Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-01-18-5074 & SEPT-OL-18-507s Hunting Maestro LLC New SF Residence TBD Ute Stock Drive - Rifle, Colorado Big Mountain Ranch 1) ALL WORK SHALL COMply W|TH 2015 TNTERNATIONAL RESIDENTIAL CODE (l.R.C.)AND 2009 I NTERNATIONAL EN ERGY CONSERVATION CODE (1. E.C.C. ) 2) TMPROVEMENTS ARE SUBJECT TO ALL APPLICABLE ITEMS CONTAINED lN THE ATTACHED ,,GARFIELD COUNTY BUILDING REQUIREMENTS". NUMBERED REFERENCES NOTED ON PLANS REFER TO SPECIFIC ITEMS ON THIS LIST. 3) INSPECTOR TO VER|Fy THAT EX|STTNG ONE-STORY CABIN DOES NOT CONTAIN KITCHEN AND/OR BATHROOM(S)AND DOES NOT CONSTTTUTE A RESIDENTIAL DWELLING UNIT. ALTERNATELY, IF EXISTING CABIN FITS GARFIELD COUNTY,S DEFINITION OF ACCESSORY DWELLING UNIT, THEN A LAND-USE CHANGE PERMIT MAY BE REQUIRED. 4) TNSTALLATTON OF STRATGHT-SHAFT DRTLLED PIER FOUNDATION SVSTEM TO FOLLOW RECOM M EN DATTONS CONTAT N ED r N G EOTECH N ICAL REPORT {PROJ ECT #16-7 -485.011 AS PREPARED By Hp-KUMAR AND DATED 12/ttlL7. SOILS ENGINEER OF RECORD SHALL BE PRESENT AT JOB SITE DURING PIER DRILLING TO VERIFY THAT BEARING STRATA HAS BEEN REACHED AND MINIMUM REQUIREMENTS CONTAINED IN THIS REPORT ARE MET. PROVIDE SOILS ENGINEER,S SEALED APPROVAL REPORT FOR CONCRETE PIER FOOTINGS AT FOUNDATION WALL INSPECTION. 5) OPEN HEARTH WOOD-BURNtNG FTREPLACES NOT ALLOWED PER l.E.C.C., SECTION 402.4.3 AS FOLLOWS: "NEW WOOD-BURNING FIREPLACES SHALL HAVE GASKETED DOORS AND OUTDOOR COMBUSTION AIR.,, 6) VER|Fy REQUTREMENTS AND COORDTNATE INSPECTIONS OF FUTURE VERTICAL LIFT WITH NORTHWEST COLORADO COUNCIL OF GOVERNMENTS, (NWCCOG) ELEVATOR INSPECTION PROGRAM. PROVIDE FINAL SIGN-OFF/APPROVAL AT FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) ouTDooR spA SHALL COMply W|TH 20L5 INTERNATIONAL SWIMMING POOL & SPA coDE, tNcLUDtNG BARRTER REQUTREMENTS (SECTION 305), LADDERS & RECESSED TREADS (SECT|ON 322)AND SAFETY (SECTTON 323). ALSO COMPLY WITH 201s LR.C. (CHAPTER 42) &MANUFACTURER'S INSTALLATION REQUIREMENTS. s) ELECTRICAL PERMtTTtNG AND INSPECTTONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.