFACE TO BOTTOM OF MH. Q Q zcc .K 1n 2 0 tr1 V ^J J Q0 E15 N Z4d ;Z61:1.-21 2 SCNMUESER f CORDON I MEYER 00000. 00000. SCI.AUESER GORDON MEYER INC. 118 W, 8th Street, Suite 200 Glenwood Springs, Color■ao 81801 (870) 945-1004 !FAX 948-88481 Aspen. Colorado (970) 925-8727 SURE FLO SCS2- \ QC N, m oZ) Lum :2 Ckl Lj ""4 0z LI L,4 C142 �zw 0 e Z� a e LLcz Z a it "O W ~C 020 O frink 3W00 O e luyOi 4 kJ SUBMERSIBLE PUMP FOR POND INSTALLATION IN AN IRRIGATION SYSTEM Job No3.:G28H-33 APPENDIX D APPROVED ROAD CUT REPARATION ADDENDUM REQUIRED BACKFILL REQUIREMENTS FOR STREET CUTS IN ASPEN GLEN CRACK SEAL r-- BOTTOM MAT r- NEW FIRST .I`T f 1 % % (2 -INCH MIN.) COMPACTED NEW TOP MAT SHALL MATCH EXISTING 1 L 12' r. MIN. UNDISTURBED SOIL 18" i-- FLOWFILL FULL DEPTH FOR BACKFILL ON MAINS & SERVICE LINES (ONE SACK MIX) COMPACTED PIPE BEDDING /,`/��` /// TRENCH WIDTH:: \1 VARIES 1 RENE., LEF VARIES SIOCCTHNESS; A 1 0 -FOOT STRAIGHT EDGE LAID ACROSS THE NEW PA►'EMENT PATCH SHOULD NOT VARY MORE THEN 1/4" IN ANY DIRECTION. Appendix E Address Monuments Driveway Textures, Patterns, Colors and Borders . MINK .- -., • • v,,.. -op. .,.. . wr w.. mon,• . r. ...tin • yap.. VOW "'lig I Utility box surrounds 1 ) Utility boxes hidden behind 48" shrubs Solar Panels Types of Roofing Garages & Garage Doors Wall Plane Changes Spas and Hot Tubs . ...fr. 51011'. Appendix F - Lighting Definitions Related to Exterior Lighting Bulb is the colloquial term used to describe the source of light. The industry term is Lamp. Chromaticity is an objective specification of the quality of a color regardless of its luminance. Color Rendering Index (CRI) is a quantitative measure of the ability of a light source to reproduce the colors of various objects faithfully in comparison with an ideal or natural light source. Correlated Color Temperature (CCT) The color temperature of a light source is determined by comparing its chromaticity with that of an ideal black -body radiator. The temperature (usually measured in Kelvin (K)) at which the heated black -body radiator matches the color of the light source is that source's color temperature. Yellow -red colors are considered warm, and blue-green colors are considered cool. Fixture height means the vertical distance from the ground directly below the centerline of the fixture to the lowest direct light emitting part of the fixture, such as the lens. Foot-candles mean the illuminance on a one square -foot surface of which there is a uniformly distributed flux of one lumen. For the purposes of these regulations, foot-candles shall be measured at finished grade. Fully shielded light means light fixtures shielded or constructed so that no light rays are directly emitted by the installed fixture at angles above the horizontal plane as certified by a photometric test report. The fixture must also be properly installed to effectively down direct light in order to conform to the definition. Exemptions from this definition may be allowed for aesthetic lighting elements such as shades with perforated patterns and opaque diffusers. Standard Illuminating Engineering Society of North America (IESNA) or International Dark Sky Association (IDA) definitions of Cut-off and Full Cut -Off shall apply. Fluorescent lamp or fluorescent tube: is a gas -discharge lamp that uses electricity to excite mercury vapor. The excited mercury atoms produce short-wave ultraviolet light that then causes a phosphor to fluoresce, producing visible light. Due to mercury content, these lamps must be disposed of as hazardous waste pursuant to Federal Law. Glare: Excessive contrast or intense and/or blinding light which creates visual discomfort or disability. High intensity discharge light source (HID) means light sources characterized by an arc tube or discharge capsule that produces light, with typical sources being metal halide, high pressure sodium and other similar types which are developed in accordance with accepted industry standards. An Incandescent and/or halogen light source is the emission of light (visible electromagnetic radiation) from a hot body due to its temperature. Incandescence occurs in incandescent lamps because the filament resists the flow of electrons. This resistance heats the filament to a temperature where part of the radiation falls in the visible spectrum. Lamp is the industry terminology for the source of the light commonly referred to as a bulb. A light -emitting diode (LED) is a semiconductor diode that emits light when an electric current is applied in the forward direction of the device. The effect is a form of electroluminescence where incoherent and narrow -spectrum light is emitted. Light trespass means the shining of light produced by a light fixture beyond the boundaries of the property on which it is located in excess of 0.1 footcandles. Light fixture is an electrical device used to create artificial light or illumination. Lumen is the SI unit of luminous flux, a measure of the perceived power of light. If a light source emits one candela of luminous intensity uniformly across a solid angle of one steradian, its total luminous flux emitted into that angle is one lumen. Alternatively, an isotropic one -candela light source emits a total luminous flux of exactly 4n lumens. The lumen can be thought of casually as a measure of the total "amount" of visible light in a defined beam or angle, or emitted from a source. Landscape Lighting: are luminaires mounted in or at grade and used solely for landscape rather than any area lighting. Luminaire: a complete lighting unit consisting of one or more electric lamps, the lamp holder(s), any reflector or lens, ballast or transformer, and any other components and accessories. Point source means the exact place from which illumination is produced (i.e., a lamp filament or discharge capsule). Acceptable Lighting 1 1 Non -acceptable Lighting Non -shielded sconces: If the lamp is completely inside the metal cap, clear glass may be used. If the lamp is below the metal cap, glass panes must be honey opal, amber, mica or darker glass. Frosted or sandblasted clear glass or white opal glass must not be used. The fixtures above are examples of non -acceptable fixtures because the lamp is below the metal cap and the glass is clear or wavy. -] t4HCMDUHTINGMCLET • Barn Lights Non -Shielded Wall Packs Floodlights or lights not aimed downward APPENDIX G - THE FAIRWAYS According to Section 4 .c of The Fairways Contract, the following requirements shall be applicable to all Home sites within The Fairways: i. All siding materials shall be in the taupe color range. This includes shades of tan, brown, and brownish gray. Stone requirements shall be consistent with such requirements for other neighborhoods within Aspen Glen. ii. Cedar shake shingles is the preferred roof material; however, an applicant may propose an alternate material that will require specific DRC approval. iii. Driveway access to all Home sites within The Fairways shall be off Golden Bear Drive. iv. Driveway access to Home sites within The Fairways shall not be permitted from Bald Eagle way. ii. Minimum floor area for all dwellings constructed within The Fairways shall be 1,500 square feet exclusive of garages and basements square footage. APPENDIX H - ROARING FORK MESA In addition to the Guidelines set forth in previous sections the following Guidelines shall be applicable to all home sites within Roaring Fork Mesa (please note the sketches attached to this Appendix): i. All applicants and their designers are encouraged to walk the existing Roaring Fork Mesa Neighborhood to get a feel for the forms, proportions, and detailing of the existing homes. ii. Exterior materials shall be limited to stone and wood siding. Stone shall be "Farmer Rock"; wood siding shall be board -on -board cedar, 8" exposure. iii. Medium sawn cedar shakes is the preferred roof material; however, an applicant may propose an alternate material that will require specific DRC approval. iv. Roof slopes shall be a mix of 8:12 and 4:12, with the 4:12 pitch dominant for exterior covered porches and shed dormers, See figures 1 & 5. v. Exterior shall include at least one covered exterior porch at the front and rear of the home. Porch design shall conform to figure 1. vi. Exterior shall include at least one timber truss at the front, rear, and one side of the home. Trusses shall conform to figures 2, 3 or 6. Trusses included as part of the covered exterior porch may count towards this requirement. vii. Exterior chimney cap design shall conform to figure 4. All exterior chimneys shall have a "Farmer Rock" stone veneer. viii. Roof eaves at 4:12 roof pitches shall have 2 x 8 exposed rafters/rafter tails with a 2 x 6 fascia. ix. Roof eaves at 8:12 pitches shall have a 2 x 10 or 2x 12 fascias with a 2 x 6 shadow board and 1 x 4 soffit board. x. Standard window trim shall be wood, 2 x 4. xi. Windows shall be metal clad wood with muntin bars in the upper portions, see figure 5. xii. Exterior wood stain colors are limited to the colors currently in use in the Roaring Fork Mesa: Natural Cedartone, Beechwood Gray and Russet found under various brand names. In addition, the following brand and colors have been added to this palette: Sherwin Williams Woodscapes Hawthornes, Chestnut and Charwood. xiii. Window cladding colors shall be limited to dark bronze, dark red or dark green. f - w D2 0 0 3 X 2X HOOD BRACKET 4X4 V400D BRACKET 8X8 WOOD POST 0 0l o J TYf I GAL PORCH - • 11 CA 1- FIG. 3 - T(F1GAL TRUSS ELEVATION ® EXTERIOR 0 STONE CAP Fla 4 - TYPICAL SHED DORMER ELEVATION 0 } 11 N I L I3 i I I L LI I l i t i t l i l }I 11 u II 11 II Illi iI H II 11 it IT II N �LJ 11 Li l! J CEDAR SHAKES BOARD -ON -BOARD MUNTIN BARS UPPER winnow CLEAR LOWER VINDOkS 2X4 wOOD TRIM kINi7Oi'IS F1& 5 - TYPICAL SHED i'ORMER ELEVATION 1/2" = l'-.0" / / / J N N.N N N. N, N �LJ 11 Li l! J CEDAR SHAKES BOARD -ON -BOARD MUNTIN BARS UPPER winnow CLEAR LOWER VINDOkS 2X4 wOOD TRIM kINi7Oi'IS F1& 5 - TYPICAL SHED i'ORMER ELEVATION 1/2" = l'-.0" ASPEN GLEN DESIGN REVIEW COMMITTEE 0080 BALD EAGLE WAY PHONE: (970)9633362 CARBONDALE, COLORADO 81623 Date: Lot #: Owner: DESIGN REVIEW COMMITTEE (DRC) PRELIMINARY REVIEW APPLICATION Street Address: Name: Address: City: State: Zip: Telephone/cell phone: Fax: Email: General Contractor: Name: Colorado License Number: Address: City: State: Zip: Telephone/cell phone: Fax: Email: Architect: Name: License Number (please include State of issuance): Address: City: State: Zip: Telephone/cell phone: Fax: Email: Landscape Architect Name: License Number (please include State of issuance): Telephone/cell phone: Email: DRC Prelim Application Effective 2014 Fax: Section 1. As the Design Guidelines are modified periodically, and these modifications may not be listed on this Application, it is the responsibility of the owner or his authorized agent(s) to ensure that the design and construction of a project conform to the requirements of the Design Guidelines. The intent of this Application is to provide a guide for an owner or the architect to ensure a complete submittal. This application shall be signed, dated, and submitted with the plans package in order for the preliminary submittal to be deemed complete by the Design Review Administrator. Failure to do so may delay review of the proposal. The Design Guidelines are comprehensive in scope for designing homes within Aspen Glen. Please review the Design Guidelines carefully prior to presenting a submittal to the Design Review Committee. All necessary materials for the Preliminary Review must be submitted to the DRC fourteen (14) days prior to your scheduled meeting. To expedite the design review process, be sure that the Preliminary Submittal is complete according to the Master Design Guidelines. Incomplete submittals will cause delays in receiving approval. Please submit 2 copies of this application form with the Preliminary Review Packet. The DRC fee is due at the beginning of the preliminary meeting or the review will be continued. The Preliminary Plan submittal package shall consist of the following: A. This preliminary application form. B. Checks for the Design Review Fee. C. Site Plan at an appropriate scale (not less than 1"=10') showing the location of buildings, building envelope, zone district setbacks, the residence and all buildings or other structures, driveway, parking areas and a grading plan and drainage plan (including existing and proposed topography) and preliminary landscape plan. The preliminary landscape plan may be combined with the Site Plan. D. Floor Plan at no less than 1/4"=1'-0". E. Roof Plan showing all roof pitches. F. All exterior elevations with both existing and final grade lines at same scale as floor plans. G. A grading and drainage plan which clearly indicates undisturbed site grade contours (one (1) foot intervals) and proposed finished grade contours. Undisturbed site grade contours and a reference bench mark tied to absolute elevations shall be established and certified by a professional land surveyor who is licensed in the state of Colorado. The plan shall clearly indicate proposed drainage paths and collection points for the completed site. The drainage portion of this plan shall be developed by a registered Colorado Civil Engineer. Note: C, D, E, F and G above shall consist of 2 complete full size sets (maximum size 24" x 36") and 5 reduced size (11" x by 17") sets. An electronic file in PDF format of the site plan (indicating the location of all proposed improvements) the landscape plan and all exterior elevations shall also be sent to the DRC Administrator. DRC Prelim Application Effective 2016 H. Statement of building height. Maximum Height Limit per the zone district and actual building height as defined by Garfield County building height calculations shall be clearly indicated on the architectural plans and tied to undisturbed site grade. Actual reference grade on site must be shown with the height calculation. I. Samples of exterior materials and colors. J. Exterior material calculations, shown on exterior elevations (i.e. percentages of stone and percentage of other materials including doors and windows) please refer to Section 5.6 C for specific criteria. K. Soils Report. A report prepared and stamped by a Colorado registered professional engineer, addressing soils conditions on the site, verifying soils bearing capacities, and identifying any other sub -surface conditions relevant to foundation and waterproofing design. L. Improvement Location Survey. The Applicant shall provide a survey stamped and signed by a licensed Colorado land surveyor, showing the location of all property lines accurately established on a plat, building envelope, building setbacks, all easements, and Aspen Glen PUD Zone Regulations. (See also Section 6.2 B of these Guidelines regarding existing trees or shrubs to be shown on the Improvement Location Survey.) M. Any accessory improvements (e.g. patios, decks, landscape walls, pergolas, hot tubs, fire pits, etc.) contemplated on the lot must be shown in the Preliminary Submittal. N. Scaled Massing Model or computer generated 'fly around' is required. Computer visuals may be presented on personal laptop or Aspen Glen large screen monitor. Other drawings, materials, or samples may be requested. O. Staking. Applicant shall provide preliminary staking at the corners of the contemplated improvements and building envelope corners as requested by the DRC. P. Story Poles may be required. Q. Landscape Plan. The plan shall be stamped by a licensed landscape architect, including the identical final grade contours as the site plan. The location and dimensions (including height) of all berms shall also be shown. R. Construction method disclosure shall be included in writing with the preliminary submittal. (See Section 5.0 of these Guidelines for an outline of allowed methods.) S. Public Notice. Fourteen days prior to the preliminary DRC review meeting, the DRC Administrator shall post a public notice on site and shall attempt to notify adjacent property owners of the proposed Improvement to Property. Interested parties may provide written comments to the DRC and/or may attend the preliminary DRC review meeting. T. Written Response. Within ten business days after the preliminary DRC review, the DRC Administrator must provide the Applicant a written response indicating approval or reasons for non -approval. Section II. A. Indication of materials and colors. (Please complete any additional information that is required in the spaces provided below.) DRC Prelim Application Effective 2016 Roof Siding Stone Stucco Cladding Fascia Soffit Other B. Exterior material calculations: North South East West Total Sq. Ft. of exterior wall: (Including windows and doors) Sq. Ft. of stone: Sq. Ft. of stucco: Sq. Ft. of wood: *please indicate which side is the front of the home. Section III. Fees $5,000.00 - Design Review Fee payable to the Homeowners Association at Aspen Glen will cover 7.5 hours of DRC review time. In the event the review exceeds 7.5 hours, including all site inspections, the applicant shall be charged an additional fee at a rate of $600 per hour. Section IV. The following questions must be answered in order for the DRC administrator to deem this application complete: A. Construction Methods: 1. Do you intend to use prefabricated wall systems? Yes No 2. Do you intend to use prefabricated components as stated in Section 5.0 of the Guidelines, other than roof trusses, cabinetry, foundation panels, metal fireplace inserts, exterior or interior handrails, or prefabricated stairs? Yes No 3. Will the prefabricated wall components be installed and assembled on-site? Yes No B. Delivery Methods: 1. Do you intend to use vehicles requiring any special permits (i.e. CDOT, sheriff, county or bridge approval), or oversized vehicles. Yes No 2. If the answer is yes, have you submitted a delivery schedule? Yes No Section V. Note this Section must be signed in order for the application to be deemed complete I hereby certify that the building plans, site plan and landscape plans as well as the information in this Preliminary Review Application are all accurate and have been submitted to the Design Review Committee DRC Prelim Application Effective 2016 pursuant to the requirements of the Design Guidelines. As the owner or owner agent I agree that the DRC and the administrator shall not be held liable or responsible in any manner for any action or for any failure to act in the exercise of their responsibilities under the Master Declaration of Covenants, Conditions and Restrictions for Aspen Glen if the action or failure to act was in good faith and without malice. Owner/Owner Agent(s) Date Section VI. Please review the following checklist to assist you in preparing your plans for Aspen Glen preliminary review as well as the requirements for building permit submittal or connections to the Roaring Fork Sanitation District. The District can be contacted at: 970-876-5008. BUILDING PLAN All Exterior Elevations — Include exterior material indication (list above). Roof Pitch — Primary and secondary. Gutters/Downspouts Water Conservation, Water Saving Faucets & Fixture Specifications E.Q.R. Schedule — Number of full bathrooms, half bathrooms, kitchens, spas and swimming pools. Neighbor Impacts — Exterior residence and landscape lights, garage entry, refuse storage, pool decks, air conditioning units, satellite dishes, irrigation pump and intake structure, etc. Construction Staging Issues, parking, access etc. Building Massing & Proportion Scale & Relationship to Site — Include site contour. Statement of the Number of Gas Fireplaces & Wood Burning Stoves — No open-hearth solid fuel fireplaces are allowed in any new dwelling unit at Aspen Glen. ❑ Wood Burning Stove; specify model and manufacturer, (as defined by State of Colorado C.R.S. 25-7- 401) SITE PLAN Property Boundaries & Building Envelope Easements & Setbacks — All easements and setbacks must be defined on the Site Plan. Building, Driveway, Parking Areas & Walk Locations — Specify all proposed surface materials. Existing & Finished Grading showing contours at one foot (1') intervals. Excavation Limits & Tree Clearing Limits Existing Natural Features — Tree canopies, streams, ponds, wetlands, rock outcroppings, etc. Utility Service Line Routing, Tap Locations, Transformers, Fire Hydrants, etc. Topographic Survey Soil Investigation & Foundation Recommendation Storm Water/Runoff Control Methods & Locations All Other Site Improvements — Retaining walls, decks, etc. Parking Spaces Locations — Minimum of four (4) parking spaces required for each dwelling unit. ❑❑❑❑❑❑❑❑❑❑❑❑ GRADING & DRAINAGE & PRELIMINARY LANDSCAPE PLAN ❑ Existing Trees & Vegetation ❑ Protection for Existing Trees & Vegetation ❑ General Massing of Proposed Evergreen & Deciduous Trees ❑ General Areas of Proposed Ground Cover DRC Prelim Application Effective 2016 River/Lake Improvements Address Monument Sketch & Location Grading & Drainage Plan including preliminary Landscape Plan with Irrigation As the Design Guidelines and the design review process are modified periodically, and these modifications may not be listed on this Application, it is the responsibility of the owner or his authorized agent(s) to ensure that proposed adjustments conform to the requirements of the Design Guidelines and the regulations as approved for the Aspen Glen Planned Unit Development, Resolution No. 92-056. The intent of this Application is only to provide a guide for an owner or the architect to ensure a complete submittal. DRC Prelim Application Effective 2016 ASPEN GLEN DESIGN REVIEW COMMITTEE 0080 BALD EAGLE WAY PHONE: (970) 963-3362 CARBONDALE, COLORADO 81623 DESIGN REVIEW COMMITTEE (DRC) APPLICATION FOR FINAL REVIEW/ SIGNIFICANT ADDITION TO A HOME/MINOR REVIEW/LANDSCAPE AMENDMENTS Date: Lot #: Street Address: Owner: Name: Address: City: State: Zip: Telephone/cell: Fax: Email Address: General Contractor: Name: Colorado License Number: Address: City: State: Zip: Telephone/cell: Fax: Email: Architect: Name: License Number (please indicate State of issuance): Address: City: State: Zip: Telephone/cell: Fax: Email: Landscape Name: Architect: License Number (please include State of issuance): Telephone/cell: Email Address: DRC Final Application Effective 2016 Introduction: As the Design Guidelines are modified periodically, and these modifications may not be listed on this Application, it is the responsibility of the owner or his authorized agent(s) to ensure that the design and construction of a project conform to the requirements of the Design Guidelines. The intent of this Application is only to provide a guide for an owner or the architect to ensure a complete submittal. However, this application shall be signed, dated, and submitted with the plans package in order for the final submittal to be deemed complete by the Design Review Administrator. Failure to do so may delay review of the proposal. The Design Guidelines are comprehensive in scope for designing homes within Aspen Glen. Please review the Design Guidelines carefully prior to presenting a submittal to the Design Review Committee. Section I. After preliminary approval has been obtained, the Final submittal shall include the following documents: A. This final application form. B. A check for the Builder Completion Deposit, made payable to the Homeowner's Association at Aspen Glen, Inc. and a completed IRS W-9 form are required at the final review meeting. C. A check for "CRAF", "SAF" and other applicable fees are required, made payable to Homeowners Association at Aspen Glen, Inc. The current fee policy can be found on the Aspen Glen website, aspenglenhoa.com. Final review will not occur and will be rescheduled if the CRAF and SAF fees and Builder's Completion Deposit are not provided at the beginning of the final review meeting. D. An approximate time schedule indicating commencement and completion dates of construction, completion of landscape work and anticipated occupancy date. E. Site plan at an appropriate scale (not less than 1"=10') showing the location of the building envelope, including zone district setbacks, the residence, other buildings and landscape structures, driveways, parking areas, recreational surfaces, proposed grading and drainage, utility connections, and finish floor elevations including garage. F. Floor plans at a scale not less than 1/4"=1'0". G. Roof plans showing all roof pitches H. All exterior elevations at a scale of not less than 1/4"=1'O" with both existing and proposed grades shown. I. Complete grading and landscape plan at scale of one inch = ten feet (1"=10'), minimum, showing the following: 1. Property line, building envelope, setbacks, labeled easements. 2. Existing vegetation to be preserved and proposed to be removed. 3. Existing topography at minimum one foot (1') contour interval. 4. Proposed contours, drainage swales, area drains, catch basins and drywells. 5. Site elevations of proposed residence and exterior hardscape elements, i.e., paving, walkways, patios, decks, spa/hot tub, fire pits and pergolas. DRC Final Application Effective 2016 2 6. Address Monumentation. The house number must be displayed in a prominent manner, monument must be made of stone and low voltage lighting may be used to light the address on the monument only. 7. Graphic representation of trees, shrubs, planting beds, lawn and native grass areas. Identify percentage of native grass versus high intensity ground cover. Please refer to Section 6.6 of these Guidelines for maximum irrigated area per lot that is allowed for Aspen Glen lots. 8. Identification of the irrigation system to be installed, i.e., drip vs. spray head, etc., and identify the High Intensity Planting (H.I.P.) areas to be zoned separate from the native and transitional landscaping zones. 9. Label hardscape construction materials, colors, and sizes. 10. Proposed vegetation and sizes of all planting materials clearly labeled on plan. 11. Provide plant list of trees and shrubs including common name, botanical name, quantities and sizes. Refer to appendices of these Guidelines for approved trees and shrubs and minimum sizes. 12. Location and types of exterior light fixtures. Provide a cut sheet of the fixture(s) as referenced in Section 4.10 Exterior Lighting. 13. Location of all utility meters, enclosures, transformers, fire hydrants, HVAC units & water meter remote readouts. Ensure that these are screened from view by minimum 4' height, B&B (balled and burlap) landscape plantings. 14. Landscape lighting which is limited to 20 (twenty) watts incandescent or halogen or 300 lumens for LED per fixture per 150 (one hundred fifty) square feet of landscaped area. 15. A landscape lighting legend that defines the number of fixtures per 150 (one hundred fifty) square feet of landscaped area. Pathway lights are limited to 24" above grade. 14. A landscape plan will be required for minor additions, minor reviews and amendments to an existing landscape scheme. The plan, whether it is a sketch or fully developed plan by a certified Landscape Architect, may be discussed with the DRC prior to submittal of the application. For minor additions and/or reviews a simple plan or photos of the existing landscaping will help determine the scope of a submittal. J. Cross section of structure indicating existing and proposed grades. K. Exterior material calculations, shown on exterior elevations. L. The following notes must be on all approved plans: 1) "All utility boxes, wall vents, roof vents and plumbing stacks/risers shall be painted to compliment adjacent exterior surface color." 2) Plywood soffits or facias are not permitted in Aspen Glen." 3) Real mullins/muttins are required." Note: E, F, G, H, I, J, and K above shall consist of 2 complete full size sets (maximum size 24" by 36") and 5 reduced size (11" x 17") sets. Copies of the Final Review Application, including plans, must be submitted to the DRC five days prior to the scheduled meeting. To expedite the design review process, DRC Final Application 3 Effective 2016 make sure that your Final submittal is complete according to the Design Guidelines. Incomplete submittals will cause delays in receiving approval. M. Scaled Massing Model or Computer generated 'fly around' is required. Computer visuals may be presented on personal laptop or Aspen Glen large screen monitor. Other drawing, materials, or samples may be requested. N. Actual samples of all exterior materials to be utilized on the structure and color samples of all finishes on actual pieces of the materials over which they will be applied. Section II. Please complete all required information in the spaces provided below. A. Please indicated approximate time schedule below: Commencement of Construction Completion of Construction Completion of Landscaping Anticipated Occupancy Date B. Actual samples of all materials to be utilized in the structure and color samples of all finishes on actual pieces of the materials over which they will be applied need to be presented to the DRC together on a sample board. Please list material and color choices below. Roof Siding Stone Stucco Cladding Fascia Soffits Trim Doors Driveway Monumentation Other Material Color C. Exterior material calculations: North South East West Total Sq. Ft. of exterior wall: (include doors & windows) Sq. Ft. of stone: Sq. Ft. of stucco: Sq. Ft. of wood: Sq. Ft. of windows: Section III. Fees A. A $20,000 Builder Completion Deposit is required, made payable to the Homeowners Association at Aspen Glen. Anticipate that this may be released at completion of landscaping and final on-site reviews by the Design Review Committee. The attached W-9 form must be completed, signed, and turned in with the Builder's DRC Final Application Effective 2016 4 Completion Deposit check at the start of DRC meeting for final review of the proposed development or the review will be delayed. B. A Construction Road Access Fee is required, made payable to Homeowners Association at Aspen Glen and is required at the start of the DRC meeting for final review of the proposed development or the review will be delayed. The fee is $300 for the first 500 square feet of improvement; for improvements between 500 square feet and 2,500 square feet a minimum fee of $1,500 will be assessed plus $0.60 per square foot of additional area above 2,500 square feet as determined by the approved plan submitted to the DRC. The calculation includes garages, basements (finished or unfinished), and attic/storage. C. A $3,000 Security Access Fee is required, made payable to Homeowners Association at Aspen Glen and is required at the start of the DRC meeting for final review of the proposed development or the review will be delayed. For minor improvements to property the fee will be assessed on a monthly basis ($166/month) tracking with the amount of time to construct the improvement. If the time to construct the improvement exceeds the initial timeline additional SAF will be deducted from the builder's completion deposit. D. RFWSD Fee: Payment for Roaring Fork Water & Sanitation District sewer and water tap fees must be paid directly to the Roaring Fork Water & Sanitation District. Please contact the Roaring Fork Water & Sanitation District administrator at (970) 945-2144. E. Other Fees: There is no final Review fee if the review is part of a proposed new home in Aspen Glen and preliminary review is complete. However, for any addition to a home that requires a building permit, or a separate structure that exceeds 200 square feet a $1,650 base fee will be charged. This is a review fee that reimburses the Homeowners Association for 2.5 hours of DRC review. In the event that the review exceeds 2.5 hours of review the applicant shall be charged an additional fee at a rate of $600.00 per hour. Final Review will not occur and will be continued if the Construction Road Access Fee, Security Access Fee and Builder's Completion Deposit are not provided at the beginning of Final Review. Section IV: the following questions must be answered in order for the DRC Administrator to deem this application complete: A. Construction Methods: 1. Do you intend to use prefabricated wall systems? Yes No 2. Do you intend to use prefabricated components as stated in Section 5.0 of the Guidelines, other than roof trusses, cabinetry, foundation panels, metal fireplace inserts, exterior or interior handrails, or prefabricated stairs? Yes No 3. Will the prefabricated wall components be installed and assembled on-site? Yes No DRC Final Application 5 Effective 2016 B. Delivery Methods: 1. Do you intend to use vehicles requiring any special permits (i.e. CDOT, sheriff, county or bridge approval), or oversized vehicles. Yes No 2. If the answer is yes, have you submitted a delivery schedule? Yes No Section V : Note this must be signed in order for the application to be deemed complete I hereby certify that the building plans, site plan and landscape plans as well as the information in this Preliminary Review Application are all accurate and have been submitted to the Design Review Committee pursuant to the requirements of the Design Guidelines. As the owner or owner agent I agree that the DRC and the administrator shall not be held liable or responsible in any manner for any action or for any failure to act in the exercise of their responsibilities under the Master Declaration of Covenants, Conditions and Restrictions for Aspen Glen if the action or failure to act was in good faith and without malice. Owner/Owner Agent(s) Date Section VI: Listed below are the final Design Review steps which take place after you receive final approval from the Design Review Committee. A. Construction Procedure Meeting - Prior to commencing construction, contractors are required to meet with the Aspen Glen Design Review Administrator, to review construction procedures. B. Height Verification Survey — Prior to the rough framing inspection conducted by Garfield County, the owner or owner's representative shall submit a completed height survey to the Aspen Glen DRCE. The Height survey shall be performed by a Colorado professional land surveyor. The DRC provides a form for the surveyor to complete. The form is attached to this application or can be obtained from the DRC Administrator. C. Dry -In Inspection- The owner/builder must notify DRC to schedule a dry -in inspection once all doors, windows, general framing and ideally exterior materials are in place in order for the DRC to review the progress to date. D. Final Compliance Inspection — Owner/Builder must notify DRC to schedule a final walk-thru. The owner/builder must provide a letter from the project engineer certifying that he/she has visited the site and that the final grading and site work complies with plans as required. The DRC shall provide a Notice of Satisfactory Completion or Notice of Noncompliance based upon approved plans and the site inspection. Any noncompliance must be satisfied before the return of the Builder's Completion Deposit. E. Certificate of Occupancy — Prior to the issuance of a Notice of Satisfactory Completion and the return of the Builder's Completion Deposit, the owner/builder shall provide the DRC with a copy of Certificate of Occupancy. F. Improvement Location Certificate — Prior to the issuance of a Notice of Satisfactory Completion and the return of the Builder's Completion Deposit, the owner/builder shall supply the DRC with a copy of an ILC to confirm that all improvements conform to the DRC approved plans. DRC Final Application 6 Effective 2016 Section VII: Please review the following checklist to assist you in preparing your plans for final review. BUILDING PLAN ❑ All Exterior Elevations — Show grade, materials, windows, doors, colors and finishing. ❑ Building Sections — Show finishes floor, finished grade, decks, patios and other pertinent information. ❑ Windows & Door Type ❑ Primary & Secondary Roof Pitch/Cold Roof Detail ❑ Exposed Flashing Material ❑ Detail of Exposed Structural Elements ❑ Statement of the Number of Gas Fireplaces & Wood Burning Stoves — No open hearth solid fuel fireplaces are allowed in any new dwelling unit at Aspen Glen. ❑ Chimney Design & Facing SITE PLAN ❑ Property Boundaries & Building Envelope ❑ Easements & Setbacks — All easements and setbacks must be defined on the Site Plan. ❑ Location of Proposed Walkways, Driveways, Parking Areas, Decks, Pools & Patios Defined ❑ Existing & Finishes Contours (at one foot intervals) ❑ Excavation Limits & Tree Clearing Limits ❑ Building Footprint ❑ Location of all Utility Meters, Transformers, Fire Hydrants, HVAC Units & Water Meter Remote Readouts ❑ Location of Utility Enclosures & Screening ❑ Service Line Routing & Tap Locations for Water, Sewer, Gas, Telephone, Cable Television & Electric ❑ Topographic Survey ❑ Soil Investigation & Foundation Recommendation ❑ Utility Line Field Verification ❑ Location of Parking Spaces ❑ Materials to be used for Construction of Roads, Walks, Driveways, Parking Areas, Decks, Pools & Patios ❑ Surface Drainage/Sub-surface Drainage Showing Inlet & Outlet Locations ❑ Finished Floor Elevations LANDSCAPE PLAN ❑ Extent & Location of all Plant Material & Landscape Features ❑ Plant Schedule — All plant material must be identified by scientific nomenclature, quantity, size and location. ❑ Treatment of all Ground Surfaces/Extent of Sodded Turf Areas to be Mowed & Irrigated ❑ Existing Plant Materials & Natural Site Features to Remain on Site ❑ Lighting Locations, Type & Wattage ❑ Re -vegetation Treatment for Steep Banks ❑ Details of Special Features — Fencing, architectural landscape elements, water fountains, etc. ❑ Design Details & Location of Entry/Address Monumentation and Landscape Lighting. IRRIGATION PLAN ❑ Proposed Irrigation Area — Maximum irrigated area based on homesite size: see Design Guidelines. ❑ Location, Size & Type of Pipe, Heads, Valves & Controllers ❑ Location & Description of Connection to Building Plumbing and/or Irrigation Laterals — Include water meter and backflow prevention. ❑ Location of Critical Landscape Elements — Delineation of sod areas, planting beds, walkways, etc. DRC Final Application 7 Effective 2016 As the Design Guidelines and the design review process are modified periodically, and these modifications may not be listed on this Application, it is the responsibility of the owner or his authorized agent(s) to ensure that proposed adjustments conform to the requirements of the Design Guidelines and the regulations as approved for the Aspen Glen Planned Unit Development, Resolution No. 92-056. The intent of this Application is only to provide a guide for an owner or the architect to ensure a complete submittal. DRC Final Application 8 Effective 2016 Aspen Glen Homeowner's Association Design Review Committee Aspen Glen Height Survey Verification Form (To be filled out by surveyor prior to completion of rough framing and before rough framing inspection) Property Location: Date: I, , Professional Land Surveyor of (Name) The state of Colorado verified that the undisturbed or natural ground surface at the midpoint of the site was: Feet Above Sea Level. Measured on: (Month) (Day) (Year) I found the building height (as specified in the Garfield County Land Use Code*) to be Inches above the undisturbed or natural ground surface. (Please state as above sea level.) Surveyor's signature Printed name Company name Address City, State, Zip Seal Feet Phone *Please confirm the methodology of the Garfield County Community Development Department when calculating building height. DRC Final Application 9 Effective 2016