I met with Tim Thulson and Chris Coyle Wednesday afternoon. They came in to talk about
Antero and the stop work order for the grading permit. They told me Antero did a good job of
backfilling the pipe and bedded it in 2 ft. of select backfill with no rocks or organic material. I
asked what spec they used. They said they would send me a copy of the spec in a letter and
asked how to get the stop work order removed. I said the county would need to discuss the
issue, but it appeared an engineer would need to possibly pot hole the installed pipe to verify
the backfill was done correctly. It appeared from our inspections that Antero had done a lousy
job of bedding the pipe. I said the spec we had tied to the grading permit was not to use any
backfill material with rocks greater than 12 inches. They asked if they provided an industry
wide spec if we would consider using it. I said they could submit one for review.
Andy Schwaller
9-30-10